Evaluation Criteria.pdf
PDF 61 KB Posted
- Attached to
- USHMM Construction IDIQ
- Solicitation number
- 95476726Q0623
- Issued by
-
United States Holocaust Memorial Museum
About this file
This is a Request for Proposals (RFP) for construction services with a two-phase selection process. Phase 1 serves as a qualification round to establish a shortlist of bidders, followed by Phase 2 where shortlisted bidders submit full proposals and participate in oral presentations with question-and-answer sessions.
Phase 1 evaluation criteria consist of three factors: (1) Proof of Bonding Capacity (Pass/Fail requirement), (2) Past Performance demonstrating a minimum of three to five similar projects in multi-trade renovations, alterations, repairs, and rehabilitation of architecturally and historically significant buildings; experience in the DC Metro area with stringent security and access constraints; experience under IDIQ contracts with multiple task orders; ability to perform multiple simultaneous projects; and Design Build experience; and (3) Key Personnel qualifications including professional resumes for a Project Manager, Cost Estimator, Superintendent, and Quality Control Lead, evaluated on education, training, relevant experience, longevity with the firm, technical competence in cost estimating and project management, and experience managing multi-discipline construction projects through all phases. For past performance projects, bidders must provide primary points of contact for reference verification (failure to provide contact information results in a non-responsive proposal), project status, scope descriptions, estimated and final construction costs, percentage of in-house work, and subcontractor lists. Phase 2 evaluation criteria include Design Bid Build and Design Build Experience, Architect and Engineering Firm Qualifications, and Management Approach.
All proposals must include a cover sheet with project name and solicitation number, a company overview limited to one page, and numbered pages with appropriately tabbed sections for each award factor. Non-conformance with submission instructions will result in unfavorable evaluation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP SELECTION PROCESS: This RFP will be broken into two phases. Phase 1 will act as a qualification round, upon which a shortlist of bidders will be selected based on their qualification proposal. For Phase 2, the shortlisted bidders shall submit a proposal based on the evaluation criteria for Phase 2. Shortest offerors will be asked to give a brief presentation on their companies qualifications followed by a Q/A session.
SELECTION CRITERIA FOR AWARD:
PHASE 1
Factor 1 – Proof of Bonding Factor 2 – Past Performance Factor 3 – Key Personnel
PROOF OF BONDING CAPACITY: Provide a copy of your bonding capacity. This is a Pass/Fail Requirement.
PAST PERFORMANCE: The bidder shall submit a minimum of three (3) up to a maximum of (5) examples of similar projects in scope, size, or complexity that meet some, if not all. Experience in performing multi-trade renovations, alterations, repair and rehabilitation of architecturally and historically significant buildings with high visibility.
Experience working in and around the DC Metro area, where stringent security, limited access, staging and other mobility issues are frequent. Past performance working under an IDIQ, with multiple T.O.s. Past Performance demonstrating the ability to perform multiple projects simultaneously. Past Performance with Design Build T.O.s or projects.
For each project submitted the contractor shall submit the primary POC’s contact information for reference check (NOT PROVIDING CONTACT INFORMATION WILL RESULT IN YOUR PROPOSAL BEING NON-RESPONSIVE). Each cited project should include its status, a brief scope description, the estimated construction cost and final construction cost, a percentage of work completed “in-house”, and a list of subcontractors that worked on the project.
KEY PERSONNEL: The evaluation of the bidder's personnel will consider the following:Their education, training, and relevant experience, as well as the longevity of the working relationship with their contracting firm. Their technical competence in the areas of cost estimating, project management, renovation, alteration, repair and rehabilitation of existing high-visibility and/or historic facilities. Their experience and knowledge in managing multi-discipline construction projects through all phases from proposal to close-out.
The bidder shall provide the professional resumes for key team members for the following disciplines:
Project Manager Cost Estimator Superintendent
Quality Control Lead
Phase 2 Design Bid Build and Design Build Experience Architect and Engineering Firm Qualifications Management Approach
PROPOSAL SUBMISSION INSTRUCTIONS (Phase 1 and Phase 2):
In response to this solicitation, the complete proposal shall include a cover sheet referencing project name and solicitation number, brief company overview, limited to no more than one (1) page, followed by the specific factors found in the selection criteria for award. All pages shall be numbered and sections appropriately tabbed according to each award factor. The contract’s proposal must include all data and information specified and must be submitted in accordance with these instructions.
Non-conformance will result in an unfavorable proposal evaluation.