EXHIBIT 1 SPECIAL PROVISIONS AND SPECIFICATIONS.docx

DOCX document 50 KB Posted

Attached to
ESB 2025 US101: MP354. 9 CURB (BROOKINGS)
Solicitation number
S-73000-00013568
Issued by
Crook County, Oregon

About this file

This document is an Exhibit 1 Special Provisions and Specifications file from the Oregon Department of Transportation (ODOT) for a highway infrastructure project located on US101 at MP354.9 in Curry County, Oregon. The project involves roadway improvements including temporary work zone traffic control, removal of existing concrete curb, construction of new Portland Cement Concrete curb, and repaving with 4 inches of Commercial Asphalt Concrete Pavement. The project will be managed by Jessica Spann, with contact information provided at 307 Highway 42 in Coquille, Oregon. The contract follows the 2024 Oregon Standard Specifications for Construction and requires contractors to submit a Traffic Control Plan and Temporary Pedestrian Accessible Route Plan for approval before commencing work.

The document specifies compliance with various technical specifications including sections on mobilization, traffic accommodation, erosion and sediment control, and environmental protection. No specific pricing details or funding sources are explicitly outlined in the document. The project emphasizes high-quality commercial practices and requires contractors to perform incidental work not separately specified in the bid schedule. The specifications include detailed requirements for traffic control, erosion management, and environmental protections, with references to ODOT's Temporary Traffic Control Handbook and potential applicable NPDES permit conditions. Contractors must adhere to strict guidelines for documentation, corrective actions, and site management throughout the project's duration.

View the file

Other files

File Type Posted
00013568 RFCQ_Attachments~1.docx DOCX document
Exhibit 5 STANDARD DRAWINGS.pdf PDF
00013568 RFCQ.docx DOCX document
04.11.25 - Request for Electrician Quotes R22009.pdf PDF
EXHIBIT 2 PROJECT LOCATION DETAILS.docx DOCX document
Preliminary Results~93.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ESB 2025 US101: MP354.9 CURB (BROOKINGS)

EXHIBIT 1

SPECIAL PROVISIONS AND SPECIFICATIONS FOR

ESB 2025 US101: MP354.9 CURB (BROOKINGS)

SCOPE

The work to be completed under this Contract, located on the Oregon Coast Highway (US101) at MP354.9, in Curry County, OR, consists of supplying the materials, equipment, labor and incidentals required to perform the following tasks as described in the Contract plans and specifications:

1. Provide Temporary Work Zone Traffic Control

2. Sawcut and remove asphalt 1.5 feet from face of existing curb.

3. Remove and dispose of existing concrete curb beginning and ending at an existing joint. Refer to Exhibit 2 for location of the work and further details.

4. Construct Portland Cement Concrete curb in accordance with Section 00759 and RD700 (Standard Curb).

5. Furnish and repave with 4 inches of Commercial Asphalt Concrete Pavement (CACP).

6. Perform additional and incidental work as called for by the plans, specifications and as directed.

PROJECT INFORMATION

General information pertaining to this Project may be obtained from the following:

Jessica Spann, Project Manager 307 Highway 42 Coquille, OR 97423 Phone: (541) 396-1143 Email: Jessica.Spann@ODOT.Oregon.gov

APPLICABLE STANDARD SPECIFICATIONS & SPECIAL PROVISIONS

2024 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION: The 2024 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed technical specifications that apply to this Invitation to Bid (ITB) and resulting Contract.

Some sections of the technical specifications are identified and modified below. Sections of the technical specifications not identified below remain applicable to the Contract according to their original terms. Part 00100 of the Standard Specifications (General Conditions) is not applicable to the Contract; however, if a technical specification (Parts 200 and beyond) references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the technical specification. The Standard Specifications are available online:

http://www.oregon.gov/ODOT/Business/Pages/Standard_Specifications.aspx

Silence of Specifications: The apparent silence of the specifications as to any detail, or the apparent omission of a detailed description concerning any point, shall be regarded as meaning that the highest value commercial practices are to prevail and that only materials and workmanship of first quality are to be used.

Where neither the Special Provisions nor the bid schedule indicate separate payment for the work to be completed under this Contract, perform the work as incidental for which no separate measurement or payment will be made.

SECTION 00210 – MOBILIZATION

Comply with Section 00210 of the Standard Specifications modified as follows:

Construction

00210.40 Mobilization – delete the last bullet of the bullet list. Obtaining and maintaining access to Doc Express®, and using Doc Express® to submit documents will not be required on this project.

Payment

00210.90 Payment – delete the last sentence in this subsection.

SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC

Comply with Section 00220 of the Standard Specifications.

SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL

Comply with Section 00221 of the Standard Specifications modified as follows:

00221.00 Scope - Add the following:

Provide work zone traffic control measures conforming to The Oregon Department of Transportation’s Temporary Traffic Control Handbook for Operations of Three Days OR Less, December 2011. Copies of this handbook can be accessed via the internet under “Publications” on the Traffic Engineering and Operations Section web site (Highway Division, Oregon Department of Transportation) at:

2011 ODOT TEMPORARY TRAFFIC CONTROL HANDBOOK (OTTCH)

00221.06 - Traffic Control Plan – Replace this subsection, except for the subsection number and title, with the following:

The Contractor must submit a Traffic Control Plan (TCP) and a Temporary Pedestrian Accessible Route Plan (TPAR) and obtain approval from the Oregon Department of Transportation Project Manager before work may commence on the Project.

SECTION 00280 – EROSION AND SEDIMENT CONTROL

Comply with Section 00280 of the Standard Specifications modified as follows:

00280.00 Scope - Replace the paragraph that begins "This Work also consists of providing temporary …" with the following paragraph:

This Work also consists of providing temporary erosion and sediment control (ESC) measures and furnishing, installing, moving, operating, maintaining, inspecting, and removing ESC throughout the Project area according to the Standard Drawings, the erosion and sediment control plan (ESCP), the Specifications, or as directed, until the site is permanently stabilized. Included also is the monitoring of weather, of stormwater and receiving waters, the reporting of monitoring observations, the reporting of corrective actions (when necessary) and the updates and revisions of the ESCP, including ESCP cover sheet, necessary to keep it representative of current site conditions and compliant with the NPDES 1200-CA, 1200-CN, OR 1200-C permit if applicable.

Delete the paragraph that begins “When contaminants, pollutants or hazardous materials…”.

Add the following paragraph to the end of this subsection:

The Agency’s NPDES 1200-CA permit is not applicable to this Project. Comply with all applicable conditions of this Section.

00280.02 Definitions ‑ Delete the definition Wet Season Work

00280.04 Erosion and Sediment Control Plan on Agency Controlled Lands ‑ Replace the bullet that begins “Information required under 1200-CA…” with the following bullet:

Information required under 1200-CA permit, if applicable.

00280.06 Erosion and Sediment Control Manager - Delete this subsection.

00280.64(b) Corrective Action Documentation – Add the following bullets to the beginning of the bullet list:

If completion of corrective action is not feasible within 24 hours, document the reasons why the time line cannot be met.

Provide a schedule for clean-up and corrective actions that restores Effective Functioning as soon as feasible. If schedule cannot be met document the reasons for the delay.

Provide all corrective action documentation and photographs to Agency within 24 hours of completion of corrective actions.

00280.91 Payment – Replace the paragraph that begins “Emergency Materials that are incorporated…” with the following paragraph:

Materials listed in 00280.48 that are incorporated into the Project will be paid for under the appropriate items listed in the Contract Schedule of Items.

SECTION 00290 - ENVIRONMENTAL PROTECTION

Comply with Section 00290 of the Standard Specifications.

SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS

Comply with Section 00310 of the Standard Specifications.

SECTION 00440 – COMMERCIAL GRADE CONCRETE

Comply with Section 00440 of the Standard Specifications.

SECTION 00640 - AGGREGATE BASE AND SHOULDERS

Comply with Section 00640 of the Standard Specifications.

SECTION 00740 – COMMERCIAL ASPHALT CONCRETE PAVEMENT (CACP)

Comply with Section 00740 of the Standard Specifications.

SECTION 00759 – MISCELLANEOUS PORTLAND CEMENT CONCRETE SRUCTURES

Comply with Section 00759 of the Standard Specifications modified as follows:

00759.11 Aggregate Base - Replace this subsection, except for the subsection number and title, with the following:

Furnish Aggregate Base Materials for Base, foundation courses, Leveling courses, or bedding meeting the requirements of 00640.10 or dense graded Base Aggregate in 00641.10 as appropriate and included in the Special Provisions.