EXHIBIT 1 - ESB US101 MP325.2 FENCE REPLACEMENT_GOLD BEACH - Specifications and Special Provisions~1.pdf

PDF 72 KB Posted

Attached to
ESB US101 MP325. 2 Fence Replacement (Gold Beach)
Solicitation number
S-73000-00013881
Issued by
Crook County, Gladstone City, Oregon

About this file

This document is a special provisions and specifications exhibit for an Oregon Department of Transportation (ODOT) highway fence replacement project located in Curry County, Oregon. The project involves replacing 215 feet of fence along the Oregon Coast Highway (US101) at Milepost 325.2 near Gold Beach, with specific tasks including providing temporary work zone traffic control, removing the existing fence, and installing a new Type 2 fence according to standard drawing RD810. The project will require the contractor to submit a Traffic Control Plan and a Temporary Pedestrian Accessible Route Plan for approval before commencing work.

The project will be executed using the 2024 Oregon Standard Specifications for Construction, with the project manager Jessica Spann based in Coquille, Oregon, available to provide general project information. The specifications emphasize that all work should meet the highest commercial practices and use first-quality materials and workmanship. Where separate payment is not indicated in the bid schedule, the contractor is expected to perform incidental work without additional compensation. The document provides detailed technical guidance for mobilization, work zone traffic control, environmental protection, and fence installation, ensuring comprehensive project execution standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 1

SPECIAL PROVISONS & SPECIFICATIONS FOR

ESB US101: MP325.2 FENCE REPLACEMENT (GOLD BEACH)

SCOPE

The work to be completed under this Contract, on the Oregon Coast Highway (US101) at MP 325.2, in Curry County, OR consists of supplying the materials, equipment, labor and incidentals required to perform the following tasks as described in the Contract plans and specifications:

1. Provide Temporary Work Zone Traffic Control.

2. Remove 215 feet of fence as shown on Exhibit 2.

3. Install 215 feet of Type 2 fence as shown on Standard Drawing RD810 and Exhibit 2.

4. Perform additional and incidental work as detailed in the Contract plans and specifications and as directed.

PROJECT INFORMATION

General information pertaining to this project may be obtained from the following:

Jessica Spann, Project Manager 307 Highway 42 Coquille, OR Phone: (541) 396-1143 Email: Jessica.Spann@odot.oregon.gov

APPLICABLE STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS

2024 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION: The 2024 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed technical specifications that apply to this Invitation to Bid (ITB) and resulting Contract.

Some sections of the technical specifications are identified and modified below. Sections of the technical specifications not identified below remain applicable to the Contract according to their original terms. Part 00100 of the Standard Specifications (General Conditions) is not applicable to the Contract; however, if a technical specification (Parts 200 and beyond) references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the technical specification. The Standard Specifications are available online:http://www.oregon.gov/ODOT/Business/Pages/Standard_Specifications.aspx

Silence of Specifications: The apparent silence of the specifications as to any detail, or the apparent omission of a detailed description concerning any point, shall be regarded as meaning that the highest value commercial practices are to prevail and that only materials and workmanship of first quality are to be used. Where neither the Special Provisions nor the bid schedule indicate separate payment for the work to be completed under this Contract, perform the work as incidental for which no separate measurement or payment will be made.

SECTION 00210 – MOBILIZATION

Comply with Section 00210 of the Standard Specifications modified as follows:

Construction

00210.40 Mobilization – delete the last bullet of the bullet list. Obtaining and maintaining access to Doc Express®, and using Doc Express® to submit documents will not be required on this project.

Payment

00210.90 Payment – delete the last sentence in this subsection.

SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL

Comply with Section 00221 of the Standard Specifications modified as follows:

00221.06 Traffic Control Plan – Replace this subsection, except for the subsection number and title, with the following:

The Contractor must submit a Traffic Control Plan (TCP) and a Temporary Pedestrian Accessible Route Plan (TPAR), and obtain approval from the Oregon Department of Transportation Project Manager before work may commence on the Project.

SECTION 00290 - ENVIRONMENTAL PROTECTION

Comply with Section 00290 of the Standard Specifications.

SECTION 01050 - FENCES

Comply with Section 01050 of the Standard Specifications.