EXHIBIT 2.pdf
PDF 6 KB Posted
- Attached to
- Grave Relocation Gallatin Co Rebid
- Solicitation number
- RFB 605 1900000368 1
- Issued by
- Elliott County, Kentucky
About this file
This is an Exhibit document specifying monument specifications and requirements for a cemetery or memorialization project. The exhibit details the standardized specifications for concrete monuments used to mark grave sites, including required inscription elements and physical dimensions. The monuments must display 1-inch minimum height lettering containing the name of the deceased, date of birth, and date of death; when dates are unavailable, the grave number from the disinterment site should be substituted. The specified monument dimensions include a 4-inch height with an 18-inch width, with the concrete foundation extending at least 2 inches beyond the monument base on all sides and set at a depth at least twice the thickness of the monument base. The foundation must be positioned to ground level at 8 inches.
No information regarding pricing terms, contract duration, award dates, bidder meetings, site visits, or response deadlines is contained within this exhibit document. This appears to be a technical specification document intended to standardize monument construction and inscription requirements across cemetery operations rather than a standalone solicitation or contract award notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_605_1900000368_1_SO_FORM.PDF | ||
| Exhibit 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 2
MONUMENTS - SIZE, SETTING AND LETTERING
Monument Inscription: 1” minimum height lettering
NAME OF DECEASED
DATE
OF BIRTH
DATE
OF DEATH
When you have unknowns, replace dates with grave number from disinterment site.
4”
18”
Concrete
Monument 2”
Foundation to extend beyond monument at least 2” on every side
Foundation depth to be at least twice as thick as the monument base
Ground Level
8”
File details come from the government source that posted it. Updated .