EXHIBIT 2.pdf

PDF 6 KB Posted

Attached to
Grave Relocation Gallatin Co
Solicitation number
RFB-605-1900000304-3
Issued by
Elliott County, Kentucky

About this file

This is an exhibit document specifying monument specifications for the Grave Relocation project in Gallatin County, Kentucky. The document establishes standardized requirements for concrete monuments to be installed at relocated grave sites, including detailed specifications for monument size, inscription requirements, foundation depth, and ground-level positioning. Monument inscriptions must include the name of the deceased, date of birth, and date of death with a minimum lettering height of one inch; when dates are unknown, the grave number from the disinterment site should be substituted. The specifications require a four-inch by eighteen-inch concrete monument with an eight-inch foundation that extends at least two inches beyond the monument on every side and has a depth at least twice as thick as the monument base.

This exhibit serves as a technical standard document rather than a procurement notice and does not contain pricing information, bidding timelines, site visit schedules, or award details. The specifications appear designed to ensure consistency and durability of memorials across the grave relocation project by establishing uniform monument construction and inscription requirements for all relocated graves within Gallatin County.

View the file

Other files

File Type Posted
Photos.pdf PDF
Final_RFB_605_1900000304_1_SO_FORM.PDF PDF
Final_RFB_605_1900000304_2_SO_FORM.PDF PDF
Grave Data Sheet.pdf PDF
Exhibit 1.pdf PDF
disinterment plan sheet - sketch.pdf PDF
Final_RFB_605_1900000304_3_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 2

MONUMENTS - SIZE, SETTING AND LETTERING

Monument Inscription: 1” minimum height lettering

NAME OF DECEASED

DATE

OF BIRTH

DATE

OF DEATH

When you have unknowns, replace dates with grave number from disinterment site.

4”

18”

Concrete

Monument 2”

Foundation to extend beyond monument at least 2” on every side

Foundation depth to be at least twice as thick as the monument base

Ground Level

8”

File details come from the government source that posted it. Updated .