STATEMENT OF WORK

North Lake Road and Rattlesnake Cove Road Maintenance and Restoration

Tonto National Forest

Scope of Work:

The work on North Lake Road includes removing erosion deposits from the roadway, cleaning ditches and culverts (including inlet/catch basin areas), re-establishing ditches, backfilling eroded downslope areas, and installing gabion baskets and/or mattresses where the fill slope has eroded away and is beginning to undercut the paved road.

The work on Rattlesnake Cove Road includes removing erosion deposits from the roadway, cleaning ditches and culverts, and backfilling eroded downslope areas, particularly around the culvert outlet.

The objective of this project is to restore the roadways to their original conditions, facilitate flow of water through culverts and ditches, prevent excessive water runoff in areas that will erode the downslope road embankments, stabilize fill slopes to mitigate the risk of future road washouts, and remove roadway debris to improve safety.

Location:

Tonto National Forest, Cave Creek Ranger District, North Lake Road (FSR 459) and Rattlesnake Cove Road (FSR 459A)

Directions:

From Phoenix, AZ (Tonto NF Supervisor’s Office) travel north on AZ-51 N for approximately 15 miles. Take Exit 15a to merge onto AZ-101 Loop E. Then take Exit 31 for Tatum Blvd.

Continue left onto N Tatum Blvd for about 5.6 miles. Turn right onto E Dixileta Dr (5.2 mi), left onto N Pima Rd (4.3 mi), right onto E Cave Creek Rd (4.2 mi), right onto Bartlett Dam Rd (13 mi), left onto North Lake Road (FSR 459) and you will arrive at the project location.

Rattlesnake Cove Road (FSR 459A) is located off of North Lake Road to the right.

Requirements/Specifications:

All road construction and maintenance work shall meet the following standards:

1) US Department of Transportation, Federal Highway Administration “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects,” FP- 14, available online at https://flh.fhwa.dot.gov/resources/specs/

2) Forest Service Supplemental Specifications to the FP-14 (attached)

Furthermore, deposition material removed from the roadway and ditches shall be placed down slope from the roadbed, outside of the work area and outside of drainages, unless needed to re-establish ditches/inlets or backfill eroded areas down slope of the roadbed. Deposition material should not be hauled offsite.

https://flh.fhwa.dot.gov/resources/specs/

The contractor shall give the Forest Service notice of project/construction schedule so that FS staff may perform regular inspections of the project and may also be present on site to inspect the finished product before the contractor mobilizes off-site.

The contractor shall install temporary regulatory and warning signs upgraded to meet all requirements of the Manual on Uniform Traffic Control Devices (MUTCD).

Measurement and payment shall be made for required work completed and accepted. The accepted quantities will be paid for at the contract unit price for each pay item designated in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment of items shown.

Deliverables:

1) Riprap sampling and test results (per Section 251 of FP-14)

2) Soil test results (e.g. density, compaction, etc.) for backfill material (per Section 209 of

FP-14)

3) Certification for asphalt concrete composition of mix (per Section 403 of FP-14)

4) Temporary traffic control plan (per Sections 156 and 635 of FP-14)

Contractor Furnished:

The intent of the contract is to provide for the completion of the project described in the contract.

Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract.

Government Furnished:

Deposition material removed from the roadway and ditches along FSR 459 and FSR 459A may be used to re-establish ditches/inlets or to backfill eroded areas down slope of the roadbed if material meets all applicable criteria per Section 209 of FP-14.

Period of Performance:

Work shall be completed within 45 days of the Award of Contract.

Contractor must begin work within 10 days of the effective date of the Notice to Proceed.

Contacts:

Simon Freeman Phone: 602-225-5371 Cell: 480-653-0182 Email: sfreeman02@fs.fed.us mailto:sfreeman02@fs.fed.us

Statement of Work
Scope of Work:
Location:
Requirements/Specifications:
Deliverables:
Contractor Furnished:
Government Furnished:
Period of Performance: