This specification document is prepared by the City of Minneapolis Public Works and outlines requirements for concrete pavement sawing and sealing services on city streets during the 2027 and 2028 construction seasons. The contractor will respond to work orders from designated city staff to provide traffic control, equipment, materials, water, saw slurry pickup and disposal, labor, joint cleaning and sealing within 24 hours of request. Work is citywide in the public right of way and includes sawing fresh joints in concrete pavement and cleaning and sealing sawed joints using hot-poured crack sealer per MnDOT specifications. The contractor must furnish all labor, power, equipment, supplies, water, slurry disposal, materials, and tools. Mobilization will be compensated each time directed by the engineer. The contract is awarded as a single bid with no multiple contractors. The City reserves the right to extend the contract one additional year beyond 2028 if agreed to by both parties. Minimum equipment requirements include saws rated at 57 horsepower with the capability to saw 150 linear feet per hour.
Payment will be made on a per-linear-foot basis as measured by the engineer to the nearest full number, with compensation for mobilization provided each time the contractor is directed to work. Partial payments will be made in accordance with MnDOT provisions subject to a 5% holdback to be released upon completion and satisfaction by the engineer, along with proof of tax compliance and lien waivers. The contractor must procure all necessary permits including water hydrant, noise, and lane use permits where applicable, and comply with all applicable regulations regarding noise and slurry disposal. The City reserves the right to increase quantities up to 100% with no unit price adjustment and to decrease quantities without limitation. Invoices must be submitted within 30 days of service delivery and payment will be rendered within 30 days of receipt unless items are questioned. No pre-payment will be made for services, and the contractor must maintain adequate insurance coverage as required by the City.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Event_4398_-_Bid_Form.xlsx | XLSX spreadsheet | |
| BID-PW_-_Pavement_sawing_and_sealing.pdf | ||
| SUBP_Language_-_Year_4_LSLR_Restoration.pdf | ||
| Event_4398_-_Call_for_Bids.pdf | ||
| WD_MN20260239_-_Hennepin_Highway_Heavy_-_07.30.26.pdf | ||
| Responsible_Contractor_Forms.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Minneapolis Specifications for
Providing Labor and Equipment for Concrete Pavement Sawing and Sealing
Event 4398
I hereby certify that these specifications were prepared by me, or under my direct supervision, and that I am a duly Registered Professional Engineer under the laws of the State of Minnesota.
Ryan Gottsleben
Date: 11/4/2026 Minnesota Registration Number 63973
Section 1. General
The City of Minneapolis Public Works is seeking bids for the services of sawing concrete pavement and sealing concrete pavement joints in City of Minneapolis streets for the 2027 and 2028 construction seasons. This work will involve responding to work orders from designated city staff for the contractor to provide traffic control, equipment, materials, water, saw slurry pick up and proper disposal, labor, joint cleaning and sealing, and any other items required to saw cut and seal concrete pavements within 24 hours of the request.
Section 2. Permits
The contractor is required to procure all necessary permits and all charges, taxes and fees, and comply with all noise, slurry disposal rules, regulations and laws. The above is to include, but not limited to, the following:
a. Water hydrant permit (if using City water)
b. Noise permit
c. Lane use permit (if applicable)
Section 3. Location of Work Site
Location of work is city wide and will be in the public right of way.
Section 4. Contract Requirements
The contractor shall furnish all labor, power, equipment, supplies, water, slurry disposal, materials, and tools to provide pavement sawing and sealing for the City of Minneapolis. This work will involve sawing joints for concrete pavement, which requires multiple blades sistered or reestablishing random cracks in new concrete pavements and for the joints to be cleaned and sealed.
The City of Minneapolis reserves the right to extend this contract one additional year beyond the 2027 and 2028 construction season if agreed to by both parties.
Items listed below are a detailed description of each bid item.
Item 1. Mobilization
Mobilization shall be paid to the contractor each time they are directed by the engineer. This shall be in and out, complete. If the contractor elects to leave and return to the location for their own needs, there will be no reimbursement for this activity.
Item 2. Concrete Pavement Joint Sawing
Work involved in this section will involve sawing fresh joints in concrete pavement as a part of concrete pavement work, as measured by the City of Minneapolis Designated Staff. The specified depth and width are shown in Figure 1. All equipment, materials, water, saw slurry pick up and disposal, traffic control, permits (if required) and any other items required to perform this work is considered incidental to the contractor’s bid.
Figure 1: Depth and width of pavement sawing where t is the concrete pavement thickness.
Item 3. Concrete Pavement Joint Sealing
Work involved in this section will involve cleaning the sawed joint and applying a hot-poured crack sealer. Cleaning shall be done by washing the joint using a 4000 psi pressure washer, followed by a 180 cfm compressed air blower. The joint shall be sealed with MnDOT 3725 Hot-Poured, Extra Low Modulus, Elastic Type Joint Crack Sealer. All equipment, materials, water, traffic control, permits (if required) and any other items required to perform this work is considered incidental to the contractor’s bid.
Section 5. General Contract Requirements
1. The city will make all efforts to identify steel in the embedded concrete but makes no assurances that they have been identified. Any resulting damage or additional cost to the contractor resulting in sawing thru steel is considered incidental to this bid item.
2. Any faulting of pavement slabs resulting in pinched blades is considered incidental to this contract.
3. After notice by the City of Minneapolis to begin work the contractor shall have 24 hours to begin their work.
4. The Contractor shall have a minimum of 57 hp rated saws with ability to saw 150 linear feet per hour.
5. One bid will be let for this package, there will not be multiple contractors for this bid.
6. Materials shall follow the provisions in MnDOT 1601 and the 2024 SALT Schedule of
Materials Control
The hierarchy for this Contract adheres to the following order:
A. Addendums
B. These Contract Documents
C. The City of Minneapolis Department of Public Works’ (MDPW) Supplemental Specifications for the Construction of Public Infrastructure in the City of Minneapolis
D. Minnesota Department of Transportation Standard Specifications for Construction, 2025
E. MnDOT 1601 and the 2024 SALT Schedule of Materials Control
Section 6. Method of Measurement
The unit of measurement will be made by the Engineer in feet, measured to the closet full number.
The contractor shall also be compensated for his mobilization onto and off the site. One mobilization shall constitute; moving on to the site, set up and moving off the site. If, upon approval of the Engineer, the contractor elects to move off this site for his own needs there will be no mobilization paid for.
(1903) Compensation for Increased or Decreased Quantities. There will be no adjustments in unit price for increased or decreased quantities under this contract. The City of Minneapolis reserves the right to increase quantities up to 100% with no unit price adjustments. The City of Minneapolis also reserves the right to decrease quantities with no limit.
Section 7. Payments
Partial payments will be made in accordance with MnDOT (1906) Partial Payments and be subject to a 5% hold back which will be released upon completion and satisfaction of the Engineer for all items listed in this section.
1. The Final Acceptance has been issued by the Engineer.
2. Proof provided by the Contractor, subcontractors, and trucking companies that they have complied with the provisions of M.S. 290.92 regarding withholding of MN State income taxes (IC 134).
3. An affidavit has been received by the Engineer from the Contractor (including his subcontractors and suppliers) showing that all claims (lien waver) against them because of this Contract have been either paid or satisfactorily secured.
4. Items listed in this section shall be provided within 45 calendar days after written notice by the Engineer to final this project. Failure to provide this documentation by the designated time will result in an assessment of fifty ($50) dollars per calendar day for the 46th through 75th calendar days beyond this request. After the 76th day the Engineer will determine if;
either a higher assessment or closing out the contract without final payment and release of the retainage due the contractor is in order. This charge will be assessed against the contractor’s retainage.
Section 8. INVOICE AND PAYMENT
Payment will be on the basis of dry pounds NaOCl (sodium hypochlorite) delivered. For each delivery and associated invoice, the following shall be documented:
• Net pounds product delivered (gross minus tare weight from weigh ticket)
• Assay weight percent sodium hypochlorite (% NaOCl w/w) for delivered load.
https://www.minneapolismn.gov/media/-www-content-assets/documents/MPLS-Standard-Supplemental-Specifications.pdf https://www.minneapolismn.gov/media/-www-content-assets/documents/MPLS-Standard-Supplemental-Specifications.pdf
All work requested under this Contract shall be placed on a City issued Purchase Order.
Contractor shall make all reasonable efforts to submit invoices and documentation in an electronic format, such as PDF or other format compatible with City software capabilities, in lieu of paper invoices and documentation, when so requested by City.
Upon delivery and acceptance of the service, the Contractor shall submit an invoice detailing the appropriate charges.
Invoices shall be submitted to:
City of Minneapolis505 Fourth Ave S, Room 310 Minneapolis, MN 55415 Email: submitinvoices@minneapolismn.gov
Upon receipt of invoice and final inspection and acceptance of the service, the City will render payment within thirty (30) days unless any items thereon are questioned, in which event payment will be withheld pending verification of the amount claimed and the validity of the claim. The Contractor shall provide complete cooperation during any such investigation.
The city will not pre-pay for service. All bills shall state the location and dates of service being billed. All fees, taxes, charges, surcharges, and revenue payments are to be itemized.
No payment will be made for materials stored off-site except in situations where payments may be considered by the City for materials which are stored in a secure area, to be verified by the City and where the Contractor maintains adequate insurance coverage protecting specific materials from loss.
Proof of insurance shall be supplied prior to payment for any materials stored off-site.