Exhaust Fan Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- 24IFB10889
- Issued by
- Day County, South Dakota
About this file
This document is an Invitation to Bid for a state and local contract opportunity issued by the South Dakota Department of the Military for the replacement of 56 exhaust fans at the Mitchell CSMS #1 facility in Mitchell, South Dakota. The project involves replacing roof-mounted, vehicle, and welding exhaust fans on both the interior and exterior of the building, including power and controls wiring rework, testing and balancing, and reconnecting to existing ductwork. The work is to be substantially complete within 150 consecutive calendar days from the Notice to Proceed date. An optional pre-bid conference is scheduled for May 9, 2024. Bids are due May 16, 2024 and must be accompanied by a 5% certified check, cashier's check, or draft, or a 10% bid bond.
The contract will be awarded by the South Dakota Department of the Military. Pricing terms, funding requirements, and sources are not provided in the document. There is no mention of any set asides or incumbents. The project is to be completed in an active equipment maintenance shop with up to 25-foot interior ceiling heights.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project Manual.pdf | ||
| Invitation to Bid.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROGER C.
NIKOLAS
RE
GIS
TE
REDPROFESSIONALENGINEER
REG. NO.
SOUTH DAKOTA
DATE: 04/19/2024
© TSP, Inc. 2023
ISSUES
SHEET NUMBER
SHEET TITLE
C
A
B
2 3
D
E
1 2 3
4 5 6
4 5 6
A
B
C
D
E
TSP, Inc.
PROJECT TITLE
1112 N. West Ave, Sioux Falls, SD 57104
(605) 336-1160 www.teamtsp.com
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LIS
TE
D
DR
AW
IN
GS
S
CA
LE
(S ) U
NL
ES
S
RE
DU
CE
D
FR
OM
O
RI
GI
NA
L x
F
OR
MA
T
Architecture Engineering
Planning
4/1 9/2
4 2
:08 :25
A M
_S D
De pt of Mi lita ry
Mi tch ell _M
_d eta ch ed .rv t
COVER SHEET
G-001
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
MITCHELL, SD
REPLACE EXHAUST
FANS
CFMO #467097
SDARNG MITCHELL
CSMS #1
JRH04/19/2024
RCN04232099
SDARNG MITCHELL CSMS #1
REPLACE EXHAUST FANS
CFMO #467097
CONSTRUCTION DOCUMENTS
04/19/2024
MITCHELL, SD
GENERAL SHEET INDEX
SHEET # SHEET NAME
G-001 COVER SHEET
DRAWING INDEX
ELECTRICAL SHEET INDEX
SHEET # SHEET NAME
E-001 ELECTRICAL SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
ED101 ELECTRICAL DEMOLITION PLAN - AREA 1
ED102 ELECTRICAL DEMOLITION PLAN - AREA 2
ED103 ELECTRICAL DEMOLITION PLAN - AREA 3
ED104 ELECTRICAL DEMOLITION PLAN - AREA 4
ED105 ELECTRICAL DEMOLITION PLAN - AREA 5
EP101 POWER PLAN - AREA 1
EP102 POWER PLAN - AREA 2
EP103 POWER PLAN - AREA 3
EP104 POWER PLAN - AREA 4
EP105 POWER PLAN - AREA 5
EP401 ENLARGED ELECTRICAL PLAN - PENTHOUSE 2001 AND ELECTRICAL SCHEDULES
MECHANICAL SHEET INDEX
SHEET # SHEET NAME
G-001 COVER SHEET
M-001 MECHANICAL SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
MD101 MECHANICAL DEMOLITION PLAN - AREA 1
MD102 MECHANICAL DEMOLITION PLAN - AREA 2
MD103 MECHANICAL DEMOLITION PLAN - AREA 3
MD104 MECHANICAL DEMOLITION PLAN - AREA 4
MD105 MECHANICAL DEMOLITION PLAN - AREA 5
MD201 MECHANICAL ROOF DEMOLITION PLAN
MH101 MECHANICAL HVAC PLAN - AREA 1
MH102 MECHANICAL HVAC PLAN - AREA 2
MH103 MECHANICAL HVAC PLAN - AREA 3
MH104 MECHANICAL HVAC PLAN - AREA 4
MH105 MECHANICAL HVAC PLAN - AREA 5
M-201 MECHANICAL ROOF PLAN
ME601 MECHANICAL SCHEDULES
TITLE/DISCIPLINE NAME/CONTACT COMPANY PHONE
PROJECT MANAGER ROGER NIKOLAS TSP, Inc. 605.336.1160
MECHANICAL ENGINEER ROGER NIKOLAS TSP, Inc. 605.336.1160
ELECTRICAL ENGINEER JAKE BUCKMILLER TSP, Inc. 605.336.1160
DESIGN TEAM
NikolasRC@teamtsp.com
NikolasRC@teamtsp.com
BuckmillerJR@teamtsp.com
INDUSTRIAL ROAD
N
OH
LM
AN
S T
NATIONAL GUARD ROAD
ISSUE DATE DESCRIPTION
NIKOLAS
RE
GIS
TE
REDPROFESSIONALENGINEER
REG. NO.
SOUTH DAKOTA
DATE:
& AND
Ø ROUND
A AIR
AC AIR CONDITIONING
ACOUS ACOUSTICAL
AD AREA DRAIN
ADD ADDENDUM
ADDL ADDITIONAL
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
AG ABOVE GROUND
ALT ALTERNATE
ALUM ALUMINUM
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECT/ARCHITECTURAL
AV ACID RESISTANT VENT
AW ACID RESISTANT WASTE
AUTO AUTOMATIC
BFF BELOW FINISHED FLOOR
BLDG BUILDING
BLW BELOW
BM BEAM
BO BY OTHER
BOT BOTTOM
BSMT BASEMENT
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
BTWN BETWEEN
CAP CAPACITY
CB CATCH BASIN
CCW COUNTER CLOCKWISE
CFCV CONSTANT FLOW CONTROL VALVE
CFM CUBIC FEET PER MINUTE
CHW CIRCULATING HOT WATER
CI CAST IRON
CLG CEILING
CLG COOLING
CO CLEAN OUT
COL COLUMN
COMB COMBINATION
CONC CONCRETE
COND CONDENSATE
CONF CONFERENCE
CONN CONNECT
CONST CONSTRUCTION
CONT CONTINUE/CONTINUATION
CONTR CONTRACT/CONTRACTOR
COORD COORDINATE
CTR CENTER
CUFT CUBIC FEET
CV CHECK VALVE
CW COLD WATER
CW CLOCKWISE
D DEGREE
DB DRY BULB
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIV DIVISION
DI DEIONIZED WATER
DMPR DAMPER
DN DOWN
DWG DRAWING
DW DISTILLED WATER
EA EACH
EAT ENTERING AIR TEMPERATURE
EL ELBOW
ELEC ELECTRICAL
ELEV ELEVATION
EP EXPLOSION PROOF
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
E/A EXHAUST AIR
EAH EXHAUST HOOD
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FD FIRE DAMPER
FDV FIRE DEPARTMENT VALVE
FHC FIRE HOSE CABINET
FL FLOOR
FLEX FLEXIBLE
FLG FLANGE
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FRP FIBERGLASS REINFORCED PIPE
FS FULL SIZE
FS FLOOR SINK
FT FOOT/FEET
FTG FOOTING
FTR FIN TUBE RADIATION
GA GAGE/GAUGE
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR/GENERAL
GPM GALLONS PER MINUTE
GR GRADE
GW GREASE WASTE
HB HOSE BIBB
HORZ HORIZONTAL
HP HORSE POWER
HP HIGH PRESSURE
HTG HEATING
HTR HEATER
HW HOT WATER
HYD HYDRANT
ID INDIRECT
IN INCH
INL INLET
INSUL INSULATION
INT INTERIOR
INV INVERT
INWG INCHES WATER GAUGE
JT JOINT
LAB LABORATORY
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
LF LINEAR FOOT
LP LOW PRESSURE
LPG LIQUEFIED PETROLEUM GAS
LR LIQUID REFRIGERANT
LS LAWN SPRINKLER
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M/A MIXED AIR
MAN MANUAL
MATL MATERIAL
MAV MANUAL AIR VENT
MAX MAXIMUM
MBD MOTORIZED BYPASS DAMPER
MBH ONE THOUSAND BTU PER HOUR
MCF ONE THOUSAND CUBIC FEET
MCW MAKE-UP COLD WATER
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MU/A MAKE-UP/AIR
N NECK / NORTH
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER / NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
O OXYGEN
O/A OUTSIDE AIR
OC ON CENTER
OF OVERFLOW
OPNG OPENING
ORD OVERFLOW ROOF DRAIN
PD PRESSURE DROP
PIV POST INDICATOR VALVE
PLBG PLUMBING
PR PAIR
PRESS PRESSURE
PRIM PRIMARY
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PW POTABLE WATER
PWR POWER
R DUCT RISER
R/A RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
REC RECESSED
RED REDUCER
REFR REFRIGERATION
RH RELATIVE HUMIDITY
REQD REQUIRED
REV REVERSE
RL/A RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
RW RAIN WATER
SF SQUARE FOOT
S/A SUPPLY AIR
SAN SANITARY
SCHED SCHEDULE
SECT SECTION
SD SMOKE DAMPER
SHT SHEET
SIM SIMILAR
SLV SLEEVE
SM SURFACE MOUNT
SP STANDPIPE / STATIC PRESSURE
SPEC SPECIFICATION
SPS STATIC PRESSURE STATION
SQ SQUARE
SR SUCTION REFRIGERANT
SSD SOIL SUBDRAIN
SS STAINLESS STEEL
STD STANDARD
STM STEAM
STRUCT STRUCTURAL
SUCT SUCTION
SUSP SUSPENDED
T THERMOSTAT
TCP TEMPERATURE CONTROL PANEL
TD TEMPERATURE DROP
TDR TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UFD UNDER FLOOR DUCT
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VEL VELOCITY
VENT VENTILATION
VERT VERTICAL
VOL VOLUME
VTR VENT THROUGH ROOF
W WASTE
WB WET BULB
WCO WALL CLEAN OUT
WH WALL HYDRANT
ABBREVIATIONS
AC AIR CONDITIONING UNIT
ACC AIR COOLED CONDENSER
ACCU AIR COOLING CONDENSING UNIT
AFMS AIR FLOW MEASURING STATION
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
CF CABINET FAN
CF CHEMICAL FEEDER
CFP CHEMICAL FEEDER PUMP
CH CHILLER
CRU CONDENSATE RETURN UNIT
CT COOLING TOWER
CUH CABINET UNIT HEATER
CWP CONDENSER WATER PUMP
CHWP CHILLED WATER PUMP
DBP DOMESTIC WATER BOOSTER PUMP
DC DUCT MOUNTED COIL
DCP DOMESTIC WATER CIRCULATING PUMP
EF EXHAUST FAN
EDC ELECTRIC DUCT COIL
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
FCU FAN COIL UNIT
FP FIRE PUMP
GI GREASE INTERCEPTOR
GRV GRAVITY ROOF VENTILATOR
H HUMIDIFIER
HWP HEATING WATER PUMP
HX HEAT EXCHANGER
HPU HEAT PUMP UNIT
HRU HEAT RECOVERY UNIT
ILC INLINE CENTRIFUGAL
PF PROPELLER FAN
PRV POWER ROOF VENTILATOR
PWF POWER WALL FAN
RE RETURN/EXHAUST FAN
RTU ROOFTOP UNIT
SA SHOCK ABSORBER
SAT SOUND ATTENUATOR
SEP SEWAGE EJECTOR PUMP
SF SUPPLY FAN
SP SUMP PUMP
UH UNIT HEATER
US UTILITY SET
UV UNIT VENTILATOR
WFMS WATER FLOW MEASURING STATION
WH WATER HEATER
EQUIPMENT ABBREVIATIONS
* NOTE *
ALL OF THE GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER
DRAWINGS IN THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET
MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.
PLUMBING AND PIPING SYMBOLSGENERAL MECHANICAL SYMBOLS
HVAC SYMBOLS
LAB AND MEDICAL SYMBOLS
FIRE PROTECTION SYMBOLS
SA
RA
ELBOW WITH TURNING VANES
LAB AIRLA
CONDENSATE DRAINCD
DUAL TEMP WATER RETURNDTWR
DOMESTIC HOT WATER - RECIRCULATINGRHW
DOMESTIC HOT WATERHW
DOMESTIC COLD WATERCW
LAB DEIONIZED WATERLDE
LAB DISTILLED WATERLDI
LAB GASLG
LAB VACUUMLV
MEDICAL AIRMA
MEDICAL CO2CO2
MEDICAL GASMGAS
MEDICAL HYDROGENH
MEDICAL NITROGENNI
DOMESTIC COLD WATER - SOFTSCW
SANITARY VENTV
SANITARY WASTE - BELOW GROUNDWB
SANITARY WASTEW
MEDICAL NITROUS OXIDENO
MEDICAL OXYGENO
MEDICAL VACUUMMV
NATURAL GASG
NATURAL GAS - 2LBG-2LB
PROCESSPRO
STORM DRAINAGERD
STORM DRAINAGE - BELOW GRADERDB
STORM DRAINAGE OVERFLOWORD
STORM DRAINAGE OVERFLOW BELOW GRADEORDB
FIRE PROTECTION OTHERFP-O
DRY FIRE SPRINKLERDF
GLYCOL HOT WATER RETURNGHR
GLYCOL HOT WATER SUPPLYGHS
HEATING WATER RETURNHWR
HEATING WATER SUPPLYHWS
OIL WASTEOW
CHILLED WATER RETURNCWR
CHILLED WATER SUPPLYCWS
CONDENSER WATER RETURNCR
CONDENSER WATER SUPPLYCS
OIL VENTOV
REFRIGERANTREF
REFRIGERANT HOT GASRHG
REFRIGERANT LIQUIDRL
REFRIGERANT SUCTIONRS
ACID WASTE ABOVE GRADEAW
ACID VENT PIPINGAV
ACID WASTE BELOW GRADEAWB
COUPLING
SOUND ATTENUATOR
M
F B
S C
MOTORIZED SMOKE
COMBINATION
SMOKE & FIRE
VOLUME
DAMPER
FIRE BACKDRAFT
TYPE
CFM
S-1 (3X)
16"x16"
R-1
VOLUME DAMPER
TOTAL
(IF EXCEEDS 1)
RETURN
DIFFUSER
VAV BOX
POWER ROOF VENTILATOR
UNIT HEATER
RADIANT
PANEL
GEOTHERMAL SUPPLYGTS
GEOTHERMAL RETURNGTR
LPS
STEAM - LP CONDENSATELPR
STEAM - LP
MPS
STEAM - MP CONDENSATEMPR
STEAM - MP
HPS
STEAM - HP CONDENSATEHPR
STEAM - HP
CONDENSATE RETURNCDR
COMBINATION WASTE AND VENTCWV
COMPRESSED AIRA
PUMP DISCHARGEPD
MITIGATION VENTMIT
GREASE VENTGV
GREASE WASTEGW
DEIONIZED WATERDI
REVERSE OSMOSIS WATERRO
DUAL TEMP WATER SUPPLYDTWS
PIPE BEING DEMOLISHED
EXISTING PIPE TAG
x x-xxx
Room
POINT WHERE NEW CONNECTS TO EXISTING
NUMBER OF DETAIL ON SHEET
NUMBER OF SHEET WHERE DETAIL APPEARS
KEYNOTE
CONTINUATION SYMBOL
ROOM NAME AND NUMBER
DOMESTIC COLD WATER - HARDHCW
DOMESTIC HOT WATER - 140 DEGRESSHW 140
RECTANGULAR DUCT SIZE TAG (WIDTH X HEIGHT)16"x8"
16"/8"
16"Ø
OVAL DUCT SIZE TAG (WIDTH / HEIGHT)
ROUND DUCT SIZE TAG (DIAMETER)
RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISEDROP
ROUND SUPPLY/OUTSIDE AIR DUCT RISEDROP
RECTANGULAR RETURN/TRANSFER AIR DUCT RISEDROP
ROUND RETURN/TRANSFER AIR DUCT RISEDROP
RECTANGULAR EXHAUST/RELIEF AIR DUCT RISEDROP
ROUND EXHAUST/RELIEF AIR DUCT RISEDROP
SA
RA
EA
EA
FLEX DUCT
x-xxx EQUIPMENT TAG
LINEAR DIFFUSER
CO2 TH
CO TS
NO2 T
HS SVV
H S
TEMPERATURE & HUMIDITY SENSORCARBON DIOXIDE SENSOR
TEMPERATURE SENSORCARBON MONOXIDE SENSOR
THERMOSTATNITROGEN DIOXIDE SENSOR
MANUAL SWITCHHUMIDITY SENSOR
SENSORHUMIDISTAT
PLUG
REDUCING 45 DEGREE TEE
45 DEGREE TEE
2"4"
4"
ROOF DRAIN FIXTURE
4" RD-1
4" ORD-1
DRAIN SIZE
DRAIN TAG
TYPE (SEE SCHEDULE)
FCO WCO W
WH-1
PLUMBING FIXTURE
PLUMBING FIXTURE TAG
TYPE (SEE SCHEDULE)
DOWNSPOUT NOZZLE
FLOOR
CLEAN
OUT
WALL
CLEAN
OUT
FLOOR
DRAIN
DOMESTIC
WATER METER GAS METER END CAP PIPE BREAK
DOMESTIC HOT WATER - RECIRCULATING 140 DEGREESRHW 140
DOMESTIC COLD WATER - FILTEREDF-CW
(E)
FIRE PROTECTION PRE-ACTIONFP-PA
FIRE PROTECTION WETFP
COMBINATION FIRE & DOMESTICFP-DOM-W
UPRIGHT SPRINKLER HEAD
PENDANT SPRINKER HEAD
RECESSED SPRINKLER HEAD
CONCEALED SPRINKLER HEAD
'D' REPRESENTS DRY SPRINKLER
HEADD
SIDEWALL SPRINKLER
HEAD
EXTENDED COVERAGE
SIDEWALL SPRINKLER HEAD
OBSTRUCTION FROM
DUCTWORK 48" AND
GREATER
48"x18" S/A
1/8" / 12" SLOPE
2"
PIPE SLOPE TAG
PIPE SIZE TAG (DIAMETER)
EXISTING DUCT TAG(E)
21. PUMP
22. FLOW SWITCH
23. PRESSURE TEMPERATURE TAP
24. MEDICAL GAS OUTLET
25. HOSE BIBB
26. WALL HYDRANT
27. FLOW METER
28. BACKFLOW PREVENTER
29. AQUASTAT
30. 3-WAY VALVE
1. SIDE CONNECTION
2. ELBOW DOWN
3. ELBOW UP
4. SHUT OFF VALVE
5. BALANCING VALVE
6. CONTROL VALVE
7. PRESSURE REDUCING VALVE
8. PRESSURE RELIEF VALVE
9. CHECK VALVE
10. AIR VENT
11. PRESSURE GAUGE
12. THERMOMETER
13. PIPE ANCHOR
14. PIPE GUIDE
15. REDUCER
16. STRAINER
17. UNION
18. DIRECTION OF FLOW
19. PITCH PIPE
20. 3-WAY CONTROL VALVE
FM AFS
2 3 4 5 6 7 8 9 10 11 12 13 14 15
302928272624232221201918 2516 17
04/19/2024
HVAC GENERAL NOTES
* NEW 1 SUPPLY AND RETURN PIPING TO COILS ARE THE SAME SIZE.
* NEW 2 CONTRACTOR SHALL LOCATE THERMOSTATS, CO2 SENSORS, AND TEMPERATURE SENSORS AT
4'-0" AFF, A MINIMUM OF 8" FROM LIGHT SWITCH.
* NEW 3 REFER TO PIPING DRAWINGS FOR THERMOSTAT, CO2 SENSOR, AND TEMPERATURE SENSOR
LOCATIONS.
* NEW 4 CONDENSATE DRAINS SHALL BE SUPPLIED FOR ALL COOLING EQUIPMENT. CONTRACTOR SHALL
ENSURE PROPER INSTALLATION AND DRAINAGE AS REQUIRED BY FEDERAL, STATE, AND LOCAL
CODES. CONDENSATE PIPING SHALL BE TYPE "L" COPPER.
* NEW 5 PROVIDE A 4" HOUSEKEEPING PAD FOR EACH PIECE OF MECHANICAL EQUIPMENT. COORDINATE
SIZES WITH MECHANICAL EQUIPMENT SELECTED.
* NEW 6 THIS CONTRACTOR SHALL BE REQUIRED TO REPLACE FILTERS ON HVAC EQUIPMENT AFTER ALL
DUST PRODUCING CONSTRUCTION HAS BEEN COMPLETED AND PRIOR TO THE FINAL PUNCH.
PROJECT GENERAL NOTES
* DEMO 1 WHERE EQUIPMENT AND/OR FIXTURES ARE INDICATED TO BE REMOVED, THE EXISTING
SERVICES SHALL BE CAPPED AND CONCEALED BEHIND FINISHED SURFACES. ABANDONED
BRANCH SERVICES SHALL BE REMOVED BACK TO THE MAINS AND CAPPED, UNLESS OTHERWISE
INDICATED.
* DEMO 2 CAP ANY ABANDONED OR UNUSED PIPE AND/OR DUCT OPENINGS.
* DEMO 3 THIS CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND PAINTING TO MATCH EXISTING
WALLS, FLOORS, AND CEILINGS.
* DEMO 4 HYDRONIC AND DOMESTIC PIPING SHALL BE THOROUGHLY CLEANED BEFORE PUTTING INTO
PERMANENT SERVICE.
* DEMO 5 WHERE MATERIAL IS INDICATED TO BE REMOVED, IT SHALL REMAIN THE PROPERTY OF THE
OWNER. THIS CONTRACTOR SHALL DISPOSE OF MATERIAL AS DIRECTED BY THE OWNER.
* EXST 1 REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.
* EXST 2 THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING, PRIOR TO FINAL
BID, ALL EXISTING CONDITIONS FOR PLUMBING AND MECHANICAL SYSTEMS.
* EXST 3 WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT
CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO
START OF WORK.
* NEW 1 COORDINATE AND COOPERATE WITH THE OTHER TRADES ON THE INSTALLATION OF PIPING, DUCTWORK, CONDUIT, LIGHTS, CABLE TRAY, STRUCTURE, AND EQUIPMENT TO PREVENT
CONFLICTS.
* NEW 2 THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS BOTH EXISTING AND THOSE
ILLUSTRATED BY THESE DOCUMENTS AS WELL AS THOSE WHICH CAN BE REASONABLY
ANTICIPATED INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL, VENTILATION, PLUMBING, AND OTHER SYSTEMS INVOLVED ON THIS PROJECT.
* NEW 3 FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL CONFORM TO ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT NOT
LIMITED TO THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL CODE.
* NEW 4 LOCATE EQUIPMENT REQUIRING ACCESS 2'-0" MAXIMUM ABOVE CEILING.
* NEW 5 ALL ROOF MOUNTED EQUIPMENT SHALL BE A MINIMUM 10'-0" FROM EDGE OF ROOF.
* NEW 6 LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE SPACE ABOVE
ELECTRICAL PANELS, TRANSFORMERS AND OTHER ELECTRICAL EQUIPMENT.
* NEW 7 ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO MECHANICAL EQUIPMENT.
* NEW 8 REFER TO PLUMBING SERIES DRAWINGS FOR GAS AND A.C. CONDENSATE DRAIN PIPING.
* NEW 9 PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL ANOTHER SIZE IS
SHOWN.
* NEW 10 FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON THE SEGMENTS, REFER TO DETAILS, SCHEDULES, AND SPECIFICATIONS.
* NEW 11 INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S WRITTEN
INSTALLATION INSTRUCTIONS.
* NEW 12 LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS INDICATED ON THE DRAWING, ARE
APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. WORK SHALL BE
COORDINATED WITH ALL OTHER TRADES TO AVOID INTERFERENCE IN THE FIELD.
* NEW 13 INSTALL EXPOSED PIPING AND DUCTWORK AS HIGH AS PRACTICAL IN ROOMS WITHOUT
CEILINGS.
* NEW 14 MATERIALS AND EQUIPMENT SHOWN ON PLANS SHALL BE NEW AND FURNISHED BY THIS
CONTRACTOR UNLESS OTHERWISE INDICATED.
* NEW 15 THIS CONTRACTOR IS RESPONSIBLE FOR ALL SLEEVES AND/OR OPENINGS WHERE REQUIRED TO
RUN PIPES AND DUCTS THROUGH FOUNDATIONS, FLOOR SLABS, WALLS, BRIDGING AND BEAMS
EXCEPT WHERE OTHERWISE INDICATED.
* NEW 16 CEILING ACCESS IS REQUIRED AT ALL REHEAT COILS, VALVES, FIRE DAMPERS, MANUAL
DAMPERS AND MOTORIZED DAMPERS LOCATED ABOVE CEILING. CEILING ACCESS PANELS WILL
BE PROVIDED UNDER THE GENERAL SECTION OF CONSTRUCTION AND SHALL BE MINIMUM OF 24"
X 24" UNLESS OTHERWISE INDICATED. COORDINATE WITH GENERAL CONTRACTOR.
* NEW 17 THE CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL EXISTING CONDITIONS AND
DIMENSIONS. NOTIFY THE A/E IMMEDIATELY OF ANY DISCREPANCIES.
* NEW 18 WHERE NEW SERVICES ARE SHOWN CONNECTING TO EXISTING, VERIFY EXACT LOCATION AND
SIZE OF EXISTING.
* NEW 19 EXISTING SERVICES SHALL BE MAINTAINED UNLESS OTHERWISE INDICATED.
* NEW 20 ALL DUCTS, PIPING, FIXTURES, ETC., WHICH ARE DASHED AND/OR INDICATED BY NOTE ON
DEMOLITION PLANS SHALL BE REMOVED.
* NEW 21 ALL PLUMBING SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH NATIONAL, STATE, AND LOCAL CODES.
* NEW 22 SEAL ALL SHEET METAL DUCTWORK JOINTS.
* NEW 23 BALANCING OF AIR AND HYDRONIC SYSTEMS SHALL BE PERFORMED BY AN NEBB OR AABC
CERTIFIED TEST AND BALANCE AGENCY.
* NEW 24 PIPE PENETRATIONS OF RATED WALLS AND FLOORS SHALL BE SLEEVED AND PROPERLY FIRE
SEALED.
* NEW 25 ALL PIPE AND DUCT PENETRATIONS OF SMOKE PARTITION WALLS SHALL BE PROPERLY SEALED
TO RESIST THE PASSAGE OF SMOKE AS REQUIRED BY THE LOCAL AUTHORITY.
* NEW 26 INSTALL FLUSH VALVE OPERATORS ON WIDE SIDE OF ACCESSIBLE STALLS.
* NEW 27 THE HEATING AND/OR COOLING HYDRONIC SYSTEM SHALL BE PROVIDED AND FILLED WITH AN
ANTIFREEZE GLYCOL SOLUTION (AS INDICATED ON THE EQUIPMENT SCHEDULES) BY THE PIPING
CONTRACTOR WHO SHALL BE RESPONSIBLE FOR DETERMINING THE AMOUNT OF GLYCOL
REQUIRED.
* NEW 28 GREASE DUCTS: PROVIDE 2-INCH THICK U.L. 2-HOUR FIRE RATED DUCT WRAP ON GREASE
DUCTS BETWEEN CEILING AND ROOF PENETRATION.
SHEET INDEX - MECHANICAL
SHEET # SHEET NAME
G-001 COVER SHEET
M-001 MECHANICAL SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
MD101 MECHANICAL DEMOLITION PLAN - AREA 1
MD102 MECHANICAL DEMOLITION PLAN - AREA 2
MD103 MECHANICAL DEMOLITION PLAN - AREA 3
MD104 MECHANICAL DEMOLITION PLAN - AREA 4
MD105 MECHANICAL DEMOLITION PLAN - AREA 5
MD201 MECHANICAL ROOF DEMOLITION PLAN
MH101 MECHANICAL HVAC PLAN - AREA 1
MH102 MECHANICAL HVAC PLAN - AREA 2
MH103 MECHANICAL HVAC PLAN - AREA 3
MH104 MECHANICAL HVAC PLAN - AREA 4
MH105 MECHANICAL HVAC PLAN - AREA 5
M-201 MECHANICAL ROOF PLAN
ME601 MECHANICAL SCHEDULES
© TSP, Inc. 2023
ISSUES
SHEET NUMBER
SHEET TITLE
C
A
B
2 3
D
E
1 2 3
4 5 6
4 5 6
A
B
C
D
E
TSP, Inc.
PROJECT TITLE
1112 N. West Ave, Sioux Falls, SD 57104
(605) 336-1160 www.teamtsp.com
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LIS
TE
D
DR
AW
IN
GS
S
CA
LE
(S ) U
NL
ES
S
RE
DU
CE
D
FR
OM
O
RI
GI
NA
L x
F
OR
MA
T
Architecture Engineering
Planning
4/1 9/2
4 2
:08 :29
A M
_S D
De pt of Mi lita ry
Mi tch ell _M
_d eta ch ed .rv t
MECHANICAL SYMBOLS,
ABBREVIATIONS, AND
GENERAL NOTES
M-001
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
MITCHELL, SD
REPLACE EXHAUST
FANS
CFMO #467097
SDARNG MITCHELL
CSMS #1
JRH04/19/2024
RCN04232099
NIKOLAS
RE
GIS
TE
REDPROFESSIONALENGINEER
REG. NO.
SOUTH DAKOTA
DATE:
127B
STORAGE
TELECOMUNICATIONS
112A
TELECOM.
ROOM
MECHANICAL
ROOM
111B
STORAGE
CUSTODIAL
CORRIDOR
LUMBER
STORAGE
LIBRARY
LOBBY
COMM SEC
REPAIR
RADIATION
CALIBRATION
CORRIDOR
VESTIBULE
OMS
HAZARDOUS
WASTE
OMS BATTERY
OMS POL
STORAGE
CUSTODIAL
CORRIDOR
CUSTODIAL
PRODUCTION
CONTROL
CSMS
HAZARDOUS
CSMS
BATTERY
CSMS POL
STORAGE
CUSTODIAL
CSMS
FLAMMABLE
OMS
FLAMMABLE
STORAGE
VESTIBULE
VESTIBULE
CORRIDOR
CORRIDOR
VESTIBULE
COLD
STORAGE
112B
ELECTRICAL
ROOM
OMS SUPER.
VESTIBULE
CSMS
SUPERVISOR
RADIATION
STORAGE
128A
ELECTRICAL
ROOM
GENERAL
SUPERVISOR
CLERK TYPIST
FITNESS
CSMS BREAK
ROOM
OMS BREAK
ROOM
111G
WOMEN'SMLATRINE
111F
WOMEN'S
LOCKER
111A
MEN'S LATRINE
111C
MEN'S LOCKER
CSMS TOOL &
SUPPLY
OMS TOOL &
SUPPLY
127C
MEN'S LOCKER
127A
MEN'S LATRINE
127G
WOMEN'S
LATRINE
127F
WOMEN'S
LOCKER
CORRIDOR
COLD
STORAGE
CORRIDOR
CUSTODIAL
INSPECTION
SUPERVISOR
AREA '5'AREA '1'
AREA '4'
AREA '3'
SEE MH104
FOR CONTINUATION
SEE MH102 FOR CONTINUATION
SEE MH103 FOR
CONTINUATION
SEE MH105
FOR CONTINUATION
AREA '2'
EF-60 EF-61
EF-18
EF-17
EF-19
EF-16
EF-15
EF-64
EF-63
EF-62
EF-4
EF-65 EF-2 EF-3 EF-14
EF-1
EF-66
EF-56
1 1
A.5
B
C
D
E
F
G
H
J
K
L
9 10 11
1.7
04/19/2024
KEYNOTES
1 REMOVE ROOF MOUNTED EXHAUST FAN AND REPLACE WITH NEW FAN. DUCTWORK BELOW ROOF
TO REMAIN.
© TSP, Inc. 2023
ISSUES
SHEET NUMBER
SHEET TITLE
C
A
B
2 3
D
E
1 2 3
4 5 6
4 5 6
A
B
C
D
E
TSP, Inc.
PROJECT TITLE
1112 N. West Ave, Sioux Falls, SD 57104
(605) 336-1160 www.teamtsp.com
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LIS
TE
D
DR
AW
IN
GS
S
CA
LE
(S ) U
NL
ES
S
RE
DU
CE
D
FR
OM
O
RI
GI
NA
L x
F
OR
MA
T
Architecture Engineering
Planning
KEY PLAN
AREA 1
AREA 2
AREA 3
AREA
AREA 5
4/1 9/2
4 2
:08 :36
A M
_S D
De pt of Mi lita ry
Mi tch ell _M
_d eta ch ed .rv t
MECHANICAL
DEMOLITION PLAN -
AREA 1
MD101
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
MITCHELL, SD
REPLACE EXHAUST
FANS
CFMO #467097
SDARNG MITCHELL
CSMS #1
JRH04/19/2024
RCN04232099
SHEET GENERAL NOTES
A EQUIPMENT, DUCTWORK, PIPING, ETC. TO BE REMOVED OR RELOCATED IS SHOWN IN HEAVY DAHSED
LINES, UNLESS NOTED OTHERWISE.
B EQUIPMENT, DUCTWORK, PIPING, ETC. TO REMAIN IS SHOWN IN LIGHT LINES, UNLESS NOTED
OTHERWISE.
C CONTRACTOR SHALL CONFIRM LOCATION AND SIZE OF EXISTING EQUIPMENT, DUCTWORK, PIPING ETC.
D COORDINATE WORK WITH ALL OTHER TRADES. UNCOORDINATED WORK WILL BE REPLACED AT THE
CONTRACTOR'S EXPENSE.
E COORDINATE ALL SYSTEM SHUTDOWNS WITH OWNER'S REPRESENTATIVE.
F COORDINATE WORK IN ALL OCCUPIED PROJECT AREAS WITH OWNER'S REPRESENTATIVE PRIOR TO
COMMENCEMENT OF WORK.
SCALE: 1/8" = 1'-0"A1 MECHANICAL DEMOLITION PLAN - AREA 1
PLAN NORTH
ADD ALTERNATE NO. 1
ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS
SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.
• EF-4
• EF-8
• EF-31
• EF-53
• EF-63
• EF-66
• EF-67
• EF-68
T
ROGER C.
NIKOLAS
RE
GIS
TE
REDPROFESSIONALENGINEER
REG. NO.
SOUTH DAKOTA
DATE:
VESTIBULE
RADIATOR
TEST & REPAIR
SMALL ARMS
TEST
MACHINE SHOP
SMALL ARMS &
GLASS REPAIR
VAULT
PAINT PREP
PAINT BOOTH
PAINT
MECHANICAL
PAINT KITCHEN
BEAD BLAST
ALLIED
TRADES
SUPERVISOR204
CANVAS &
CARPENTER
SHOP
CANVAS &
CARPENTER
STORAGE
WELDING &
BODY SHOP
COORIDOR
CSMS
MAINTENANCE
BAY
AREA '2'
EF-6 EF-5
EF-7
EF-54
EF-11EF-10
EF-69
EF-12
EF-67
EF-68
EF-71 EF-8
EF-70
1 1
1 1
EF-31
L
M
N
3 5 87
04/19/2024
KEYNOTES
1 REMOVE ROOF MOUNTED EXHAUST FAN AND REPLACE WITH NEW FAN. DUCTWORK BELOW ROOF
TO REMAIN.
2 REMOVE VEHICLE EXAHUST FAN AND REPLACE WITH NEW.
3 REMOVE WELDING EXHAUST FAN AND REPLACE WITH NEW.
4 REMOVE SIDEWALL PROP. FAN AND REPLACE WITH NEW.
5 EXISTING DOWNDRAFT WELDING TABLE.
© TSP, Inc. 2023
ISSUES
SHEET NUMBER
SHEET TITLE
C
A
B
2 3
D
E
1 2 3
4 5 6
4 5 6
A
B
C
D
E
TSP, Inc.
PROJECT TITLE
1112 N. West Ave, Sioux Falls, SD 57104
(605) 336-1160 www.teamtsp.com
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LIS
TE
D
DR
AW
IN
GS
S
CA
LE
(S ) U
NL
ES
S
RE
DU
CE
D
FR
OM
O
RI
GI
NA
L x
F
OR
MA
T
Architecture Engineering
Planning
KEY PLAN
AREA 1
AREA 2
AREA 3
AREA
AREA 5
4/1 9/2
4 2
:08 :41
A M
_S D
De pt of Mi lita ry
Mi tch ell _M
_d eta ch ed .rv t
MECHANICAL
DEMOLITION PLAN -
AREA 2
MD102
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
MITCHELL, SD
REPLACE EXHAUST
FANS
CFMO #467097
SDARNG MITCHELL
CSMS #1
JRH04/19/2024
RCN04232099
SHEET GENERAL NOTES
A EQUIPMENT, DUCTWORK, PIPING, ETC. TO BE REMOVED OR RELOCATED IS SHOWN IN HEAVY DAHSED
LINES, UNLESS NOTED OTHERWISE.
B EQUIPMENT, DUCTWORK, PIPING, ETC. TO REMAIN IS SHOWN IN LIGHT LINES, UNLESS NOTED
OTHERWISE.
C CONTRACTOR SHALL CONFIRM LOCATION AND SIZE OF EXISTING EQUIPMENT, DUCTWORK, PIPING ETC.
D COORDINATE WORK WITH ALL OTHER TRADES. UNCOORDINATED WORK WILL BE REPLACED AT THE
CONTRACTOR'S EXPENSE.
E COORDINATE ALL SYSTEM SHUTDOWNS WITH OWNER'S REPRESENTATIVE.
F COORDINATE WORK IN ALL OCCUPIED PROJECT AREAS WITH OWNER'S REPRESENTATIVE PRIOR TO
COMMENCEMENT OF WORK.
SCALE: 1/8" = 1'-0"A1 MECHANICAL DEMOLITION PLAN - AREA 2 PLAN NORTH
ADD ALTERNATE NO. 1
ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS
SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.
• EF-4
• EF-8
• EF-31
• EF-53
• EF-63
• EF-66
• EF-67
ROGER C.
NIKOLAS
RE
GIS
TE
REDPROFESSIONALENGINEER
REG. NO.
SOUTH DAKOTA
DATE:
MECHANICAL
ENGINE TEST
MECHANICAL
TRANS TEST
305A
CONTROL
ROOM
TRANS DYNO
ENGINE DYNO
CONTROL
ROOM
TRANS &
POWER PACK
LUBRICATION
BAY
TRANS &
ENGINE TEST
CSMS
MAINTANENCE
BAYS
INJECTOR
TEST FUEL &
INJECTION
REPAIR & POP
VALVE TEST
CSMS
WARM-UP BAY
AREA '3'
EF-32
EF-37
EF-33
EF-36
EF-30
EF-34EF-35
EF-21
EF-23
EF-25
EF-20
EF-22
EF-28
1 1
E
F
G
H
J
K
1.1 1.2
1.3
1.4
1.5
1.6
1.7
04/19/2024
KEYNOTES
1 REMOVE ROOF MOUNTED EXHAUST FAN AND REPLACE WITH NEW FAN. DUCTWORK BELOW ROOF
TO REMAIN.
2 REMOVE VEHICLE EXHAUST FAN AND REPLACE WITH NEW.
3 EXISTING EXHUAST FAN AND DUCTWORK TO REMAIN.
© TSP, Inc. 2023
ISSUES
SHEET NUMBER
SHEET TITLE
C
A
B
2 3
D
E
1 2 3
4 5 6
4 5 6
A
B
C
D
E
TSP, Inc.
PROJECT TITLE
1112 N. West Ave, Sioux Falls, SD 57104
(605) 336-1160 www.teamtsp.com
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LIS
TE
D
DR
AW
IN
GS
S
CA
LE
(S ) U
NL
ES
S
RE
DU
CE
D
FR
OM
O
RI
GI
NA
L x
F
OR
MA
T
Architecture Engineering
Planning
KEY PLAN
AREA 1
AREA 2
AREA 3
AREA
AREA 5
4/1 9/2
4 2
:08 :46
A M
_S D
De pt of Mi lita ry
Mi tch ell _M
_d eta ch ed .rv t
MECHANICAL
DEMOLITION PLAN -
AREA 3
MD103
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
MITCHELL, SD
REPLACE EXHAUST
FANS
CFMO #467097
SDARNG MITCHELL
CSMS #1
JRH04/19/2024
RCN04232099
SHEET GENERAL NOTES
A EQUIPMENT, DUCTWORK, PIPING, ETC. TO BE REMOVED OR RELOCATED IS SHOWN IN HEAVY DAHSED
LINES, UNLESS NOTED OTHERWISE.
B EQUIPMENT, DUCTWORK, PIPING, ETC. TO REMAIN IS SHOWN IN LIGHT LINES, UNLESS NOTED
OTHERWISE.
C CONTRACTOR SHALL CONFIRM LOCATION AND SIZE OF EXISTING EQUIPMENT, DUCTWORK, PIPING ETC.
D COORDINATE WORK WITH ALL OTHER TRADES. UNCOORDINATED WORK WILL BE REPLACED AT THE
CONTRACTOR'S EXPENSE.
E COORDINATE ALL SYSTEM SHUTDOWNS WITH OWNER'S REPRESENTATIVE.
F COORDINATE WORK IN ALL OCCUPIED PROJECT AREAS WITH OWNER'S REPRESENTATIVE PRIOR TO
COMMENCEMENT OF WORK.
SCALE: 1/8" = 1'-0"A1 MECHANICAL DEMOLITION PLAN - AREA 3 PLAN NORTH
ADD ALTERNATE NO. 1
ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS
SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.
• EF-4
• EF-8
• EF-31
• EF-53
• EF-63
• EF-66
• EF-67
HH
ROGER C.
NIKOLAS
RE
GIS
TE
REDPROFESSIONALENGINEER
REG. NO.
SOUTH DAKOTA
DATE:
OMS WARM-UP
BAY
CSMS WASH
BAY
401A
OMS
MAINTANANCE
BAY
AREA '4'
AREA '1'
SEE MH101 FOR
CONTINUATION
EF-64
EF-51 EF-52
EF-40
EF-39 EF-41
EF-42
EF-43
EF-46
1 1
1 1
A
A.1
A.2
A.3
A.4
A.5
B
5 8 9 10
04/19/2024
© TSP, Inc. 2023
ISSUES
SHEET NUMBER
SHEET TITLE
C
A
B
2 3
D
E
1 2 3
4 5 6
4 5 6
A
B
C
D
E
TSP, Inc.
PROJECT TITLE
1112 N. West Ave, Sioux Falls, SD 57104
(605) 336-1160 www.teamtsp.com
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LIS
TE
D
DR
AW
IN
GS
S
CA
LE
(S ) U
NL
ES
S
RE
DU
CE
D
FR
OM
O
RI
GI
NA
L x
F
OR
MA
T
Architecture Engineering
Planning
KEY PLAN
AREA 1
AREA 2
AREA 3
AREA
AREA 5
4/1 9/2
4 2
:08 :50
A M
_S D
De pt of Mi lita ry
Mi tch ell _M
_d eta ch ed .rv t
MECHANICAL
DEMOLITION PLAN -
AREA 4
MD104
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
MITCHELL, SD
REPLACE EXHAUST
FANS
CFMO #467097
SDARNG MITCHELL
CSMS #1
JRH04/19/2024
RCN04232099
SHEET GENERAL NOTES
A EQUIPMENT, DUCTWORK, PIPING, ETC. TO BE REMOVED OR RELOCATED IS SHOWN IN HEAVY DAHSED
LINES, UNLESS NOTED OTHERWISE.
B EQUIPMENT, DUCTWORK, PIPING, ETC. TO REMAIN IS SHOWN IN LIGHT LINES, UNLESS NOTED
OTHERWISE.
C CONTRACTOR SHALL CONFIRM LOCATION AND SIZE OF EXISTING EQUIPMENT, DUCTWORK, PIPING ETC.
D COORDINATE WORK WITH ALL OTHER TRADES. UNCOORDINATED WORK WILL BE REPLACED AT THE
CONTRACTOR'S EXPENSE.
E COORDINATE ALL SYSTEM SHUTDOWNS WITH OWNER'S REPRESENTATIVE.
F COORDINATE WORK IN ALL OCCUPIED PROJECT AREAS WITH OWNER'S REPRESENTATIVE PRIOR TO
COMMENCEMENT OF WORK.
PLAN NORTH
KEYNOTES
1 REMOVE ROOF MOUNTED EXHAUST FAN AND REPLACE WITH NEW FAN. DUCTWORK BELOW ROOF
TO REMAIN.
2 REMOVE VEHICLE EXAHUST FAN AND REPLACE WITH NEW.
SCALE: 1/8" = 1'-0"A1 MECHANICAL DEMOLITION PLAN - FIRST LEVEL
ADD ALTERNATE NO. 1
ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS
SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.
• EF-4
• EF-8
• EF-31
• EF-53
• EF-63
• EF-66
• EF-67
NIKOLAS
RE
GIS
TE
REDPROFESSIONALENGINEER
REG. NO.
SOUTH DAKOTA
DATE:
VESTIBULE
COMM / EL
SUPERVISOR
CALIBRATION
CALIBRATION
STORAGE
LASER & NIGHT
VISION REPAIR
INSTRUMENT
REPAIR
COMM / EL
WORK
CORRIDOR
509A
COMM / EL BAY
TIRE
INSPECTION &
SEL. FOR
RECAPPING
AREA '5'
EF-53
EF-48
EF-47
EF-49
EF-58
EF-50
EF-56
EF-59
C
D
E
F
11 12
04/19/2024
© TSP, Inc. 2023
ISSUES
SHEET NUMBER
SHEET TITLE
C
A
B
2 3
D
E
1 2 3
4 5 6
4 5 6
A
B
C
D
E
TSP, Inc.
PROJECT TITLE
1112 N. West Ave, Sioux Falls, SD 57104
(605) 336-1160 www.teamtsp.com
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LIS
TE
D
DR
AW
IN
GS
S
CA
LE
(S ) U
NL
ES
S
RE
DU
CE
D
FR
OM
O
RI
GI
NA
L x
F
OR
MA
T
Architecture Engineering
Planning
KEY PLAN
AREA 1
AREA 2
AREA 3
AREA
AREA 5
4/1 9/2
4 2
:08 :55
A M
_S D
De pt of Mi lita ry
Mi tch ell _M
_d eta ch ed .rv t
MECHANICAL
DEMOLITION PLAN -
AREA 5
MD105
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
MITCHELL, SD
REPLACE EXHAUST
FANS
CFMO #467097
SDARNG MITCHELL
CSMS #1
JRH04/19/2024
RCN04232099
SHEET GENERAL NOTES
A EQUIPMENT, DUCTWORK, PIPING, ETC. TO BE REMOVED OR RELOCATED IS SHOWN IN HEAVY DAHSED
LINES, UNLESS NOTED OTHERWISE.
B EQUIPMENT, DUCTWORK, PIPING, ETC. TO REMAIN IS SHOWN IN LIGHT LINES, UNLESS NOTED
OTHERWISE.
C CONTRACTOR SHALL CONFIRM LOCATION AND SIZE OF EXISTING EQUIPMENT, DUCTWORK, PIPING ETC.
D COORDINATE WORK WITH ALL OTHER TRADES. UNCOORDINATED WORK WILL BE REPLACED AT THE
CONTRACTOR'S EXPENSE.
E COORDINATE ALL SYSTEM SHUTDOWNS WITH OWNER'S REPRESENTATIVE.
F COORDINATE WORK IN ALL OCCUPIED PROJECT AREAS WITH OWNER'S REPRESENTATIVE PRIOR TO
COMMENCEMENT OF WORK.
PLAN NORTH
SCALE: 1/8" = 1'-0"A1 MECHANICAL DEMOLITION PLAN - AREA 5
KEYNOTES
1 REMOVE ROOF MOUNTED EXHAUST FAN AND REPLACE WITH NEW FAN. DUCTWORK BELOW ROOF
TO REMAIN.
2 REMOVE VEHICLE EXAHUST FAN AND REPLACE WITH NEW.
3 EXHAUST FAN AND ALL DUCTWORK TO REMAIN.
ADD ALTERNATE NO. 1
ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS
SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.
• EF-4
• EF-8
• EF-31
• EF-53
• EF-63
• EF-66
• EF-67
NIKOLAS
RE
GIS
TE
REDPROFESSIONALENGINEER
REG. NO.
SOUTH DAKOTA
DATE:
EF-33
EF-37
EF-35 EF-34
EF-30
EF-21
EF-23
EF-20
EF-22
EF-65 EF-4 EF-2 EF-3 EF-14
EF-61
EF-60
EF-15
EF-16
EF-19
EF-17
EF-18
EF-64
EF-63
EF-62
EF-39 EF-41
EF-40 EF-42
EF-51 EF-52
EF-48
EF-47
EF-1
EF-66
EF-6 EF-5
EF-54
EF-7
EF-10 EF-11
EF-67 EF-68 EF-8
EF-70
EF-36
1 1
1 1 1 1 1
1 1
1 1
1 1
A
A.1
A.2
A.3
A.4
A.5
B
C
D
E
F
G
H
J
K
L
M
N
5 8 9 10 11
1.1 1.2
1.3
1.4
1.5
1.6
1.7
04/19/2024
© TSP, Inc. 2023
ISSUES
SHEET NUMBER
SHEET TITLE
C
A
B
2 3
D
E
1 2 3
4 5 6
4 5 6
A
B
C
D
E
TSP, Inc.
PROJECT TITLE
1112 N. West Ave, Sioux Falls, SD 57104
(605) 336-1160 www.teamtsp.com
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LIS
TE
D
DR
AW
IN
GS
S
CA
LE
(S ) U
NL
ES
S
RE
DU
CE
D
FR
OM
O
RI
GI
NA
L x
F
OR
MA
T
Architecture Engineering
Planning
KEY PLAN
AREA 1
AREA 2
AREA 3
AREA
AREA 5
4/1 9/2
4 2
:08 :59
A M
_S D
De pt of Mi lita ry
Mi tch ell _M
_d eta ch ed .rv t
MECHANICAL ROOF
DEMOLITION PLAN
MD201
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
MITCHELL, SD
REPLACE EXHAUST
FANS
CFMO #467097
SDARNG MITCHELL
CSMS #1
JRH04/19/2024
RCN04232099
KEYNOTES
1 REMOVE ROOF MOUNTED EXHAUST FAN AND REPLACE WITH NEW FAN. ROOF CURB TO REMAIN.
2 GRAVITY VENTILATOR TO REMAIN.
SCALE: 1" = 20'-0"A1 MECHANICAL DEMOLTION PLAN - ROOF PLAN NORTH
ADD ALTERNATE NO. 1
ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS
SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.
• EF-4
• EF-8
• EF-31
• EF-53
• EF-63
• EF-66
• EF-67
NIKOLAS
RE
GIS
TE
REDPROFESSIONALENGINEER
REG. NO.
SOUTH DAKOTA
DATE:
127B
STORAGE
TELECOMUNICATIONS
112A
TELECOM.
ROOM
MECHANICAL
ROOM
111B
STORAGE
CUSTODIAL
CORRIDOR
LUMBER
STORAGE
LIBRARY
LOBBY
COMM SEC
REPAIR
RADIATION
CALIBRATION
COLD
STORAGE
CORRIDOR
VESTIBULE
OMS
HAZARDOUS
WASTE
OMS BATTERY
OMS POL
STORAGE
CUSTODIAL
CORRIDOR
CUSTODIAL
PRODUCTION
CONTROL
CSMS
HAZARDOUS
CSMS
BATTERY
CSMS POL
STORAGE
CUSTODIAL
CSMS
FLAMMABLE
OMS
FLAMMABLE
STORAGE
VESTIBULE
VESTIBULE
CORRIDOR
CORRIDOR
COLD
STORAGE
112B
ELECTRICAL
ROOM
OMS SUPER.
VESTIBULE
CSMS
SUPERVISOR
RADIATION
STORAGE
128A
ELECTRICAL
ROOM
132B
MECH.
GENERAL
SUPERVISOR
CLERK TYPIST
FITNESS
CSMS BREAK
ROOM
OMS BREAK
ROOM
111G
WOMEN'SMLATRINE
111F
WOMEN'S
LOCKER
111A
MEN'S LATRINE
111C
MEN'S LOCKER
CSMS TOOL &
SUPPLY
OMS TOOL &
SUPPLY
127C
MEN'S LOCKER
127A
MEN'S LATRINE
127G
WOMEN'S
LATRINE
127F
WOMEN'S
LOCKER
CORRIDOR
COLD
STORAGE
CORRIDOR
CUSTODIAL
INSPECTION
SUPERVISOR
AREA '5'AREA '1'
AREA '4'
AREA '3'
SEE MH104 FOR CONTINUATION
SEE MH102 FOR CONTINUATION
SEE MH103 FOR
CONTINUATION
SEE MH105
FOR CONTINUATION
AREA '2'
(E) 12"x10" E/A1
(E) 12"x10" E/A1
(E) 20"x16" E/A (E) 16"x12"
(E) 12"x8"
(E) 16"x10"
(E) 12"x8"
(E) 16"x10"
(E) 12"x8"
(E) E
(E) E
(E) E
(E) E
(E) E
(E) E
(E) E
(E) E
(E) E
(E) E 400(E) E
(E) E
(E) 12"x10" E/A1
(E) 12"x10" E/A
(E) 12"x10" E/A
(E) E
12"x10" E/A (E) 12"x10" E/A
(E) E
12"x10" E/A
(E ) 2
0" x1
6" E
/A
(E) 16"x10"(E) 12"x8"
(E) 12"x8"
(E ) 1
6" x1
2"
(E) 16"x10"
(E) 12"x8"
A.5
B
C
D
E
F
G
H
J
K
L
3 5 8 9 10 117
EF-60 EF-61
EF-18
EF-17
EF-19
EF-16
EF-15
EF-64
EF-63
EF-62
EF-4
EF-65 EF-2 EF-3 EF-14
EF-1
EF-66
EF-64
(E) EF-56(E) 12"x10" E/A
04/19/2024
KEYNOTES
1 EXISTING E/A DUCT UP THROUGH ROOF TO NEW PRV. FIELD VERIFY SIZE.
© TSP, Inc. 2023
ISSUES
SHEET NUMBER
SHEET TITLE
C
A
B
2 3
D
E
1 2 3
4 5 6
4 5 6
A
B
C
D
E
TSP, Inc.
PROJECT TITLE
1112 N. West Ave, Sioux Falls, SD 57104
(605) 336-1160 www.teamtsp.com
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LIS
TE
D
DR
AW
IN
GS
S
CA
LE
(S ) U
NL
ES
S
RE
DU
CE
D
FR
OM
O
RI
GI
NA
L x
F
OR
MA
T
Architecture Engineering
Planning
KEY PLAN
AREA 1
AREA 2
AREA 3
AREA
AREA 5
4/1 9/2
4 2
:09 :06
A M
_S D
De pt of Mi lita ry
Mi tch ell _M
_d eta ch ed .rv t
MECHANICAL HVAC
PLAN - AREA 1
MH101
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
MITCHELL, SD
REPLACE EXHAUST
FANS
CFMO #467097
SDARNG MITCHELL
CSMS #1
JRH04/19/2024
RCN04232099
SHEET GENERAL NOTES
A ALL NEW FANS SHALL BE CONTROLLED THE SAME AS THE RESPECTIVE EXISTING FAN. BMS
CONTRACTOR TO FIELD VERIFY EXISTING AND RECONNECT. REMAP ALL EXISTING CONTROL AND
MONITOR POINTS AT BMS WORKSTATION. ADD FAN SPEED INDICATION AND FAN SPEED
MODULATION FOR ALL NEW DIRECT DRIVE FANS WITH EC MOTORS OR VFDS.
B BALANCE ALL EXHAUST SYSTEMS TO AIRFLOWS SHOWN. WHERE AIRFLOWS ARE NOT SHOWN ON
THIS SHEET, BALANCE FAN TO FLOWS LISTED ON EQUIPMENT SCHEDULE.
SCALE: 1/8" = 1'-0"A1 MECHANICAL HVAC PLAN - FIRST LEVEL PLAN NORTH
NOTE:
ALL PRODUCTS AND MATERIALS SHALL COMPLY WITH FEDERAL BUILD AMERICA BUY AMERICA
ACT REQUIREMENTS
ADD ALTERNATE NO. 1
ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS
SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.
• EF-4
• EF-8
• EF-31
• EF-53
• EF-63
• EF-66
• EF-67
ROGER C.
NIKOLAS
RE
GIS
TE
REDPROFESSIONALENGINEER
REG. NO.
SOUTH DAKOTA
DATE:
VESTIBULE
RADIATOR
TEST & REPAIR
SMALL ARMS
TEST
MACHINE SHOP
SMALL ARMS &
GLASS REPAIR
VAULT
PAINT PREP
PAINT BOOTH
PAINT
MECHANICAL
PAINT KITCHEN
BEAD BLAST
ALLIED
TRADES
SUPERVISOR204
CANVAS &
CARPENTER
SHOP
CANVAS &
CARPENTER
STORAGE
WELDING &
BODY SHOP
COORIDOR
CSMS
MAINTENANCE
BAY
AREA '1'
SEE MH101 FOR CONTINUATION
AREA '2'
EF-71
EF-31
EF-12
EF-69
(E) 12"Ø (E) 12"Ø
1 1
(E) 12"x10" E/A
(E) E-
(E) E
(E) 12"x10" E/A
L
M
N
3 5 87
EF-6 EF-5
EF-7
EF-54
EF-11EF-10
EF-67
EF-68
EF-8
EF-70
EF-31
EF-6 EF-5
EF-7
EF-54
EF-11EF-10
EF-67
EF-68
EF-8
EF-70
LOCKER
04/19/2024
© TSP, Inc. 2023
ISSUES
SHEET NUMBER
SHEET TITLE
C
A
B
2 3
D
E
1 2 3
4 5 6
4 5 6
A
B
C
D
E
TSP, Inc.
PROJECT TITLE
1112 N. West Ave, Sioux Falls, SD 57104
(605) 336-1160 www.teamtsp.com
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LIS
TE
D
DR
AW
IN
GS
S
CA
LE
(S ) U
NL
ES
S
RE
DU
CE
D
FR
OM
O
RI
GI
NA
L x
F
OR
MA
T
Architecture Engineering
Planning
KEY PLAN
AREA 1
AREA 2
AREA 3
AREA
AREA 5
4/1 9/2
4 2
:09 :10
A M
_S D
De pt of Mi lita ry
Mi tch ell _M
_d eta ch ed .rv t
MECHANICAL HVAC
PLAN - AREA 2
MH102
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
MITCHELL, SD
REPLACE EXHAUST
FANS
CFMO #467097
SDARNG MITCHELL
CSMS #1
JRH04/19/2024
RCN04232099
KEYNOTES
1 EXISTING E/A DUCT UP THROUGH ROOF TO NEW PRV. FIELD VERIFY SIZE.
2 INSTALL NEW FAN SIMILAR TO EXISTING. CONNECT TO EXISTING INLET AND DISCHARGE DUCTWORK.
MODIFY EXISTING DUCTWORK AS NECESSARY TO CONNECT TO NEW FAN.
3 EXISTING EXHAUST FAN DISCHARGE UP THROUGH ROOF TO EXISTING GRAVITY HOOD OR
GOOSENECK.
4 EXISTING DOWNDRAFT WELDING TABLE.
5 MODIFY/EXTEND EXISTING ANGLE IRON FRAMING AS NECESSARY TO INSTALL NEW FAN.
SHEET GENERAL NOTES
A ALL NEW FANS SHALL BE CONTROLLED THE SAME AS THE RESPECTIVE EXISTING FAN. BMS
CONTRACTOR TO FIELD VERIFY EXISTING AND RECONNECT. REMAP ALL EXISTING CONTROL AND
MONITOR POINTS AT BMS WORKSTATION. ADD FAN SPEED INDICATION AND FAN SPEED
MODULATION FOR ALL NEW DIRECT DRIVE FANS WITH EC MOTORS OR VFDS.
B BALANCE ALL EXHAUST SYSTEMS TO AIRFLOWS SHOWN. WHERE AIRFLOWS ARE NOT SHOWN ON
THIS SHEET, BALANCE FAN TO FLOWS LISTED ON EQUIPMENT SCHEDULE.
SCALE: 1/8" = 1'-0"A1 MECHANICAL HVAC PLAN - AREA 2 PLAN NORTH
NOTE:
ALL PRODUCTS AND MATERIALS SHALL COMPLY WITH FEDERAL BUILD AMERICA BUY AMERICA
ACT REQUIREMENTS
ADD ALTERNATE NO. 1
ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS
SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.
• EF-4
• EF-8
• EF-31
• EF-53
• EF-63
• EF-66
• EF-67
ROGER C.
NIKOLAS
RE
GIS
TE
REDPROFESSIONALENGINEER
REG. NO.
SOUTH DAKOTA
DATE:
MECHANICAL
ENGINE TEST
MECHANICAL
TRANS TEST
305A
CONTROL
ROOM
TRANS DYNO
ENGINE DYNO
CONTROL
ROOM
TRANS &
POWER PACK
LUBRICATION
BAY
TRANS &
ENGINE TEST
CSMS
MAINTANENCE
BAYS
INJECTOR
TEST FUEL &
INJECTION
REPAIR & POP
VALVE TEST
CSMS
WARM-UP BAY
AREA '3'
AREA '1' SEE
MH101 FOR
CONTINUATION
EF-25
EF-28
EF-32
(E) 16"x14" E/A
1 1 1
(E) 12"Ø E/A (E) 12"Ø E/A
(E) 12"Ø E/A
(E) 12"Ø E/A
(E) 12"Ø E/A
(E) 12"Ø E/A
E
F
G
H
J
K
1.1 1.2
1.3
1.4
1.5
1.6
1.7
EF-65
EF-37
EF-33
EF-36
EF-30
EF-34EF-35
EF-21
EF-23
EF-20
EF-22
04/19/2024
KEYNOTES
1 EXISTING E/A DUCT UP THROUGH ROOF TO NEW PRV. FIELD VERIFY SIZE.
2 INSTALL NEW FAN SIMILAR TO EXISTING. CONNECT TO EXISTING INLET AND DISCHARGE DUCTWORK.
MODIFY EXISTING DUCTWORK AS NECESSARY TO CONNECT TO NEW FAN.
3 EXISTING EXHAUST FAN DISCHARGE UP THROUGH ROOF TO EXISTING GRAVITY HOOD OR
GOOSENECK.
4 EXISTING EXHAUST FAN.
© TSP, Inc. 2023
ISSUES
SHEET NUMBER
SHEET TITLE
C
A
B
2 3
D
E
1 2 3
4 5 6
4 5 6
A
B
C
D
E
TSP, Inc.
PROJECT TITLE
1112 N. West Ave, Sioux Falls, SD 57104
(605) 336-1160 www.teamtsp.com
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LIS
TE
D
DR
AW
IN
GS
S
CA
LE
(S ) U
NL
ES
S
RE
DU
CE
D
FR
OM
O
RI
GI
NA
L x
F
OR
MA
T
Architecture Engineering
Planning
KEY PLAN
AREA 1
AREA 2
AREA 3
AREA
AREA 5
4/1 9/2
4 2
:09 :15
A M
_S D
De pt of Mi lita ry
Mi tch ell _M
_d eta ch ed .rv t
MECHANICAL HVAC
PLAN - AREA 3
MH103
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
MITCHELL, SD
REPLACE EXHAUST
FANS
CFMO #467097
SDARNG MITCHELL
CSMS #1
JRH04/19/2024
RCN04232099
SHEET GENERAL NOTES
A ALL NEW FANS SHALL BE CONTROLLED THE SAME AS THE RESPECTIVE EXISTING FAN. BMS
CONTRACTOR TO FIELD VERIFY EXISTING AND RECONNECT. REMAP ALL EXISTING CONTROL AND
MONITOR POINTS AT BMS WORKSTATION. ADD FAN SPEED INDICATION AND FAN SPEED
MODULATION FOR ALL NEW DIRECT DRIVE FANS WITH EC MOTORS OR VFDS.
B BALANCE ALL EXHAUST SYSTEMS TO AIRFLOWS SHOWN. WHERE AIRFLOWS ARE NOT SHOWN ON
THIS SHEET, BALANCE FAN TO FLOWS LISTED ON EQUIPMENT SCHEDULE.
SCALE: 1/8" = 1'-0"A1 MECHANICAL HVAC PLAN - AREA 3 PLAN NORTH
NOTE:
ALL PRODUCTS AND MATERIALS SHALL COMPLY WITH FEDERAL BUILD AMERICA BUY AMERICA
ACT REQUIREMENTS
ADD ALTERNATE NO. 1
ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS
SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.
• EF-4
• EF-8
• EF-31
• EF-53
• EF-63
• EF-66
• EF-67
ROGER C.
NIKOLAS
RE
GIS
TE
REDPROFESSIONALENGINEER
REG. NO.
SOUTH DAKOTA
DATE:
OMS WARM-UP
BAY
CSMS WASH
BAY
401A
OMS
MAINTANANCE
BAY
AREA '4'
AREA '1'
SEE MH101 FOR
CONTINUATION
EF-46
EF-43
1 1
(E) 12"Ø
(E) 12"Ø
(E) 12"Ø E/A
(E) 12"Ø
(E) 12"Ø
(E) 12"Ø E/A
A
A.1
A.2
A.3
A.4
A.5
B
5 8 9 10
EF-51 EF-52
EF-40
EF-39 EF-41
EF-42
04/19/2024
© TSP, Inc. 2023
ISSUES
SHEET NUMBER
SHEET TITLE
C
A
B
2 3
D
E
1 2 3
4 5 6
4 5 6
A
B
C
D
E
TSP, Inc.
PROJECT TITLE
1112 N. West Ave, Sioux Falls, SD 57104
(605) 336-1160 www.teamtsp.com
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LIS
TE
D
DR
AW
IN
GS
S
CA
LE
(S ) U
NL
ES
S
RE
DU
CE
D
FR
OM
O
RI
GI
NA
L x
F
OR
MA
T
Architecture Engineering
Planning
KEY PLAN
AREA 1
AREA 2
AREA 3
AREA
AREA 5
4/1 9/2
4 2
:09 :20
A M
_S D
De pt of Mi lita ry
Mi tch ell _M
_d eta ch ed .rv t
MECHANICAL HVAC
PLAN - AREA 4
MH104
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
MITCHELL, SD
REPLACE EXHAUST
FANS
CFMO #467097
SDARNG MITCHELL
CSMS #1
JRH04/19/2024
RCN04232099
SHEET GENERAL NOTES
A ALL NEW FANS SHALL BE CONTROLLED THE SAME AS THE RESPECTIVE EXISTING FAN. BMS
CONTRACTOR TO FIELD VERIFY EXISTING AND RECONNECT. REMAP ALL EXISTING CONTROL AND
MONITOR POINTS AT BMS WORKSTATION. ADD FAN SPEED INDICATION AND FAN SPEED
MODULATION FOR ALL NEW DIRECT DRIVE FANS WITH EC MOTORS OR VFDS.
B BALANCE ALL EXHAUST SYSTEMS TO AIRFLOWS SHOWN. WHERE AIRFLOWS ARE NOT SHOWN ON
THIS SHEET, BALANCE FAN TO FLOWS LISTED ON EQUIPMENT SCHEDULE.
PLAN NORTH
KEYNOTES
1 EXISTING E/A DUCT UP THROUGH ROOF TO NEW PRV. FIELD VERIFY SIZE.
2 INSTALL NEW FAN SIMILAR TO EXISTING. CONNECT TO EXISTING INLET AND DISCHARGE DUCTWORK.
MODIFY EXISTING DUCTWORK AS NECESSARY TO CONNECT TO NEW FAN.
3 EXISTING EXHAUST FAN DISCHARGE UP THROUGH ROOF TO EXISTING GRAVITY HOOD OR
GOOSENECK.
SCALE: 1/8" = 1'-0"A1 MECHANICAL HVAC PLAN - AREA 4
NOTE:
ALL PRODUCTS AND MATERIALS SHALL COMPLY WITH FEDERAL BUILD AMERICA BUY AMERICA
ACT REQUIREMENTS
ADD ALTERNATE NO. 1
ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS
SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.
• EF-4
• EF-8
• EF-31
• EF-53
• EF-63
• EF-66
• EF-67
NIKOLAS
RE
GIS
TE
REDPROFESSIONALENGINEER
REG. NO.
SOUTH DAKOTA
DATE:
VESTIBULE 501
COMM / EL
SUPERVISOR
CALIBRATION
CALIBRATION
STORAGE
LASER & NIGHT
VISION REPAIR
INSTRUMENT
REPAIR
COMM / EL
WORK
CORRIDOR
509A
COMM / EL BAY
TIRE
INSPECTION &
SEL. FOR
RECAPPING
AREA '5'AREA '1'
SEE SHEET
MH101 FOR
CONTINUATION
EF-53
C
D
E
F
11 12
EF-53
EF-48
EF-47
(E) EF-49
(E) EF-58
(E) EF-50
(E) EF-56
(E) EF-59
04/19/2024
© TSP, Inc. 2023
ISSUES
SHEET NUMBER
SHEET TITLE
C
A
B
2 3
D
E
1 2 3
4 5 6
4 5 6
A
B
C
D
E
TSP, Inc.
PROJECT TITLE
1112 N. West Ave, Sioux Falls, SD 57104
(605) 336-1160 www.teamtsp.com
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LIS
TE
D
DR
AW
IN
GS
S
CA
LE
(S ) U
NL
ES
S
RE
DU
CE
D
FR
OM
O
RI
GI
NA
L x
F
OR
MA
T
Architecture Engineering
Planning
KEY PLAN
AREA 1
AREA 2
AREA 3
AREA
AREA 5
4/1 9/2
4 2
:09 :25
A M
_S D
De pt of Mi lita ry
Mi tch ell _M
_d eta ch ed .rv t
MECHANICAL HVAC
PLAN - AREA 5
MH105
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
MITCHELL, SD
REPLACE EXHAUST
FANS
CFMO #467097
SDARNG MITCHELL
CSMS #1
JRH04/19/2024
RCN04232099
SHEET GENERAL NOTES
A ALL NEW FANS SHALL BE CONTROLLED THE SAME AS THE RESPECTIVE EXISTING FAN. BMS
CONTRACTOR TO FIELD VERIFY EXISTING AND RECONNECT. REMAP ALL EXISTING CONTROL AND
MONITOR POINTS AT BMS WORKSTATION. ADD FAN SPEED INDICATION AND FAN SPEED
MODULATION FOR ALL NEW DIRECT DRIVE FANS WITH EC MOTORS OR VFDS.
B BALANCE ALL EXHAUST SYSTEMS TO AIRFLOWS SHOWN. WHERE AIRFLOWS ARE NOT SHOWN ON
THIS SHEET, BALANCE FAN TO FLOWS LISTED ON EQUIPMENT SCHEDULE.
PLAN NORTH
KEYNOTES
1 EXISTING E/A DUCT UP THROUGH ROOF TO NEW PRV. FIELD VERIFY SIZE.
2 INSTALL NEW FAN SIMILAR TO EXISTING. CONNECT TO EXISTING INLET AND DISCHARGE DUCTWORK.
MODIFY EXISTING DUCTWORK AS NECESSARY TO CONNECT TO NEW FAN.
3 EXISTING EXHAUST FAN DISCHARGE UP THROUGH ROOF TO EXISTING GRAVITY HOOD OR
GOOSENECK.
4 EXISTING SNORKEL EXHAUST FAN.
SCALE: 1/8" = 1'-0"A1 MECHANICAL HVAC PLAN - AREA 5
NOTE:
ALL PRODUCTS AND MATERIALS SHALL COMPLY WITH FEDERAL BUILD AMERICA BUY AMERICA
ACT REQUIREMENTS
ADD ALTERNATE NO. 1
ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS
SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.
• EF-4
• EF-8
• EF-31
• EF-53
• EF-63
• EF-66
• EF-67
NIKOLAS
RE
GIS
TE
REDPROFESSIONALENGINEER
REG. NO.
SOUTH DAKOTA
DATE:
EF-37
EF-33
EF-35
EF-36
EF-34
EF-30
EF-21
EF-23
EF-20
EF-22
EF-65
EF-4
EF-2
EF-3
EF-14
EF-60
EF-15
EF-19
EF-17
EF-18
EF-64
EF-16
EF-39 EF-41
EF-40 EF-42
EF-52
EF-62
EF-63
EF-66
EF-1
EF-5EF-6
EF-7
EF-54
EF-11EF-10
EF-67 EF-68
EF-70
EF-8
EF-47
EF-48
EF-61
EF-51
A
A.1
A.2
A.3
A.4
A.5
B
C
D
E
F
G
H
J
K
L
M
N
5 8 9 10 11
1.1 1.2
1.3
1.4
1.5
1.6
1.7
1 1 1
1 1
1 1
1 1
2 2
04/19/2024
KEYNOTES
1 INSTALL NEW FAN ON EXISTING ROOF CURB. VERIFY CURB DIMENSIONS AND PROVIDE CURB
ADAPTOR WHERE REQUIRED.
2 EXISTING GRAVITY EXHAUST HOOD AND DUCT DOWN THROUGH ROOF TO VEHICLE EXHAUST FAN.
3 EXISTING GOOSENECK AND DUCT DOWN THROUGH ROOF TO WELDING EXHAUST FAN EF-31.
4 EXISTING GOOSENECK AND DUCT DOWN TO SNORKEL EXHAUST FAN.
© TSP, Inc. 2023
ISSUES
SHEET NUMBER
SHEET TITLE
C
A
B
2 3
D
E
1 2 3
4 5 6
4 5 6
A
B
C
D
E
TSP, Inc.
PROJECT TITLE
1112 N. West Ave, Sioux Falls, SD 57104
(605) 336-1160 www.teamtsp.com
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LIS
TE
D
DR
AW
IN
GS
S
CA
LE
(S ) U
NL
ES
S
RE
DU
CE
D
FR
OM
O
RI
GI
NA
L x
F
OR
MA
T
Architecture Engineering
Planning
KEY PLAN
AREA 1
AREA 2
AREA 3
AREA
AREA 5
4/1 9/2
4 2
:09 :29
A M
_S D
De pt of Mi lita ry
Mi tch ell _M
_d eta ch ed .rv t
MECHANICAL ROOF
PLAN
M-201
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
MITCHELL, SD
REPLACE EXHAUST
FANS
CFMO #467097
SDARNG MITCHELL
CSMS #1
JRH04/19/2024
RCN04232099
SCALE: 1" = 20'-0"A1 MECHANICAL PLAN - ROOF PLAN NORTH
NOTE:
ALL PRODUCTS AND MATERIALS SHALL COMPLY WITH FEDERAL BUILD AMERICA BUY AMERICA
ACT REQUIREMENTS
NIKOLAS
RE
GIS
TE
REDPROFESSIONALENGINEER
REG. NO.
SOUTH DAKOTA
DATE: 04/19/2024
© TSP, Inc. 2023
ISSUES
SHEET NUMBER
SHEET TITLE
C
A
B
2 3
D
E
1 2 3
4 5 6
4 5 6
A
B
C
D
E
TSP, Inc.
PROJECT TITLE
1112 N. West Ave, Sioux Falls, SD 57104
(605) 336-1160 www.teamtsp.com
ISSUE DATE
CHECKED BY
DRAWN BY
PROJECT #
LIS
TE
D
DR
AW
IN
GS
S
CA
LE
(S ) U
NL
ES
S
RE
DU
CE
D
FR
OM
O
RI
GI
NA
L x
F
OR
MA
T
Architecture Engineering
Planning
4/1 9/2
4 2
:09 :34
A M
_S D
De pt of Mi lita ry
Mi tch ell _M
_d eta ch ed .rv t
MECHANICAL
SCHEDULES
ME601
CO
NS
TR
UC
TI
ON
D
OC
UM
EN
TS
MITCHELL, SD
REPLACE EXHAUST
FANS
CFMO #467097
SDARNG MITCHELL
CSMS #1
JRH04/19/2024
RCN04232099
EXHAUST FAN & POWER ROOF VENT SCHEDULE
EQUIPMENT REQUIREMENTS ELECTRICAL REQUIREMENTS
UNIT
NO. MANUFACTURER MODEL NO. TYPE AIRFLOW TSP RPM
BRAKE
POWER POWER SONES
UNIT
WEIGHT
EQUIPMENT
NOTES VOLT/PH
MIN CKT
AMP MOCP WIRE SIZE / CONDUIT
CONTROLLER CONTROL
BY
DISCONNECT ELECTRICAL
NOTESTYPE SIZE LOCATION CTL DEVICE AUX BY TYPE BY
EF-1 RuppAir DR85HRA DIRECT DRIVE, DOWNBLAST 2000 CFM 0.70 in-wg 1467 0.55 hp 1.00 hp 17.5 79 lb 3,4 120 / 1 V 12.3 A 20 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-2 RuppAir DR50HRA DIRECT DRIVE, DOWNBLAST 650 CFM 0.50 in-wg 1053 0.13 hp 0.50 hp 7.6 65 lb 3,4 277 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-3 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 500 CFM 0.50 in-wg 1185 0.10 hp 0.25 hp 6.8 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-4 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 400 CFM 0.50 in-wg 1102 0.07 hp 0.25 hp 6 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 E2 EF-5 RuppAir DU85HRA DIRECT DRIVE, UPBLAST 2100 CFM 0.40 in-wg 1375 0.49 hp 0.75 hp 15.9 81 lb 2,4 480 / 3 V 1.7 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-6 RuppAir DU85HRA DIRECT DRIVE, UPBLAST 2100 CFM 0.40 in-wg 1375 0.49 hp 0.75 hp 15.9 81 lb 2,4 480 / 3 V 1.7 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-7 RuppAir DU85HRA DIRECT DRIVE, DOWNBLAST 1500 CFM 0.40 in-wg 1081 0.24 hp 0.75 hp 7.7 107 lb 2,4 480 / 3 V 1.7 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-8 RuppAir DU85HRA DIRECT DRIVE, DOWNBLAST 2100 CFM 0.40 in-wg 1375 0.49 hp 0.75 hp 15.9 81 lb 2,4 480 / 3 V 1.7 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 E3 EF-10 RuppAir DR180HRA DIRECT DRIVE, DOWNBLAST 2300 CFM 0.40 in-wg 864 0.49 hp 1.00 hp 8.6 165 lb 2,4 480 / 3 V 2.2 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-11 RuppAir DR180HRA DIRECT DRIVE, DOWNBLAST 2300 CFM 0.40 in-wg 864 0.49 hp 1.00 hp 8.6 165 lb 2,4 480 / 3 V 2.2 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-12 CAR-MON CMB-25F BELT DRIVE UTILITY SET 2800 CFM 5.00 in-wg 2520 3.10 hp 5.00 hp 0 235 lb 6 480 / 3 V 9.5 A EXISTING SEE CIRCUIT SCHEDULE STARTER 1 MCC-2 - - EXISTING EXISTING NFDS DIV. 26 E1 EF-14 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 500 CFM 0.50 in-wg 1185 0.09 hp 0.25 hp 6.8 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-15 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 650 CFM 0.50 in-wg 1332 0.13 hp 0.25 hp 8.5 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-16 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 650 CFM 0.50 in-wg 1332 0.13 hp 0.25 hp 8.5 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-17 RuppAir DR50HRA DIRECT DRIVE, DOWNBLAST 650 CFM 0.50 in-wg 1053 0.13 hp 0.50 hp 7.6 65 lb 3,4 277 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-18 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 500 CFM 0.50 in-wg 1185 0.09 hp 0.25 hp 6.8 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-19 RuppAir DR85HRA DIRECT DRIVE, DOWNBLAST 2000 CFM 0.70 in-wg 1467 0.55 hp 1.00 hp 17.5 79 lb 3,4 120 / 1 V 14.5 A 25 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-20 RuppAir DR240HRA DIRECT DRIVE, DOWNBLAST 4000 CFM 0.40 in-wg 652 0.71 hp 1.50 hp 9.2 242 lb 2,4 480 / 3 V 3.8 A 6 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-21 RuppAir DR240HRA DIRECT DRIVE, DOWNBLAST 4000 CFM 0.40 in-wg 652 0.71 hp 1.50 hp 9.2 242 lb 2,4 480 / 3 V 3.8 A 6 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-22 RuppAir DR240HRA DIRECT DRIVE, DOWNBLAST 4000 CFM 0.40 in-wg 652 0.71 hp 1.50 hp 9.2 242 lb 2,4 480 / 3 V 3.8 A 6 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-23 RuppAir DR240HRA DIRECT DRIVE, DOWNBLAST 4000 CFM 0.40 in-wg 652 0.71 hp 1.50 hp 9.2 242 lb 2,4 480 / 3 V 3.8 A 6 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-25 CAR-MON CMB-30F BELT DRIVE UTILITY SET 4200 CFM 5.00 in-wg 1992 4.60 hp 7.50 hp 0 325 lb 6 480 / 3 V 13.8 A EXISTING SEE CIRCUIT SCHEDULE STARTER 1 MCC-3 - - EXISTING EXISTING NFDS DIV. 26 E1 EF-28 CAR-MON CMB-30F BELT DRIVE UTILITY SET 4200 CFM 5.00 in-wg 1992 4.60 hp 7.50 hp 0 325 lb 6 480 / 3 V 13.8 A EXISTING SEE CIRCUIT SCHEDULE STARTER 1 MCC-3 - - EXISTING EXISTING NFDS DIV. 26 E1 EF-30 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 500 CFM 0.50 in-wg 1185 0.10 hp 0.25 hp 6.8 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-31 CAR-MON CMW-11 DIRECT DRIVE UTILITY SET 1100 CFM 3.00 in-wg 0 0.00 hp 1.00 hp 0 0 lb 5 480 / 3 V 2.6 A EXISTING SEE CIRCUIT SCHEDULE STARTER 1 MCC-2 - - EXISTING EXISTING NFDS DIV. 26 E1, E2 EF-32 CAR-MON CMB-25F BELT DRIVE UTILITY SET 2800 CFM 5.00 in-wg 2520 3.10 hp 5.00 hp 0 235 lb 6 480 / 3 V 9.5 A EXISTING SEE CIRCUIT SCHEDULE STARTER 1 MCC-3 - - EXISTING EXISTING NFDS DIV. 26 E1 EF-33 RuppAir DR180HRA DIRECT DRIVE, DOWNBLAST 1500 CFM 0.40 in-wg 687 0.24 hp 1.00 hp 5.1 164 lb 2,4 480 / 3 V 1.8 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-34 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 500 CFM 0.50 in-wg 1195 0.10 hp 0.25 hp 6.8 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-35 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 600 CFM 0.50 in-wg 1279 0.12 hp 0.25 hp 7.9 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-36 RuppAir DR180HRA DIRECT DRIVE, DOWNBLAST 1200 CFM 0.50 in-wg 692 0.23 hp 1.00 hp 5.1 164 lb 2,4 480 / 3 V 1.8 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-37 RuppAir DR180HRA DIRECT DRIVE, DOWNBLAST 1500 CFM 0.40 in-wg 687 0.24 hp 1.00 hp 5.1 164 lb 2,4 480 / 3 V 1.8 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-39 RuppAir DR240HRA DIRECT DRIVE, DOWNBLAST 3200 CFM 0.40 in-wg 581 0.48 hp 1.50 hp 7.4 242 lb 2,4 480 / 3 V 3.8 A 6 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-40 RuppAir DR240HRA DIRECT DRIVE, DOWNBLAST 3200 CFM 0.40 in-wg 581 0.48 hp 1.50 hp 7.4 242 lb 2,4 480 / 3 V 3.8 A 6 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .