This document is a set of technical specifications for an aggregate supply contract between the Oregon Department of Transportation (ODOT) and a contractor. The project involves the relocation of an aggregate stockpile from the Cinder Butte Quarry (ODOT property) to the Huntington Sand Shed on Highway 30. The contractor must furnish the specified aggregates in accordance with Sections 00290, 00330, and 00680 of the 2024 Oregon Standard Specifications, with some modifications. The contract requires the work to be completed by December 1, 2024. Acceptance of the aggregates will be based on visual inspection by the ODOT project manager, and the quantity will be measured by cross-section of the completed stockpile, with no allowance for settlement or shrinkage. ODOT may elect to increase or decrease the quantities by up to 50% at the contracted price.
Payment will be made for the relocation of the materials to the designated location, and no separate payment will be made for cleanup or site preparation. The contract does not include Part 00100 (General Conditions) of the Standard Specifications, but any referenced sections from Part 00100 will apply to support the technical specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESB_RFCQ_Services_Final~1.docx | DOCX document | |
| 00011281 Addendum 1.docx | DOCX document | |
| ESB_RFCQ_Attachments_Final~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit 1 ESB – Cinder Butte Quarry Stockpile Relocation
TECHNICAL SPECIFICATIONS
This project is for the Oregon Department of Transportation (ODOT) for providing and delivering of specified Aggregates to the Following locations:
· From ODOT Property located on HWY 449 MP 5.68 (Cinder Butte Quarry)
· To Huntington Sand Shed HWY 30 MP 3.4 & In accordance with all terms, conditions and specifications included in or attached with this document.
All numbered references in this Special provision shall be understood to refer to Sections and Subsections of the Standard Specifications bearing like numbers and to the Sections and Subsections contained herein in their entirety.
2024 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION: The 2024 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed technical specifications that apply to this Request for Competitive Quotes and resulting Contract.
Some sections of the technical specifications are identified and modified below. Sections of the technical specifications not identified below remain applicable to the Contract according to their original terms. Part 00100 of the Standard Specifications (General Conditions) is not applicable to the Contract; however, if a technical specification (Parts 200 and beyond) references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the technical specification. The Standard Specifications are available online:
http://www.oregon.gov/ODOT/HWY/SPECS/Pages/standard_specifications.aspx
Project Description and Location
Aggregate Specifications Furnish aggregates in stockpile according to Section, 00290, 00330, and 00680 of the 2024 Oregon Standard Specifications supplemented and/or modified as follows:
Section 00180 – Prosecution and Progress Comply with Section 00180 - Add the following paragraph to subsection 00180.50 of the Standard Specification:
00180.50(h) Contract Time – The Contractor shall complete all work to be done under the contract no later than December 1, 2024.
00680.16 Acceptance of Aggregates – Replace this subsection with the following:
Acceptance will be visual by the Engineer
00680.41 Piling of Materials - Add the following paragraphs to subsection 00680.41 of the Standard Specifications:
Contact the ODOT Project Manager prior to delivery for location of the stockpile. The contractor shall not place material in any areas other than designated locations. The material shall be piled at the designated stockpile site as directed by the ODOT Project Manager.
00680.42 Places of Delivery - Replace this subsection with the following:
00680.42 Places of Delivery –
· Huntington Sand Shed HWY 30 MP 3.4
Maintenance Crew will set out traffic cones at the location for the stockpiling of the material on ODOT property prior to stockpiling.
00680.80 Measurement – Replace this subsection with the following:
The quantity of accepted aggregate material will be the number of cubic yards placed in a stockpile at the place of delivery. Measurement of cubic yards will be by cross-section measurement of the completed stockpiles, with no allowance for settlement or shrinkage.
Material purchased F.O.B. stockpile site shall be stockpile measure. Truck measure will not be acceptable. Compaction is likely due to stockpiling and the unit of payment shall be stockpile cubic yards only. When measurement by volume, the quantities of each designated size of Material will be measured on the volume bases, by cross section measurement or digital terrain model of the completed neat stockpiles, with no allowance for settlement or shrinkage.
Any volumes in excess or short of 5% of the requested amount will not be accepted and shall be corrected at the contractors cost to satisfy the owner.
(A) Quantity Change - ODOT may elect to increase or decrease the quantities by fifty percent (50%) and the contractor agrees to deliver as ordered at the bid price.
00680.90 Payment – Replace this subsection with the following:
00680.90 Payment –
Payment will be payment in full for relocating all materials in stockpiles to the locations shown and as directed and for furnishing all Equipment, labor, and Incidentals necessary to complete the Work as specified. No separate or additional payment will be made for cleanup and preparation of stockpile sites.
Delivery of specified material of this contract must be received on site by December 1, 2024.
***END OF SPECIAL PROVISIONS***