This file consists of architectural and engineering drawings for access control system upgrades at multiple buildings operated by the City of Eugene, Oregon. The project involves installation of new card readers at designated doors across four buildings: a main office building (two doors), a maintenance building (four doors), and a fuel building (one door). The work includes relocation of an existing camera to eye level, installation of concealed desk door release buttons at office locations, and underground data conduit runs connecting the gate motor, card readers, and new Lenel access control panels. The drawings, dated from 1996 to 2022, are marked as reference documents only and indicate that the existing gate motor, underground 4-inch conduit sleeve, and electrical distribution panels are to be utilized. The project coordinates with the owner regarding specific installation heights and locations for card readers and release buttons, with metal door and frame construction specified throughout the facilities.

The scope of work requires new 1-inch underground data conduit installation from the office to the gate motor and pedestal, as well as conduit runs between the maintenance and fuel buildings, with routing through existing infrastructure where available. New Lenel access control panels are to be mounted to existing panel boards in the data and communication rooms located at mezzanine levels. The project specifications indicate that exterior and interior doors are primarily metal construction, with coordination required between the contractor and building owner for final placement of access control components. The drawings serve as reference materials only and do not constitute final construction documents, with all bidders instructed to verify existing conditions and coordinate final design elements with the project owner prior to construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E (2) TWO DOORS FOR ACCESS

READERS THIS BUILDING

NOTE TO BIDDERS - THIS 05/09/22 DRAWING IS FOR REFERENCE ONLY

TO SHOW THE BUILDING AND GATE PEDESTAL SCHEDULED FOR WORK

E GATE PEDESTAL

LOCATION

EXIST 4" CONDUIT

SLEEVE UNDER

DRIVE ENTRANCE

NEW 1" UNDERGROUND

DATA CONDUIT RUN FROM

OFFICE TO GATE MOTOR &

GATE MOTOR TO PEDESTAL;

RUN 1" THROUGH 4" SLEEVE

EXIST GATE

MOTOR

NOTE TO BIDDERS - THIS 08/31/22 DRAWING IS FOR REFERENCE

ONLY TO SHOW THE BUILDING AND GATE PEDESTAL SCHEDULED

FOR WORK

E CAMERA - RELOCATE HIGHER ON TRIM;

INSTALL AT EYE LEVEL, COORDINATE HEIGHT

WITH OWNER.

INSTALL NEW CARD READER OVER E

THROUGH HOLE AT TRIM.

RED CIRCLED AREAS ARE E DOORS

SCHEDULED FOR NEW CARDREADERS,

TYPICAL OF TWO (2) THIS BUILDING.

EXTERIOR AND INTERIOR DOORS AND

FRAMES ARE METAL.

LENEL PANEL SHALL BE LOCATED IN

THIS AREA. CONTRACTOR CAN

MOUNT TO EXISTING PANEL BOARD

TWO (2) CONCEALED DESK DOOR

RELEASE BUTTONS INSTALLED AT

OFFICES TO OPERATE MAIN

EXTERIOR DOOR. COORDNATE

LOCATION WITH OWNER.

MAINTENANCE BUILDING

- TWO (2) DOORS

NOTE TO BIDDERS - THIS 1996 DRAWING IS

FOR REFERENCE ONLY TO SHOW THE

BUILDING SCHEDULED FOR ACCESS WORK

NOTE TO BIDDERS - THIS 1996 DRAWING

IS FOR REFERENCE ONLY TO SHOW

LOCATION OF DOORS AND DATA/

COMMUNICATION ROOM

RED CIRCLED DOORS ARE E

DOORS SCHEDULED FOR NEW

CARDREADERS, TYPICAL OF TWO

(2) THIS BUILDING.

EXTERIOR DOORS AND FRAMES

ARE METAL

DATA/ COMMUNICATION ROOM

IS AT MEZZANINE LEVEL OVER

THE WOMEN'S ROOM.

EXISTING LENEL PANEL IS

LOCATED AT DATA/

COMMUNICATION ROOM

STAIR LOCATION TO DATA/

COMMUNICATION ROOM

S T

A

IR

S

E THROUGH WALL

CONDUIT TO SHOP FOR

CABLING

NOTE TO BIDDERS - THIS 1996 DRAWING

IS FOR REFERENCE ONLY TO SHOW THE

GENERAL SPACE OF BUILDING

NOTE TO BIDDERS - THIS 1999 DRAWING IS

BUILDINGS SCHEDULED FOR ACCESS WORK

MAINTENANCE BUILDING -

E FOUR (4) DOORS

FUEL BUILDING -

E ONE (1) DOOR

SEE ELECTRICAL

SITE PLAN FOR NEW

UNDERGROUND

CONDUIT RUNS

DATA/ COMMUNICATION ROOM AT

MEZZANINE - NEW LENEL PANEL TO

MOUNTED TO EXISTING PANEL BOARD

RED CIRCLED DOORS ARE DOORS

SCHEDULED FOR NEW

CARDREADERS, TYPICAL OF FOUR

(4) THIS BUILDING.

EXTERIOR DOORS ARE METAL,

INTERIOR DOORS ARE WOOD, AND

ALL DOOR FRAMES ARE METAL

NOTE TO BIDDERS - THIS 1999 DRAWING IS

FOR REFERENCE ONLY TO SHOW

LOCATION OF DOORS AT THE

MAINTENANCE BUILDING, DATA/

COMMUNICATION ROOM, & ELECT PANELS

E ELECTRICAL

DISTRIBUTION

PANELS THIS AREA -

SEE ELECT PLAN

FOR REFERENCE ONLY TO SHOW LOCATION

OF DATA/ COMMUNICATION ROOM & TO

SHOW THE GENERAL SPACE OF BUILDING

DATA/ COMMUNICATION

ROOM AT MEZZANINE

FOR REFERENCE ONLY TO SHOW LOCATION

OF DATA/ COMMUNICATION ROOM & TO

SHOW THE GENERAL SPACE OF BUILDING

DATA/ COMMUNICATION

ROOM AT MEZZANINE

RED CIRCLED DOOR IS DOOR

SCHEDULED FOR NEW

CARDREADER, TYPICAL OF

ONE (1) THIS BUILDING.

EXTERIOR DOOR AND FRAME

ARE METAL

NOTE TO BIDDERS - THIS 1999 DRAWING

IS FOR REFERENCE ONLY TO SHOW

LOCATION OF DOOR AT FUEL BUILDING

NOTE TO BIDDERS - THIS 1999 DRAWING

IS FOR REFERENCE ONLY TO SHOW THE

GENERAL SPACE OF BUILDING

GENERAL LOCATION OF CONDUIT.

NEW 1" UNDERGROUND DATA

CONDUIT RUN FROM

MAINTENANCE BUILDING TO

FUEL BUILDING

E ELECTRICAL

DISTRIBUTION

PANELS THIS AREA

DATA/ COMMUNICATION ROOM AT

MEZZANINE - NEW LENEL PANEL TO

MOUNT TO EXISTING PANEL BOARD

NOTE TO BIDDERS - THIS 1999 DRAWING

IS FOR REFERENCE ONLY TO SHOW THE

GENERAL LOCATION OF DATA ROOM &

ELECTICAL PANELS.

F24320 - 01_ESTACADA OFFICE REMODEL_AS-BUILTS A101 (1).pdf

File details come from the government source that posted it. Updated .