Escanaba Site Diagram.pdf
PDF 1 MB Posted
- Attached to
- 751/24228. SAA; Various Locations- Solar Arrays
- Solicitation number
- RFQ 171 250000000414 4
- Issued by
- Washtenaw County, Burt CDP, Michigan
About this file
This is a site diagram document prepared by the Michigan Department of Natural Resources (DNR) Finance & Operations division for the Escanaba Solar Arrays project. The project targets a solar array installation with a capacity of 31 kilowatts, with flexibility regarding either roof or ground mounting configurations. The site presents specific geographical considerations, including a westward slope and an existing mural on the eastern side that must be accommodated in the design planning. Reference to existing construction documentation suggests that preliminary site analysis and infrastructure assessments have already been completed to inform the solar installation design.
The diagram document provides preliminary site planning information necessary for vendors or contractors to understand the physical constraints and opportunities associated with the proposed solar array installation. The mention of existing construction documents indicates that detailed architectural or structural specifications are available for reference. No specific pricing terms, response dates, or procurement timeline information is included within this particular diagram document. Additional procurement documentation would be required to establish pricing structures, project schedules, bidding procedures, and contract award details for this solar installation initiative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Gaylord CSC 4.jpg | JPG image | |
| Consumers Cadillac FY24.pdf | ||
| Gaylord CSC 3.jpg | JPG image | |
| Cadillac 3.jpeg | JPEG file | |
| Design Build Advertisement 24228.pdf | ||
| Cadillac 4.jpeg | JPEG file | |
| Gaylord CSC 1.jpg | JPG image | |
| Cadillac 2.jpeg | JPEG file | |
| Consumers Cadillac FY25.pdf | ||
| Cadillac Site Diagram.pdf | ||
| Esc. Dist. Offic Bldg. and Maintenance Garages.pdf | ||
| CHERRYLAND T.C. FY24.pdf | ||
| Gaylord CSC 2.jpg | JPG image | |
| Escanaba 3.jpg | JPG image | |
| Cadillac 1.jpeg | JPEG file | |
| Design Build (Rev03-2025).pdf | ||
| Escanaba 1.jpg | JPG image | |
| CHERRYLAND T.C. FY25.pdf | ||
| Escanaba 2.jpg | JPG image |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
751/24228.SAA DNR Finance & Operations - Escanaba Solar Arrays Target 31 kw - Possible roof or ground mount Site drops off to west / mural on east - see existing construction docs
File details come from the government source that posted it. Updated .