EvaluationScoreMatrix.xls
XLS spreadsheet 67 KB Posted
- Solicitation number
- S-63400-00005632
- Issued by
- Coos County, Oregon
About this file
This is an Evaluation Score Matrix document used by the Oregon Parks and Recreation Department (OPRD) to assess bids submitted for ITB #9243, Invasive Species Treatment at Bandon State Natural Area. The evaluation involved two assessors scoring proposals across multiple criteria including equipment specifications (new and unused condition, white color, extended cab, hydraulically powered outriggers and crane extensions, and 4x4 drivetrain on 19.5 chassis), price, and delivery timeline capability. The procurement sought contractors to perform mechanical and herbicide-based invasive plant management across approximately 20 acres at the Bandon State Natural Area in Coos County, Oregon, with specific tasks including mechanical mowing and mulching of gorse patches and spot spraying of European beachgrass and gorse resprouts. Tasks 2 and 3 were required to be completed by March 10, 2023, and Task 4 by December 31, 2023, with bids due on February 7, 2023, at 2:00 pm Pacific Time and an anticipated award date of February 13, 2023.
The evaluation matrix shows multiple vendors submitted proposals, with Nelson Turn-Key Build achieving the highest score of 60.00 for their complete turn-key build option (maximum score 60) and ranking first. Altec Turn-Key Build scored 68.90 on technical criteria but was ranked as unable to meet the delivery timeline. Service body-only options from Nelson and Knapheide scored lower with maximum scores of 40, with Nelson Service Body options achieving scores of 50.00 and Knapheide options scoring 48.70. The procurement required prevailing wage rate compliance per the Oregon Bureau of Labor and Industries, specific insurance coverage, and compliance with Oregon preferences for goods manufactured or produced in-state and from recycled materials. The contract was structured as a one-time service agreement with a not-to-exceed compensation amount, with Green Ridge Resources identified as the apparent successful bidder with a low bid of $37,000.00.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 9243 Invasive Species Treatments.pdf | ||
| 9243 Intent to Award Notification.pdf | ||
| Bid Tab~4.xlsx | XLSX spreadsheet | |
| Attachment 5 SAMPLE CONTRACT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposal Detail Scores
| Proposal Evaluation Detail Scores | Enter actual number of evaluators: | 2 | |||||||
| Evaluation Team | |||||||||
| Maximum | |||||||||
| Score | evaluator 1 | evaluator 2 | evaluator 3 | evaluator 4 | evaluator 5 | ||||
| 1 | Firm Name Nelson Turn-Key Build | 60 | |||||||
| New and Unused | 10 | 10 | 10 | ||||||
| White in Color | 10 | 10 | 10 | ||||||
| Extended Cab | 10 | 0 | 0 | Price Score | 10 | ||||
| Hydraulically Powered Outriggers | 10 | 10 | 10 | Average Score | 50.00 | ||||
| Hydraulically Powered Crane Extension | 10 | 10 | 10 | Total Score | 60.00 | ||||
| 4x4 Drivetrain on 19.5 chassis | 10 | 10 | 10 | RANK | 1 | ||||
| Total | 50 | 50 | 0 | 0 | 0 | ||||
| 2 | Firm Name Nelson Turn-Key Build | 60 | |||||||
| New and Unused | 10 | 10 | 10 | ||||||
| White in Color | 10 | 10 | 10 | ||||||
| Extended Cab | 10 | 0 | 0 | Price Score | 10 | ||||
| Hydraulically Powered Outriggers | 10 | 10 | 10 | Average Score | 50.00 | ||||
| Hydraulically Powered Crane Extension | 10 | 10 | 10 | Total Score | 60.00 | ||||
| 4x4 Drivetrain on 19.5 chassis | 10 | 10 | 10 | RANK | 1 | ||||
| Total | 50 | 50 | 0 | 0 | 0 | ||||
| 3 | Firm Name Altec Turn-Key Build | ||||||||
| New and Unused | 10 | 10 | 10 | ||||||
| White in Color | 10 | 10 | 10 | ||||||
| Extended Cab | 10 | 10 | 10 | Price Score | 8.9 | ||||
| Hydraulically Powered Outriggers | 10 | 10 | 10 | Average Score | 60.00 | ||||
| Hydraulically Powered Crane Extension | 10 | 10 | 10 | Total Score | 68.90 | ||||
| 4x4 Drivetrain on 19.5 chassis | 10 | 10 | 10 | RANK | Can't meet delivery timeline | ||||
| Total | 60 | 60 | 0 | 0 | 0 | ||||
| Maximum | |||||||||
| Score | evaluator 1 | evaluator 2 | evaluator 3 | evaluator 4 | evaluator 5 | ||||
| 4 | Firm Name Knapheide Service Body Only 1 | 40 | |||||||
| New and Unused | 10 | 10 | 10 | Price Score | 8.7 | ||||
| White in Color | 10 | 10 | 10 | Average Score | 40.00 | ||||
| Hydraulically Powered Outriggers | 10 | 10 | 10 | Total Score | 48.70 | ||||
| Hydraulically Powered Crane Extension | 10 | 10 | 10 | RANK | 2 | ||||
| Total | 40 | 40 | 0 | 0 | 0 | ||||
| 5 | Firm Name Knapheide Service Body Only 2 | 40 | |||||||
| New and Unused | 10 | 10 | 10 | Price Score | 8.7 | ||||
| White in Color | 10 | 10 | 10 | Average Score | 40.00 | ||||
| Hydraulically Powered Outriggers | 10 | 10 | 10 | Total Score | 48.70 | ||||
| Hydraulically Powered Crane Extension | 10 | 10 | 10 | RANK | 2 | ||||
| Total | 40 | 40 | 0 | 0 | 0 | ||||
| 6 | Firm Name Nelson Service Body Only 1 | 40 | |||||||
| New and Unused | 10 | 10 | 10 | Price Score | 10 | ||||
| White in Color | 10 | 10 | 10 | Average Score | 40.00 | ||||
| Hydraulically Powered Outriggers | 10 | 10 | 10 | Total Score | 50.00 | ||||
| Hydraulically Powered Crane Extension | 10 | 10 | 10 | RANK | 1 | ||||
| Total | 40 | 40 | 0 | 0 | 0 | ||||
| 4 | Firm Name Nelson Service Body Only 2 | 40 | |||||||
| New and Unused | 10 | 10 | 10 | Price Score | 10 | ||||
| White in Color | 10 | 10 | 10 | Average Score | 40.00 | ||||
| Hydraulically Powered Outriggers | 10 | 10 | 10 | Total Score | 50.00 | ||||
| Hydraulically Powered Crane Extension | 10 | 10 | 10 | RANK | 1 | ||||
| Total | 40 | 40 | 0 | 0 | 0 |
&C&"Arial,Bold"&12SOP SCORE DETAILS RFP xxxx (PCMS xxxxx) &"Arial,Bold Italic"[insert project name]
File details come from the government source that posted it. Updated .