Exhibit 3 - Specifications~2.doc

DOC document 138 KB Posted

Attached to
Re-bid Odell Lake Painting
Solicitation number
S-73000-00017503
Issued by
Oregon

About this file

This is an Exhibit 3 Specifications document for the Oregon Department of Transportation (ODOT) Odell Lake Painting Project located at the Odell Lake Maintenance Station on Highway 58 at MP 64.3. The project encompasses painting, caulking, and surface preparation work for historical homes, garages, and a dormitory at the site, all of which fall under U.S. Forest Service (USFS) authority and require SHPO approval. The scope of work includes hand sanding and scraping of loose paint chips, feathering edges, caulking around windows with approved 25-year paintable caulking, replacing door and window trim as needed, securing loose siding with pin nails, removing and replacing shutters for painting, and applying one coat of primer followed by two coats of finish paint using approved Sherwin Williams or Rodda paint products. All work must comply with lead paint safety protocols, and each employee performing scraping or sanding must hold an Individual Lead Paint Certification. Work is scheduled for completion by August 24, 2026, with final completion no later than September 22, 2026. The contractor must conduct a pre-bid site visit, schedule work at least ten business days in advance, and perform work on weekdays between 7 a.m. and 5 p.m., excluding weekends and state holidays. The ODOT Project Manager is David Sturges, and the contractor is responsible for obtaining all necessary permits and coordinating with special inspections firms contracted by ODOT.

The contractor must provide submittals for approval prior to starting on-site work and is responsible for all cleanup, debris removal, material storage, and site protection throughout the project duration. Paint colors will be selected at the time of Notice to Proceed, and no pressure washing is permitted due to proximity to Rosery Creek. The contractor must account for protected bat species potentially present behind shutters and notify the ODOT Project Manager of any missing siding to discuss remedial options. All materials and minor components necessary for a complete project must be supplied by the contractor unless specifically noted as existing or ODOT-provided. ODOT will pay for special inspections conducted by an approved firm, but the contractor must pay for additional inspections resulting from failure to meet required standards. At project closeout, the contractor must complete all punch list items, provide as-built drawings marked in red, submit all operations and maintenance information, provide a signed certification that all subcontractors and suppliers have been paid, and provide a one-year installation warranty on all workmanship plus manufacturer warranties for equipment.

View the file

Other files

File Type Posted
Revised Attachment B - Sample Contract.docx DOCX document
Revised 00017503_RFCQ.docx DOCX document
00017503_RFCQ~1.docx DOCX document
00017503_Addendum One.docx DOCX document
Attachment B - Sample Contract~10.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 3

Specifications Oregon Department of Transportation

Project Name Odell Lake Painting Project Project Location:

Site Name Odell Lake Maintenance Station MP. 64.3 Hwy 58 Odell Lake ODOT Contact:

The ODOT Project Manager for this project is David Sturges

· E-mail: david.sturges@odot.oregon.gov

· Cell: 503-580-1121

· Address: 885 Airport Rd Se Bldg. X

· Salem, OR. 97301

The ODOT Project Manager may designate an additional ODOT contact person or engineer to support inspections or questions in the field.

Project Background These are historical homes and USFS has authority over all work and must approve prior to any work being done. The homes and garages and dormitory are in need of scraping off loose paint chips and feather edges to smooth transition.

Project Description:

The homes and garages, and dormitory need caulking, USFS has given approval along with SHPO and ODOT Environmental has cleared the work to be done. All structures are assumed to have lead paint and all safety protocols for lead paint removal are in place. An Individual Lead Paint Certification must be held for each employee removing or scraping or sanding any structure. No pressure washing allowed due to the location of Rosery Creek. Door trim and window trims may need to be replaced, and the contractor is responsible for all measurements for replacement quantities. Replacement material profiles must match existing. All loose siding will need to be pin nailed back in place, gaps in siding to be caulked and pin nailed. Remove all caulking from around windows and caulked with 25 year paintable caulking. Porches, porch ceilings, columns, handrails, doors and frames are included in this scope. Shutters will need to be removed to paint behind each one, shutters to be painted trim color and removed prior to painting and replaced back after body is painted. There are a lot of bats in this area, Contractor needs to be aware of bats behind the shutters. The bats are a protected species.

In areas where there is missing siding contractor to notify PM to discuss options for keeping this area from leaking. Paint colors will be chosen at time of Notice to Proceed. Paint products approved are Sherwin Williams Extreme Bond Primer and Duration Exterior Acrylic Latex. Rodda Prime Solution First Coat Primer and Ultra-Premium Cover Coat Waterborne Acrylic Latex. The dormitory is closed due to Fire Season in effect.

Detailed Project Specifications:

1. Outline of work:

The houses will need to be hand sanded, all paint materials will need to be captured and disposed of per industry standards. Scraping of large paint chips, caulk around all windows with approved outdoor caulking that is paintable. The dormitory will need to be hand scraped and all loose material placed in bags and disposed of per code for Lead paint. One coat of primer to be sprayed and back rolled and two (2) coats of finish of approved colors per USFS.

General Construction Notes:

· The contractor shall make a site visit and examine existing conditions prior to providing a bid. Any discrepancies shall be brought to the attention of ODOT through a request for clarification as set forth in the bid documents.

· Clarifications shall be requested in writing prior to any installation. Incorrect installations shall be corrected at no additional cost to ODOT.

· All work shown is to be by the contractor unless specifically noted as being by ODOT or by others. All materials shown are to be provided by the contractor unless specifically noted as existing or provided by ODOT.

· Drawings are schematic in nature, major components and equipment are shown on the drawings. The contractor shall supply and install all minor components and materials necessary to provide a complete and functional project whether all such components are noted in the drawings and specifications.

· Plans and specifications call out specific makes and models of equipment in some locations. Substitution requests shall be made during the bid process. ODOT shall at its sole discretion determine the acceptability of substitutions. No substitutions shall be installed without prior written approval from the ODOT Construction Project Manager.

· All equipment and materials shall be installed in accordance with the manufacturer’s published installation instructions and recommendations.

· Clean the entire work area at the conclusion of the project to the satisfaction of the ODOT Project Manager.

Submittals

The Contractor shall provide the following submittals at a minimum to the ODOT Project Manager. Submittals shall be approved by the ODOT Project Manager prior to the start of on-site construction.

Scheduling of Contract:

· Substantial completion of the Work shall be no later than 8/24/2026. Final completion shall be no later than 9/22/2026.

· After award of contract, the Contractor shall contact the ODOT Project Manager to schedule the Work at least ten (10) business days prior to the start of any work/demolition.

· The Work shall be accomplished on weekdays between the hours of 7 a.m. and 5 p.m. Work hours shall exclude weekends and State Holidays, unless specifically requested by the Contractor and approved by the ODOT Project Managers.

· Any permits required for the Work are the responsibility of the Contractor. The Contractor shall provide copies of permits to the ODOT Project Manager prior to the start of work. The Contractor shall be responsible for posting all permits on site in accordance with local jurisdiction requirements.

· The Contractor shall submit to the ODOT Project Managers a list of the contact information for the Contractor’s project manager and site superintendent, as well as a list of all Subcontractors and their key representatives.

· ODOT shall be responsible for contracting with a special inspections firm based upon the list of inspections required by the Architect/Engineer of Record, manufacturer, or jurisdiction. ODOT shall provide contact info for the approved special inspections firm to the Contractor. The Contractor shall be responsible for scheduling special inspections as to not delay the project schedule. The special inspections firm shall be required by contract to provide copies of the special inspections report to ODOT and the Contractor. The Contractor shall be solely responsible for addressing any deficiencies identified during special inspections. ODOT shall pay for special inspections. Additional inspections required due to Contractor’s failure to reach required standards shall be paid for by Contractor.

· The Contractor shall coordinate the efforts of all Suppliers and Subcontractors and shall maintain orderly progress of the Work, prevent duplication of effort, and ensure proper sequence of operations.

Clean-Up/Conditions of Site:

· The Contractor shall be responsible for keeping the ODOT Project Manager informed of all activity throughout the Work.

· The Contractor shall clean up all worksite debris resulting from construction and remove all excess construction materials and scraps from the premises. The Contractor shall broom-clean their work area at the end of each workday and neatly stack materials and debris in an approved location. The contractor shall clean the entire work area at the conclusion of the project to the satisfaction of the ODOT Project Manager.

· The Contractor shall protect materials subject to damage by temperature or other weather conditions.

· The location for storage of materials, debris, or dumpster on the Premises shall be approved in advance by the ODOT Project Manager. Disposal facilities, bins, or dumpsters shall not be provided by ODOT.

· The Contractor shall notify the ODOT Project Manager at least two (2) days in advance of any major deliveries.

· Contractor shall immediately notify the ODOT Project Manager of any damage done by the Contractor to the Premises, grounds, or adjacent State properties. Damage done by the Contractor to the Premises or surrounding area shall be repaired to existing conditions as found prior to the commencement of the Work.

· ODOT shall not be responsible for the security of the Contractor’s materials, tools, personal belongings, or equipment on the Premises.

· It is the responsibility of the Contractor to ensure the Work is performed in accordance with Oregon OSHA rules and regulations.

· The Contractor shall immediately bring to the attention of the ODOT Project Manager any conflicts or issues between existing utilities and the Work.

Close Out:

· All special inspections must be complete prior to Substantial Completion.

· Inspection of the work by the ODOT Project Manager for establishment of Substantial Completion shall be made within five (5) business days after receipt of the Contractor’s email request. At this time, the ODOT Project Manager and the Contractor shall develop a punch list document of any incomplete or deficient work.

· Prior to Final Completion, the Contractor shall complete all items on the punch list.

· The Contractor shall provide final inspection reports for all permits applicable to this Contract signed by authorities having jurisdiction

· The Contractor shall maintain one set of the approved drawings for recording as-built conditions. Mark (in red) the actual location of all underground utilities and any changes. At the time of Final Completion, the Contractor shall turn over the one marked-up set of record drawings to the ODOT Project Manager.

· Prior to Final Completion, the Contractor shall provide one (1) digital copy via email of all operations, maintenance, and warranty information to the ODOT Project Manager.

· Prior to Final Completion, provide ODOT Project Manager with information for all equipment provided by the project, including but not limited to: Manufacturer, model, serial number, consumables, installation date, purchase date.

· Prior to Final Completion, and as prerequisite for final payment, provide ODOT Project Manager with signed certification that all subcontractors and suppliers have been paid in full and in compliance with all prompt payment requirements. All disputes with property owners have been resolved, all obligations on the project have been satisfied, all monetary claims and indebtedness have been paid, and, to the best of the Contractor's knowledge, there are no claims of any kind outstanding against the project.

· Prior to Final Completion, the Contractor shall fully instruct ODOT’s operating and maintenance personnel in the operation, adjustment, and maintenance of products, equipment, and systems.

· Inspection of the work by the ODOT Project Manager for establishment of Final Completion shall be made within five (5) business days after receipt of the Contractor’s email request.

Warranty:

· Contractor shall provide a 1 year Installation warranty on all workmanship.

· Contractor shall provide all warranties for equipment applicable to this Contract Revision: 5/7/24