Executed-CCGI change order.pdf

PDF 925 KB Posted

Attached to
Change Order Notice-Sourcewell Electric Vehicle Supply Equipment
Solicitation number
26-560IFA-IFA56-B-51668
Issued by
Illinois

About this file

This is a Change Order Request filed by the Illinois Finance Authority (IFA) with the State of Illinois Chief Procurement Office regarding a participation contract with CCGI Holdings Inc. for Electric Vehicle Supply Equipment (EVSE) and related services through the Sourcewell cooperative purchasing program. The project encompasses the development of publicly-accessible EV charging infrastructure across 175 locations in Illinois spanning 23 counties and involving 33 project partners. The charging infrastructure initiative includes an estimated 659 Level 2 EV charging ports and 58 DC fast-charging ports. CCGI Holdings Inc. will serve as a turnkey EVSE service provider responsible for supplying and installing charging hardware, managing network operations, and providing ongoing maintenance and support throughout a five-year project period extending from October 15, 2025 to July 20, 2026, with service delivery continuing through the completion of all installations.

The original contract cost of $2,388,909.00 is being increased to $2,505,377.00, representing a cost increase of $116,468.00. The cost adjustment was necessitated by formal site visits conducted after contract execution, during which the vendor identified additional infrastructure requirements at certain locations requiring increased electrical capacity and additional conduit installations. IFA notes that the UChicago site was subsequently removed from the project scope, partially offsetting costs. The change order justification emphasizes that IFA has already invested significant time and resources with the current vendor, and selecting an alternative vendor would delay the project by approximately six months, result in loss of completed site engineering and design work, and cause the State to miss the June 30 federal tax credit deadline for EV charging station installations. The change order was approved on March 26-27, 2026, by the Agency Purchasing Officer, State Purchasing Officer, and Chief Procurement Officer.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Change Order Request for Participation or Piggyback Contract State of Illinois Chief Procurement Office General Services Change Order Request for Participation or Piggyback Contract v.25.1 Page of Section I - General Information Section II - Change Order Information

1. Provide the original contract description:

2. Provide a detailed description and explanation for the change required:

3. The completion date will be

4. The Cost will be

5. The circumstances said to necessitate this change was not reasonably foreseeable at the time the contract was signed.

The change is germane to the original contract as signed.

APPROVAL SIGNATURES

Agency Purchasing Officer Approval I know and understand the contents of this Change Order Request and attest that all statements are true and correct.

State Purchasing Officer Recommendation Based on my review of the provided information, with the requested change(s) for the following reason(s):

Unified Procurement Program Review and Recommendation Based on my review of the provided information, in the best interests of the State to allow the requested change(s) to the existing contract for the following reason(s):

Chief Procurement Officer Approval Based on my review of the provided information, I determine in the best interests of the State to allow the requested change(s) to the contract for the following reason(s):

6.5.0.20190320.2.935878.932721

CurrentPage:
PageCount:
AGENCYDROPDOWN: IFA - IL Finance Authority
TextField1: Change Order Notice-Sourcewell Electric Vehicle Supply Equipment
TextField2: Sourcewell- Solicitation Electric Vehicle Supply Equipment and Related Services
TextField3: CCGI Holdings Inc.
TextField4: 10/15/25-07/20/26
TextField5: $2,388,909.00
DropDownList1: Participation
TextField6: 25-560IFA-IFA56-P-86687
TextField7: 26-560IFA-IFA56-R-311944
TextField8: The State has identified 175 locations (Project Sites) for publicly-accessible EV charging infrastructure through 33 project partners (Project Partners) across 23 counties. The focus of the charging infrastructure at the Project Sites includes a need-based and proportional reflection of Level 2 and DC Fast Charging EV Charging Infrastructure, with the following estimated quantities: 659 Level 2 EV charging ports, 58 DC fast-charging ports. All numbers are current estimates and subject to revision. The State is dedicated to procuring the services of one or more turnkey EVSE service providers who will oversee the development of individual Project Sites across Illinois for roughly two-thirds of Project Partners roughly two dozen who want to use a statewide vendor(s) instead of their own EVSE service provider. This approach aims to ensure a coordinated statewide strategy to developing community charging infrastructure to serve unmet market needs and significantly reduce the administrative workload for local governments and ensure a streamlined, efficient process for the development of EVSE. Service providers may be responsible for all or some of the Project Sites. The turnkey service provider will be responsible for supplying and installing charging hardware, managing network operations, and providing ongoing maintenance and support throughout the five-year project period.
TextField9: Original budget was based off rough estimates without the vendor having seen each of the sites. After performing formal site visits, the vendor determined that certain sites would be more expensive to install due to the need for increased electrical capacity, additional conduit. Justifications for costs increases at each site are provided in the accompanying Excel document. In addition the UChicago site was removed from the site list lowering the initial cost. IFA has already invested significant time and energy into this vendor. If IFA had to use a different method to procure this service, it would set us back about 6 months and we would lose all the site, engineering, and design work done by the current vendor to date, which IFA would still be obligated to pay. Additionally, selecting a new vendor would cause IFA to miss the June 30 installation deadline to receive federal tax credits for EV charging stations.
CheckBox1: 0
CheckBox2: 0
CheckBox3: 1
DateField1:
CheckBox4: 1
CheckBox5: 0
CheckBox6: 0
TextField10: $2,505,377.00
:
SignatureField1:
TextField11: Craig Holloway
DateField2: 2026-03-26
DropDownList2: I agree
explanationfield:
spoSignatureField2:
spoprintedname: Jennifer Shourd
DateField3:
DropDownList3: it is
TextField12: allows the agency to continue an ongoing project, change was not reasonably foreseeable at time of execution.
SignatureField2:
TextField13: Andrew Hennig
DateField4: 2026-03-27
DropDownList4: it is
TextField15: allows the agency to continue its ongoing project, change was not reasonably foreseeable at time of contract execution.
SignatureField3:
TextField16: Ellen Holzman Daley
DateField5: 2026-03-27

File details come from the government source that posted it. Updated .