EWRF_SCADA-_Bid_Set-Drawings.pdf
PDF 18 MB Posted
- Solicitation number
- Y26-748
- Issued by
- Orange County, Orlando City, Florida
About this file
This is a construction bid set document prepared by CPH Architects Engineers for Orange County Utilities Department in Florida for the East Water Reclamation Facility (EWRF) SCADA Servers and Operations Improvement Project (CIP Project Package B). The project encompasses SCADA system upgrades, fiber infrastructure installation, control room modifications, PLC replacements, and operational improvements at the facility located at 9150 Curry Ford Road in Orlando, Florida. The scope of work includes extending the western wall in the computer room, removing and replacing windows in the control room with block, installing new workstations with improved lighting, flooring and ceiling finishes, implementing a new HVAC system, upgrading the existing WinCC SCADA system and server racks, upgrading Basin 7 instrumentation, improving plant-wide fiber connectivity, replacing generator building DeviceNet systems, and enhancing plant camera and wireless access systems. Sealed bids are being accepted with submission deadlines that have been extended to August 25, 2026 at 4:00 p.m. EST via the OpenGov e-Procurement Platform, with an estimated contract value of $14,314,240.85.
The project requires compliance with the 2023 Florida Building Code, Florida Fire Prevention Code, Florida Life Safety Code, NFPA 70 National Electrical Code, and applicable plumbing and mechanical codes. The construction is classified as Type II-B construction and is sprinklered. The contractor shall obtain all permits at their expense, verify existing conditions in the field, coordinate with Orange County Utilities representatives, and maintain operational continuity of existing treatment processes throughout construction. Key contractor responsibilities include calling Sunshine State One Call 48 hours prior to construction start, notifying Orange County Utility Construction Section seven days in advance, performing exploratory excavations at proposed work locations, managing dewatering and erosion control, and maintaining emergency contact information on-site. The contractor must submit a Construction Administration Request (CAR) for any activities requiring operational staff involvement, with a minimum 30-day advance notice for activities affecting treatment process operation and 60 days for unit process shutdowns. All work must conform to Orange County Utilities Standards and Construction Specifications Manual, and the contractor shall provide as-built drawings, manufacturers' documentation, warranty information, and operator training upon project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J:\O28604\Civil\DWG\_Current_Plan_Set\O28604 G-100 Cover.dwg
JANUARY 2025
BYRON W. BROOKS
COUNTY ADMINISTRATOR
ED TORRES, M.S.,P.E.,L.E.E.D.A.P.
DIRECTOR ORANGE COUNTY UTILITIES DEPARTMENT
OCU FILE NO.: 97011
CIP NO:
ATTENTION IS DIRECTED TO THE FACT THAT THESE
PLANS MAY HAVE BEEN REDUCED IN SIZE BY
REPRODUCTION. THIS MUST BE CONSIDERED WHEN
OBTAINING SCALED DATA. DIMENSION
INFORMATION SHOULD NOT BE OBTAINED BY
SCALING THE PLANS. DIMENSION INFORMATION
NOT PROVIDED HEREIN CAN BE OBTAINED BY
CONTACTING ORANGE COUNTY UTILITIES
ENGINEERING DIVISION, AT (407)254-9900
PLANS PREPARED BY:
www.cphcorp.com
Architects Engineers
Environmental Landscape Architects
M / E / P Planners Surveyors
Traffic/Transportation
A Full Service A & E Firm
1117 East Robinson Street - Orlando, FL 32801 Phone: 407.425.0452
Architectural Lic. No. AA2600926 Landscape Lic. No. LC0000298
Licenses:
Engineering C.O.A. No. 3215
Survey L.B. No. 7143
CONSTRUCTION PLANS FOR:
EWRF SCADA SERVERS &
OPERATIONS IMPROVEMENT CIP PROJECT
PACKAGE B
BOARD OF COUNTY COMMISSIONERSBOARD OF COUNTY COMMISSIONERS
JERRY L. DEMINGS
ORANGE COUNTY MAYOR
NICOLE H. WILSON
DISTRICT 1
CHRISTINE MOORE
DISTRICT 2
MAYRA URIBE
DISTRICT 3
MARIBEL GOMEZ CORDERO
DISTRICT 4
KELLY MARTINEZ SEMRAD
DISTRICT 5
MICHAEL "MIKE" SCOTT
DISTRICT 6
BID SET
S. ALAFAYA TR.
AS SHOWN
Location Sheet.dwg
AS SHOWN
G-200
AS SHOWNSCALE:
SHEET:9150 CURRY FORD ROAD ORLANDO, FL. 32825
DRAWING NO. :
OF
REV DATE DESCRIPTION
DESIGNED BY:
DRAWN BY:
CHECKED BY:
OCU FILE NO.:
CADD FILE:
www.cphcorp.com 1117 East Robinson Street ~ Orlando, FL 32801 ~ Phone: 407.425.0452
Licenses:
Eng. C.O.A. No. 3215
Survey L.B. No. 7143
Arch. Lic. No. AA2600926
Lndscp. Lic. No. LC0000298
A Full Service A & E Firm
Architects Engineers
Environmental Landscape Architects
M / E / P Planners Structural Surveyors
Traffic/Transportation
GCM
97011
J:\O28604\Civil\DWG\_Current_Plan_Set\O28604 G-200 Location Sheet Index.dwg
LOCATION MAP
EWRF
SITE
Scada Servers & Operations Improvements Project
LOCATION MAP AND DRAWING INDEX
EWRF SCADA SERVERS & OPERATIONS
IMPROVEMENTS
ORANGE COUNTY FLORIDA
KAYLA JOY LOCKCUFF, P.E.
P.E. LIC. # 90685
BID SET
DRAWING INDEX
TITLEDWG. NO.
COVER SHEETG-100
SHEET NO.
G-200
G-300
G-400
ELECTRICAL NOTES, SYMBOLS AND ABBREVIATIONSE-001
PARTIAL SITE PLAN 1E-002
PARTIAL SITE PLAN 2E-003
MCC-9 SLD
E-004
MCC-10 SLD
E-005
MCC-11 & 12 SLD
E-006
MCC-13 SLD
E-007
MCC-14 SLD
E-008
E-009
E-010
PARTIAL SITE PLAN 3
POWER PANEL 7 & POWER PANEL 8 SLD
LOCATION MAP AND DRAWING INDEX
GENERAL NOTES, ABBREVIATIONS AND LEGEND
OCU ENGINEERING NOTES
E-011
MCC-18 SLD
E-012
E-013
A001 GENERAL INFORMATION AND ABBREVIATIONS
A002 CODE SUMMARY & LIFE SAFETY PLAN
A010 DEMOLITION FLOOR PLAN
A100 ARCHITECTURAL FLOOR PLAN
A110 ELEVATIONS & DETAILS
A160 FINISH PLAN
M000 MECHANICAL LEGEND
M100 MECHANICAL FLOOR PLAN
MD100 MECHANICAL DEMOLITION PLAN
PARTIAL SITE PLAN 4
MCC-19, SLD
FP000
FP101 FIRE PROTECTION FLOOR PLAN
MCC-9 MCC-10 FRONT VIEWS AND DEMOLITIONE-016
E-017
E-018
E-019
MCC-17 & MCC-18 FRONT VIEWS AND DEMOLOTION
E-020
MCC-19 & MCC-20 FRONT VIEWS AND DEMILOTION
E-021
E-022
E-023
E-024 ELEMENTARY CONTROL & RISER DIAGRAMS
SERVER/CONTROL ROOM DEMOLITION PLAN
MCC-19 & MCC-20 FRONT VIEW AND MODIFICATIONS
MCC-17 & MCC-18 FRONT VIEWS & MODIFICATIONS
E-031
E-032
E-033
ELECTRICAL DETAIL 1E-034
MCC-11, MCC-12, MCC-13 & MCC-14 FRONT VIEWS & DEMOLITION
MCC-9 & MCC-10 FRONT VIEWS & MODIFICATIONS
MCC-11, MCC-12, MCC-13, & MCC-14 FRONT VIEWS & MODIFICATIONS
E-025 MIXER ELEMENTARY DIAGRAM 2
E-026 PANEL SCHEDULES
E-027 BASIN 7 ELECTRICAL PLAN - EAST
E-029 MAIN ELECTRICAL/BLOWER BUILDING SWITCHGEAR ROOM ELECTRICAL PLAN
E-028 BASIN 7 ELECTRICAL PLAN - WEST
E-030 WEST ELECTRICAL BUILDING ELECTRICAL PLAN
SERVER/CONTROL ROOM ELECTRICAL PLAN
SERVER/CONTROL ROOM LIGHTING PLAN
ELECTRICAL DETAIL 2E-035
ELECTRICAL DETAIL 3E-036
FIRE PROTECTION SYSTEM, SYMBOLS, LEGEND, ABBREVIATIONS & GENERAL NOTES
INSTRUMENT SYM, NOTES ,& ABBV I-001
BASIN 7 P&IDI-002
EWRF FIBER NETWORK ARCHITECTUREI-003
BASIN 7 PROFINET NETWORK ARCHITECTUREI-004
EWRF SERVER RACKS & SCADA SYSTEM ARCHITECTUREI-005
INSTRUMENTATION DETAILS 1I-006
I-007
DWG. NO.SHEET NO.
DRAWING INDEX
TITLE
58 OF 58 INSTRUMENTATION DETAILS 1
MCC-20 SLDE-014
POWER PANEL 7 & POWER PANEL BE-015
ABBREVIATIONS
AC ASBESTOS CEMENT
ALUM. ALUMINUM
APPROX. APPROXIMATELY
ASPH. ASPHALT
ASSEM. ASSEMBLY
BE BURIED ELECTRIC
BL BASELINE
B.M. BENCHMARK
B.O. BLOWOFF
BT BURIED TELEPHONE
B.F.V. BUTTERFLY VALVE
CATV CABLE TELEVISION
C.B. CATCH BASIN
C.F.S. CUBIC FEET PER SECOND
CIP CAST IRON PIPE
CL CENTERLINE
C.M. CONCRETE MONUMENT
C.M.P. CORRUGATED METAL PIPE
CONC. CONCRETE
CONN. CONNECTION
CONST. CONSTRUCT
CONT. CONTINUOUS
CORP. CORPORATION
C.V. CHECK VALVE
C.Y. CUBIC YARD
DBL. DOUBLE
DHW DESIGN HIGH WATER
DIA. DIAMETER
DIP DUCTILE IRON PIPE
DWLS. DOWELS
DWG. DRAWING
ELEC ELECTRIC
EA. EACH
EFF EFFLUENT
ELEV. ELEVATION
EMB. EMBED OR EMBEDDED
E/P EDGE OF PAVEMENT
ESMT. EASEMENT
E.W. EACH WAY
EXIST. EXISTING
EXP. JT. EXPANSION JOINT
F.D. FLOOR DRAIN
F.D.E.P. FLORIDA DEPT. OF
ENVIRONMENTAL PROTECTION
F.D.O.T. FLORIDA DEPT. OF
TRANSPORTATION
F.F. FINISHED FLOOR
F.H. FIRE HYDRANT
FLG. FLANGE
FL. FLOW LINE
FM FORCEMAIN
FT. FEET
FTG. FOOTING
GA GAUGE
GAL. GALLONS
GEN. GENERATOR
GRD. GROUND
G.S.P. GALVANIZED STEEL PIPE
GM GAS MAIN
GPM GALLONS PER MINUTE
GV GATE VALVE
HB HOSE BIBB
HDWL. HEADWALL
HT. HEIGHT
HP HIGH POINT
HORIZ. HORIZONTAL
H.W.L. HIGH WATER LEVEL
I.D. INSIDE DIAMETER
IN. INCHES
INV. INVERT
I.P. IRON PIPE
I.R. IRON ROD
J.B. JUNCTION BOX
JUNC. JUNCTION
LAT. LATERAL
LF LINEAR FEET
REF: REFERENCE MADE TO AN APPLICABLE
SECTION(S) OF THE TECHNICAL
SPECIFICATIONS FOR THIS PROJECT.
LEGEND
GUY WIRE AND ANCHOR EXISTING STORM PIPE
CAP EXISTING BURIED TELEPHONE
PLUG EXISTING FIBER OPTIC CABLE
BENCHMARK EXISTING BURIED ELECTRIC
TREE (TYPE & SIZE NOTED) EXISTING OVERHEAD ELECTRIC
SHRUB EXISTING CABLE TV (BURIED)
PROPOSED ELEVATION EXISTING ELEVATION
PROPOSED FORCE MAIN EXISTING FORCE MAIN
PROPOSED GRAVITY MAIN EXISTING GRAVITY MAIN
PROPOSED WATER SERVICE EXISTING WATER MAIN
PROPOSED CHAIN-LINK FENCE EXISTING CHAN-LINK FENCE
PROPOSED WOOD FENCE EXISTING WOOD FENCE
PROPOSED POWER POLE EXISTING POWER POLE
PROPOSED MANHOLE (SPECIFY) EXISTING MANHOLE (SPECIFY)
PROPOSED VALVE (SPECIFY) EXISTING VALVE (SPECIFY)
PROPOSED WATER METER EXISTING WATER METER
PROPOSED BACK-FLOW EXISTING BACK-FLOW
PREVENTER PREVENTER
AKA ALSO KNOWN AS L.S. LIFT STATION
LT LEFT
L.W.L. LOW WATER LEVEL
MAX. MAXIMUM
MATL MATERIAL
M.H. MANHOLE
MIN. MINIMUM
MOD MODIFIED
M.O.T. MAINTENANCE OF TRAFFIC
M.J. MECHANICAL JOINT
N.G. NATURAL GROUND
NO. NUMBER
NPW NON-POTABLE WATER
N.T.S. NOT TO SCALE
O.C.U. ORANGE COUNTY UTILITIES
O.D. OUTSIDE DIAMETER
O.H.E. OVERHEAD ELECTRIC
O.U.C. ORLANDO UTILITY COMMISSION
PAVT. PAVEMENT
P.B. PULL BOX
PG. PAGE
P.I. POINT OF INTERSECTION
PL PROPERTY LINE
POLY. POLYETHYLENE
PP POWER POLE
PROP. PROPOSED
PS PUMP STATION
P.S.I. POUNDS PER SQUARE INCH
P.U.E. PERMANENT UTILITY EASEMENT
PV PLUG VALVE
RAD. PT. RADIUS POINT
R RADIUS
RCP REINFORCED CONCRETE PIPE
REINF. REINFORCED
REQ. REQUIRED
RPZ REDUCED PRESSURE ZONE
BACKFLOW PREVENTER
RT. RIGHT
RW RECLAIMED WATER
R/W RIGHT OF WAY
SAN. SANITARY SEWER
SCH. SCHEDULE
S.D. STORM DRAIN
S.F. SQUARE FEET
ENVIRONMENTAL PROTECTION
SHT. SHEET
TRANSPORTATION
SPECS. SPECIFICATIONS
SQ. SQUARE
SS STAINLESS STEEL
STA. STATION
STD. STANDARD
STL. STEEL
S.Y. SQUARE YARDS
TEL TELEPHONE
T&B TOP AND BOTTOM
TBM TEMPORARY BENCH MARK
TCE TEMPORARY CONSTRUCTION
EASEMENT
TEMP. TEMPORARY
THD. THREADED
THK. THICK
TYP. TYPICAL
U.G. UNDERGROUND
VAC VOLTABE ALTERNATING CURRENT
VCP VITRIFIED CLAY PIPE
VDC VOLTAGE DIRECT CURRENT
VERT. VERTICAL
V.V.H. VERIFIED VERTICALLY &
HORIZONTALLY
W/ WITH
WM WATERMAIN
W/M WATER METER
WP WALL PIPE
WS WATER SERVICE
W.S. WATER SURFACE
WWF WELDED WIRE FABRIC
"X" SPOT ELEVATION
FKA FORMALLY KNOWN AS
I.E. INVERT ELEVATION
BCL BURRIED CABLE LINE
POLE_ID POLE_ID
GENERAL NOTES
1. EXCAVATE CAUTIOUSLY LOCATIONS OF EXISTING UTILITIES INDICATED HERE IN ARE BASED ON BEST AVAILABLE INFORMATION AND ARE NOT TO BE CONSIDERED ALL INCLUSIVE. CONTRACTOR SHALL VERIFY EXACT LOCATION, CHARACTER AND NATURE OF ALL EXISTING AND PROPOSED UTILITIES PRIOR TO BEGINNING CONSTRUCTION AND PRIOR TO FABRICATION OF PIPING AND EQUIPMENT TO
ENSURE PROPER ASSEMBLY OF ALL ITEMS.
2. COVER OVER ALL PIPES SHALL BE THREE (3) FEET MINIMUM, OR AS SHOWN.
3. PIPES SHALL NOT BE DEFLECTED.
4. ALL PIPE JOINTS SHALL BE MECHANICALLY RESTRAINED AND BELLS SHALL BE RFD.
5. ALL EXCAVATIONS SHALL BE BACK FILLED AT THE END OF EACH WORK DAY. ALL FINAL BACK FILL IS
TO BE COMPACTED TO 98% OF MAXIMUM MODIFIED PROCTOR.
6. ALL SITE WORK SHALL BE COORDINATED WITH THE COUNTY RESIDENT PROJECT REPRESENTATIVE
(RPR).
7. ELEVATIONS SHOWN ARE BASED ON NAVD 1988 DATUM.
8. NEW OR RELOCATED, UNDERGROUND WATER MAINS SHALL BE LAID TO PROVIDE A HORIZONTAL DISTANCE OF AT LEAST SIX FEET, AND PREFERABLY TEN FEET, BETWEEN THE OUTSIDE OF THE
WATER MAIN AND THE OUTSIDE OF ANY EXISTING OR PROPOSED GRAVITY- OR PRESSURE-TYPE
SANITARY SEWER, WASTEWATER FORCE MAIN, OR PIPELINE CONVEYING RECLAIMED WATER NOT
REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C. THE MINIMUM HORIZONTAL SEPARATION DISTANCE BETWEEN WATER MAINS AND GRAVITY-TYPE SANITARY SEWERS SHALL BE REDUCED TO THREE FEET WHERE THE BOTTOM OF THE WATER MAIN IS LAID AT LEAST SIX INCHES ABOVE THE TOP
OF THE SEWER. NEW OR RELOCATED, UNDERGROUND WATER MAINS CROSSING ANY EXISTING OR
PROPOSED GRAVITY-OR VACUUM-TYPE SANITARY SEWER SHALL BE LAID SO THE OUTSIDE OF THE WATER MAIN IS AT LEAST SIX INCHES, AND PREFERABLY 12 INCHES, ABOVE OR AT LEAST 12 INCHES BELOW THE OUTSIDE OF THE OTHER PIPELINE. HOWEVER, IT IS PREFERABLE TO LAY THE WATER MAIN ABOVE THE OTHER PIPELINE. NEW OR RELOCATED, UNDERGROUND WATER MAINS CROSSING
ANY EXISTING OR PROPOSED PRESSURE TYPE SANITARY SEWER, WASTEWATER OR STORMWATER
FORCE MAIN, OR PIPELINE CONVEYING RECLAIMED WATER SHALL BE LAID SO THE OUTSIDE OF THE WATER MAIN IS AT LEAST 12 INCHES ABOVE OR BELOW THE OUTSIDE OF THE OTHER PIPELINE.
HOWEVER, IT IS PREFERABLE TO LAY THE WATER MAIN ABOVE THE OTHER PIPELINE.
AT THE UTILITY CROSSINGS DESCRIBED ABOVE, ONE FULL LENGTH OF WATER MAIN PIPE SHALL BE CENTERED ABOVE OR BELOW THE OTHER PIPELINE SO THE WATER MAIN JOINTS WILL BE AS FAR AS POSSIBLE FROM THE OTHER PIPELINE. ALTERNATIVELY, AT SUCH CROSSINGS, THE PIPES SHALL BE
ARRANGED SO ALL WATER MAIN JOINTS ARE AT LEAST THREE FEET FROM ALL JOINTS IN
VACUUM-TYPE SANITARY SEWERS, OR PIPELINES CONVEYING RECLAIMED WATER REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C., AND AT LEAST SIX FEET FROM ALL JOINTS IN GRAVITY-OR
PRESSURE-TYPE SANITARY SEWERS, WASTEWATER FORCE MAINS, OR PIPELINES CONVEYING
RECLAIMED WATER NOT REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C.
9. ALL EXISTING AND PROPOSED WATER, WASTEWATER AND REUSE VALVES SHALL BE OPERATED BY
ORANGE COUNTY UTILITIES AUTHORIZED REPRESENTATIVES. EXISTING VALVE BOXES AND
MANHOLES, WHICH ARE TO REMAIN, SHALL BE ADJUSTED TO THE FINISHED GRADE. ALL VALVES
UNDER CONSTRUCTION SHALL REMAIN CLOSED DURING CONSTRUCTION.
10. THE CONTRACTOR SHALL PROVIDE TANKERS AND SIGNED DOCUMENT ACKNOWLEDGING THE
UNDERSTANDING OF THE ORANGE COUNTY UTILITY "EMERGENCY WASTEWATER SPILL AND WATER
MAIN BREAK PROCEDURES", IN THE PRE-CONSTRUCTION PACKET FOR THE MEETING.
11. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ON-SITE DURING THE LIFE OF THE PROJECT, A WEATHERPROOF ENCLOSURE CONTAINING A READILY ACCESSIBLE LIST OF EMERGENCY CONTACTS
AND PHONE NUMBERS.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SATISFACTION OF ALL REQUIREMENTS OF
REGULATORY AGENCY PERMITS WITH REGARD TO CONSTRUCTION ACTIVITIES AND RELATED
CONDITIONS.
13. THE CONTRACTOR SHALL CALL SUNSHINE STATE ONE CALL NO LESS THAN FORTY-EIGHT (48) HOURS
PRIOR TO THE START OF CONSTRUCTION. - PHONE - 800-432-4777.
14. ADVANCE NOTIFICATION OF CONSTRUCTION
THE ORANGE COUNTY UTILITY CONSTRUCTION SECTION (407) 254-9798, SHALL BE NOTIFIED AT LEAST
SEVEN (7) DAYS PRIOR TO ANY CONSTRUCTION ACTIVITY.
15. THE CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS AT ALL LOCATION OF PROPOSED WORK AND FIELD LOCATE EXISTING UTILITIES. THE EXPLORATORY EXCAVATIONS SHALL BE MADE A MINIMUM OF FORTY-EIGHT (48) HOURS IN ADVANCE OF THE WORK. IF THERE IS A POTENTIAL CONFLICT, THE CONTRACTOR SHALL NOTIFY THE COUNTY RESIDENT PROJECT REPRESENTATIVE IMMEDIATELY WITH INFORMATION WHICH SHALL INCLUDE LOCATION, ELEVATION, UTILITY TYPE, MATERIAL AND SIZE.
16. THE DISPOSAL OF ANY EXCESS EARTH WORK MATERIAL SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
17. THE CONTRACTOR SHALL REPLACE WITH EQUAL MATERIAL, OR AS DIRECTED BY THE RPR, ALL PAVING, GRASSED AREAS, STABILIZED EARTH, DRIVEWAYS, ETC., DISTURBED OR DAMAGED BY THE CONSTRUCTION OR RELATED ACTIVITIES. ALL DISTURBED AREAS SHALL BE SODDED, EXCEPT DIRT
DRIVES AND WHERE INDICATED IN THE DRAWINGS.
18. SALVAGE AND/OR DISPOSAL OF ALL EXISTING EQUIPMENT SHALL BE AT THE DIRECTION OF THE RPR.
19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER DISPOSAL OF ALL STRUCTURES, PIPE, CONDUIT, WIRE, FITTINGS, PANELS, ETC. THAT ARE DEMOLISHED, DISASSEMBLED, OR REMOVED, PER
SECTION 02080 OF THE SPECIFICATION MANUAL OF THIS PROJECT.
20. CONTRACTOR SHALL PROTECT AND MAINTAIN ALL EXISTING TREE, SHRUBS, AND PLANTS UNLESS
OTHERWISE NOTED.
21. FINISHED GRADE ELEVATION AT THE BUILDING FACE WHERE NOT ADJACENT TO PAVEMENT SHALL BE
APPROXIMATE 6 INCH BELOW FINISHED FLOOR ELEVATIONS UNLESS OTHERWISE NOTED.
22. THE CONTRACTOR IS RESPONSIBLE TO SUBMIT A CAR (CONSTRUCTION ADMINISTRATION REQUEST) TO THE OWNER'S REPRESENTATIVE FOR ANY INTERACTION REQUIRING THE INVOLVEMENT OF THE
OWNER'S OPERATIONAL STAFF INCLUDING BUT NOT LIMITED TO THE FOLLOWING EXAMPLES:
EXISTING VALVE ACTUATION, PROCESS INTERRUPTION, EQUIPMENT OPERATION INTERRUPTION, POWER INTERRUPTIONS, FLOW DIVERSIONS, TRAINING. THE CONTRACTOR WILL NOT HAVE
CONTRACT WITH THE OPERATIONS STAFF WITHOUT OWNER'S REPRESENTATIVE'S KNOWLEDGE.
THE OWNER'S REPRESENTATIVE RESERVES THE RIGHT TO DIRECT THE CONTRACTOR TO PROVIDE A CAR AT HIS DISCRETION. UNLESS OTHERWISE NOTED BY THE OWNER'S REPRESENTATIVE, A CAR SHALL BE SUBMITTED A MINIMUM OF SEVEN (7) CALENDAR DAYS IN ADVANCE OF THE INTENDED
OPERATION NOTED WITHIN THE CAR. UNLESS OTHERWISE NOTED WITHIN THE CONTRACT
DOCUMENTS, FOR ALL ACTIVITIES AFFECTING TREATMENT PROCESS OPERATION, A CAR SHALL BE
SUBMITTED A MINIMUM OF THIRTY (30) DAYS IN ADVANCE OF THE SCHEDULED ACTIVITY.
UNLESS OTHERWISE NOTED WITHIN THE CONTRACT DOCUMENTS, THE SCHEDULE FOR
PERFORMING WORK WHICH WILL REQUIRE SHUTTING DOWN A UNIT PROCESS MUST BE
COORDINATED WITH THE OWNER BY CAR SUBMITTAL A MINIMUM OF SIXTY (60) DAYS IN ADVANCE
OF THE SCHEDULE ACTIVITY. REFERENCE A BLANK COPY OF THE FORM IN APPENDIX B OF THE
SPECIFICATIONS.
23. CONTRACTOR SHALL FIELD VERIFY PRECISE LOCATION, ELEVATION, AND ARRANGEMENT OF
CONNECTIONS OF NEW PIPELINES WITH EXISTING PIPELINES BASED ON FIELD CONDITIONS,
INCLUDING EXPOSING EXISTING PIPING PRIOR TO FABRICATING NEW PIPING. CONTRACTOR SHALL
PROVIDED FITTINGS, ADAPTERS, SOLID SLEEVE CLOSURES, AND HARNESSED MECHANICAL
COUPLING; ROTATE FITTINGS; DEFLECT JOINTS; AND MODIFY EXISTING PIPING AS APPLICABLE AND
AS REQUIRED TO MAKE CONNECTIONS, INCLUDING ADJUSTMENTS FOR ANY OFFSETS IN
CENTERLINE ELEVATIONS BETWEEN PIPELINES. CONTRACTOR SHALL PROVIDE TEMPORARY PLUG
WITH FACTORY OUTLET SIZED AS REQUIRED FOR CONTRACTOR'S TESTING AND DISINFECTION
WORK BEFORE MAKING CONNECTION, WHEN APPLICABLE. CONTRACTOR SHALL COORDINATE
MAKING EACH CONNECTION WITH THE OWNER.
24. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DE-WATERING REQUIRED DURING
CONSTRUCTION AND TO OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR THE TEMPORARY
DEWATERING OF DRAINAGE STRUCTURES.
25. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL TEMPORARY PLUGS, BLOCKING, TAPS, AND
TESTING EQUIPMENT REQUIRED TO COMPLETE PRESSURE TESTING, AS SPECIFIED.
26. THE CONTRACTOR SHALL NOTIFY THE COUNTY SEVEN (7) WORKING DAYS IN ADVANCE OF ANY
SANITARY FORCE MAIN SHUT-DOWN.
27. ADVANCE NOTIFICATION OF PENDING CONNECTION
THE ORANGE COUNTY UTILITY WATER DIVISION AND THE ORANGE COUNTY UTILITY WATER
RECLAMATION DIVISION SHALL BE NOTIFIED AT LEAST SEVEN (7) DAYS IN ADVANCE TO SCHEDULE
MAIN TIE-INS AND VALVE OPERATIONS.
28. REPAIR IMMEDIATELY
ALL DAMAGE TO ORANGE COUNTY MAINS SHALL BE REPAIRED IMMEDIATELY BY THE CONTRACTOR
AT THE CONTRACTOR'S EXPENSE. IF THE REPAIR IS NOT DONE IN A TIMELY MAINER, AS
DETERMINED BY THE ORANGE COUNTY UTILITY RPR, ORANGE COUNTY MAY PERFORM REPAIRS
AND THE CONTRACTOR WILL BE CHARGED FOR SAID REPAIRS.
29. TELEPHONE NOTIFICATIONS
THE ORANGE COUNTY DISPATCH OPERATOR SHALL BE NOTIFIED IMMEDIATELY IN THE EVENT OF A
FORCEMAIN, GRAVITY SEWER, OR WATER MAIN BREAK OR DAMAGE AT (407)836-2777 (24-HOURS
ASSISTANCE).
30. ALL WORK AND MATERIAL SHALL CONFORM TO THE ORANGE COUNTY UTILITIES STANDARDS AND CONSTRUCTION SPECIFICATIONS MANUAL, LATEST EDITION OR AS INDICATED IN THE PROJECT
SPECIFICATIONS OR DRAWINGS.
31. THE EXISTING PROCESS FACILITIES SHALL REMAIN IN OPERATION CONTINUOUSLY THROUGHOUT THE CONSTRUCTION ACTIVITIES. INDIVIDUAL PROCESS FACILITIES CAN BE TAKEN OUT OF SERVICE
FOR LIMITED PERIODS OF TIME AS COORDINATED WITH THE COUNTY.
32. CONTRACTOR IS CAUTIONED TO MAKE CONTINUOUS OBSERVATIONS OF THE EXISTING STRUCTURE DURING THE PERFORMANCE OF HIS WORK. SHOULD HE BECOME AWARE OF ANY SITUATIONS THAT REQUIRE FURTHER INVESTIGATION OR STUDY, SUCH AS CRACKS AND MOVEMENTS, ETC., HE/SHE
SHALL IMMEDIATELY NOTIFY THE ENGINEER AND OWNER.
33. THE CONTRACTOR SHALL OBTAIN ALL PERMITS AT CONTRACTOR'S EXPENSE BEFORE STARTING
ANY WORK OR ORDERING ANY MATERIAL. DO NOT BEGIN CONSTRUCTION UNLESS AND UNTIL A
WRITTEN PERMIT HAS BEEN ISSUED IN ACCORDANCE WITH THE REQUIREMENTS OF THE BUILDING
CODE. SUBMIT ORIGINAL COPIES TO OWNER BEFORE PROCEEDING.
34. THE CONTRACTOR SHALL PROTECT PROPERTY FROM DEBRIS AND DUST, WITHIN WORKING AREA.
35. THE STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH MECHANICAL AND
ELECTRICAL DRAWINGS WHERE APPLICABLE.
G-300 General Notes.dwg
AS SHOWN
DEMOLITION NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE TO SUPPORT, SECURE, REMOVE
IF NECESSARY, AND REINSTALL ANY EXISTING MECHANICAL EQUIPMENT
PRIOR TO ANY DEMOLITION ACTIVITIES.
2. ANY DAMAGE TO EXISTING STRUCTURES TO REMAIN OR ADJACENT AREAS,
SHALL BE RECTIFIED TO THE SATISFACTION OF THE OWNER AT THE
CONTRACTOR'S EXPENSE.
3. DEMOLITION OPERATIONS AND REMOVAL OF DEBRIS SHALL BE DONE IN AN
ORDERLY MANNER WITH THE LEAST POSSIBLE DISRUPTION TO THE
OPERATION OF THE FACILITIES.
4. THE CONTRACTOR SHALL COORDINATE WITH THE OWNERS
REPRESENTATIVE AND ENGINEER REGARDING HOURS FOR DEMOLITION,
REMOVAL OF DEBRIS, DELIVERY AND STORAGE OF MATERIAL, ACCESS AND
EGRESS, ETC.
5. AT COMPLETION OF EACH DAY'S WORK, THE CONTRACTOR SHALL CLEAN
AREAS OF ANY ACCUMULATION OF DEBRIS, MATERIALS, DIRT, ETC.,
RESULTING FROM DEMOLITION OPERATIONS. IT IS NOT PERMITTED TO
ALLOW DEBRIS TO ACCUMULATE AND IT SHALL BE REMOVED FROM THE SITE
AS SOON AS POSSIBLE.
6. DO NOT REMOVE NON-DAMAGED SOUND MATERIAL. THE EXACT EXTENT OF
DEMOLITION SHALL BE ESTABLISHED BY SOUNDING THE DAMAGED AREA.
UTILITIES ORANGE COUNTY DISPACT --------------- 407-836-2777 (24-HR ASSISTANCE)
WASTEWATER ORANGE COUNTY UTILITIES (O. C. U.) ----------- 407-254-9680
EMERGENCY NUMBERS
REF: REFERENCE MADE TO THE LATEST BUILDING CODE
DEMOLITION NOTES
1. TANKS SHALL BE EMPTIED AND CLEANED FROM SURFACE DEBRIS AND
SLUDGE, REMOVE ALL VEGETATION FROM TANKS AND WALKWAYS.
CONCRETE SURFACES SHALL BE ADEQUATELY CLEAN TO ALLOW
INSPECTION AND REPAIR.
2. DEMOLITION SHALL BE PERFORMED BY QUALIFIED AND EXPERIENCED
PERSONNEL. DEMOLITION OPERATIONS SHALL BE PERFORMED IN AN
ORDERLY AND CONTROLLED MANNER TO PREVENT HAZARDS TO
PERSONNEL AND PROPERTY.
3. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND
EQUIPMENT NECESSARY TO PERFORM ALL OPERATIONS REQUIRED FOR
THE DEMOLITION, REMOVAL, CUTTING AND ALTERATION OF WORK
SHOWN ON THE DRAWINGS.
4. THE CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL
NECESSARY FALSEWORK, SHORING, BRACING, WEDGING AND ANY
OTHER TEMPORARY CONSTRUCTION REQUIRED. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR THE SAFETY OF THE STRUCTURE DURING
THIS OPERATION. THE CONTRACTOR SHALL TAKE ADEQUATE
PRECAUTIONS TO PREVENT DAMAGE TO THE EXISTING STRUCTURE AND
IS RESPONSIBLE FOR SITE SAFETY AND PROTECTION OF THE PUBLIC,
WORKMEN AND PROPERTY DURING ALL PHASES OF THE WORK.
5. THE CONTRACTOR SHALL BE RESPONSIBLE TO SUPPORT, SECURE,
REMOVE IF NECESSARY, AND REINSTALL ANY EXISTING MECHANICAL
EQUIPMENT PRIOR TO ANY DEMOLITION ACTIVITIES.
6. ANY DAMAGE TO EXISTING STRUCTURES TO REMAIN OR ADJACENT
AREAS, SHALL BE RECTIFIED TO THE SATISFACTION OF THE OWNER AT
THE CONTRACTOR'S EXPENSE.
7. DEMOLITION OPERATIONS AND REMOVAL OF DEBRIS SHALL BE DONE IN
AN ORDERLY MANNER WITH THE LEAST POSSIBLE DISRUPTION TO THE
OPERATION OF THE FACILITIES.
8. THE CONTRACTOR SHALL COORDINATE WITH THE OWNERS
REPRESENTATIVE AND ENGINEER REGARDING HOURS FOR DEMOLITION,
REMOVAL OF DEBRIS, DELIVERY AND STORAGE OF MATERIAL, ACCESS
AND EGRESS, ETC.
9. AT COMPLETION OF EACH DAY'S WORK, THE CONTRACTOR SHALL CLEAN
AREAS OF ANY ACCUMULATION OF DEBRIS, MATERIALS, DIRT, ETC.,
RESULTING FROM DEMOLITION OPERATIONS. IT IS NOT PERMITTED TO
ALLOW DEBRIS TO ACCUMULATE AND IT SHALL BE REMOVED FROM THE
SITE AS SOON AS POSSIBLE.
SCALE:
SHEET:9150 CURRY FORD ROAD ORLANDO, FL. 32825
DRAWING NO. :
OF
REV DATE DESCRIPTION
DESIGNED BY:
DRAWN BY:
CHECKED BY:
OCU FILE NO.:
CADD FILE:
LINE IS 2 INCHES
AT FULL SIZE
(IF NOT SCALE ACCORDINGLY) www.cphcorp.com
1117 East Robinson Street ~ Orlando, FL 32801 ~ Phone: 407.425.0452
Licenses:
Eng. C.O.A. No. 3215
Survey L.B. No. 7143
Arch. Lic. No. AA2600926
Lndscp. Lic. No. LC0000298
A Full Service A & E Firm
Architects Engineers
Environmental Landscape Architects
M / E / P Planners Structural Surveyors
Traffic/Transportation
KL / DEM
DEM
GCM
97011
1 11/1/2021 ADDENDUM 1
J:\O28604\Civil\DWG\_Current_Plan_Set\O28604 G-300 - G-400 General Notes.dwg
GENERAL NOTES, ABBREVIATIONS AND
LEGEND
EWRF SCADA SERVERS & OPERATIONS
IMPROVEMENTS
ORANGE COUNTY FLORIDA
General Notes.dwg
AS SHOWN
EROSION AND SEDIMENT CONTROLS:
1. AN EROSION CONTROL PLAN SHALL BE PREPARED BY THE CONTRACTOR AND SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO THE PRE-CONSTRUCTION MEETING. THE CONTRACTOR SHALL EXECUTE ALL MEASURES NECESSARY TO LIMIT THE TRANSPORT OF SEDIMENTS OUTSIDE THE LIMITS OF THE PROJECT TO THE VOLUME AND AMOUNT AS THAT ARE EXISTING PRIOR TO THE COMMENCEMENT OF CONSTRUCTION PERIOD. PROVISION MUST BE MADE TO PRESERVE THE INTEGRITY AND CAPACITY OF CHECK WEIRS, SEDIMENT BASINS, SLOPE DRAINS, GRADING PATTERNS, ETC. REQUIRED TO MEET THIS PROVISION THROUGHOUT THE LIFE OF THE CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE HAY BALES, SILT BARRIERS, TEMPORARY GRASSING, ETC. AS REQUIRED TO FULLY COMPLY WITH THE INTENT OF THIS SPECIFICATION. PROVIDE STORM WATER BY-PASS PIPING OF PUMPING TO
MAINTAIN DRAINAGE IN ALL LOCATIONS NECESSARY FOR EQUIPMENT STAGING.
A. STOCKPILING MATERIAL
NO EXCAVATED MATERIAL SHALL BE STOCKPILED IN SUCH A MANNER AS TO DIRECT RUNOFF DIRECTLY OFF THE PROJECT SITE OR INTO ANY ADJACENT WATER BODY OR STORMWATER COLLECTION FACILITY.
B. EXPOSED AREA LIMITATION
THE SURFACE AREA OF OPEN, RAW ERODABLE SOIL EXPOSED BY CLEARING AND GRUBBING OPERATIONS OR EXCAVATION AND FILLING OPERATIONS SHALL BE CONTROLLED, SO THAT THIS OPERATION WILL NOT
SIGNIFICANTLY AFFECT OFFSITE DEPOSIT SEDIMENTS.
C. INLET PROTECTION
INLETS AND CATCH BASINS SHALL BE PROTECTED FROM SEDIMENT LADEN STORMWATER RUNOFF UNTIL THE COMPLETION OF THE ALL CONSTRUCTION OPERATIONS THAT MAY CONTRIBUTE SEDIMENT TO THE INLET.
D. TEMPORARY SEEDING
AREAS OPENED BY CONSTRUCTION OPERATIONS THAT ARE NOT ANTICIPATED TO BE DRESSED OR RECEIVE FINAL GRASSING TREATMENT WITHIN THIRTY (30) DAYS SHALL BE SEEDED WITH A QUICK GROWING GRASS SPECIES WHICH WILL PROVIDE AN EARLY COVER, DURING THE SEASON IN WHICH IT IS PLANTED. TEMPORARY SEEDING SHALL BE CONTROLLED SO AS TO NOT ALTER OR COMPETE WITH PERMANENT GRASSING. THE RATE
OF SEEDING SHALL BE 30 POUNDS PER ACRE.
E. TEMPORARY SEEDING AND MULCHING
SLOPES STEEPER THAN 6:1 THAT FALL WITHIN THE CATEGORY ESTABLISHED IN 4 ABOVE, SHALL ADDITIONALLY RECEIVE MULCHING OF APPROXIMATELY TWO (2) INCHES, LOOSE MEASURE, OF MULCH
MATERIAL CUT INTO THE SOIL OF THE SEEDED AREA TO A DEPTH OF FOUR (4) INCHES.
F. TEMPORARY GRASSING
SEEDED OR SEEDED AND MULCHED AREA(S) SHALL BE ROLLED AND WATERED AS REQUIRED TO ASSURE
OPTIMUM GROWING CONDITIONS FOR THE ESTABLISHMENT OF A GOOD GRASS COVER.
G. TEMPORARY RE-GRASSING
IF, AFTER 14 DAYS, THE TEMPORARY GRASSED AREAS HAVE NOT ATTAINED A MINIMUM OF 75% GOOD GRASS COVER, THE AREA WILL BE REWORKED AND ADDITIONAL SEEDS APPLIED TO ESTABLISH THE DESIRED
VEGETATION COVER.
H. MAINTENANCE
ALL FEATURES OF THE PROJECT SHALL BE CONSTRUCTED TO PREVENT EROSION AND SEDIMENT AND SHALL BE MAINTAINED DURING THE LIFE OF THE CONSTRUCTION SO AS TO FUNCTION PROPERLY WITHOUT THE
TRANSPORT OF SEDIMENTS OUTSIDE THE LIMITS OF THE PROJECT.
2. TEMPORARY SILT FENCES AND STAKED SILT BARRIERS, SHALL BE IN ACCORDANCE WITH F.D.O.T. STANDARD SPECIFICATION, SEC. 104.6, 104.7 AND SEC. 985 AND SHALL BE INSTALLED ALONG THE WESTERN LIMITS OF THE
PROJECT.
3. TEMPORARY SILT FENCES AND STAKED SILT BARRIERS, SHALL BE IN ACCORDANCE WITH F.D.O.T. STANDARD SPECIFICATION, SEC. 104.6, 104.7 AND SEC. 985 AND SHALL BE INSTALLED ALONG THE WESTERN LIMITS OF THE
PROJECT.
G-400 General Notes.dwg
AS SHOWN
SCALE:
SHEET:9150 CURRY FORD ROAD ORLANDO, FL. 32825
DRAWING NO. :
OF
REV DATE DESCRIPTION
DESIGNED BY:
DRAWN BY:
CHECKED BY:
OCU FILE NO.:
CADD FILE:
LINE IS 2 INCHES
AT FULL SIZE
(IF NOT SCALE ACCORDINGLY) www.cphcorp.com
1117 East Robinson Street ~ Orlando, FL 32801 ~ Phone: 407.425.0452
Licenses:
Eng. C.O.A. No. 3215
Survey L.B. No. 7143
Arch. Lic. No. AA2600926
Lndscp. Lic. No. LC0000298
A Full Service A & E Firm
Architects Engineers
Environmental Landscape Architects
M / E / P Planners Structural Surveyors
Traffic/Transportation
KL / DEM
DEM
GCM
J:\O28604\Civil\DWG\_Current_Plan_Set\O28604 G-300 - G-400 General Notes.dwg
OUC ENGINEERING NOTES
EWRF SCADA SERVERS & OPERATIONS
IMPROVEMENTS
ORANGE COUNTY FLORIDA
97011 www.cphcorp.com
1117 East Robinson Street ~ Orlando, FL 32801 ~ Phone: 407.425.0452
Licenses:
Eng. C.O.A. No. 3215 Survey L.B. No. 7143
Arch. Lic. No. AA2600926 Lndscp. Lic. No. LC0000298
Architects Engineers
Environmental Landscape Architects
M / E / P Planners
Surveyors Traffic/Transportation
A Full Service A & E Firm SCALE:
SHEET:9150 CURRY FORD ROAD ORLANDO, FL. 32825
ORANGE COUNTY
ENGINEERING DIVISION
UTILITIES DEPARTMENT
DRAWING NO. :
OF
DESIGNED BY:
DRAWN BY:
CHECKED BY:
OCU FILE NO.: X
CADD FILE: X
LINE IS 2 INCHES
AT FULL SIZE
(IF NOT SCALE ACCORDINGLY)
NOTE: THE SCALE OF THESE PLANS MAY HAVE CHANGED DUE TO REPRODUCTION
AS SHOWN97011
BID SET
C:\Users\jmillard\Documents\O28604_Orange County Utilities Operations Improvements - A - 2022_jmillard1.rvt
8/7/2024 1:12:46 PM
A001
EWRF SCADA SERVERS & OPERATIONS
IMPROVEMENTS,
ORANGE COUNTY FLORIDA
GENERAL INFORMATION AND ABBREVIATIONS
O28604
JKM
BKS
CPH
ABREVIATIONS
A
& AND
@ AT
A/E ARCHITECT / ENGINEER
AB ANCHOR BOLT
AC AIR CONDITIONING
ACC ACCESSIBLE
ACOUST ACOUSTICAL
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
AD ACCESS DOOR
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AGGR AGGREGATE
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
ATTN ATTENTION
AUTO AUTOMATIC
AV AUDIOVISUAL
B
BD BOARD
BIT BITUMINOUS
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BO BOTTOM OF
BOB BOTTOM OF BEAM
BOC BOTTOM OF CURB
BOT BOTTOM
BRG BEARING
BRK BRICK
BRKT BRACKET
BSMNT BASEMENT
BUR BUILT UP ROOFING
C
C CHANNEL
C/C CENTER TO CENTER
CAB CABINET
CAT CATEGORY
CB CATCH BASIN
CB CEMENT BOARD
CBU CEMENTITIOUS BACKER UNIT
CCTV CLOSED CIRCUIT TELEVISION
CEM CEMENT
CER CERAMIC
CG CORNER GUARD
CH CHILLER
CI CAST IRON
CIP CAST-lN-PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CLEANOUT
COL COLUMN
CONC CONCRETE
COND CONDITION
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
CTR CENTER
CTSK COUNTERSUNK
CUST CUSTODIAL
CW COLD WATER
D
D DEEP, DEPTH
DBL DOUBLE
DEG DEGREE
DEMO DEMOLISH OR DEMOLITION
DEMO DEMOLITION
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DIMS DIMENSIONS
DISP DISPENSER
DIV DIVISION
DMPF DAMP PROOFING
DN DOWN
DO DOOR OPENING
DR DOOR
DRN DRAIN
DS DOWNSPOUT
DTL DETAIL
DW DISHWASHER
DWG DRAWING
DWR DRAWER
GENERAL NOTES TO CONTRACTOR
1 APPLICABLE BUILDING CODE AND OTHER ORDINANCES, CODES AND REGULATIONS LISTED IN THE SPECIFICATIONS OR ON THE
DRAWINGS, AND REQUIRED BY LOCAL BUILDING AUTHORITIES. THE GOVERNING CODES, RULES AND REGULATIONS ARE COLLECTIVELY REFERRED TO AS "THE CODE". THE CONTRACTOR SHALL REPORT ANY INCONSISTENCIES, CONFLICTS OR OMISSIONS DISCOVERED TO
THE ARCHITECT FOR INTERPRETATION PRIOR TO PERFORMING ANY WORK.
2 THE GENERAL CONTRACTOR SHALL CONTACT BUILDING MANAGEMENT TO DETERMINE THE RULES OF THE BUILDING RELATIVE TO CONSTRUCTION; WHEN AND HOW DELIVERIES CAN BE MADE, WHAT PHASES AND TYPES OF CONSTRUCTION MAY BE DONE ON REGULAR OR OVERTIME BASIS AND, IN GENERAL, ANY SPECIAL BUILDING REQUIREMENTS WHICH WILL AFFECT THE COST OF ALL WORK BORNE BY THE GENERAL CONTRACTOR. ALL WORK SHALL CONFORM TO ALL BASE BUILDING STANDARD SPECIFICATIONS AND BUILDING REGULATIONS WHICH THE GENERAL CONTRACTOR SHALL OBTAIN PRIOR TO SUBMISSION OF BID.
3 THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SUB-CONTRACTORS RECEIPT OF COMPLETE SETS OF THESE DOCUMENTS AS WELL AS ALL FUTURE ADDENDA, BULLETINS, FIELD DIRECTIVES AND CHANGE ORDERS.
4 THE GENERAL CONTRACTOR SHALL COORDINATE WITH BUILDING MANAGEMENT THE STORAGE OF MATERIALS. GENERAL CONTRACTOR SHALL PROVIDE PROTECTION AS NECESSARY TO PREVENT VANDALISM AND LOSS OF MATERIALS BY THEFT OR DAMAGE SUSTAINED DUE TO EXPOSURE TO INAPPROPRIATE ENVIRONMENTAL CONDITIONS. GENERAL CONTRACTOR WILL REPAIR AND REPLACE ANY DAMAGE OR
LOSS AT THE GENERAL CONTRACTOR'S EXPENSE WITHOUT CHARGE TO THE OWNER / TENANT.
5 1.WHERE ADJACENT AREAS BEYOND THE IMMEDIATE CONSTRUCTION AREA WILL BE OCCUPIED DURING THE CONSTRUCTION PERIOD, THE GENERAL CONTRACTOR SHALL:
a.CONFORM TO OWNERS AND TENANT REQUIREMENTS FOR HOURS OF CONSTRUCTION OPERATIONS, ACCESS TO TENANT SPACES AND
ALLOWABLE NOISE LEVEL DURING TENANT BUSINESS HOURS;
b.NOT BLOCK HALLWAYS, ACCESSIBLE ROUTES OR MEANS OF EGRESS FOR TENANTS OF BUILDING;
c.NOT CAUSE INTERRUPTIONS OF ELECTRICAL SERVICES TO THE TENANTS OF THE BUILDING WITHOUT PRIOR NOTIFICATION AND
APPROVALS;
d.PROPERLY PROTECT ALL FLOORS, MAIL CHUTES AND DOORS IN PUBLIC AREAS SUBJECT TO CONSTRUCTION TRAFFIC;
e.PROVIDE SHOE WIPING MATS AT ALL OPENINGS BETWEEN CONSTRUCTION AREAS AND ALL PUBLIC SPACES;
f.KEEP ALL ACTIVE AREAS CLEAN AND FREE FROM DEBRIS;
g.ERECT AND MAINTAIN TEMPORARY BRACING, LIGHTS, DUSTPROOF PARTITIONS, BARRICADES, FENCES AND WARNING SIGNS AS NECESSARY TO PREVENT INJURY, NOISE, DUST AND INCONVENIENCE TO OTHER TENANTS, THE PUBLIC AND TO PREVENT DAMAGE TO
ADJACENT CONSTRUCTION TO REMAIN;
h.FOLLOW THE RECOMMENDED CONTROL MEASURES OF THE SHEET METAL AND AIR CONDITIONING NATIONAL CONTRACTORS ASSOCIATION (SMACNA) IAQ GUIDELINES FOR OCCUPIED BUILDINGS UNDER CONSTRUCTION, 2ND EDITION 2008, ANSI / SMACNA 008-2008, CHAPTER 3;
i.INSTALL FILTRATION MEDIA AT ALL RETURN AIR GRILLS FOR PERMANENTLY INSTALLED AIR HANDLERS TO BE USED DURING
CONSTRUCTION WITH A MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 8;
j.PROVIDE A ZIPWALL (OR SIMILAR) BARRIER IN AREAS WHERE NO IMMEDIATE ADJACENT SPACES (I.E. CORRIDORS) ARE AVAILABLE, SEPARATING THE CONSTRUCTION SPACE FROM ANY OCCUPIED SPACE;
PROVIDE A TEMPORARY FRAMED PARTITION IN AREAS WHERE LARGER SPACES ARE REQUIRED TO BE SEPARATE AND PORTIONS OF ROOMS ARE OCCUPIED. FINISHED SIDE OF TEMPORARY WALL FACING ADJACENT OCCUPIED SPACE SHALL BE PAINTED TO LOOK
SIMILAR TO THE OCCUPIED SPACE.
6 6.ALL CUTTING, CHASING, DRILLING OR DEMOLITION OF WALLS, SLABS, ETC. REQUIRING THE USE OF JACKHAMMERS OR OTHER HEAVY HAND OR POWER TOOLS SHALL BE PERFORMED AFTER REGULAR BUSINESS HOURS ON AN OVERTIME BASIS, IF NECESSARY, UNLESS THE BUILDING MANAGEMENT AND ANY AFFECTED TENANTS PROVIDE A WRITTEN WAIVER EXPRESSLY PERMITTING OTHERWISE.
7 THE GENERAL CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS FOR THE DURATION OF THIS PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR SHALL PROVIDE PUBLIC PROTECTION AS NECESSARY AND REQUIRED BY GOVERNING AGENCIES HAVING JURISDICTION UNTIL OWNER / TENANT ACCEPTANCE OF THE PREMISES.
8 FOR THE DURATION OF THE PROJECT, ALL EXITS, EXIT AND OPERABLE LIGHTING, FIRE PROTECTION DEVICES AND ALARMS AND ANY OTHER REQUIRED OR EXISTING SAFETY EQUIPMENT SHALL BE MAINTAINED AS REQUIRED BY ANY APPLICABLE CODES, REGULATIONS OR STANDARDS HAVING JURISDICTION OVER THE WORK. UNLESS NOTED OTHERWISE, ALL EXISTING, SERVICES AND DEVICES SHALL
REMAIN ACTIVE AND IN GOOD REPAIR.
9 THE GENERAL CONTRACTOR SHALL PROTECT THE PROPERTY OF THE TENANT AND THE BUILDING OWNER INCLUDING, BUT NOT LIMITED TO, WINDOWS, FLOOR AND CEILING FINISHES, PUBLIC TOILETS, ELEVATORS, DOORS AND BUCKS, ELECTRICAL AND HVAC EQUIPMENT.
THE GENERAL CONTRACTOR SHALL PROTECT ADJOINING PROPERTY. DAMAGE CAUSED BY THE GENERAL CONTRACTOR'S WORK OR WORKMEN MUST BE MADE GOOD IN A TIMELY FASHION. PATCHING AND REPLACEMENT OF DAMAGED WORK SHALL BE PERFORMED AT THE COST OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ALL OF ITS SUB-CONTRACTORS. IF THE GENERAL CONTRACTOR FAILS TO COMPLETE THE REPAIRS IN A TIMELY FASHION, REPAIRS WILL BE MADE BY A CONTRACTOR SELECTED BY THE OWNER / TENANT OR OWNER / TENANT'S REPRESENTATIVE AND BACK CHARGED TO THE
GENERAL CONTRACTOR ACCORDINGLY.
10 THE GENERAL CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS THE LANDLORD, TENANT AND ARCHITECT AGAINST ANY AND ALL CLAIMS AND DEMANDS FOR THE DAMAGE TO THE PROPERTY OF ANY PERSON, FIRM OR INDIVIDUAL OR FOR PERSONAL INJURIES (INCLUDING DEATH) ARISING OUT OF OR SUFFERED WHILE ENGAGED IN, OR CAUSED IN WHOLE OR IN PART, BY THE EXECUTION OF THE WORK; THE CONTRACTOR SHALL WELL AND TRULY DEFEND THE LANDLORD, TENANT AND ARCHITECT AND SHALL PAY ALL MONIES AWARDED FOR SUCH DAMAGES OR INJURIES (INCLUDING DEATH), ALL COSTS INCLUDING REASONABLE ATTORNEY'S FEES SUSTAINED AND SHALL OBTAIN A FULL ACQUAINTANCE AND RELEASE IN FAVOR OF THE LANDLORD, TENANT AND ARCHITECT, UNLESS SUCH LIABILITY RESULTS SOLELY FROM THE NEGLIGENCE OF THE LANDLORD, TENANT, ARCHITECT, ITS AGENTS OR EMPLOYEES.
11 THE ARCHITECT SHALL NOT BE HELD RESPONSIBLE FOR THE PERFORMANCE OF ANY WORK, THE MEANS AND METHODS OF CONSTRUCTION CHOSEN BY THE CONTRACTOR OR ANY SUB-CONTRACTORS, NOR SHALL THE ARCHITECT GUARANTEE THE
PERFORMANCE OF THEIR CONTRACTS.
12 THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE WORK OF ALL SUB-CONTRACTORS AND SHALL PERFORM SUCH MISCELLANEOUS WORK AS MAY BE NECESSARY FOR THE COMPLETION OF THE WORK. IT IS EXPECTED THAT THE GENERAL CONTRACTOR SHALL ALSO CLOSELY COORDINATE THE WORK WITH THAT OF ALL OTHER VENDORS RETAINED BY THE OWNER / TENANT
TO ASSURE THAT ALL SCHEDULES ARE MET AND WORK PROCEEDS WITHOUT DELAY.
13 BIDDERS, BEFORE SUBMITTING PROPOSALS, SHALL VISIT AND CAREFULLY EXAMINE THE AREAS AFFECTED BY THE WORK TO FAMILIARIZE THEMSELVES WITH ALL EXISTING CONDITIONS AND ANY DIFFICULTIES THAT WILL AFFECT THE EXECUTION OF THE WORK.
SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE AND LATER CLAIMS WILL NOT BE RECOGNIZED FOR EXTRA LABOR, EQUIPMENT OR MATERIALS REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WHICH COULD HAVE BEEN REASONABLY FORESEEN HAD SUCH AN EXAMINATION BEEN MADE. THE GENERAL CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS ON THE JOB SITE AND REPORT ANY AND ALL DISCREPANCIES AND / OR UNUSUAL CONDITIONS TO THE
ARCHITECT PRIOR TO FINALIZING BIDS OR COMMENCEMENT OF ANY WORK.
14 THE GENERAL CONTRACTOR SHALL MAKE KNOWN ANY AND ALL LIMITATIONS, EXCLUSIONS OR MODIFICATIONS TO THE PROJECT DURING THE BIDDING PROCESS. ANY AND ALL LIMITATIONS, EXCLUSIONS OR MODIFICATIONS NOT ITEMIZED IN THE BID PROPOSAL DOCUMENTS ARE PRESUMED "INCLUDED", IN WHICH CASE NO ADDITIONAL MONIES WILL BE ALLOCATED FOR THIS WORK.
15 EXISTING CONSTRUCTION AND DIMENSIONS SHOWN ARE PER EXISTING DRAWINGS AND FIELD VERIFICATION OF EXISTING CONDITIONS AND DIMENSIONS. ALL EXISTING INFORMATION MUST BE VERIFIED IN THE FIELD. EVERY EFFORT HAS BEEN MADE TO ASSURE THE ACCURACY OF THE EXISTING CONDITIONS AND DIMENSIONS REFLECTED IN THE CONSTRUCTION DOCUMENTS, HOWEVER, IT IS STILL UP TO THE GENERAL CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS. SHOULD ANY DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS ARISE RESULTING FROM THE GENERAL CONTRACTOR'S FIELD INVESTIGATIONS AND INSPECTIONS, SUCH DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO THE COMMENCEMENT OF ANY WORK. EXISTING CONSTRUCTION CONDITIONS IN AREAS WHERE NEW WORK IS NOT PLANNED MAY NOT BE COMPLETELY SHOWN.
16 EXHAUSTIVE AND INVASIVE INSPECTIONS OF EXISTING CONDITIONS WERE NOT PERFORMED BY THE ARCHITECT. AS SUCH, ADVERSE CONDITIONS MAY BE DISCOVERED DURING THE PROGRESSION OF THE WORK. IF SUCH ADVERSE CONDITIONS ARE REVEALED OR DISCOVERED DURING THE PROGRESSION OF THE WORK, SUCH CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT IMMEDIATELY BEFORE THE COMPLETION OF ANY WORK ADVERSELY EFFECTED BY THESE DISCOVERIES.
17 WITHIN ONE (1) WEEK (5 BUSINESS DAYS) OF THE AWARD OF THIS CONTRACT AND PRIOR TO MOBILIZATION FOR ANY WORK, THE GENERAL CONTRACTOR SHALL FURNISH A CONSTRUCTION SCHEDULE SHOWING THE PROGRESSION OF THE WORK FOR THE TIMELY COMPLETION OF THE PROJECT. THIS SCHEDULE SHALL INDICATE ALL ORDERING LEAD TIMES, LENGTH OF TIME FOR EACH PHASE, ITS START AND COMPLETION, WITH A PROJECTED TIMELY COMPLETION DATE. THE CONSTRUCTION SCHEDULE SHALL BE APPROVED IN
WRITING BY THE OWNER / TENANT PRIOR TO THE COMMENCEMENT OF ANY WORK.
18 THE GENERAL CONTRACTOR AND SUB-CONTRACTORS SHALL ATTEND JOB MEETINGS AS REQUIRED BY CONTRACT.
19 THE GENERAL CONTRACTOR SHALL OBTAIN ALL PERMITS FOR ALL SITE DEVELOPMENT WORK, PAY ALL FEES FOR PERMITS AND CHECK ALL GOVERNING AUTHORITIES' SPECIFICATIONS FOR, BUT NOT LIMITED TO, GUTTERS, SIDEWALKS, POLES, AND OTHER STRUCTURES, INCLUDING THE REMOVAL OR RELOCATION OF EXISTING UTILITIES OR OTHER PHYSICAL OBJECTS SHOWN ON PLANS OR NOTED OTHERWISE. SEPARATE PERMITS, WHEN REQUIRED AND / OR WHEN WORK ITEMS ARE DESIGN / BUILD IN NATURE, SHALL BE OBTAINED BY THE GENERAL CONTRACTOR FOR MECHANICAL, PLUMBING, FIRE SPRINKLERS, ELECTRICAL AND FIRE ALARM SYSTEMS.
DESCRIPTIVE, DETAILED DESIGN AND REQUIRED SUBMITTAL DOCUMENTS INFORMATION SHALL BE PROVIDED FOR REVIEW BY THE REGULATING AUTHORITIES AND BY THE OWNER / TENANT AND ARCHITECT PRIOR TO ANY WORK BEING PERFORMED. SEE SPECIFICATIONS FOR REQUIRED DESIGN / BUILD SYSTEMS. SUBMIT PLAN TO AND OBTAIN PERMIT FROM THE AUTHORITY HAVING JURISDICTION OVER DESIGN / BUILD SYSTEMS' INSTALLATION OR MODIFICATION. ALL WORK SHALL COMPLY WITH GOVERNING CODES AND REGULATIONS APPLICABLE TO THE WORK. NOTHING IN THE CONSTRUCTION DOCUMENTS IS TO BE CONSTRUED TO PERMIT WORK
WHICH DOES NOT CONFORM TO CURRENT GOVERNING CODES.
ABREVIATIONS
E
E EAST
EA EACH
EB EXPANSION BOLT
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENG ENGINEER
EP ELECTRICAL PANEL
EPDM ETHYLENE PROPYLENE DIENE M-CLASS
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EX EXISTING
EXH EXHAUST
EXP EXPANSION
EXT EXTERIOR
F
FA FIRE ALARM
FB FACE BRICK
FD FLOOR DRAIN OR FIRE DEPARTMENT
FDC FIRE DEPARTMENT CONNECTION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF&E FURNITURE, FIXTURES AND EQUIPMENT
FFB FLUSH FLOOR BOX
FFEL FINISH FLOOR ELEVATION
FH FULL HEIGHT OR FLAT HEAD
FHC FIRE HOSE CABINET
FIN FINISH
FIXT FIXTURE
FLASH FLASHING
FLR FLOOR
FLUOR FLUORESCENT
FND FOUNDATION
FO FACE OF OR FINISHED OPENING
FP FIRE PROTECTION
FPG FIREPROOFING
FR FIRE RESISTANT
FRC FIBER REINFORCED CONCRETE
FRP FIBER REINFORCED PLASTIC
FRT FIRE RETARDANT TREATED
FS FLOOR SINK
FT FEET/FOOT
FTG FOOTING
FURN FURNITURE
FURR FURRING
FWC FABRIC WALL COVERING
FWP FABRIC WRAPPED PANEL
G
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACT(OR)
GEN GENERAL
GFRC GLASS FIBER REINFORCED CONCRETE
GL GLASS
GLAZ GLAZING
GR GRADE
GRAN GRANULAR
GRD GROUND
GRFG GLASS FIBER REINFORCED GYPSUM
GSM GALVANIZED SHEET METAL
GV GAS VALVE
GWB GYPSUM WALL BOARD
GYP GYPSUM
H
H HIG
HB HOSE BIB
HC HANDICAPPED OR HOLLOW CORE
HDWD HARDWOOD
HDWR HARDWARE
HGT HEIGHT
HM HOLLOW METAL
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HRC HOSE REEL CABINET
HT HEIGHT
HTG HEATING
HVAC HEATING VENTILATION & AIR CONDITIONING
HW HOT WATER
I
ID INSIDE DIAMETER
IN INCH/INCHES
INCAND INCANDESCENT
INCL INCLUDED/INCLUDING
INFO INFORMATION
INSUL INSULATED OR INSULATION
INT INTERIOR
INTERM INTERMEDIATE
INV INVERT
J
JAN JANITOR
JC JANITOR'S CLOSET
JST JOIST
JT JOINT
K
KIT KITCHEN
ABREVIATIONS
KO KNOCK OUT
L
LAM LAMINATE
LAV LAVATORY
LB POUND
LF LINEAR FEET
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LT LIGHT
LTG LIGHTING
LTWT LIGHTWEIGHT
LVL LEVEL
LVR LOUVER
M
MAINT MAINTENANCE
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MECH MECHANICAL
MED MEDIUM
MEMBR MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MR MOISTURE RESISTANT
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
N
N NORTH
NA NOT APPLICABLE
NC NOISE CRITERIA
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NON RATED
NTS NOT TO SCALE
O
CFCI CONTRACTOR FURNISHED, CONTRACTOR
INSTALLED
OA OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER
OD OVERFLOW DRAIN
OF OWNER FURNISHED
OFCI OWNER FURNISHED, CONTRACTOR INSTALLED
OFF OFFICE
OFOI OWNER FURNISHED, OWNER INSTALLED
OH OVERHEAD
OPNG OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P
P PAINT
PAV PAVING
PBD PARTICLE BOARD
PC PRECAST
PDF POWER DRIVEN FASTENER
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PI. PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNL PANEL
PNT PAINT OR PAINTED
POL POLISHED
PR PAIR
PREFAB PREFABRICATED
PROJ PROJECT
PSF POUNDS PER SQUARE FOOT
PT POINT
PT PRESSURE TREATED
PTD PAINTED
PTN PARTITION
PVC POLYVINYL CHLORIDE
Q
QT QUARRY TILE
QTY QUANTITY
R
R RADIUS/RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE
RBR RUBBER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
RECPT RECEPTACLE
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCED REINFORCING
REINF REINFORCED
REL RELOCATE
ABREVIATIONS
REM REMOVABLE
REQ REQUIRE/REQUIRED
REQD REQUIRED
RESIL RESILIENT
REV REVISION/REVISED
RM ROOM
RO ROUGH OPENING
RTD RATED
RTG RATING
RWL RAIN WATER LEADER
S
S SOUTH
SA SUPPLY AIR
SAF SELF ADHERED FLASHING
SC SOLID CORE
SCHED SCHEDULE
SD STORM DRAIN
SECT SECTION
SF SQUARE FEET/FOOT
SH SPRINKLER HEAD
SHR SHOWER
SHT SHEET
SIM SIMILAR
SJ SAW JOINT
SM SHEET METAL
SM SURFACE MOUNTED
SP STANDPIPE
SPEC SPECIFIED OR SPECIFICATION
SPK SPRINKLE
SPKR SPEAKER
SQ SQUARE
SS STAINLESS STEEL
SSK SERVICE SINK
STA STATION
STC SOUND TRANSMISSION COEFFICIENT
STL STEEL
STOR STORAGE
STRG STRINGER
STRUCT STRUCTURAL
STRUCT STRUCTURE OR STRUCTURAL
SUBCAT SUBCATEGORY
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TB TOWEL BAR
TDC TRAFFIC DECK COATING
TEL TELEPHONE/TELECOM
TELE TELEPHONE
TEMP TEMPORARY
THK THICKNESS
THRU THROUGH
TKBD TACK BOARD
TLT TOILET
TMPD TEMPERED
TO TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE OR TOP OF CURB
TOS TOP OF STEEL
TOW TOP OF WALL
TS TUBE STEEL
TV TELEVISION
TYP TYPICAL
U
UL UNDERWRITERS LABORATORY
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
URNL URINAL
V
VAC VENTILATION AND AIR CONDITIONING
VAR VARIES
VCT VINYL COMPOSITION TILE
VER VERIFY
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VP VISION PANEL
VR VAPOR RETARDER
VT VINYL TILE
VWC VINYL WALL COVERING
W
W WIDE OR WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WIN WINDOW
WM WIRE MESH
WP WATERPROOF OR WATERPROOFING
WPM WATERPROOF MEMBRANE
WS WEATHER-STRIPPING
WSCT WAINSCOT
WT WEIGHT
WV WATER VALVE
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
Y
YR YEAR
GENERAL NOTES TO CONTRACTOR
20 ALL REQUIRED PERMITS MUST BE OBTAINED FROM THE FIRE DEPARTMENT HAVING JURISDICTION PRIOR TO THE COMMENCEMENT OF
ANY WORK.
21 ALL COSTS FOR INSPECTIONS AND / OR TESTS SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR UNLESS NOTED
OTHERWISE.
22 THE CONTRACTOR SHALL PAY THE EXPENSES FOR ALL TRANSPORTATION, HOISTING AND ELEVATOR USE CHARGES ON ALL MATERIALS OR EQUIPMENT TO THE POINT OF USE AND SHALL BE RESPONSIBLE FOR ALL UNLOADING, CHECKING AND STORAGE OF THE SAME IN
CONNECTION WITH THE WORK.
23 OF THE INEVITABLE WASTE THAT IS GENERATED, AS MANY OF THE WASTE MATERIALS AS ECONOMICALLY FEASIBLE SHALL BE REUSED, SALVAGED OR RECYCLED. WASTE DISPOSAL IN LANDFILLS SHALL BE MINIMIZED. THE GENERAL CONTRACTOR SHALL COORDINATE WASTE MATERIALS HANDLING AND SEPARATION FOR ALL TRADES. THE GENERAL CONTRACTOR SHALL PROVIDE SEPARATION, HANDLING, TRANSPORTATION, RECYCLING, SALVAGE AND LANDFILL FOR ALL DEMOLITION AND WASTE MATERIALS. RECYCLABLE MATERIALS CAN BE COMMINGLED IN DUMPSTERS ON-SITE AS LONG AS PROVISION IS MADE FOR HAULING TO A TRANSFER STATION WHERE SEPARATION WILL OCCUR. TRANSFER STATION MUST PROVIDE DOCUMENTATION REPORTING TYPES OF MATERIALS SEPARATED BY LOAD AND PERCENTAGE OF EACH LOAD. FINAL DESTINATION OF SORTED MATERIALS MUST ALSO BE REPORTED.
DIVERSION GOALS: A MINIMUM OF 75% OF TOTAL PROJECT WASTE SHALL BE DIVERTED FROM LANDFILL. THE FOLLOWING WASTE
CATEGORIES, AT A MINIMUM, SHALL BE DIVERTED FROM LANDFILL:
a.CLEAN DIMENSIONED WOOD, PALLET WOOD;
b.PLYWOOD, ORIENTED STRAND BOARD AND PARTICLEBOARD;
c.CONCRETE;
d.CARDBOARD, PAPER, PACKAGING AND METALS;
e.GYPSUM DRYWALL - UNPAINTED;
f.ACOUSTIC TILE;
g.PAINT;
h.GLASS;
i.PLASTICS;
j.CARPET AND PAD;
k.BEVERAGE CONTAINERS.
24 THE GENERAL CONTRACTOR SHALL MAKE ALL ARRANGEMENTS, MAINTAIN AND PAY ALL COSTS FOR TEMPORARY WATER, PLUMBING, POWER, LIGHTING, HEATING OR VENTILATION REQUIRED TO PROPERLY CONDUCT THE WORK.
25 DIMENSIONS ARE TO FACE OF STUD, CONCRETE, OR MASONRY UNLESS NOTED OTHERWISE. DOORS SHALL BE 8" FROM ADJACENT MASONRY WALLS, 4" FROM ADJACENT STUD WALLS OR CENTERED IN THE WALL IN WHICH IT OCCURS UNLESS NOTED OTHERWISE. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS SHALL GOVERN. ANY DIMENSIONAL DISCREPANCIES ENCOUNTERED SHALL BE REPORTED TO THE ARCHITECT IMMEDIATELY FOR CLARIFICATION PRIOR TO THE COMMENCEMENT OF THE ASSOCIATED WORK.
26 LARGER SCALE DRAWINGS SHALL GOVERN OVER SMALLER SCALE DRAWINGS.
27 INSTALL ALL EQUIPMENT AND MATERIALS PER MANUFACTURERS' RECOMMENDATIONS. ANY DIFFICULTIES OR DISCREPANCIES ARE TO BE REPORTED TO THE ARCHITECT IMMEDIATELY PRIOR TO THE COMMENCEMENT OF THE ASSOCIATED WORK.
28 THE GENERAL CONTRACTOR AND EACH SUB-CONTRACTOR SHALL WARRANTEE ALL WORK PERFORMED UNDER THEIR RESPECTIVE CONTRACT(S) FOR A MINIMUM PERIOD OF ONE (1) YEAR. ALL DEFECTS IN THE WORK OCCURRING IN THE WARRANTEE PERIOD SHALL BE CORRECTED AT NO ADDITIONAL COST TO THE LANDLORD, OWNER OR TENANT, WHICHEVER IS APPLICABLE.
29 THE OWNER / TENANT, ARCHITECT, CONSULTANTS AND ALL INSPECTORS FROM ANY AGENCIES HAVING JURISDICTION OVER THE WORK SHALL BE PERMITTED ACCESS TO THE JOB SITE AT ALL TIMES DURING NORMAL WORKING HOURS.
30 THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO EXECUTE ALL WORK, EXCEPT WHERE
NOTED AS NOT IN CONTRACT.
31 MINOR DETAILS NOT SHOWN OR SPECIFIED BUT NECESSARY FOR PROPER CONSTRUCTION OF ANY PART OF THE WORK SHALL BE INCLUDED AS IF THEY WERE INDICATED IN THE DRAWINGS UNLESS OTHERWISE AGREED UPON. WHERE THE CONTRACT, CONSTRUCTION NOTES OR DRAWINGS CALL FOR ANY WORK OF A MORE STRINGENT NATURE THAN THAT REQUIRED BY THE BUILDING CODE OR ANY OTHER ENTITY HAVING JURISDICTION OVER THE WORK, THE WORK OF THE MORE STRINGENT NATURE CALLED SHALL BE
FURNISHED IN ALL CASES.
32 FOR ALL MATERIALS PURCHASED, THE GENERAL CONTRACTOR SHALL FURNISH MATERIALS WHICH YIELD THE HIGHEST PERCENT OF PRE-CONSUMER (POST-INDUSTRIAL) AND POST-CONSUMER RECYCLED CONTENT. THE CONTRACTOR SHALL FURNISH THESE MATERIALS WITHIN THE PARAMETERS OF THE BUDGET AND SHALL NOT PURCHASE ANY COST ADDING MATERIAL OR PAY A PREMIUM (MORE THAN
FAIR MARKET VALUE) WITHOUT OWNER / TENANT ACKNOWLEDGEMENT AND APPROVAL.
33 FOR ALL MATERIALS PURCHASED, THE GENERAL CONTRACTOR SHALL FURNISH MATERIALS MANUFACTURED WITHIN A 500 MILE RADIUS OF THE PROJECT SITE WHERE AVAILABLE, WITHIN BUDGET, WITHIN FAIR MARKET VALUE AND DO NOT RISK TO THE PROJECT SCHEDULE.
34 FOR ALL NEW WOOD PRODUCTS INCLUDING, BUT NOT LIMITED TO, PARTICLE BOARD, MEDIUM DENSITY FIBERBOARD, PLYWOOD, ORIENTED STRAND BOARD AND WOOD DOORS, THE GENERAL CONTRACTOR SHALL FURNISH MATERIALS THAT CONTAIN NO ADDED
UREA-FORMALDEHYDE
35 DETAILS ARE INTENDED TO SHOW THE INTENT OF THE DESIGN. MINOR MODIFICATIONS MAY BE REQUIRED TO SUIT FIELD CONDITIONS.
THESE MODIFICATIONS SHALL BE INCLUDED AS PART OF THE WORK.
36 ALL WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER BY MECHANICS AND TRADES PERSONS SKILLED IN THEIR RESPECTIVE
TRADES AND IN ACCORDANCE WITH THE BEST ACCEPTED TRADE PRACTICES.
37 THE GENERAL CONTRACTOR SHALL CONFIRM THE AVAILABILITY AND DELIVERY TIMES FOR ALL SPECIFIED MATERIALS AND EQUIPMENT REQUIRED TO PERFORM THE WORK UPON RECEIPT OF THE CONSTRUCTION DOCUMENTS. SHOULD THE AVAILABILITY OF SPECIFIED ITEMS DELAY THE ON-TIME COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND OWNER / TENANT IMMEDIATELY AND PROPOSE AN EQUIVALENT SUBSTITUTION TO BE REVIEWED BY THE ARCHITECT AND OWNER / TENANT.
38 SUBSTITUTION OF ALL EQUALS SHALL BE ONLY AS APPROVED BY THE ARCHITECT. WHERE THE TERM "OR EQUAL" IS USED THE ARCHITECT SHALL BE THE SOLE JUDGE OF EQUALITY BASED UPON THE INFORMATION FURNISHED BY THE CONTRACTOR.
SUBSTITUTIONS MUST BE ACCEPTED IN WRITING BEFORE THEY MAY BE USED.
39 THE GENERAL CONTRACTOR SHALL PREPARE SUBMITTALS FOR REVIEW BY THE ARCHITECT FOR ALL MATERIALS AND EQUIPMENT SPECIFIED. IF THE GENERAL CONTRACTOR, OWNER / TENANT, OR OWNER / TENANT’S REPRESENTATIVE SUBSTITUTES A MATERIAL, METHOD OF ATTACHMENT, REVISES A CONSTRUCTION DETAIL OR IN ANY WAY ALTERS THE WORK SUCH THAT IT NO LONGER CONFORMS TO THESE DOCUMENTS WITHOUT THE WRITTEN ACCEPTANCE OF THE ARCHITECT, SUCH ACTION CONSTITUTES ACCEPTANCE OF FULL LIABILITY BY THE GENERAL CONTRACTOR OF ANY AND ALL COMPONENTS, SYSTEMS OR ITEMS AFFECTED BY THE SUBSTITUTION.
FURTHER, SUCH SUBSTITUTION WILL RELIEVE THE ARCHITECT OF ANY RESPONSIBILITY OR LIABILITY INCLUDING, BUT NOT LIMITED TO, AESTHETIC CONSEQUENCES, SUBSEQUENT FAILURE(S) AND PERSONAL OR PROPERTY DAMAGE ATTRIBUTABLE TO THIS CHANGE.
40 REVIEW OF A SPECIFIC ITEM SHALL NOT INCLUDE REVIEW OF AN ASSEMBLY OF WHICH THE ITEM IS A COMPONENT.
41 SUBMITTALS THAT CONTAIN EXCESSIVE ERRORS OR ARE INCOMPLETE OR INADEQUATE MAY BE RETURNED WITHOUT ACTION. COSTS INCURRED FOR THE RESULTANT DELAYS WILL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR.
42 REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE GENERAL CONTRACTOR OF OBLIGATIONS OR RESPONSIBILITIES FOR…
This is the start of the file's text. The full file is on GovTribe.