This document is an Invitation to Bid for a state and local contract opportunity issued by the South Dakota Department of the Military for the replacement of 56 exhaust fans at the Mitchell CSMS #1 facility in Mitchell, South Dakota. The project involves replacing roof-mounted, vehicle, and welding exhaust fans on both the interior and exterior of the building, including power and controls wiring rework, testing and balancing, and reconnecting to existing ductwork. The work is to be substantially complete within 150 consecutive calendar days from the Notice to Proceed date. An optional pre-bid conference is scheduled for May 9, 2024. Bids are due May 16, 2024 and must be accompanied by a 5% certified check, cashier's check, or draft, or a 10% bid bond.

The contract will be awarded by the South Dakota Department of the Military. Pricing terms, funding requirements, and sources are not provided in the document. There is no mention of any set asides or incumbents. The project is to be completed in an active equipment maintenance shop with up to 25-foot interior ceiling heights.

View the file

Other files

File Type Posted
Project Manual.pdf PDF
Invitation to Bid.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROGER C.

NIKOLAS

RE

GIS

TE

REDPROFESSIONALENGINEER

REG. NO.

SOUTH DAKOTA

DATE: 04/19/2024

© TSP, Inc. 2023

ISSUES

SHEET NUMBER

SHEET TITLE

C

A

B

2 3

D

E

1 2 3

4 5 6

4 5 6

A

B

C

D

E

TSP, Inc.

PROJECT TITLE

1112 N. West Ave, Sioux Falls, SD 57104

(605) 336-1160 www.teamtsp.com

ISSUE DATE

CHECKED BY

DRAWN BY

PROJECT #

LIS

TE

D

DR

AW

IN

GS

S

CA

LE

(S ) U

NL

ES

S

RE

DU

CE

D

FR

OM

O

RI

GI

NA

L x

F

OR

MA

T

Architecture Engineering

Planning

4/1 9/2

4 2

:08 :25

A M

_S D

De pt of Mi lita ry

Mi tch ell _M

_d eta ch ed .rv t

COVER SHEET

G-001

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

MITCHELL, SD

REPLACE EXHAUST

FANS

CFMO #467097

SDARNG MITCHELL

CSMS #1

JRH04/19/2024

RCN04232099

SDARNG MITCHELL CSMS #1

REPLACE EXHAUST FANS

CFMO #467097

CONSTRUCTION DOCUMENTS

04/19/2024

MITCHELL, SD

GENERAL SHEET INDEX

SHEET # SHEET NAME

G-001 COVER SHEET

DRAWING INDEX

ELECTRICAL SHEET INDEX

SHEET # SHEET NAME

E-001 ELECTRICAL SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES

ED101 ELECTRICAL DEMOLITION PLAN - AREA 1

ED102 ELECTRICAL DEMOLITION PLAN - AREA 2

ED103 ELECTRICAL DEMOLITION PLAN - AREA 3

ED104 ELECTRICAL DEMOLITION PLAN - AREA 4

ED105 ELECTRICAL DEMOLITION PLAN - AREA 5

EP101 POWER PLAN - AREA 1

EP102 POWER PLAN - AREA 2

EP103 POWER PLAN - AREA 3

EP104 POWER PLAN - AREA 4

EP105 POWER PLAN - AREA 5

EP401 ENLARGED ELECTRICAL PLAN - PENTHOUSE 2001 AND ELECTRICAL SCHEDULES

MECHANICAL SHEET INDEX

SHEET # SHEET NAME

G-001 COVER SHEET

M-001 MECHANICAL SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES

MD101 MECHANICAL DEMOLITION PLAN - AREA 1

MD102 MECHANICAL DEMOLITION PLAN - AREA 2

MD103 MECHANICAL DEMOLITION PLAN - AREA 3

MD104 MECHANICAL DEMOLITION PLAN - AREA 4

MD105 MECHANICAL DEMOLITION PLAN - AREA 5

MD201 MECHANICAL ROOF DEMOLITION PLAN

MH101 MECHANICAL HVAC PLAN - AREA 1

MH102 MECHANICAL HVAC PLAN - AREA 2

MH103 MECHANICAL HVAC PLAN - AREA 3

MH104 MECHANICAL HVAC PLAN - AREA 4

MH105 MECHANICAL HVAC PLAN - AREA 5

M-201 MECHANICAL ROOF PLAN

ME601 MECHANICAL SCHEDULES

TITLE/DISCIPLINE NAME/CONTACT COMPANY PHONE

PROJECT MANAGER ROGER NIKOLAS TSP, Inc. 605.336.1160

MECHANICAL ENGINEER ROGER NIKOLAS TSP, Inc. 605.336.1160

ELECTRICAL ENGINEER JAKE BUCKMILLER TSP, Inc. 605.336.1160

DESIGN TEAM

NikolasRC@teamtsp.com

E-MAIL

NikolasRC@teamtsp.com

BuckmillerJR@teamtsp.com

INDUSTRIAL ROAD

N

OH

LM

AN

S T

NATIONAL GUARD ROAD

ISSUE DATE DESCRIPTION

NIKOLAS

RE

GIS

TE

REDPROFESSIONALENGINEER

REG. NO.

SOUTH DAKOTA

DATE:

& AND

Ø ROUND

A AIR

AC AIR CONDITIONING

ACOUS ACOUSTICAL

AD AREA DRAIN

ADD ADDENDUM

ADDL ADDITIONAL

AFF ABOVE FINISHED FLOOR

AFUE ANNUAL FUEL UTILIZATION EFFICIENCY

AG ABOVE GROUND

ALT ALTERNATE

ALUM ALUMINUM

AP ACCESS PANEL

APPROX APPROXIMATE

ARCH ARCHITECT/ARCHITECTURAL

AV ACID RESISTANT VENT

AW ACID RESISTANT WASTE

AUTO AUTOMATIC

BFF BELOW FINISHED FLOOR

BLDG BUILDING

BLW BELOW

BM BEAM

BO BY OTHER

BOT BOTTOM

BSMT BASEMENT

BTU BRITISH THERMAL UNITS

BTUH BRITISH THERMAL UNITS PER HOUR

BTWN BETWEEN

CAP CAPACITY

CB CATCH BASIN

CCW COUNTER CLOCKWISE

CFCV CONSTANT FLOW CONTROL VALVE

CFM CUBIC FEET PER MINUTE

CHW CIRCULATING HOT WATER

CI CAST IRON

CLG CEILING

CLG COOLING

CO CLEAN OUT

COL COLUMN

COMB COMBINATION

CONC CONCRETE

COND CONDENSATE

CONF CONFERENCE

CONN CONNECT

CONST CONSTRUCTION

CONT CONTINUE/CONTINUATION

CONTR CONTRACT/CONTRACTOR

COORD COORDINATE

CTR CENTER

CUFT CUBIC FEET

CV CHECK VALVE

CW COLD WATER

CW CLOCKWISE

D DEGREE

DB DRY BULB

DET DETAIL

DIA DIAMETER

DIAG DIAGONAL

DIV DIVISION

DI DEIONIZED WATER

DMPR DAMPER

DN DOWN

DWG DRAWING

DW DISTILLED WATER

EA EACH

EAT ENTERING AIR TEMPERATURE

EL ELBOW

ELEC ELECTRICAL

ELEV ELEVATION

EP EXPLOSION PROOF

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

E/A EXHAUST AIR

EAH EXHAUST HOOD

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

F DEGREES FAHRENHEIT

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FD FIRE DAMPER

FDV FIRE DEPARTMENT VALVE

FHC FIRE HOSE CABINET

FL FLOOR

FLEX FLEXIBLE

FLG FLANGE

FO FUEL OIL

FOV FUEL OIL VENT

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FPM FEET PER MINUTE

FRP FIBERGLASS REINFORCED PIPE

FS FULL SIZE

FS FLOOR SINK

FT FOOT/FEET

FTG FOOTING

FTR FIN TUBE RADIATION

GA GAGE/GAUGE

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEN GENERATOR/GENERAL

GPM GALLONS PER MINUTE

GR GRADE

GW GREASE WASTE

HB HOSE BIBB

HORZ HORIZONTAL

HP HORSE POWER

HP HIGH PRESSURE

HTG HEATING

HTR HEATER

HW HOT WATER

HYD HYDRANT

ID INDIRECT

IN INCH

INL INLET

INSUL INSULATION

INT INTERIOR

INV INVERT

INWG INCHES WATER GAUGE

JT JOINT

LAB LABORATORY

LB POUND

LB/HR POUNDS PER HOUR

LAT LEAVING AIR TEMPERATURE

LF LINEAR FOOT

LP LOW PRESSURE

LPG LIQUEFIED PETROLEUM GAS

LR LIQUID REFRIGERANT

LS LAWN SPRINKLER

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M/A MIXED AIR

MAN MANUAL

MATL MATERIAL

MAV MANUAL AIR VENT

MAX MAXIMUM

MBD MOTORIZED BYPASS DAMPER

MBH ONE THOUSAND BTU PER HOUR

MCF ONE THOUSAND CUBIC FEET

MCW MAKE-UP COLD WATER

MD MOTORIZED DAMPER

MECH MECHANICAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MTR MOTOR

MU/A MAKE-UP/AIR

N NECK / NORTH

NC NOISE CRITERIA

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NUMBER / NORMALLY OPEN

NOM NOMINAL

NTS NOT TO SCALE

O OXYGEN

O/A OUTSIDE AIR

OC ON CENTER

OF OVERFLOW

OPNG OPENING

ORD OVERFLOW ROOF DRAIN

PD PRESSURE DROP

PIV POST INDICATOR VALVE

PLBG PLUMBING

PR PAIR

PRESS PRESSURE

PRIM PRIMARY

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

PW POTABLE WATER

PWR POWER

R DUCT RISER

R/A RETURN AIR

RCP RADIANT CEILING PANEL

RD ROOF DRAIN

REC RECESSED

RED REDUCER

REFR REFRIGERATION

RH RELATIVE HUMIDITY

REQD REQUIRED

REV REVERSE

RL/A RELIEF AIR

RM ROOM

RPM REVOLUTIONS PER MINUTE

RW RAIN WATER

SF SQUARE FOOT

S/A SUPPLY AIR

SAN SANITARY

SCHED SCHEDULE

SECT SECTION

SD SMOKE DAMPER

SHT SHEET

SIM SIMILAR

SLV SLEEVE

SM SURFACE MOUNT

SP STANDPIPE / STATIC PRESSURE

SPEC SPECIFICATION

SPS STATIC PRESSURE STATION

SQ SQUARE

SR SUCTION REFRIGERANT

SSD SOIL SUBDRAIN

SS STAINLESS STEEL

STD STANDARD

STM STEAM

STRUCT STRUCTURAL

SUCT SUCTION

SUSP SUSPENDED

T THERMOSTAT

TCP TEMPERATURE CONTROL PANEL

TD TEMPERATURE DROP

TDR TRENCH DRAIN

TEMP TEMPERATURE

TYP TYPICAL

UFD UNDER FLOOR DUCT

UG UNDERGROUND

VAC VACUUM

V VENT

VAV VARIABLE AIR VOLUME

VEL VELOCITY

VENT VENTILATION

VERT VERTICAL

VOL VOLUME

VTR VENT THROUGH ROOF

W WASTE

WB WET BULB

WCO WALL CLEAN OUT

WH WALL HYDRANT

ABBREVIATIONS

AC AIR CONDITIONING UNIT

ACC AIR COOLED CONDENSER

ACCU AIR COOLING CONDENSING UNIT

AFMS AIR FLOW MEASURING STATION

AHU AIR HANDLING UNIT

AS AIR SEPARATOR

B BOILER

CF CABINET FAN

CF CHEMICAL FEEDER

CFP CHEMICAL FEEDER PUMP

CH CHILLER

CRU CONDENSATE RETURN UNIT

CT COOLING TOWER

CUH CABINET UNIT HEATER

CWP CONDENSER WATER PUMP

CHWP CHILLED WATER PUMP

DBP DOMESTIC WATER BOOSTER PUMP

DC DUCT MOUNTED COIL

DCP DOMESTIC WATER CIRCULATING PUMP

EF EXHAUST FAN

EDC ELECTRIC DUCT COIL

ET EXPANSION TANK

EWH ELECTRIC WATER HEATER

FCU FAN COIL UNIT

FP FIRE PUMP

GI GREASE INTERCEPTOR

GRV GRAVITY ROOF VENTILATOR

H HUMIDIFIER

HWP HEATING WATER PUMP

HX HEAT EXCHANGER

HPU HEAT PUMP UNIT

HRU HEAT RECOVERY UNIT

ILC INLINE CENTRIFUGAL

PF PROPELLER FAN

PRV POWER ROOF VENTILATOR

PWF POWER WALL FAN

RE RETURN/EXHAUST FAN

RTU ROOFTOP UNIT

SA SHOCK ABSORBER

SAT SOUND ATTENUATOR

SEP SEWAGE EJECTOR PUMP

SF SUPPLY FAN

SP SUMP PUMP

UH UNIT HEATER

US UTILITY SET

UV UNIT VENTILATOR

WFMS WATER FLOW MEASURING STATION

WH WATER HEATER

EQUIPMENT ABBREVIATIONS

* NOTE *

ALL OF THE GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER

DRAWINGS IN THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET

MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.

PLUMBING AND PIPING SYMBOLSGENERAL MECHANICAL SYMBOLS

HVAC SYMBOLS

LAB AND MEDICAL SYMBOLS

FIRE PROTECTION SYMBOLS

SA

RA

ELBOW WITH TURNING VANES

LAB AIRLA

CONDENSATE DRAINCD

DUAL TEMP WATER RETURNDTWR

DOMESTIC HOT WATER - RECIRCULATINGRHW

DOMESTIC HOT WATERHW

DOMESTIC COLD WATERCW

LAB DEIONIZED WATERLDE

LAB DISTILLED WATERLDI

LAB GASLG

LAB VACUUMLV

MEDICAL AIRMA

MEDICAL CO2CO2

MEDICAL GASMGAS

MEDICAL HYDROGENH

MEDICAL NITROGENNI

DOMESTIC COLD WATER - SOFTSCW

SANITARY VENTV

SANITARY WASTE - BELOW GROUNDWB

SANITARY WASTEW

MEDICAL NITROUS OXIDENO

MEDICAL OXYGENO

MEDICAL VACUUMMV

NATURAL GASG

NATURAL GAS - 2LBG-2LB

PROCESSPRO

STORM DRAINAGERD

STORM DRAINAGE - BELOW GRADERDB

STORM DRAINAGE OVERFLOWORD

STORM DRAINAGE OVERFLOW BELOW GRADEORDB

FIRE PROTECTION OTHERFP-O

DRY FIRE SPRINKLERDF

GLYCOL HOT WATER RETURNGHR

GLYCOL HOT WATER SUPPLYGHS

HEATING WATER RETURNHWR

HEATING WATER SUPPLYHWS

OIL WASTEOW

CHILLED WATER RETURNCWR

CHILLED WATER SUPPLYCWS

CONDENSER WATER RETURNCR

CONDENSER WATER SUPPLYCS

OIL VENTOV

REFRIGERANTREF

REFRIGERANT HOT GASRHG

REFRIGERANT LIQUIDRL

REFRIGERANT SUCTIONRS

ACID WASTE ABOVE GRADEAW

ACID VENT PIPINGAV

ACID WASTE BELOW GRADEAWB

COUPLING

SOUND ATTENUATOR

M

F B

S C

MOTORIZED SMOKE

COMBINATION

SMOKE & FIRE

VOLUME

DAMPER

FIRE BACKDRAFT

TYPE

CFM

S-1 (3X)

16"x16"

R-1

VOLUME DAMPER

TOTAL

(IF EXCEEDS 1)

RETURN

DIFFUSER

VAV BOX

POWER ROOF VENTILATOR

UNIT HEATER

RADIANT

PANEL

GEOTHERMAL SUPPLYGTS

GEOTHERMAL RETURNGTR

LPS

STEAM - LP CONDENSATELPR

STEAM - LP

MPS

STEAM - MP CONDENSATEMPR

STEAM - MP

HPS

STEAM - HP CONDENSATEHPR

STEAM - HP

CONDENSATE RETURNCDR

COMBINATION WASTE AND VENTCWV

COMPRESSED AIRA

PUMP DISCHARGEPD

MITIGATION VENTMIT

GREASE VENTGV

GREASE WASTEGW

DEIONIZED WATERDI

REVERSE OSMOSIS WATERRO

DUAL TEMP WATER SUPPLYDTWS

PIPE BEING DEMOLISHED

EXISTING PIPE TAG

x x-xxx

Room

POINT WHERE NEW CONNECTS TO EXISTING

NUMBER OF DETAIL ON SHEET

NUMBER OF SHEET WHERE DETAIL APPEARS

KEYNOTE

CONTINUATION SYMBOL

ROOM NAME AND NUMBER

DOMESTIC COLD WATER - HARDHCW

DOMESTIC HOT WATER - 140 DEGRESSHW 140

RECTANGULAR DUCT SIZE TAG (WIDTH X HEIGHT)16"x8"

16"/8"

16"Ø

OVAL DUCT SIZE TAG (WIDTH / HEIGHT)

ROUND DUCT SIZE TAG (DIAMETER)

RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISEDROP

ROUND SUPPLY/OUTSIDE AIR DUCT RISEDROP

RECTANGULAR RETURN/TRANSFER AIR DUCT RISEDROP

ROUND RETURN/TRANSFER AIR DUCT RISEDROP

RECTANGULAR EXHAUST/RELIEF AIR DUCT RISEDROP

ROUND EXHAUST/RELIEF AIR DUCT RISEDROP

SA

RA

EA

EA

FLEX DUCT

x-xxx EQUIPMENT TAG

LINEAR DIFFUSER

CO2 TH

CO TS

NO2 T

HS SVV

H S

TEMPERATURE & HUMIDITY SENSORCARBON DIOXIDE SENSOR

TEMPERATURE SENSORCARBON MONOXIDE SENSOR

THERMOSTATNITROGEN DIOXIDE SENSOR

MANUAL SWITCHHUMIDITY SENSOR

SENSORHUMIDISTAT

PLUG

REDUCING 45 DEGREE TEE

45 DEGREE TEE

2"4"

4"

ROOF DRAIN FIXTURE

4" RD-1

4" ORD-1

DRAIN SIZE

DRAIN TAG

TYPE (SEE SCHEDULE)

FCO WCO W

WH-1

PLUMBING FIXTURE

PLUMBING FIXTURE TAG

TYPE (SEE SCHEDULE)

DOWNSPOUT NOZZLE

FLOOR

CLEAN

OUT

WALL

CLEAN

OUT

FLOOR

DRAIN

DOMESTIC

WATER METER GAS METER END CAP PIPE BREAK

DOMESTIC HOT WATER - RECIRCULATING 140 DEGREESRHW 140

DOMESTIC COLD WATER - FILTEREDF-CW

(E)

FIRE PROTECTION PRE-ACTIONFP-PA

FIRE PROTECTION WETFP

COMBINATION FIRE & DOMESTICFP-DOM-W

UPRIGHT SPRINKLER HEAD

PENDANT SPRINKER HEAD

RECESSED SPRINKLER HEAD

CONCEALED SPRINKLER HEAD

'D' REPRESENTS DRY SPRINKLER

HEADD

SIDEWALL SPRINKLER

HEAD

EXTENDED COVERAGE

SIDEWALL SPRINKLER HEAD

OBSTRUCTION FROM

DUCTWORK 48" AND

GREATER

48"x18" S/A

1/8" / 12" SLOPE

2"

PIPE SLOPE TAG

PIPE SIZE TAG (DIAMETER)

EXISTING DUCT TAG(E)

21. PUMP

22. FLOW SWITCH

23. PRESSURE TEMPERATURE TAP

24. MEDICAL GAS OUTLET

25. HOSE BIBB

26. WALL HYDRANT

27. FLOW METER

28. BACKFLOW PREVENTER

29. AQUASTAT

30. 3-WAY VALVE

1. SIDE CONNECTION

2. ELBOW DOWN

3. ELBOW UP

4. SHUT OFF VALVE

5. BALANCING VALVE

6. CONTROL VALVE

7. PRESSURE REDUCING VALVE

8. PRESSURE RELIEF VALVE

9. CHECK VALVE

10. AIR VENT

11. PRESSURE GAUGE

12. THERMOMETER

13. PIPE ANCHOR

14. PIPE GUIDE

15. REDUCER

16. STRAINER

17. UNION

18. DIRECTION OF FLOW

19. PITCH PIPE

20. 3-WAY CONTROL VALVE

FM AFS

2 3 4 5 6 7 8 9 10 11 12 13 14 15

302928272624232221201918 2516 17

04/19/2024

HVAC GENERAL NOTES

* NEW 1 SUPPLY AND RETURN PIPING TO COILS ARE THE SAME SIZE.

* NEW 2 CONTRACTOR SHALL LOCATE THERMOSTATS, CO2 SENSORS, AND TEMPERATURE SENSORS AT

4'-0" AFF, A MINIMUM OF 8" FROM LIGHT SWITCH.

* NEW 3 REFER TO PIPING DRAWINGS FOR THERMOSTAT, CO2 SENSOR, AND TEMPERATURE SENSOR

LOCATIONS.

* NEW 4 CONDENSATE DRAINS SHALL BE SUPPLIED FOR ALL COOLING EQUIPMENT. CONTRACTOR SHALL

ENSURE PROPER INSTALLATION AND DRAINAGE AS REQUIRED BY FEDERAL, STATE, AND LOCAL

CODES. CONDENSATE PIPING SHALL BE TYPE "L" COPPER.

* NEW 5 PROVIDE A 4" HOUSEKEEPING PAD FOR EACH PIECE OF MECHANICAL EQUIPMENT. COORDINATE

SIZES WITH MECHANICAL EQUIPMENT SELECTED.

* NEW 6 THIS CONTRACTOR SHALL BE REQUIRED TO REPLACE FILTERS ON HVAC EQUIPMENT AFTER ALL

DUST PRODUCING CONSTRUCTION HAS BEEN COMPLETED AND PRIOR TO THE FINAL PUNCH.

PROJECT GENERAL NOTES

* DEMO 1 WHERE EQUIPMENT AND/OR FIXTURES ARE INDICATED TO BE REMOVED, THE EXISTING

SERVICES SHALL BE CAPPED AND CONCEALED BEHIND FINISHED SURFACES. ABANDONED

BRANCH SERVICES SHALL BE REMOVED BACK TO THE MAINS AND CAPPED, UNLESS OTHERWISE

INDICATED.

* DEMO 2 CAP ANY ABANDONED OR UNUSED PIPE AND/OR DUCT OPENINGS.

* DEMO 3 THIS CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND PAINTING TO MATCH EXISTING

WALLS, FLOORS, AND CEILINGS.

* DEMO 4 HYDRONIC AND DOMESTIC PIPING SHALL BE THOROUGHLY CLEANED BEFORE PUTTING INTO

PERMANENT SERVICE.

* DEMO 5 WHERE MATERIAL IS INDICATED TO BE REMOVED, IT SHALL REMAIN THE PROPERTY OF THE

OWNER. THIS CONTRACTOR SHALL DISPOSE OF MATERIAL AS DIRECTED BY THE OWNER.

* EXST 1 REMOVE ALL UNUSED PIPING, DUCTWORK AND ACCESSORIES.

* EXST 2 THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING, PRIOR TO FINAL

BID, ALL EXISTING CONDITIONS FOR PLUMBING AND MECHANICAL SYSTEMS.

* EXST 3 WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT

CONSTRUCTION DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO

START OF WORK.

* NEW 1 COORDINATE AND COOPERATE WITH THE OTHER TRADES ON THE INSTALLATION OF PIPING, DUCTWORK, CONDUIT, LIGHTS, CABLE TRAY, STRUCTURE, AND EQUIPMENT TO PREVENT

CONFLICTS.

* NEW 2 THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS BOTH EXISTING AND THOSE

ILLUSTRATED BY THESE DOCUMENTS AS WELL AS THOSE WHICH CAN BE REASONABLY

ANTICIPATED INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL, ELECTRICAL, VENTILATION, PLUMBING, AND OTHER SYSTEMS INVOLVED ON THIS PROJECT.

* NEW 3 FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL CONFORM TO ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT NOT

LIMITED TO THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL MECHANICAL CODE.

* NEW 4 LOCATE EQUIPMENT REQUIRING ACCESS 2'-0" MAXIMUM ABOVE CEILING.

* NEW 5 ALL ROOF MOUNTED EQUIPMENT SHALL BE A MINIMUM 10'-0" FROM EDGE OF ROOF.

* NEW 6 LOCATE DUCTWORK, PIPING AND MECHANICAL EQUIPMENT AWAY FROM THE SPACE ABOVE

ELECTRICAL PANELS, TRANSFORMERS AND OTHER ELECTRICAL EQUIPMENT.

* NEW 7 ADJUST PIPING AND DUCTWORK SIZES TO PROPERLY CONNECT TO MECHANICAL EQUIPMENT.

* NEW 8 REFER TO PLUMBING SERIES DRAWINGS FOR GAS AND A.C. CONDENSATE DRAIN PIPING.

* NEW 9 PIPE SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL ANOTHER SIZE IS

SHOWN.

* NEW 10 FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON THE SEGMENTS, REFER TO DETAILS, SCHEDULES, AND SPECIFICATIONS.

* NEW 11 INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S WRITTEN

INSTALLATION INSTRUCTIONS.

* NEW 12 LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT AS INDICATED ON THE DRAWING, ARE

APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD. WORK SHALL BE

COORDINATED WITH ALL OTHER TRADES TO AVOID INTERFERENCE IN THE FIELD.

* NEW 13 INSTALL EXPOSED PIPING AND DUCTWORK AS HIGH AS PRACTICAL IN ROOMS WITHOUT

CEILINGS.

* NEW 14 MATERIALS AND EQUIPMENT SHOWN ON PLANS SHALL BE NEW AND FURNISHED BY THIS

CONTRACTOR UNLESS OTHERWISE INDICATED.

* NEW 15 THIS CONTRACTOR IS RESPONSIBLE FOR ALL SLEEVES AND/OR OPENINGS WHERE REQUIRED TO

RUN PIPES AND DUCTS THROUGH FOUNDATIONS, FLOOR SLABS, WALLS, BRIDGING AND BEAMS

EXCEPT WHERE OTHERWISE INDICATED.

* NEW 16 CEILING ACCESS IS REQUIRED AT ALL REHEAT COILS, VALVES, FIRE DAMPERS, MANUAL

DAMPERS AND MOTORIZED DAMPERS LOCATED ABOVE CEILING. CEILING ACCESS PANELS WILL

BE PROVIDED UNDER THE GENERAL SECTION OF CONSTRUCTION AND SHALL BE MINIMUM OF 24"

X 24" UNLESS OTHERWISE INDICATED. COORDINATE WITH GENERAL CONTRACTOR.

* NEW 17 THE CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL EXISTING CONDITIONS AND

DIMENSIONS. NOTIFY THE A/E IMMEDIATELY OF ANY DISCREPANCIES.

* NEW 18 WHERE NEW SERVICES ARE SHOWN CONNECTING TO EXISTING, VERIFY EXACT LOCATION AND

SIZE OF EXISTING.

* NEW 19 EXISTING SERVICES SHALL BE MAINTAINED UNLESS OTHERWISE INDICATED.

* NEW 20 ALL DUCTS, PIPING, FIXTURES, ETC., WHICH ARE DASHED AND/OR INDICATED BY NOTE ON

DEMOLITION PLANS SHALL BE REMOVED.

* NEW 21 ALL PLUMBING SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH NATIONAL, STATE, AND LOCAL CODES.

* NEW 22 SEAL ALL SHEET METAL DUCTWORK JOINTS.

* NEW 23 BALANCING OF AIR AND HYDRONIC SYSTEMS SHALL BE PERFORMED BY AN NEBB OR AABC

CERTIFIED TEST AND BALANCE AGENCY.

* NEW 24 PIPE PENETRATIONS OF RATED WALLS AND FLOORS SHALL BE SLEEVED AND PROPERLY FIRE

SEALED.

* NEW 25 ALL PIPE AND DUCT PENETRATIONS OF SMOKE PARTITION WALLS SHALL BE PROPERLY SEALED

TO RESIST THE PASSAGE OF SMOKE AS REQUIRED BY THE LOCAL AUTHORITY.

* NEW 26 INSTALL FLUSH VALVE OPERATORS ON WIDE SIDE OF ACCESSIBLE STALLS.

* NEW 27 THE HEATING AND/OR COOLING HYDRONIC SYSTEM SHALL BE PROVIDED AND FILLED WITH AN

ANTIFREEZE GLYCOL SOLUTION (AS INDICATED ON THE EQUIPMENT SCHEDULES) BY THE PIPING

CONTRACTOR WHO SHALL BE RESPONSIBLE FOR DETERMINING THE AMOUNT OF GLYCOL

REQUIRED.

* NEW 28 GREASE DUCTS: PROVIDE 2-INCH THICK U.L. 2-HOUR FIRE RATED DUCT WRAP ON GREASE

DUCTS BETWEEN CEILING AND ROOF PENETRATION.

SHEET INDEX - MECHANICAL

SHEET # SHEET NAME

G-001 COVER SHEET

M-001 MECHANICAL SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES

MD101 MECHANICAL DEMOLITION PLAN - AREA 1

MD102 MECHANICAL DEMOLITION PLAN - AREA 2

MD103 MECHANICAL DEMOLITION PLAN - AREA 3

MD104 MECHANICAL DEMOLITION PLAN - AREA 4

MD105 MECHANICAL DEMOLITION PLAN - AREA 5

MD201 MECHANICAL ROOF DEMOLITION PLAN

MH101 MECHANICAL HVAC PLAN - AREA 1

MH102 MECHANICAL HVAC PLAN - AREA 2

MH103 MECHANICAL HVAC PLAN - AREA 3

MH104 MECHANICAL HVAC PLAN - AREA 4

MH105 MECHANICAL HVAC PLAN - AREA 5

M-201 MECHANICAL ROOF PLAN

ME601 MECHANICAL SCHEDULES

© TSP, Inc. 2023

ISSUES

SHEET NUMBER

SHEET TITLE

C

A

B

2 3

D

E

1 2 3

4 5 6

4 5 6

A

B

C

D

E

TSP, Inc.

PROJECT TITLE

1112 N. West Ave, Sioux Falls, SD 57104

(605) 336-1160 www.teamtsp.com

ISSUE DATE

CHECKED BY

DRAWN BY

PROJECT #

LIS

TE

D

DR

AW

IN

GS

S

CA

LE

(S ) U

NL

ES

S

RE

DU

CE

D

FR

OM

O

RI

GI

NA

L x

F

OR

MA

T

Architecture Engineering

Planning

4/1 9/2

4 2

:08 :29

A M

_S D

De pt of Mi lita ry

Mi tch ell _M

_d eta ch ed .rv t

MECHANICAL SYMBOLS,

ABBREVIATIONS, AND

GENERAL NOTES

M-001

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

MITCHELL, SD

REPLACE EXHAUST

FANS

CFMO #467097

SDARNG MITCHELL

CSMS #1

JRH04/19/2024

RCN04232099

NIKOLAS

RE

GIS

TE

REDPROFESSIONALENGINEER

REG. NO.

SOUTH DAKOTA

DATE:

127B

STORAGE

TELECOMUNICATIONS

112A

TELECOM.

ROOM

MECHANICAL

ROOM

111B

STORAGE

CUSTODIAL

CORRIDOR

LUMBER

STORAGE

LIBRARY

LOBBY

COMM SEC

REPAIR

RADIATION

CALIBRATION

CORRIDOR

VESTIBULE

OMS

HAZARDOUS

WASTE

OMS BATTERY

OMS POL

STORAGE

CUSTODIAL

CORRIDOR

CUSTODIAL

PRODUCTION

CONTROL

CSMS

HAZARDOUS

CSMS

BATTERY

CSMS POL

STORAGE

CUSTODIAL

CSMS

FLAMMABLE

OMS

FLAMMABLE

STORAGE

VESTIBULE

VESTIBULE

CORRIDOR

CORRIDOR

VESTIBULE

COLD

STORAGE

112B

ELECTRICAL

ROOM

OMS SUPER.

VESTIBULE

CSMS

SUPERVISOR

RADIATION

STORAGE

128A

ELECTRICAL

ROOM

GENERAL

SUPERVISOR

CLERK TYPIST

FITNESS

CSMS BREAK

ROOM

OMS BREAK

ROOM

111G

WOMEN'SMLATRINE

111F

WOMEN'S

LOCKER

111A

MEN'S LATRINE

111C

MEN'S LOCKER

CSMS TOOL &

SUPPLY

OMS TOOL &

SUPPLY

127C

MEN'S LOCKER

127A

MEN'S LATRINE

127G

WOMEN'S

LATRINE

127F

WOMEN'S

LOCKER

CORRIDOR

COLD

STORAGE

CORRIDOR

CUSTODIAL

INSPECTION

SUPERVISOR

AREA '5'AREA '1'

AREA '4'

AREA '3'

SEE MH104

FOR CONTINUATION

SEE MH102 FOR CONTINUATION

SEE MH103 FOR

CONTINUATION

SEE MH105

FOR CONTINUATION

AREA '2'

EF-60 EF-61

EF-18

EF-17

EF-19

EF-16

EF-15

EF-64

EF-63

EF-62

EF-4

EF-65 EF-2 EF-3 EF-14

EF-1

EF-66

EF-56

1 1

A.5

B

C

D

E

F

G

H

J

K

L

9 10 11

1.7

04/19/2024

KEYNOTES

1 REMOVE ROOF MOUNTED EXHAUST FAN AND REPLACE WITH NEW FAN. DUCTWORK BELOW ROOF

TO REMAIN.

© TSP, Inc. 2023

ISSUES

SHEET NUMBER

SHEET TITLE

C

A

B

2 3

D

E

1 2 3

4 5 6

4 5 6

A

B

C

D

E

TSP, Inc.

PROJECT TITLE

1112 N. West Ave, Sioux Falls, SD 57104

(605) 336-1160 www.teamtsp.com

ISSUE DATE

CHECKED BY

DRAWN BY

PROJECT #

LIS

TE

D

DR

AW

IN

GS

S

CA

LE

(S ) U

NL

ES

S

RE

DU

CE

D

FR

OM

O

RI

GI

NA

L x

F

OR

MA

T

Architecture Engineering

Planning

KEY PLAN

AREA 1

AREA 2

AREA 3

AREA

AREA 5

4/1 9/2

4 2

:08 :36

A M

_S D

De pt of Mi lita ry

Mi tch ell _M

_d eta ch ed .rv t

MECHANICAL

DEMOLITION PLAN -

AREA 1

MD101

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

MITCHELL, SD

REPLACE EXHAUST

FANS

CFMO #467097

SDARNG MITCHELL

CSMS #1

JRH04/19/2024

RCN04232099

SHEET GENERAL NOTES

A EQUIPMENT, DUCTWORK, PIPING, ETC. TO BE REMOVED OR RELOCATED IS SHOWN IN HEAVY DAHSED

LINES, UNLESS NOTED OTHERWISE.

B EQUIPMENT, DUCTWORK, PIPING, ETC. TO REMAIN IS SHOWN IN LIGHT LINES, UNLESS NOTED

OTHERWISE.

C CONTRACTOR SHALL CONFIRM LOCATION AND SIZE OF EXISTING EQUIPMENT, DUCTWORK, PIPING ETC.

D COORDINATE WORK WITH ALL OTHER TRADES. UNCOORDINATED WORK WILL BE REPLACED AT THE

CONTRACTOR'S EXPENSE.

E COORDINATE ALL SYSTEM SHUTDOWNS WITH OWNER'S REPRESENTATIVE.

F COORDINATE WORK IN ALL OCCUPIED PROJECT AREAS WITH OWNER'S REPRESENTATIVE PRIOR TO

COMMENCEMENT OF WORK.

SCALE: 1/8" = 1'-0"A1 MECHANICAL DEMOLITION PLAN - AREA 1

PLAN NORTH

ADD ALTERNATE NO. 1

ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS

SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.

• EF-4

• EF-8

• EF-31

• EF-53

• EF-63

• EF-66

• EF-67

• EF-68

T

ROGER C.

NIKOLAS

RE

GIS

TE

REDPROFESSIONALENGINEER

REG. NO.

SOUTH DAKOTA

DATE:

VESTIBULE

RADIATOR

TEST & REPAIR

SMALL ARMS

TEST

MACHINE SHOP

SMALL ARMS &

GLASS REPAIR

VAULT

PAINT PREP

PAINT BOOTH

PAINT

MECHANICAL

PAINT KITCHEN

BEAD BLAST

ALLIED

TRADES

SUPERVISOR204

CANVAS &

CARPENTER

SHOP

CANVAS &

CARPENTER

STORAGE

WELDING &

BODY SHOP

COORIDOR

CSMS

MAINTENANCE

BAY

AREA '2'

EF-6 EF-5

EF-7

EF-54

EF-11EF-10

EF-69

EF-12

EF-67

EF-68

EF-71 EF-8

EF-70

1 1

1 1

EF-31

L

M

N

3 5 87

04/19/2024

KEYNOTES

1 REMOVE ROOF MOUNTED EXHAUST FAN AND REPLACE WITH NEW FAN. DUCTWORK BELOW ROOF

TO REMAIN.

2 REMOVE VEHICLE EXAHUST FAN AND REPLACE WITH NEW.

3 REMOVE WELDING EXHAUST FAN AND REPLACE WITH NEW.

4 REMOVE SIDEWALL PROP. FAN AND REPLACE WITH NEW.

5 EXISTING DOWNDRAFT WELDING TABLE.

© TSP, Inc. 2023

ISSUES

SHEET NUMBER

SHEET TITLE

C

A

B

2 3

D

E

1 2 3

4 5 6

4 5 6

A

B

C

D

E

TSP, Inc.

PROJECT TITLE

1112 N. West Ave, Sioux Falls, SD 57104

(605) 336-1160 www.teamtsp.com

ISSUE DATE

CHECKED BY

DRAWN BY

PROJECT #

LIS

TE

D

DR

AW

IN

GS

S

CA

LE

(S ) U

NL

ES

S

RE

DU

CE

D

FR

OM

O

RI

GI

NA

L x

F

OR

MA

T

Architecture Engineering

Planning

KEY PLAN

AREA 1

AREA 2

AREA 3

AREA

AREA 5

4/1 9/2

4 2

:08 :41

A M

_S D

De pt of Mi lita ry

Mi tch ell _M

_d eta ch ed .rv t

MECHANICAL

DEMOLITION PLAN -

AREA 2

MD102

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

MITCHELL, SD

REPLACE EXHAUST

FANS

CFMO #467097

SDARNG MITCHELL

CSMS #1

JRH04/19/2024

RCN04232099

SHEET GENERAL NOTES

A EQUIPMENT, DUCTWORK, PIPING, ETC. TO BE REMOVED OR RELOCATED IS SHOWN IN HEAVY DAHSED

LINES, UNLESS NOTED OTHERWISE.

B EQUIPMENT, DUCTWORK, PIPING, ETC. TO REMAIN IS SHOWN IN LIGHT LINES, UNLESS NOTED

OTHERWISE.

C CONTRACTOR SHALL CONFIRM LOCATION AND SIZE OF EXISTING EQUIPMENT, DUCTWORK, PIPING ETC.

D COORDINATE WORK WITH ALL OTHER TRADES. UNCOORDINATED WORK WILL BE REPLACED AT THE

CONTRACTOR'S EXPENSE.

E COORDINATE ALL SYSTEM SHUTDOWNS WITH OWNER'S REPRESENTATIVE.

F COORDINATE WORK IN ALL OCCUPIED PROJECT AREAS WITH OWNER'S REPRESENTATIVE PRIOR TO

COMMENCEMENT OF WORK.

SCALE: 1/8" = 1'-0"A1 MECHANICAL DEMOLITION PLAN - AREA 2 PLAN NORTH

ADD ALTERNATE NO. 1

ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS

SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.

• EF-4

• EF-8

• EF-31

• EF-53

• EF-63

• EF-66

• EF-67

ROGER C.

NIKOLAS

RE

GIS

TE

REDPROFESSIONALENGINEER

REG. NO.

SOUTH DAKOTA

DATE:

MECHANICAL

ENGINE TEST

MECHANICAL

TRANS TEST

305A

CONTROL

ROOM

TRANS DYNO

ENGINE DYNO

CONTROL

ROOM

TRANS &

POWER PACK

LUBRICATION

BAY

TRANS &

ENGINE TEST

CSMS

MAINTANENCE

BAYS

INJECTOR

TEST FUEL &

INJECTION

REPAIR & POP

VALVE TEST

CSMS

WARM-UP BAY

AREA '3'

EF-32

EF-37

EF-33

EF-36

EF-30

EF-34EF-35

EF-21

EF-23

EF-25

EF-20

EF-22

EF-28

1 1

E

F

G

H

J

K

1.1 1.2

1.3

1.4

1.5

1.6

1.7

04/19/2024

KEYNOTES

1 REMOVE ROOF MOUNTED EXHAUST FAN AND REPLACE WITH NEW FAN. DUCTWORK BELOW ROOF

TO REMAIN.

2 REMOVE VEHICLE EXHAUST FAN AND REPLACE WITH NEW.

3 EXISTING EXHUAST FAN AND DUCTWORK TO REMAIN.

© TSP, Inc. 2023

ISSUES

SHEET NUMBER

SHEET TITLE

C

A

B

2 3

D

E

1 2 3

4 5 6

4 5 6

A

B

C

D

E

TSP, Inc.

PROJECT TITLE

1112 N. West Ave, Sioux Falls, SD 57104

(605) 336-1160 www.teamtsp.com

ISSUE DATE

CHECKED BY

DRAWN BY

PROJECT #

LIS

TE

D

DR

AW

IN

GS

S

CA

LE

(S ) U

NL

ES

S

RE

DU

CE

D

FR

OM

O

RI

GI

NA

L x

F

OR

MA

T

Architecture Engineering

Planning

KEY PLAN

AREA 1

AREA 2

AREA 3

AREA

AREA 5

4/1 9/2

4 2

:08 :46

A M

_S D

De pt of Mi lita ry

Mi tch ell _M

_d eta ch ed .rv t

MECHANICAL

DEMOLITION PLAN -

AREA 3

MD103

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

MITCHELL, SD

REPLACE EXHAUST

FANS

CFMO #467097

SDARNG MITCHELL

CSMS #1

JRH04/19/2024

RCN04232099

SHEET GENERAL NOTES

A EQUIPMENT, DUCTWORK, PIPING, ETC. TO BE REMOVED OR RELOCATED IS SHOWN IN HEAVY DAHSED

LINES, UNLESS NOTED OTHERWISE.

B EQUIPMENT, DUCTWORK, PIPING, ETC. TO REMAIN IS SHOWN IN LIGHT LINES, UNLESS NOTED

OTHERWISE.

C CONTRACTOR SHALL CONFIRM LOCATION AND SIZE OF EXISTING EQUIPMENT, DUCTWORK, PIPING ETC.

D COORDINATE WORK WITH ALL OTHER TRADES. UNCOORDINATED WORK WILL BE REPLACED AT THE

CONTRACTOR'S EXPENSE.

E COORDINATE ALL SYSTEM SHUTDOWNS WITH OWNER'S REPRESENTATIVE.

F COORDINATE WORK IN ALL OCCUPIED PROJECT AREAS WITH OWNER'S REPRESENTATIVE PRIOR TO

COMMENCEMENT OF WORK.

SCALE: 1/8" = 1'-0"A1 MECHANICAL DEMOLITION PLAN - AREA 3 PLAN NORTH

ADD ALTERNATE NO. 1

ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS

SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.

• EF-4

• EF-8

• EF-31

• EF-53

• EF-63

• EF-66

• EF-67

HH

ROGER C.

NIKOLAS

RE

GIS

TE

REDPROFESSIONALENGINEER

REG. NO.

SOUTH DAKOTA

DATE:

OMS WARM-UP

BAY

CSMS WASH

BAY

401A

OMS

MAINTANANCE

BAY

AREA '4'

AREA '1'

SEE MH101 FOR

CONTINUATION

EF-64

EF-51 EF-52

EF-40

EF-39 EF-41

EF-42

EF-43

EF-46

1 1

1 1

A

A.1

A.2

A.3

A.4

A.5

B

5 8 9 10

04/19/2024

© TSP, Inc. 2023

ISSUES

SHEET NUMBER

SHEET TITLE

C

A

B

2 3

D

E

1 2 3

4 5 6

4 5 6

A

B

C

D

E

TSP, Inc.

PROJECT TITLE

1112 N. West Ave, Sioux Falls, SD 57104

(605) 336-1160 www.teamtsp.com

ISSUE DATE

CHECKED BY

DRAWN BY

PROJECT #

LIS

TE

D

DR

AW

IN

GS

S

CA

LE

(S ) U

NL

ES

S

RE

DU

CE

D

FR

OM

O

RI

GI

NA

L x

F

OR

MA

T

Architecture Engineering

Planning

KEY PLAN

AREA 1

AREA 2

AREA 3

AREA

AREA 5

4/1 9/2

4 2

:08 :50

A M

_S D

De pt of Mi lita ry

Mi tch ell _M

_d eta ch ed .rv t

MECHANICAL

DEMOLITION PLAN -

AREA 4

MD104

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

MITCHELL, SD

REPLACE EXHAUST

FANS

CFMO #467097

SDARNG MITCHELL

CSMS #1

JRH04/19/2024

RCN04232099

SHEET GENERAL NOTES

A EQUIPMENT, DUCTWORK, PIPING, ETC. TO BE REMOVED OR RELOCATED IS SHOWN IN HEAVY DAHSED

LINES, UNLESS NOTED OTHERWISE.

B EQUIPMENT, DUCTWORK, PIPING, ETC. TO REMAIN IS SHOWN IN LIGHT LINES, UNLESS NOTED

OTHERWISE.

C CONTRACTOR SHALL CONFIRM LOCATION AND SIZE OF EXISTING EQUIPMENT, DUCTWORK, PIPING ETC.

D COORDINATE WORK WITH ALL OTHER TRADES. UNCOORDINATED WORK WILL BE REPLACED AT THE

CONTRACTOR'S EXPENSE.

E COORDINATE ALL SYSTEM SHUTDOWNS WITH OWNER'S REPRESENTATIVE.

F COORDINATE WORK IN ALL OCCUPIED PROJECT AREAS WITH OWNER'S REPRESENTATIVE PRIOR TO

COMMENCEMENT OF WORK.

PLAN NORTH

KEYNOTES

1 REMOVE ROOF MOUNTED EXHAUST FAN AND REPLACE WITH NEW FAN. DUCTWORK BELOW ROOF

TO REMAIN.

2 REMOVE VEHICLE EXAHUST FAN AND REPLACE WITH NEW.

SCALE: 1/8" = 1'-0"A1 MECHANICAL DEMOLITION PLAN - FIRST LEVEL

ADD ALTERNATE NO. 1

ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS

SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.

• EF-4

• EF-8

• EF-31

• EF-53

• EF-63

• EF-66

• EF-67

NIKOLAS

RE

GIS

TE

REDPROFESSIONALENGINEER

REG. NO.

SOUTH DAKOTA

DATE:

VESTIBULE

COMM / EL

SUPERVISOR

CALIBRATION

CALIBRATION

STORAGE

LASER & NIGHT

VISION REPAIR

INSTRUMENT

REPAIR

COMM / EL

WORK

CORRIDOR

509A

COMM / EL BAY

TIRE

INSPECTION &

SEL. FOR

RECAPPING

AREA '5'

EF-53

EF-48

EF-47

EF-49

EF-58

EF-50

EF-56

EF-59

C

D

E

F

11 12

04/19/2024

© TSP, Inc. 2023

ISSUES

SHEET NUMBER

SHEET TITLE

C

A

B

2 3

D

E

1 2 3

4 5 6

4 5 6

A

B

C

D

E

TSP, Inc.

PROJECT TITLE

1112 N. West Ave, Sioux Falls, SD 57104

(605) 336-1160 www.teamtsp.com

ISSUE DATE

CHECKED BY

DRAWN BY

PROJECT #

LIS

TE

D

DR

AW

IN

GS

S

CA

LE

(S ) U

NL

ES

S

RE

DU

CE

D

FR

OM

O

RI

GI

NA

L x

F

OR

MA

T

Architecture Engineering

Planning

KEY PLAN

AREA 1

AREA 2

AREA 3

AREA

AREA 5

4/1 9/2

4 2

:08 :55

A M

_S D

De pt of Mi lita ry

Mi tch ell _M

_d eta ch ed .rv t

MECHANICAL

DEMOLITION PLAN -

AREA 5

MD105

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

MITCHELL, SD

REPLACE EXHAUST

FANS

CFMO #467097

SDARNG MITCHELL

CSMS #1

JRH04/19/2024

RCN04232099

SHEET GENERAL NOTES

A EQUIPMENT, DUCTWORK, PIPING, ETC. TO BE REMOVED OR RELOCATED IS SHOWN IN HEAVY DAHSED

LINES, UNLESS NOTED OTHERWISE.

B EQUIPMENT, DUCTWORK, PIPING, ETC. TO REMAIN IS SHOWN IN LIGHT LINES, UNLESS NOTED

OTHERWISE.

C CONTRACTOR SHALL CONFIRM LOCATION AND SIZE OF EXISTING EQUIPMENT, DUCTWORK, PIPING ETC.

D COORDINATE WORK WITH ALL OTHER TRADES. UNCOORDINATED WORK WILL BE REPLACED AT THE

CONTRACTOR'S EXPENSE.

E COORDINATE ALL SYSTEM SHUTDOWNS WITH OWNER'S REPRESENTATIVE.

F COORDINATE WORK IN ALL OCCUPIED PROJECT AREAS WITH OWNER'S REPRESENTATIVE PRIOR TO

COMMENCEMENT OF WORK.

PLAN NORTH

SCALE: 1/8" = 1'-0"A1 MECHANICAL DEMOLITION PLAN - AREA 5

KEYNOTES

1 REMOVE ROOF MOUNTED EXHAUST FAN AND REPLACE WITH NEW FAN. DUCTWORK BELOW ROOF

TO REMAIN.

2 REMOVE VEHICLE EXAHUST FAN AND REPLACE WITH NEW.

3 EXHAUST FAN AND ALL DUCTWORK TO REMAIN.

ADD ALTERNATE NO. 1

ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS

SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.

• EF-4

• EF-8

• EF-31

• EF-53

• EF-63

• EF-66

• EF-67

NIKOLAS

RE

GIS

TE

REDPROFESSIONALENGINEER

REG. NO.

SOUTH DAKOTA

DATE:

EF-33

EF-37

EF-35 EF-34

EF-30

EF-21

EF-23

EF-20

EF-22

EF-65 EF-4 EF-2 EF-3 EF-14

EF-61

EF-60

EF-15

EF-16

EF-19

EF-17

EF-18

EF-64

EF-63

EF-62

EF-39 EF-41

EF-40 EF-42

EF-51 EF-52

EF-48

EF-47

EF-1

EF-66

EF-6 EF-5

EF-54

EF-7

EF-10 EF-11

EF-67 EF-68 EF-8

EF-70

EF-36

1 1

1 1 1 1 1

1 1

1 1

1 1

A

A.1

A.2

A.3

A.4

A.5

B

C

D

E

F

G

H

J

K

L

M

N

5 8 9 10 11

1.1 1.2

1.3

1.4

1.5

1.6

1.7

04/19/2024

© TSP, Inc. 2023

ISSUES

SHEET NUMBER

SHEET TITLE

C

A

B

2 3

D

E

1 2 3

4 5 6

4 5 6

A

B

C

D

E

TSP, Inc.

PROJECT TITLE

1112 N. West Ave, Sioux Falls, SD 57104

(605) 336-1160 www.teamtsp.com

ISSUE DATE

CHECKED BY

DRAWN BY

PROJECT #

LIS

TE

D

DR

AW

IN

GS

S

CA

LE

(S ) U

NL

ES

S

RE

DU

CE

D

FR

OM

O

RI

GI

NA

L x

F

OR

MA

T

Architecture Engineering

Planning

KEY PLAN

AREA 1

AREA 2

AREA 3

AREA

AREA 5

4/1 9/2

4 2

:08 :59

A M

_S D

De pt of Mi lita ry

Mi tch ell _M

_d eta ch ed .rv t

MECHANICAL ROOF

DEMOLITION PLAN

MD201

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

MITCHELL, SD

REPLACE EXHAUST

FANS

CFMO #467097

SDARNG MITCHELL

CSMS #1

JRH04/19/2024

RCN04232099

KEYNOTES

1 REMOVE ROOF MOUNTED EXHAUST FAN AND REPLACE WITH NEW FAN. ROOF CURB TO REMAIN.

2 GRAVITY VENTILATOR TO REMAIN.

SCALE: 1" = 20'-0"A1 MECHANICAL DEMOLTION PLAN - ROOF PLAN NORTH

ADD ALTERNATE NO. 1

ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS

SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.

• EF-4

• EF-8

• EF-31

• EF-53

• EF-63

• EF-66

• EF-67

NIKOLAS

RE

GIS

TE

REDPROFESSIONALENGINEER

REG. NO.

SOUTH DAKOTA

DATE:

127B

STORAGE

TELECOMUNICATIONS

112A

TELECOM.

ROOM

MECHANICAL

ROOM

111B

STORAGE

CUSTODIAL

CORRIDOR

LUMBER

STORAGE

LIBRARY

LOBBY

COMM SEC

REPAIR

RADIATION

CALIBRATION

COLD

STORAGE

CORRIDOR

VESTIBULE

OMS

HAZARDOUS

WASTE

OMS BATTERY

OMS POL

STORAGE

CUSTODIAL

CORRIDOR

CUSTODIAL

PRODUCTION

CONTROL

CSMS

HAZARDOUS

CSMS

BATTERY

CSMS POL

STORAGE

CUSTODIAL

CSMS

FLAMMABLE

OMS

FLAMMABLE

STORAGE

VESTIBULE

VESTIBULE

CORRIDOR

CORRIDOR

COLD

STORAGE

112B

ELECTRICAL

ROOM

OMS SUPER.

VESTIBULE

CSMS

SUPERVISOR

RADIATION

STORAGE

128A

ELECTRICAL

ROOM

132B

MECH.

GENERAL

SUPERVISOR

CLERK TYPIST

FITNESS

CSMS BREAK

ROOM

OMS BREAK

ROOM

111G

WOMEN'SMLATRINE

111F

WOMEN'S

LOCKER

111A

MEN'S LATRINE

111C

MEN'S LOCKER

CSMS TOOL &

SUPPLY

OMS TOOL &

SUPPLY

127C

MEN'S LOCKER

127A

MEN'S LATRINE

127G

WOMEN'S

LATRINE

127F

WOMEN'S

LOCKER

CORRIDOR

COLD

STORAGE

CORRIDOR

CUSTODIAL

INSPECTION

SUPERVISOR

AREA '5'AREA '1'

AREA '4'

AREA '3'

SEE MH104 FOR CONTINUATION

SEE MH102 FOR CONTINUATION

SEE MH103 FOR

CONTINUATION

SEE MH105

FOR CONTINUATION

AREA '2'

(E) 12"x10" E/A1

(E) 12"x10" E/A1

(E) 20"x16" E/A (E) 16"x12"

(E) 12"x8"

(E) 16"x10"

(E) 12"x8"

(E) 16"x10"

(E) 12"x8"

(E) E

(E) E

(E) E

(E) E

(E) E

(E) E

(E) E

(E) E

(E) E

(E) E 400(E) E

(E) E

(E) 12"x10" E/A1

(E) 12"x10" E/A

(E) 12"x10" E/A

(E) E

12"x10" E/A (E) 12"x10" E/A

(E) E

12"x10" E/A

(E ) 2

0" x1

6" E

/A

(E) 16"x10"(E) 12"x8"

(E) 12"x8"

(E ) 1

6" x1

2"

(E) 16"x10"

(E) 12"x8"

A.5

B

C

D

E

F

G

H

J

K

L

3 5 8 9 10 117

EF-60 EF-61

EF-18

EF-17

EF-19

EF-16

EF-15

EF-64

EF-63

EF-62

EF-4

EF-65 EF-2 EF-3 EF-14

EF-1

EF-66

EF-64

(E) EF-56(E) 12"x10" E/A

04/19/2024

KEYNOTES

1 EXISTING E/A DUCT UP THROUGH ROOF TO NEW PRV. FIELD VERIFY SIZE.

© TSP, Inc. 2023

ISSUES

SHEET NUMBER

SHEET TITLE

C

A

B

2 3

D

E

1 2 3

4 5 6

4 5 6

A

B

C

D

E

TSP, Inc.

PROJECT TITLE

1112 N. West Ave, Sioux Falls, SD 57104

(605) 336-1160 www.teamtsp.com

ISSUE DATE

CHECKED BY

DRAWN BY

PROJECT #

LIS

TE

D

DR

AW

IN

GS

S

CA

LE

(S ) U

NL

ES

S

RE

DU

CE

D

FR

OM

O

RI

GI

NA

L x

F

OR

MA

T

Architecture Engineering

Planning

KEY PLAN

AREA 1

AREA 2

AREA 3

AREA

AREA 5

4/1 9/2

4 2

:09 :06

A M

_S D

De pt of Mi lita ry

Mi tch ell _M

_d eta ch ed .rv t

MECHANICAL HVAC

PLAN - AREA 1

MH101

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

MITCHELL, SD

REPLACE EXHAUST

FANS

CFMO #467097

SDARNG MITCHELL

CSMS #1

JRH04/19/2024

RCN04232099

SHEET GENERAL NOTES

A ALL NEW FANS SHALL BE CONTROLLED THE SAME AS THE RESPECTIVE EXISTING FAN. BMS

CONTRACTOR TO FIELD VERIFY EXISTING AND RECONNECT. REMAP ALL EXISTING CONTROL AND

MONITOR POINTS AT BMS WORKSTATION. ADD FAN SPEED INDICATION AND FAN SPEED

MODULATION FOR ALL NEW DIRECT DRIVE FANS WITH EC MOTORS OR VFDS.

B BALANCE ALL EXHAUST SYSTEMS TO AIRFLOWS SHOWN. WHERE AIRFLOWS ARE NOT SHOWN ON

THIS SHEET, BALANCE FAN TO FLOWS LISTED ON EQUIPMENT SCHEDULE.

SCALE: 1/8" = 1'-0"A1 MECHANICAL HVAC PLAN - FIRST LEVEL PLAN NORTH

NOTE:

ALL PRODUCTS AND MATERIALS SHALL COMPLY WITH FEDERAL BUILD AMERICA BUY AMERICA

ACT REQUIREMENTS

ADD ALTERNATE NO. 1

ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS

SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.

• EF-4

• EF-8

• EF-31

• EF-53

• EF-63

• EF-66

• EF-67

ROGER C.

NIKOLAS

RE

GIS

TE

REDPROFESSIONALENGINEER

REG. NO.

SOUTH DAKOTA

DATE:

VESTIBULE

RADIATOR

TEST & REPAIR

SMALL ARMS

TEST

MACHINE SHOP

SMALL ARMS &

GLASS REPAIR

VAULT

PAINT PREP

PAINT BOOTH

PAINT

MECHANICAL

PAINT KITCHEN

BEAD BLAST

ALLIED

TRADES

SUPERVISOR204

CANVAS &

CARPENTER

SHOP

CANVAS &

CARPENTER

STORAGE

WELDING &

BODY SHOP

COORIDOR

CSMS

MAINTENANCE

BAY

AREA '1'

SEE MH101 FOR CONTINUATION

AREA '2'

EF-71

EF-31

EF-12

EF-69

(E) 12"Ø (E) 12"Ø

1 1

(E) 12"x10" E/A

(E) E-

(E) E

(E) 12"x10" E/A

L

M

N

3 5 87

EF-6 EF-5

EF-7

EF-54

EF-11EF-10

EF-67

EF-68

EF-8

EF-70

EF-31

EF-6 EF-5

EF-7

EF-54

EF-11EF-10

EF-67

EF-68

EF-8

EF-70

LOCKER

04/19/2024

© TSP, Inc. 2023

ISSUES

SHEET NUMBER

SHEET TITLE

C

A

B

2 3

D

E

1 2 3

4 5 6

4 5 6

A

B

C

D

E

TSP, Inc.

PROJECT TITLE

1112 N. West Ave, Sioux Falls, SD 57104

(605) 336-1160 www.teamtsp.com

ISSUE DATE

CHECKED BY

DRAWN BY

PROJECT #

LIS

TE

D

DR

AW

IN

GS

S

CA

LE

(S ) U

NL

ES

S

RE

DU

CE

D

FR

OM

O

RI

GI

NA

L x

F

OR

MA

T

Architecture Engineering

Planning

KEY PLAN

AREA 1

AREA 2

AREA 3

AREA

AREA 5

4/1 9/2

4 2

:09 :10

A M

_S D

De pt of Mi lita ry

Mi tch ell _M

_d eta ch ed .rv t

MECHANICAL HVAC

PLAN - AREA 2

MH102

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

MITCHELL, SD

REPLACE EXHAUST

FANS

CFMO #467097

SDARNG MITCHELL

CSMS #1

JRH04/19/2024

RCN04232099

KEYNOTES

1 EXISTING E/A DUCT UP THROUGH ROOF TO NEW PRV. FIELD VERIFY SIZE.

2 INSTALL NEW FAN SIMILAR TO EXISTING. CONNECT TO EXISTING INLET AND DISCHARGE DUCTWORK.

MODIFY EXISTING DUCTWORK AS NECESSARY TO CONNECT TO NEW FAN.

3 EXISTING EXHAUST FAN DISCHARGE UP THROUGH ROOF TO EXISTING GRAVITY HOOD OR

GOOSENECK.

4 EXISTING DOWNDRAFT WELDING TABLE.

5 MODIFY/EXTEND EXISTING ANGLE IRON FRAMING AS NECESSARY TO INSTALL NEW FAN.

SHEET GENERAL NOTES

A ALL NEW FANS SHALL BE CONTROLLED THE SAME AS THE RESPECTIVE EXISTING FAN. BMS

CONTRACTOR TO FIELD VERIFY EXISTING AND RECONNECT. REMAP ALL EXISTING CONTROL AND

MONITOR POINTS AT BMS WORKSTATION. ADD FAN SPEED INDICATION AND FAN SPEED

MODULATION FOR ALL NEW DIRECT DRIVE FANS WITH EC MOTORS OR VFDS.

B BALANCE ALL EXHAUST SYSTEMS TO AIRFLOWS SHOWN. WHERE AIRFLOWS ARE NOT SHOWN ON

THIS SHEET, BALANCE FAN TO FLOWS LISTED ON EQUIPMENT SCHEDULE.

SCALE: 1/8" = 1'-0"A1 MECHANICAL HVAC PLAN - AREA 2 PLAN NORTH

NOTE:

ALL PRODUCTS AND MATERIALS SHALL COMPLY WITH FEDERAL BUILD AMERICA BUY AMERICA

ACT REQUIREMENTS

ADD ALTERNATE NO. 1

ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS

SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.

• EF-4

• EF-8

• EF-31

• EF-53

• EF-63

• EF-66

• EF-67

ROGER C.

NIKOLAS

RE

GIS

TE

REDPROFESSIONALENGINEER

REG. NO.

SOUTH DAKOTA

DATE:

MECHANICAL

ENGINE TEST

MECHANICAL

TRANS TEST

305A

CONTROL

ROOM

TRANS DYNO

ENGINE DYNO

CONTROL

ROOM

TRANS &

POWER PACK

LUBRICATION

BAY

TRANS &

ENGINE TEST

CSMS

MAINTANENCE

BAYS

INJECTOR

TEST FUEL &

INJECTION

REPAIR & POP

VALVE TEST

CSMS

WARM-UP BAY

AREA '3'

AREA '1' SEE

MH101 FOR

CONTINUATION

EF-25

EF-28

EF-32

(E) 16"x14" E/A

1 1 1

(E) 12"Ø E/A (E) 12"Ø E/A

(E) 12"Ø E/A

(E) 12"Ø E/A

(E) 12"Ø E/A

(E) 12"Ø E/A

E

F

G

H

J

K

1.1 1.2

1.3

1.4

1.5

1.6

1.7

EF-65

EF-37

EF-33

EF-36

EF-30

EF-34EF-35

EF-21

EF-23

EF-20

EF-22

04/19/2024

KEYNOTES

1 EXISTING E/A DUCT UP THROUGH ROOF TO NEW PRV. FIELD VERIFY SIZE.

2 INSTALL NEW FAN SIMILAR TO EXISTING. CONNECT TO EXISTING INLET AND DISCHARGE DUCTWORK.

MODIFY EXISTING DUCTWORK AS NECESSARY TO CONNECT TO NEW FAN.

3 EXISTING EXHAUST FAN DISCHARGE UP THROUGH ROOF TO EXISTING GRAVITY HOOD OR

GOOSENECK.

4 EXISTING EXHAUST FAN.

© TSP, Inc. 2023

ISSUES

SHEET NUMBER

SHEET TITLE

C

A

B

2 3

D

E

1 2 3

4 5 6

4 5 6

A

B

C

D

E

TSP, Inc.

PROJECT TITLE

1112 N. West Ave, Sioux Falls, SD 57104

(605) 336-1160 www.teamtsp.com

ISSUE DATE

CHECKED BY

DRAWN BY

PROJECT #

LIS

TE

D

DR

AW

IN

GS

S

CA

LE

(S ) U

NL

ES

S

RE

DU

CE

D

FR

OM

O

RI

GI

NA

L x

F

OR

MA

T

Architecture Engineering

Planning

KEY PLAN

AREA 1

AREA 2

AREA 3

AREA

AREA 5

4/1 9/2

4 2

:09 :15

A M

_S D

De pt of Mi lita ry

Mi tch ell _M

_d eta ch ed .rv t

MECHANICAL HVAC

PLAN - AREA 3

MH103

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

MITCHELL, SD

REPLACE EXHAUST

FANS

CFMO #467097

SDARNG MITCHELL

CSMS #1

JRH04/19/2024

RCN04232099

SHEET GENERAL NOTES

A ALL NEW FANS SHALL BE CONTROLLED THE SAME AS THE RESPECTIVE EXISTING FAN. BMS

CONTRACTOR TO FIELD VERIFY EXISTING AND RECONNECT. REMAP ALL EXISTING CONTROL AND

MONITOR POINTS AT BMS WORKSTATION. ADD FAN SPEED INDICATION AND FAN SPEED

MODULATION FOR ALL NEW DIRECT DRIVE FANS WITH EC MOTORS OR VFDS.

B BALANCE ALL EXHAUST SYSTEMS TO AIRFLOWS SHOWN. WHERE AIRFLOWS ARE NOT SHOWN ON

THIS SHEET, BALANCE FAN TO FLOWS LISTED ON EQUIPMENT SCHEDULE.

SCALE: 1/8" = 1'-0"A1 MECHANICAL HVAC PLAN - AREA 3 PLAN NORTH

NOTE:

ALL PRODUCTS AND MATERIALS SHALL COMPLY WITH FEDERAL BUILD AMERICA BUY AMERICA

ACT REQUIREMENTS

ADD ALTERNATE NO. 1

ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS

SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.

• EF-4

• EF-8

• EF-31

• EF-53

• EF-63

• EF-66

• EF-67

ROGER C.

NIKOLAS

RE

GIS

TE

REDPROFESSIONALENGINEER

REG. NO.

SOUTH DAKOTA

DATE:

OMS WARM-UP

BAY

CSMS WASH

BAY

401A

OMS

MAINTANANCE

BAY

AREA '4'

AREA '1'

SEE MH101 FOR

CONTINUATION

EF-46

EF-43

1 1

(E) 12"Ø

(E) 12"Ø

(E) 12"Ø E/A

(E) 12"Ø

(E) 12"Ø

(E) 12"Ø E/A

A

A.1

A.2

A.3

A.4

A.5

B

5 8 9 10

EF-51 EF-52

EF-40

EF-39 EF-41

EF-42

04/19/2024

© TSP, Inc. 2023

ISSUES

SHEET NUMBER

SHEET TITLE

C

A

B

2 3

D

E

1 2 3

4 5 6

4 5 6

A

B

C

D

E

TSP, Inc.

PROJECT TITLE

1112 N. West Ave, Sioux Falls, SD 57104

(605) 336-1160 www.teamtsp.com

ISSUE DATE

CHECKED BY

DRAWN BY

PROJECT #

LIS

TE

D

DR

AW

IN

GS

S

CA

LE

(S ) U

NL

ES

S

RE

DU

CE

D

FR

OM

O

RI

GI

NA

L x

F

OR

MA

T

Architecture Engineering

Planning

KEY PLAN

AREA 1

AREA 2

AREA 3

AREA

AREA 5

4/1 9/2

4 2

:09 :20

A M

_S D

De pt of Mi lita ry

Mi tch ell _M

_d eta ch ed .rv t

MECHANICAL HVAC

PLAN - AREA 4

MH104

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

MITCHELL, SD

REPLACE EXHAUST

FANS

CFMO #467097

SDARNG MITCHELL

CSMS #1

JRH04/19/2024

RCN04232099

SHEET GENERAL NOTES

A ALL NEW FANS SHALL BE CONTROLLED THE SAME AS THE RESPECTIVE EXISTING FAN. BMS

CONTRACTOR TO FIELD VERIFY EXISTING AND RECONNECT. REMAP ALL EXISTING CONTROL AND

MONITOR POINTS AT BMS WORKSTATION. ADD FAN SPEED INDICATION AND FAN SPEED

MODULATION FOR ALL NEW DIRECT DRIVE FANS WITH EC MOTORS OR VFDS.

B BALANCE ALL EXHAUST SYSTEMS TO AIRFLOWS SHOWN. WHERE AIRFLOWS ARE NOT SHOWN ON

THIS SHEET, BALANCE FAN TO FLOWS LISTED ON EQUIPMENT SCHEDULE.

PLAN NORTH

KEYNOTES

1 EXISTING E/A DUCT UP THROUGH ROOF TO NEW PRV. FIELD VERIFY SIZE.

2 INSTALL NEW FAN SIMILAR TO EXISTING. CONNECT TO EXISTING INLET AND DISCHARGE DUCTWORK.

MODIFY EXISTING DUCTWORK AS NECESSARY TO CONNECT TO NEW FAN.

3 EXISTING EXHAUST FAN DISCHARGE UP THROUGH ROOF TO EXISTING GRAVITY HOOD OR

GOOSENECK.

SCALE: 1/8" = 1'-0"A1 MECHANICAL HVAC PLAN - AREA 4

NOTE:

ALL PRODUCTS AND MATERIALS SHALL COMPLY WITH FEDERAL BUILD AMERICA BUY AMERICA

ACT REQUIREMENTS

ADD ALTERNATE NO. 1

ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS

SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.

• EF-4

• EF-8

• EF-31

• EF-53

• EF-63

• EF-66

• EF-67

NIKOLAS

RE

GIS

TE

REDPROFESSIONALENGINEER

REG. NO.

SOUTH DAKOTA

DATE:

VESTIBULE 501

COMM / EL

SUPERVISOR

CALIBRATION

CALIBRATION

STORAGE

LASER & NIGHT

VISION REPAIR

INSTRUMENT

REPAIR

COMM / EL

WORK

CORRIDOR

509A

COMM / EL BAY

TIRE

INSPECTION &

SEL. FOR

RECAPPING

AREA '5'AREA '1'

SEE SHEET

MH101 FOR

CONTINUATION

EF-53

C

D

E

F

11 12

EF-53

EF-48

EF-47

(E) EF-49

(E) EF-58

(E) EF-50

(E) EF-56

(E) EF-59

04/19/2024

© TSP, Inc. 2023

ISSUES

SHEET NUMBER

SHEET TITLE

C

A

B

2 3

D

E

1 2 3

4 5 6

4 5 6

A

B

C

D

E

TSP, Inc.

PROJECT TITLE

1112 N. West Ave, Sioux Falls, SD 57104

(605) 336-1160 www.teamtsp.com

ISSUE DATE

CHECKED BY

DRAWN BY

PROJECT #

LIS

TE

D

DR

AW

IN

GS

S

CA

LE

(S ) U

NL

ES

S

RE

DU

CE

D

FR

OM

O

RI

GI

NA

L x

F

OR

MA

T

Architecture Engineering

Planning

KEY PLAN

AREA 1

AREA 2

AREA 3

AREA

AREA 5

4/1 9/2

4 2

:09 :25

A M

_S D

De pt of Mi lita ry

Mi tch ell _M

_d eta ch ed .rv t

MECHANICAL HVAC

PLAN - AREA 5

MH105

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

MITCHELL, SD

REPLACE EXHAUST

FANS

CFMO #467097

SDARNG MITCHELL

CSMS #1

JRH04/19/2024

RCN04232099

SHEET GENERAL NOTES

A ALL NEW FANS SHALL BE CONTROLLED THE SAME AS THE RESPECTIVE EXISTING FAN. BMS

CONTRACTOR TO FIELD VERIFY EXISTING AND RECONNECT. REMAP ALL EXISTING CONTROL AND

MONITOR POINTS AT BMS WORKSTATION. ADD FAN SPEED INDICATION AND FAN SPEED

MODULATION FOR ALL NEW DIRECT DRIVE FANS WITH EC MOTORS OR VFDS.

B BALANCE ALL EXHAUST SYSTEMS TO AIRFLOWS SHOWN. WHERE AIRFLOWS ARE NOT SHOWN ON

THIS SHEET, BALANCE FAN TO FLOWS LISTED ON EQUIPMENT SCHEDULE.

PLAN NORTH

KEYNOTES

1 EXISTING E/A DUCT UP THROUGH ROOF TO NEW PRV. FIELD VERIFY SIZE.

2 INSTALL NEW FAN SIMILAR TO EXISTING. CONNECT TO EXISTING INLET AND DISCHARGE DUCTWORK.

MODIFY EXISTING DUCTWORK AS NECESSARY TO CONNECT TO NEW FAN.

3 EXISTING EXHAUST FAN DISCHARGE UP THROUGH ROOF TO EXISTING GRAVITY HOOD OR

GOOSENECK.

4 EXISTING SNORKEL EXHAUST FAN.

SCALE: 1/8" = 1'-0"A1 MECHANICAL HVAC PLAN - AREA 5

NOTE:

ALL PRODUCTS AND MATERIALS SHALL COMPLY WITH FEDERAL BUILD AMERICA BUY AMERICA

ACT REQUIREMENTS

ADD ALTERNATE NO. 1

ALL WORK ASSOCIATED WITH REMOVAL AND REPLACEMENT OF THE FOLLOWING FANS

SHALL BE DONE UNDER BID ALTERNATE NO. 1. OMIT WORK UNDER THE BASE BID.

• EF-4

• EF-8

• EF-31

• EF-53

• EF-63

• EF-66

• EF-67

NIKOLAS

RE

GIS

TE

REDPROFESSIONALENGINEER

REG. NO.

SOUTH DAKOTA

DATE:

EF-37

EF-33

EF-35

EF-36

EF-34

EF-30

EF-21

EF-23

EF-20

EF-22

EF-65

EF-4

EF-2

EF-3

EF-14

EF-60

EF-15

EF-19

EF-17

EF-18

EF-64

EF-16

EF-39 EF-41

EF-40 EF-42

EF-52

EF-62

EF-63

EF-66

EF-1

EF-5EF-6

EF-7

EF-54

EF-11EF-10

EF-67 EF-68

EF-70

EF-8

EF-47

EF-48

EF-61

EF-51

A

A.1

A.2

A.3

A.4

A.5

B

C

D

E

F

G

H

J

K

L

M

N

5 8 9 10 11

1.1 1.2

1.3

1.4

1.5

1.6

1.7

1 1 1

1 1

1 1

1 1

2 2

04/19/2024

KEYNOTES

1 INSTALL NEW FAN ON EXISTING ROOF CURB. VERIFY CURB DIMENSIONS AND PROVIDE CURB

ADAPTOR WHERE REQUIRED.

2 EXISTING GRAVITY EXHAUST HOOD AND DUCT DOWN THROUGH ROOF TO VEHICLE EXHAUST FAN.

3 EXISTING GOOSENECK AND DUCT DOWN THROUGH ROOF TO WELDING EXHAUST FAN EF-31.

4 EXISTING GOOSENECK AND DUCT DOWN TO SNORKEL EXHAUST FAN.

© TSP, Inc. 2023

ISSUES

SHEET NUMBER

SHEET TITLE

C

A

B

2 3

D

E

1 2 3

4 5 6

4 5 6

A

B

C

D

E

TSP, Inc.

PROJECT TITLE

1112 N. West Ave, Sioux Falls, SD 57104

(605) 336-1160 www.teamtsp.com

ISSUE DATE

CHECKED BY

DRAWN BY

PROJECT #

LIS

TE

D

DR

AW

IN

GS

S

CA

LE

(S ) U

NL

ES

S

RE

DU

CE

D

FR

OM

O

RI

GI

NA

L x

F

OR

MA

T

Architecture Engineering

Planning

KEY PLAN

AREA 1

AREA 2

AREA 3

AREA

AREA 5

4/1 9/2

4 2

:09 :29

A M

_S D

De pt of Mi lita ry

Mi tch ell _M

_d eta ch ed .rv t

MECHANICAL ROOF

PLAN

M-201

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

MITCHELL, SD

REPLACE EXHAUST

FANS

CFMO #467097

SDARNG MITCHELL

CSMS #1

JRH04/19/2024

RCN04232099

SCALE: 1" = 20'-0"A1 MECHANICAL PLAN - ROOF PLAN NORTH

NOTE:

ALL PRODUCTS AND MATERIALS SHALL COMPLY WITH FEDERAL BUILD AMERICA BUY AMERICA

ACT REQUIREMENTS

NIKOLAS

RE

GIS

TE

REDPROFESSIONALENGINEER

REG. NO.

SOUTH DAKOTA

DATE: 04/19/2024

© TSP, Inc. 2023

ISSUES

SHEET NUMBER

SHEET TITLE

C

A

B

2 3

D

E

1 2 3

4 5 6

4 5 6

A

B

C

D

E

TSP, Inc.

PROJECT TITLE

1112 N. West Ave, Sioux Falls, SD 57104

(605) 336-1160 www.teamtsp.com

ISSUE DATE

CHECKED BY

DRAWN BY

PROJECT #

LIS

TE

D

DR

AW

IN

GS

S

CA

LE

(S ) U

NL

ES

S

RE

DU

CE

D

FR

OM

O

RI

GI

NA

L x

F

OR

MA

T

Architecture Engineering

Planning

4/1 9/2

4 2

:09 :34

A M

_S D

De pt of Mi lita ry

Mi tch ell _M

_d eta ch ed .rv t

MECHANICAL

SCHEDULES

ME601

CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

MITCHELL, SD

REPLACE EXHAUST

FANS

CFMO #467097

SDARNG MITCHELL

CSMS #1

JRH04/19/2024

RCN04232099

EXHAUST FAN & POWER ROOF VENT SCHEDULE

EQUIPMENT REQUIREMENTS ELECTRICAL REQUIREMENTS

UNIT

NO. MANUFACTURER MODEL NO. TYPE AIRFLOW TSP RPM

BRAKE

POWER POWER SONES

UNIT

WEIGHT

EQUIPMENT

NOTES VOLT/PH

MIN CKT

AMP MOCP WIRE SIZE / CONDUIT

CONTROLLER CONTROL

BY

DISCONNECT ELECTRICAL

NOTESTYPE SIZE LOCATION CTL DEVICE AUX BY TYPE BY

EF-1 RuppAir DR85HRA DIRECT DRIVE, DOWNBLAST 2000 CFM 0.70 in-wg 1467 0.55 hp 1.00 hp 17.5 79 lb 3,4 120 / 1 V 12.3 A 20 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-2 RuppAir DR50HRA DIRECT DRIVE, DOWNBLAST 650 CFM 0.50 in-wg 1053 0.13 hp 0.50 hp 7.6 65 lb 3,4 277 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-3 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 500 CFM 0.50 in-wg 1185 0.10 hp 0.25 hp 6.8 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-4 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 400 CFM 0.50 in-wg 1102 0.07 hp 0.25 hp 6 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 E2 EF-5 RuppAir DU85HRA DIRECT DRIVE, UPBLAST 2100 CFM 0.40 in-wg 1375 0.49 hp 0.75 hp 15.9 81 lb 2,4 480 / 3 V 1.7 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-6 RuppAir DU85HRA DIRECT DRIVE, UPBLAST 2100 CFM 0.40 in-wg 1375 0.49 hp 0.75 hp 15.9 81 lb 2,4 480 / 3 V 1.7 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-7 RuppAir DU85HRA DIRECT DRIVE, DOWNBLAST 1500 CFM 0.40 in-wg 1081 0.24 hp 0.75 hp 7.7 107 lb 2,4 480 / 3 V 1.7 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-8 RuppAir DU85HRA DIRECT DRIVE, DOWNBLAST 2100 CFM 0.40 in-wg 1375 0.49 hp 0.75 hp 15.9 81 lb 2,4 480 / 3 V 1.7 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 E3 EF-10 RuppAir DR180HRA DIRECT DRIVE, DOWNBLAST 2300 CFM 0.40 in-wg 864 0.49 hp 1.00 hp 8.6 165 lb 2,4 480 / 3 V 2.2 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-11 RuppAir DR180HRA DIRECT DRIVE, DOWNBLAST 2300 CFM 0.40 in-wg 864 0.49 hp 1.00 hp 8.6 165 lb 2,4 480 / 3 V 2.2 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-12 CAR-MON CMB-25F BELT DRIVE UTILITY SET 2800 CFM 5.00 in-wg 2520 3.10 hp 5.00 hp 0 235 lb 6 480 / 3 V 9.5 A EXISTING SEE CIRCUIT SCHEDULE STARTER 1 MCC-2 - - EXISTING EXISTING NFDS DIV. 26 E1 EF-14 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 500 CFM 0.50 in-wg 1185 0.09 hp 0.25 hp 6.8 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-15 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 650 CFM 0.50 in-wg 1332 0.13 hp 0.25 hp 8.5 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-16 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 650 CFM 0.50 in-wg 1332 0.13 hp 0.25 hp 8.5 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-17 RuppAir DR50HRA DIRECT DRIVE, DOWNBLAST 650 CFM 0.50 in-wg 1053 0.13 hp 0.50 hp 7.6 65 lb 3,4 277 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-18 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 500 CFM 0.50 in-wg 1185 0.09 hp 0.25 hp 6.8 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-19 RuppAir DR85HRA DIRECT DRIVE, DOWNBLAST 2000 CFM 0.70 in-wg 1467 0.55 hp 1.00 hp 17.5 79 lb 3,4 120 / 1 V 14.5 A 25 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-20 RuppAir DR240HRA DIRECT DRIVE, DOWNBLAST 4000 CFM 0.40 in-wg 652 0.71 hp 1.50 hp 9.2 242 lb 2,4 480 / 3 V 3.8 A 6 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-21 RuppAir DR240HRA DIRECT DRIVE, DOWNBLAST 4000 CFM 0.40 in-wg 652 0.71 hp 1.50 hp 9.2 242 lb 2,4 480 / 3 V 3.8 A 6 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-22 RuppAir DR240HRA DIRECT DRIVE, DOWNBLAST 4000 CFM 0.40 in-wg 652 0.71 hp 1.50 hp 9.2 242 lb 2,4 480 / 3 V 3.8 A 6 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-23 RuppAir DR240HRA DIRECT DRIVE, DOWNBLAST 4000 CFM 0.40 in-wg 652 0.71 hp 1.50 hp 9.2 242 lb 2,4 480 / 3 V 3.8 A 6 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-25 CAR-MON CMB-30F BELT DRIVE UTILITY SET 4200 CFM 5.00 in-wg 1992 4.60 hp 7.50 hp 0 325 lb 6 480 / 3 V 13.8 A EXISTING SEE CIRCUIT SCHEDULE STARTER 1 MCC-3 - - EXISTING EXISTING NFDS DIV. 26 E1 EF-28 CAR-MON CMB-30F BELT DRIVE UTILITY SET 4200 CFM 5.00 in-wg 1992 4.60 hp 7.50 hp 0 325 lb 6 480 / 3 V 13.8 A EXISTING SEE CIRCUIT SCHEDULE STARTER 1 MCC-3 - - EXISTING EXISTING NFDS DIV. 26 E1 EF-30 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 500 CFM 0.50 in-wg 1185 0.10 hp 0.25 hp 6.8 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-31 CAR-MON CMW-11 DIRECT DRIVE UTILITY SET 1100 CFM 3.00 in-wg 0 0.00 hp 1.00 hp 0 0 lb 5 480 / 3 V 2.6 A EXISTING SEE CIRCUIT SCHEDULE STARTER 1 MCC-2 - - EXISTING EXISTING NFDS DIV. 26 E1, E2 EF-32 CAR-MON CMB-25F BELT DRIVE UTILITY SET 2800 CFM 5.00 in-wg 2520 3.10 hp 5.00 hp 0 235 lb 6 480 / 3 V 9.5 A EXISTING SEE CIRCUIT SCHEDULE STARTER 1 MCC-3 - - EXISTING EXISTING NFDS DIV. 26 E1 EF-33 RuppAir DR180HRA DIRECT DRIVE, DOWNBLAST 1500 CFM 0.40 in-wg 687 0.24 hp 1.00 hp 5.1 164 lb 2,4 480 / 3 V 1.8 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-34 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 500 CFM 0.50 in-wg 1195 0.10 hp 0.25 hp 6.8 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-35 RuppAir DR30HRA DIRECT DRIVE, DOWNBLAST 600 CFM 0.50 in-wg 1279 0.12 hp 0.25 hp 7.9 59 lb 3,4 120 / 1 V 3.7 A 15 A SEE CIRCUIT SCHEDULE ECM - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-36 RuppAir DR180HRA DIRECT DRIVE, DOWNBLAST 1200 CFM 0.50 in-wg 692 0.23 hp 1.00 hp 5.1 164 lb 2,4 480 / 3 V 1.8 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-37 RuppAir DR180HRA DIRECT DRIVE, DOWNBLAST 1500 CFM 0.40 in-wg 687 0.24 hp 1.00 hp 5.1 164 lb 2,4 480 / 3 V 1.8 A 3 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-39 RuppAir DR240HRA DIRECT DRIVE, DOWNBLAST 3200 CFM 0.40 in-wg 581 0.48 hp 1.50 hp 7.4 242 lb 2,4 480 / 3 V 3.8 A 6 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV. 23 - EF-40 RuppAir DR240HRA DIRECT DRIVE, DOWNBLAST 3200 CFM 0.40 in-wg 581 0.48 hp 1.50 hp 7.4 242 lb 2,4 480 / 3 V 3.8 A 6 A SEE CIRCUIT SCHEDULE VFD - INTEGRAL - - DIV. 23 DIV. 23 DISC. SW. DIV.