NSPIRE_Contract_Industry_Day_Slides.pptx
PPTX presentation 155 KB Posted
- Attached to
- Industry Day Training Services
- Solicitation number
- Not on record
About this file
Industry Day Slide Show
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PIH_REAC_Industry_Day_Questions_and_Answers_FINAL.pdf | ||
| https://youtu.be/kQh0NgjT0ks | — | |
| Industry_Day_NSPIRE_Inspections_Agenda_KAT_Update.pdf | ||
| KAT_List_of_KTR_SIGN_In_SHEET-Industry_Day.xlsx | XLSX spreadsheet | |
| HESSIT_INDUSTRY_DAY_QA.docx | DOCX document | |
| Strategic_Sourcing_RFI_for_IndustryDay_Update_4-21-16.docx | DOCX document | |
| HESSIT_IndustryDay_Slides.pptx | PPTX presentation | |
| Strategic_Sourcing_Agenda_for_IndustryDay.docx | DOCX document | |
| Draft_PWS.doc | DOC document | |
| Strategic_Sourcing_Agenda_for_IndustryDay.docx | DOCX document | |
| Strategic_Sourcing_RFI_for_IndustryDay_Final.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Improving Real Estate Assessment Center (REAC) Inspections:
National Standards for the Physical Inspection of Real Estate (NSPIRE) June 21, 2019
CO Detector Survey Wall Moisture Timeline
FY2020
Track 2: NSPIRE Standards, Protocols, and Processes 14 Day Notice Released Demonstration Listening Sessions 14 Day Notice Effective Stakeholder Outreach Reverse Auction Program Replacement Track 1: Changes To Current Process Initiate POA Self-Inspections Initiate Contractor Inspections First Scores Generated
Initiate New Scoring Model Final Rule Standards & Scoring Demonstration Execution: Test, Evaluate, Validate & Refine Analysis & Design
FY2019
FY2021
Start Demonstration
Stakeholder Feedback Demonstration Notice Released
3 Inspectable Areas 3 Categories of Deficiencies 3 Types of Inspections NSPIRE Model NSPIRE Model - Conceptual View 3 Types of Inspections – Confidence Increased Property Owner/Agent (POA) Self-Inspections REAC Contracted Inspections HUD Quality Assurance Inspections 3 Categories of Deficiencies – Resident Focused Safety and Health Function and Operability Condition and Appearance 3 Inspectable Areas – Complexity Reduced Unit Inside Outside Underpinned by 3 mutually supporting components
NSPIRE: 3 Types of Inspections POA Self-Inspections Who: Property Owners/Management What: All deficiencies reported to HUD When: Once a year Where: All units Why: To gain a reasonable level of confidence in results & To ensure work orders are being generated
REAC Contracted Inspections Who: Contract Inspectors What: CTQs When: Periodic inspections (3, 2, 1 years) Where: High sample rate Why: To gain a high level of confidence in results
HUD Federal Employee Inspections Who: HUD Federal Inspectors What: CTQs++ When: Triggered by poor conditions Where: Highest sample rate Why: To gain the highest level of confidence in results
Reasonable assurance into property’s condition
Evidentiary support to enforcement and/or sanctions
*CTQs = Critical to Quality Indicators; Inspection standards that have a high correlation to quality
NSPIRE: 3 Categories of Deficiencies
Urgent: Emergency Work Order
Planned: Routine Work Order
Programmed: Discretionary Maintenance Response Level Subjective Objective
Precision CTQs Per Category
Safety & Health
Function & Operability
Condition & Appearance
NSPIRE: 3 Inspectable Areas
5 Inspectable areas will feed into the 3 new inspectable areas
Simplified, intuitive approach based on the inspectable item’s physical location Dwelling Units 35% Building Systems 20% Common Areas 15% Site 15% Building Exterior 15% Dwelling Units 50% Inside 25% Outside 25% Property won’t pass overall inspection if the Dwelling Units inspectable area fails.
CURRENT
5 INSPECTABLE AREAS
NEW
3 INSPECTABLE AREAS
Failure Threshold Value image1.png image2.png image3.png image4.svg image5.png image6.svg image7.png image8.svg image9.png image10.svg
File details come from the government source that posted it.