Exhibit 2 - Contract Discrepancy Notice.docx
DOCX document 72 KB Posted
- Attached to
- Reinforcement Bar
- Solicitation number
- 803
- Issued by
- Idaho
About this file
This file is a Contract Discrepancy Notice template issued by the Idaho Transportation Department (ITD) for use in monitoring contractor performance on state contracts. The document serves as a formal communication tool to document instances where contractors fail to meet contractual requirements. The notice distinguishes between two types of performance issues: Discrepancies, which require mandatory contractor response and corrective action, and Observations, which identify potential compliance concerns that may warrant attention but do not mandate a formal response unless specifically noted. The template includes structured sections for ITD to detail the nature of non-compliance, reference applicable contract provisions, specify required corrective measures, and attach supporting documentation such as photographs. The contractor must provide a detailed resolution plan with an estimated completion date, which ITD then reviews and either accepts, partially accepts, or rejects based on the adequacy of the proposed corrective actions. The process includes documented signatures from both the contractor and ITD contract monitor at multiple stages, establishing clear accountability and providing an audit trail for contract administration and performance monitoring.
The notice template does not specify pricing terms, set-asides, incumbent information, or funding details, as it is a standardized form designed for use across multiple ITD contracts rather than a procurement-specific document. The discrepancy resolution process is intended to create a collaborative framework between ITD and contractors to achieve compliance, with follow-up dates scheduled to verify that corrective actions have been completed as promised. This mechanism reflects ITD's systematic approach to contract administration and quality assurance on state infrastructure and construction projects, ensuring that contractors maintain performance standards throughout the contract term.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ803 - Attachment 2 - Price Sheet.xlsx | XLSX spreadsheet | |
| Drawings.pdf | ||
| Exhibit 1 - Deliverable Acceptance Form.docx | DOCX document | |
| ITD - Signature Page.docx | DOCX document | |
| Insurance Requirements 2023.docx | DOCX document | |
| RFQ803 - Attachment 1 - Reinforcing Bar.docx | DOCX document | |
| State of Idaho Contract Terms and Conditions_2024.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit 2 - Contract Discrepancy Notice
| Contract No: |
| TBD |
Contract Name:
Discrepancy Information: This Contract Discrepancy Notice identifies the Discrepancy(ies) found by ITD while monitoring the Contractor’s performance required per the referenced contract. Items identified as “Discrepancy” require a response from the Contractor. Items identified as “Observation” are areas of concern that may lead to a future Discrepancy if not addressed. Observations do not require a response unless otherwise noted in this notice.
ITD has identified the following Discrepancy(ies):
(Add additional tables for multiple discrepancies)
| Description of Discrepancy: |
| Describe the discrepancy in detail and explain how the contractor is out of compliance. Attach photos or other supporting documents and reference here. |
| Contract Reference: |
| Site the document name, attachment #, and section # of the requirement out of compliance. |
| Required Action: |
| Site the required corrective action from the contract. |
| Contractor’s Resolution: |
| Contractor to describe action that will be taken to correct the discrepancy in order to become compliant with the contract. |
| Estimated Resolution Date: |
| Contractor to provide estimated date it anticipates resolving the discrepancy by. |
ITD Contract Monitor - Check appropriate box with regard to Contractor’s resolution
| Accept ☐ |
| Partially Accept ☐ |
| Reject ☐ |
Reason for Rejection or Partially Accepted
Anticipated Follow Up Date on Resolution
ITD Contract Monitor Signature
Date
Contractor - Sign below to indicate your understanding of the Discrepancy(ies) and your responsibility for resolution.
Contractor Printed Name
Title
Contractor Signature
Date
Resolution
ITD Contract Monitor – Sign below to indicate that each Discrepancy has been resolved based on the actions detailed in the Contractor’s Resolution for each Discrepancy.
ITD Contract Monitor Signature
Date
ITD has identified the following Observations (no response required):
| Description of Observation: |
| Describe the observation in detail and explain how it may lead to a non-compliance issue in the future. Attach photos or other supporting documents and reference here. |
| Contractor’s Response (optional): |
| Contractor to describe action that will be taken to correct the discrepancy in order to become compliant with the contract. |
1 | Page image1.png
File details come from the government source that posted it. Updated .