This document outlines the technical specifications for the ESB - Huntington Sand Shed Fencing Project in Oregon. The project is to provide all material, labor, and equipment necessary to construct Type 1W and CL-5 fencing at the Huntington Sand Shed. The work must be completed by December 15, 2023 and adhere to the 2021 Oregon Standard Specifications for Construction, 2021 Standard Drawings, the Routine Road Maintenance "Blue Book", and the provided special provisions. The project is located within the jurisdictions of Malheur County and Oregon City.

The technical specifications detail requirements for the fence construction, including materials, dimensions, and installation. Ground disturbance and erosion control measures are also addressed. Contractors must seek underground utility locates prior to installation and may need to accommodate alternate fence locations to avoid utilities. Payment for the project will be made at the contract lump sum amount for mobilization, with no separate or additional payment for disposal of debris, vegetation, and wire.

View the file

Other files

File Type Posted
Exhibit 2 (Plans).pdf PDF
Preliminary Bid Results~8.xlsx XLSX spreadsheet
5759 - Notice of Intent to Award.pdf PDF
35820_ESB_RFCQ_Attach_279C_Final09282023.pdf PDF
Intent To Award~1.xlsx XLSX spreadsheet
35820_ESB_RFCQ_279C_Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev 1/4/2019

Exhibit 1 Technical Specifications

ESB- Huntington Sand Shed Fencing Project

2021 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION: The 2021 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed technical specifications that apply to this Request for Competitive Quotes and resulting Contract.

Some sections of the technical specifications are identified and modified below. Sections of the technical specifications not identified below remain applicable to the Contract according to their original terms.

Part 00100 of the Standard Specifications (General Conditions) is not applicable to the Contract;

however, if a technical specification (Parts 200 and beyond) references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the technical specification. The Standard Specifications are available online:

http://www.oregon.gov/ODOT/HWY/SPECS/Pages/standard_specifications.aspx

WORK SCOPE: This ESB Contract is to provide all material, labor and equipment necessary to Construct Type 1W and CL-5 Fencing at the Huntington Sand Shed.

The Bidder shall furnish all material, labor, and equipment necessary to perform all tasks in accordance with the 2021 Standard Specifications, 2021 Standard Drawings, the current version of the Routine Road Maintenance “Blue Book” and these Special Provisions to include the terms and conditions in the contract documents.

This ESB Project must be completed by December 15, 2031.

http://www.oregon.gov/ODOT/HWY/SPECS/Pages/standard_specifications.aspx

Parking and Staging of Equipment should take place off the paved shoulder. Erosion control maybe be required were ground is disturbed. This may include wattles, bio-bags, straw mulch, and seeding. All work must take place within ODOT property.

Stormwater management will apply to this project. The goal would be to reduce or eliminate pollutants of concerns, to the maximum extent practicable, from entering the waters of the state.

Minimization Measures, Avoidance Measures, and BMPs:

1. Use best professional judgment on installing erosion control and implementing good housekeeping practices for this fence maintenance project.

2. Minimize ground disturbance.

3. There are no known wetlands along this project. Should a wetlands be determine during construction it should be avoided.

4. Install erosion control devices where appropriate to prevent work from possibly impacting wetlands, stormdrains, etc.

5. Should concrete be delivered by truck, truck chute cleanout with proper containment of green clean out will be required at a location approved by the Project Manager.

6. All inlets, catchments, wetlands and waterways will be protected from green concrete.

7. All matter, debris, vegetation and wire shall be removed and disposed of in accordance to Standard

Specification 00290.20. No separate or additional payment will be made.

The adjacent land owners may have livestock within this work zone. The Contractor may need to have a secondary fence in place to insure livestock do not enter the Interstate. The Contractor can make arrangements with each of the property owners on how to handle livestock.

LOCATES: Contractor shall seek underground utility locates prior to installing any portion of the new fence. If adjustment to the fence location is needed to avoid underground utilities, the project manager will accommodate reasonable alternate locations.

Applicable Standard Specifications: “2021 Oregon Standard Specifications for Construction”, 2021 Oregon Standard Drawings, the current version of the Routine Road Maintenance “Blue Book” and these Special Provisions.

The Contractor shall not incorporate Materials into the Project prior to submittal of Materials Conformance Documents acceptable to the Engineer. Contractor shall not incorporate any rejected or none approved Materials.

SECTION 00180 – PROSECUTION AND PROGRESS

Comply with Section 00180 of the Standard Specifications modified as follows:

00180.50(h) Contract Time – The Contractor shall complete all work to be done under the contract no later than December 15, 2023.

SECTION 00210 – MOBILIZATION

Comply with Section 00210 of the Standard Specifications modified as follows:

00210.90 Payment – Payment for mobilization will be made at the contract lump sum amount for item “Mobilization”.

SECTION 00225 – WORK ZONE TRAFFIC CONTROL

Comply with Section 00225 of the Standard Specifications modified as follows:

00225.02 General Requirements – add the following after the last paragraph of this subsection:

Provide Temporary Traffic Control in accordance with the “ODOT Temporary Traffic Control Handbook for Operations of Three Days or Less”.

Section 01050 - Fences Description

01050.00 Scope - This Work consists of constructing:

• Fences, gates, and gateways of barbed wire, woven wire fabric, chain link fabric, or combinations, to the lines and grades shown or directed.

Materials

01050.10 Materials – Add the following:

Fence Gates shall meet the following:

Height Overall ......................52” Horizontal Rails (6) . . . . . 1.66” O.D., 16-gauge Tube Gate posts ……..8 ich diameter Hinges . . . . . . 3/4” x 12” Threaded-rod or 180° Flat Gate with Latch with 33” Chain w/Keeper

Single gate is one 16 foot gate installed. A double gate is two 16 foot gates with a center closure.