Escalator Modernization.pdf
PDF 3 MB Posted
- Attached to
- Escalator Modernization
- Solicitation number
- PE-92200-RFP-2027-000000090
- Issued by
- Fulton County, Atlanta City, Georgia
About this file
This is a Request for Proposal (RFP) and Request for Quotation (RFQ) document from the Georgia World Congress Center Authority (GWCCA) for escalator modernization services at the Georgia World Congress Center's Building C. The project scope includes in-truss modernization of escalators C38-40, C44-54, and C59-60 (13 units), along with complete rip-out and replacement of escalators C55-58 (4 units), for a total of 17 escalators requiring modernization. The GWCCA is seeking responses from consultants and contractors specializing in escalator modernization who can provide all engineering, labor, materials, transportation, and equipment necessary for project completion. A mandatory proposal conference and site visit is scheduled for August 6, 2026, at 11:00 a.m. at the Georgia World Congress Center's Building B Administration office, with two representatives per firm permitted to attend. Written questions must be submitted by August 15, 2026, at 10:00 a.m., and all proposals must be submitted via email to Erle Coleman at EColeman@gwcc.com by August 27, 2026, at 10:00 a.m. The contract award will be based on cost of required work, interim maintenance costs, warranty maintenance costs, completion schedule, contractor's track record with similar projects, and maintenance capability in the project location. Proposals remain valid for 180 days following the submission deadline.
Contractors must provide separate pricing for base modernization work, interim preventive maintenance during installation (commencing when each escalator group begins work through completion), and 12-month warranty preventive maintenance beginning at final acceptance of each group. The payment schedule is structured as 25% down payment upon contract award, 35% upon material delivery, 30% progress payment, and 10% retainage due upon completion. Contractors must obtain all required permits and pay associated fees, schedule and coordinate all final inspections with governing authorities, and provide comprehensive closeout documentation including as-built drawings, wiring diagrams, maintenance control programs, parts catalogs, and four sets of keys. The contractor is responsible for all site preparation, wellway and pit work, electrical service installation, escalator surrounds, protection of work and property, cleaning and restoration of the facility, and 24-hour emergency callback service during both interim and warranty maintenance periods. All work must comply with ASME A17.1 and A17.2 codes, local building codes, fire codes, and ADA requirements, with the existing maintenance contract suspended during the modernization and warranty periods.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GEORGIA WORLD CONGRESS CENTER
ESCALATOR MODERNIZATION
Georgia World Congress Center Authority 285 Andrew Young International Blvd NW
Atlanta, Georgia 30313
Prepared by
Lerch Bates Inc.
900 Circle 75
Suite 1300 Atlanta, Georgia 30339
PROCUREMENT OBJECTIVE
1. Summary Statement
The Georgia World Congress Center Authority (“GWCCA” or the “Authority”) is interested in receiving responses from consultants or agencies specializing in escalator modernization. This Request for Proposal (“RFP”) seeks to identify potential providers of the above-mentioned services and is not lowest-responsive bid procurement. All respondents to this RFP are subject to instructions communicated in this document and are cautioned to completely review the entire RFP and follow instructions carefully.
The Authority retains the right to reject any or all proposals or subsequent submittals and/or proposals, and to waive technicalities, irregularities, and informalities, and retains the right to cancel or conclude this procurement at any time without selecting a firm to provide the described services, without any liability to any respondents, or any other person or entity, and is under no obligation to make an award relating to this RFP to any person or entity. The final terms of any Consulting Agreement contemplated by this procurement may require compliance with the final terms and conditions of any project-related Agreements of the Authority; subject, in all cases, to strict compliance with the applicable provisions of the laws of the State of Georgia.
A. IMPORTANT- RESTRICTION OF COMMUNICATION.
From the time of advertisement of this solicitation until final award is made to a successful respondent and such award is announced, interested firms are not allowed or permitted to communicate about this solicitation or scope with any staff or any official representatives of the Authority, or their contractors or consultants, except for submission of questions as instructed in the RFP, or as provided by any existing work agreement(s). Finalists and Apparent Awardee(s) are restricted from making public statements or press releases about their selection as finalists or their apparent award. For violation of this restriction, the Authority reserves the right to reject the submittal of the offending respondent.
B. GENERAL INFORMATION.
The Georgia World Congress Center Authority (GWCCA) campus, which includes Georgia World Congress Center, Centennial Olympic Park, Mercedes-Benz Stadium, and Signia by Hilton Atlanta, is the largest combined convention, sports, and entertainment campus in North America. Since 2014, GWCCA has managed and operated the Savannah Convention Center (SCC) – marking the industry’s first-ever private-to-public facility management agreement. These facilities exist for the primary benefit of promoting and facilitating events and activities that generate economic benefits to the citizens of the state of Georgia as well as enhance the quality of life for every Georgian.
2. Mandatory Proposal Conference/Site Visit
A Mandatory proposal conference/Site Visit will be held on August 6th at 11:00 A.M. at the following location:
Georgia World Congress Center Authority Sales/Event Conference Room Building B, Administration 285 Andrew Young International Blvd Atlanta, Georgia 30313
Attendance at this conference is Mandatory in order to submit a proposal. Two (2) representatives from each firm may attend. A map to the facilities and the parking decks is available at http://www.gwcc.com/pdf/gwccmap.pdf.. For information regarding this conference contact: Erle Coleman, Georgia World Congress Center Authority, (404) 223- 4244.
The purpose of this conference will be to clarify the contents of this Request for Proposal in order to help ensure a thorough understanding of the Authority’s requirements. Any questions as to the requirements of this Request for Proposal, or any apparent omission or discrepancy should be presented to the Authority’s representatives at this conference. This conference also provides a forum by which interested parties will have equal access to relevant RFP information prior to the final proposal submission.
3. Obtaining Proposal Documents
The complete RFP package Documents, scope of work, proposal form and associated Addendum (if issued) will be PUBLICALLY POSTED on the GEORGIA PROCUREMENT REGISTRY at the following web address (and may be directly downloaded using Acrobat 7.0):
http://ssl.doas.state.ga.us/PRSapp/PR_index.jsp
4. Submission and Deadline
Proposals will be emailed with a to the following:
Authority 285 International Boulevard, NW Atlanta, Georgia 30313-1591 Attn: Erle Coleman, Supply Chain Management Director Telephone: (404) 223-4244
All proposals must be submitted via email to EColeman@gwcc.com. To ensure delivery, proposers must request a read receipt when submitting their proposal. If a read receipt is not received within 2 hours, it is the proposer’s responsibility to follow up.
Such submission will be received until 10:00 A.M. on August 27, 2026.
http://www.gwcc.com/pdf/gwccmap.pdf http://ssl.doas.state.ga.us/PRSapp/PR_index.jsp
Any proposal received after the date and time specified or prepared or submitted may not be eligible for consideration.
5. Duration of Offer
Once submitted, a proposal becomes the property of the Authority and constitutes an offer by the Proposer that may not be revoked or withdrawn after the time set for deadline for receipt of proposals and shall remain open for acceptance for a period of One Hundred and Eighty (180) days following such time, and thereafter only in writing.
6. Proposer Questions: Requests for Information, Extensions of Deadlines, or Addenda
Proposers are expected to exercise their best professional independent judgment in analyzing the requirements of this RFP to ascertain whether additional clarification is necessary or desirable before responding.
Proposer questions, interpretations of this document, requests for information, requests for extensions of proposal deadlines, or requests for clarification of the scope of services/work shall be submitted in writing to the Issuing Officer ONLY at the e-mail address provided. Questions and requests submitted shall be numbered and separated from each other by at least two-line spaces. The e-mail message title shall reference the RFP title and number. To be given consideration these questions shall be submitted to the Authority by no later than August 15th, 2026, 10:00 a.m. The Authority may but is not required to, answer questions submitted. If, upon review of such questions/requests, the Authority deems that a change in any part of the proposal documents is in order, an addendum addressing that change may be issued to all interested parties via the Georgia Procurement Registry. All interested parties are responsible for monitoring the site for the latest information regarding the proposed project. Failure of any Proposer to receive any such addenda or interpretation shall not relieve the Proposer from any obligation that shall apply to their proposal as submitted. All addenda so issued shall become part of this RFP. Requests for extensions of proposal deadline(s) will be reviewed by the Authority and may be approved or denied at the sole discretion of the Authority.
Corrections, changes or clarifications, if required, will be made in written addenda. The Authority will not be responsible for any other instructions, interpretations, or explanations. Any written addenda to the proposal documents issued by the Authority prior to the proposal acceptance deadline will be considered a part of these documents. No response other than written will be binding upon the Authority. (See also “Restrictions of Communications”)
BACKGROUND and INTENT
General Information
1. Organizational Context:
Georgia World Congress Center is the largest LEED Gold certified convention center in the world and continues to be one of the nation’s premier destinations for conventions, trade shows, film production, and much more. GWCC encompasses 3.9 million square feet and is among the largest convention centers in the nation in terms of exhibit space. GWCC features 13 exhibit halls offering 1.5 million square feet of prime exhibit space in addition to 98 meeting rooms, 3 auditoriums, 2 grand ballrooms, and various outdoors spaces and plazas. Georgia International Plaza includes a parking deck and pedestrian plaza on Andrew Young International Boulevard adjacent to Georgia World Congress Center and Mercedes-Benz Stadium.
Centennial Olympic Park Commemorating the 1996 Centennial Olympic Games, Centennial Olympic Park (COP) is a 22-acre urban oasis in the center of Atlanta’s dynamic downtown entertainment district and is operated by Georgia World Congress Center Authority. COP’s great lawn provides natural seating for 20,000 and new features make it the ideal location for a variety of events. Centennial Olympic Park is located adjacent to the Georgia World Congress Center.
Mercedes-Benz Stadium/The Home Depot Backyard The 71,000-seat Mercedes-Benz Stadium (MBS) is home to the Atlanta Falcons and Atlanta United and annually hosts the AFLAC Kickoff Game, Chick-fil-A Peach Bowl, SEC Football Championship Game along with other special events and concerts that provide fans with an unparalleled experience while contributing to the economic growth and success of Atlanta and the state of Georgia. Sitting in the former footprint of the Georgia Dome, The Home Depot Backyard functions as a fan experience zone and parking lot during events at MBS, and as greenspace open to the public on non-event days.
Savannah Convention Center In 2014, the Georgia International Maritime and Trade Center Authority (now Savannah-Georgia Convention Center Authority) approved the selection of GWCCA to manage and operate the Savannah International Trade & Convention Center – today known as Savannah Convention Center (SCC) – marking the industry’s first-ever private-to-public facility management agreement.
The 330,000-square-foot SCC currently features 100,000 square feet of exhibit space, a 367-seat auditorium, 50,000 square feet of prime meeting space consisting of 13 meeting rooms, a 25,000-square-foot Grand Ballroom, and four executive board rooms. In fiscal year 2020, the Georgia General Assembly approved $70M in bonds for an expansion project that will double the exhibit hall space as well as offer a 40,000 square-foot ballroom, 15 new meetings rooms, and a 900-space parking deck. The SCC expansion project broke ground in March 2021.
Signia by Hilton Atlanta Owned by GWCCA and managed by Hilton Management Services, Signia by Hilton Atlanta is the city’s largest downtown ground-up hotel development project in 40 years. The 453-foot-high, 976-room hotel overlooks Mercedes-Benz Stadium and is connected to Georgia World Congress Center’s Building C. Signia by Hilton Atlanta offers more than 100,000 square feet of meeting space, including the largest hotel ballroom in Georgia, an outdoor event deck and lawn, and three boardrooms. The hotel also features eight signature food and beverage experiences, including three restaurants and three bars, as well as world-class amenities, including a spa, beauty bar and fitness center with yoga stations, Peloton bikes and more.
1. Intent
The intent of this project is to provide the Owner a proposal for the Escalator Modernization.
The Contractor is to provide to the Owner, as a minimum equipment, labor, materials and such other appurtenances as are required.
END OF SECTION I
LERCH BATES INC.
Elevator Consulting Group ESCALATORS
SECTION 00020
TABLE OF CONTENTS
PART 1 - GENERAL
1.1 PROJECT: ELEVATOR MODERNIZATION
1.2 CONTRACT DOCUMENTS
1.3 CONSTRUCTION SCHEDULE
1.4 ELECTRONIC QUOTATION
1.5 NOTICE OF INTENT TO SUBMIT A QUOTATION
1.6 OPENING
1.7 QUOTATION
1.8 PURCHASER’S RIGHTS
Georgia World Congress Center C 38-40, 44-60 LB Project No. 0100063703 2025 Lerch Bates Inc.
July 21, 2026 00020 - 1
SECTION 00020
REQUEST FOR QUOTATION
PART 1 - GENERAL
1.1 PROJECT: ESCALATOR IN TRUSS MODERNIZATION AND COMPLETE REPLACEMENT (ROAR)
The Georgia World Congress Center
285 Andrew Young International Blvd.
Atlanta, GA 30313
“C” Wing Escalators #38-40, 44-54, 59-60 in truss modernizations. Escalators 55-58 will be complete rip out and replacements
A. Lerch Bates Inc. has been authorized by The Georgia World Congress Center to request your firm to submit a quotation for:
1. All engineering, labor, materials, transportation, services, and equipment necessary and reasonably incidental to perform work required by Contract Documents.
2. Warranty preventive maintenance.
3. Continuing preventive maintenance subsequent to completion of work.
1.2 CONTRACT DOCUMENTS
A. One set of electronic contract documents are provided for your use.
B. Make inquiries to the Director of Supply Chain, Erle Coleman.
C. Permission to review existing equipment and site conditions shall be secured from Erle Coleman, 404- 223-4244, EColeman@GWCC.com.
D. We will be conducting a site visit of this property on ……………. for all interested bidders.
1.3 CONSTRUCTION SCHEDULE
A. See Section 00310, “Quotation Form” for project schedule.
1.4 ELECTRONIC QUOTATION
A. Email quotations will be received until 5:00 pm prevailing local time on …………… identified as follows:
2025 Lerch Bates Inc.
00020 - 2
Contractor
Address City/State/Zip
ESCALATOR MODERNIZATION
The Georgia World Congress Center 285 Andrew Young International Blvd
Atlanta, GA 30313
CONFIDENTIAL QUOTATION
Email quotation to: The Georgia World Congress Center
285 Andrew young International Blvd.
Atlanta, GA 30313
Attn: Erle Coleman
EColeman@GWCC.com
B. Quotations must be submitted on form provided as a part of Contract Documents, Section 00310.
Quotations shall be subject to all requirements of Contract Documents, site conditions, General Conditions, Supplementary and Special Conditions and any other documents issued in connection with project. All blank spaces and questions on the quotation form must be completed and/or responded to.
Failure to comply will constitute a non-responsive submittal.
C. If Contractor desires to furnish items different from specified, Contractor shall submit substitution as an alternate quotation. Contractor shall supply Consultant with information in regard to proposed substitution of components or materials. Consultant shall decide whether the Contractor’s substitution is equivalent to that specified. Deviation from requirements of Contract Documents shall be stated, in writing, in Contractor’s transmittal letter submitted with quotation.
1.5 NOTICE OF INTENT TO SUBMIT A QUOTATION
A. Contractors who elect not to provide a quotation after having reviewed Contract Documents and site conditions shall notify Consultant no later than ten (10) working days prior to quotation due date.
Failure to submit a quotation without prior notice will be construed as justifiable cause for elimination of such Contractor for future consideration.
1.6 OPENING
A. Opening of quotations will be in private. Contractor selection will be based upon the following criteria:
1. Cost of required work.
2. Cost of interim maintenance.
3. Cost of warranty maintenance.
4. Completion schedule.
5. Contractor’s successful completion of similar projects and track record in the location of project.
6. Contractor’s maintenance capability in the location of the project.
2025 Lerch Bates Inc.
00020 - 3
1.7 QUOTATION
A. All quotations shall be firm. Escalation will not be permitted if Contract is awarded within 180 days from quotation due date.
B. If award is deferred beyond 180 days, Contractors’ quotations shall be subject to adjustment to reflect changes in the cost of labor and material.
1.8 CONTRACTOR
A. Contractor shall be prepared to provide evidence of experience, qualifications and financial ability to carry out the requirements of the Contract Documents.
1.9 PURCHASER’S RIGHTS
A. Purchaser reserves right to reject any or all quotations, to accept other than lowest quotation and to waive any informality in connection with opening and award of Contract.
END OF SECTION
SECTION 00100
PART 1 - GENERAL
1.1 EXAMINATION
1.2 EXISTING MAINTENANCE CONTRACT
2026 Lerch Bates Inc.
00100 - 1
SECTION 00100
INSTRUCTIONS TO CONTRACTOR
PART 1 - GENERAL
1.1 EXAMINATION
A. In order to discover and resolve conflicts or lack of definition which might create problems, Contractor must review Contract Documents, existing site conditions, and existing equipment specified to be retained for compatibility with its product prior to submitting quotation. Site review shall include, but not be limited to adequacy of access, retained equipment, wellways, overhead clearances, electrical power characteristics, structural supports, etc. Investigation and structural calculations required to determine compliance of existing escalator components including support beams, with ASME A17.1, Rule 8.7.2.15.2, are responsibility of Contractor. Attach specific, written exception and/or clarification with quotation. Compliance with all provisions of Contract Documents is assumed and required in absence of written exception. If written exception is acceptable to Contractor and Consultant, an Addendum to the specifications will be issued and authorized. Purchaser will not pay for change to building structure, structural supports, mechanical, electrical or other systems required to accommodate Contractor’s equipment if not identified before Contract award and authorized as stipulated above.
B. Submission of quotation is considered evidence that Contractor has visited and is conversant with the site facilities, site conditions, requirements of the Contract Documents, pertinent state and local codes, state of labor and material markets, and has made due allowance in his quotation for all contingencies.
Should Contractor’s investigation of site conditions or local codes or rules reveal requirements contrary to Contract Documents, or if Contractor finds any discrepancies or omissions from Contract Documents, or if Contractor is in doubt as to their meaning, they shall contact the Consultant for clarification at least five working days prior to quotation due date.
C. No oral explanation will be made and no oral instructions will be given before quotation due date.
Contractor shall act promptly and allow sufficient time for a reply to reach him before submission of his quotation. Any required interpretation or supplemental instructions will be issued in the form of an addendum to the specifications and forwarded to all pre-qualified Contractors.
D. Provide everything necessary for and incidental to the satisfactory completion of work required by Contract Documents. All required preparations and hoisting and movement of new equipment, reused equipment, or removal of existing equipment shall be the responsibility of Contractor.
1.2 EXISTING MAINTENANCE CONTRACT
A. The existing maintenance contract will be suspended from the time of manning the group of escalators to the completion of the warranty maintenance period on these specific units. Warranty maintenance will end one year from the end of all escalators in the individual groups and return to the campus maintenance.
SECTION 00310
PART 1 - GENERAL
1.1 CONTRACTOR’S BASE QUOTATION
1.2 ADDENDA
1.3 CONTRACTOR’S OTHER SUPPORTING ENCLOSURES
1.4 PROPOSED MODERNIZATION INSTALLATION SCHEDULE
1.5 CONTRACTOR PROPOSED MODERNIZATION COMPONENTS AND TECHNOLOGY
1.6 CONTRACTOR’S LIST OF SUBCONTRACTORS
1.7 SUBMISSION AND ACCEPTANCE OF QUOTATIONS
1.8 ALTERNATES
1.9 CONTRACTOR SIGNATURE
2026 Lerch Bates Inc.
00310 - 1
SECTION 00310
QUOTATION FORM
DATE:
PROJECT:
SUBMITTED BY:
Name of CONTRACTOR
CONTRACTOR’S Representative Telephone Number
Street Address
City State Zip Code
TO Company The Georgia World Congress Center
Address 285 Andrew Young International Blvd.
City, State Zip Atlanta, GA 30313
Attn: Attn: Erle Coleman (EColeman@GWCC.com) mailto:EColeman@GWCC.com
2026 Lerch Bates Inc.
00310 - 2
PART 1 - GENERAL
1.1 CONTRACTOR’S BASE QUOTATION
A. Having examined documents prepared by Lerch Bates Inc. dated February 1, 2026, and having reviewed site conditions, applicable codes and all conditions affecting and governing the work, the Undersigned Contractor hereby offers to provide all engineering, labor, materials, transportation, services and equipment necessary and incidental to properly execute required work of the Contract Documents for the sum of:
Item: 1 In-Truss Escalator Modernization Section 143100: Units: C 38-40
Dollars $
Item: 2 In-Truss Escalator Modernization Section 143100: Units: C 44-46
Item: 3 In-Truss Escalator Modernization Section 143100: Units: C 47-48
Item: 4 In-Truss Escalator Modernization Section 143100: Units: C 49-51
Item: 5 In-Truss Escalator Modernization Section 143100: Units: C 52-54
Item: 6 Complete Rip Out and Replacement Escalator Section 143105:
Units: C 55-56
Item: 7 Complete Rip Out and Replacement Escalator Section 143105:
Units: C 57-58
2026 Lerch Bates Inc.
00310 - 3
Item: 8 In-Truss Escalator Modernization Section 143100: Units: C 59-60
Total Items 1-8 Modernization of C38-40, 44-60
B. MAINTENANCE
1. Interim Preventative Maintenance commencing at the beginning of manning each escalator group for modernization and ending when all escalators in the group are completely modernized.
This price IS to included in the Base Quotation above, A 1.1 items 1-8
Escalators C 38-40: $ /Month
Escalators C 44-46: $ /Month
Escalators C 47-48: $ /Month
Escalators C 49-51: $ /Month
Escalators C 52-54: $ /Month
Escalators C 55-56: $ /Month
Escalators C 57-58: $ /Month
Escalators C 59-60 $ /Month
2. 12-Month Warranty Preventive Maintenance commencing at the end of the last escalator in each group: This price IS to included in the Base Quotation above, A 1.1 items 1-8
Escalators C 38-40: $ /Month
Escalators C 44-46: $ /Month
Escalators C 47-48: $ /Month
Escalators C 49-51: $ /Month
Escalators C 52-54: $ /Month
Escalators C 55-56: $ /Month
Escalators C 57-58: $ /Month
Escalators C 59-60 $ /Month
NOTE: Purchaser reserves the right to pay warranty maintenance cost in a lump sum or on a monthly basis during period maintenance is actually performed.
3. Contract Maintenance: None associated with this project.
C. Provide add cost of modernization crew working overnight hours per week if requested: $
2026 Lerch Bates Inc.
00310 - 4
D. Enter a cost figure for all pricing requested. Failure to comply, subjects quotation to disqualification.
E. Undersigned affirms that quotations provided represent entire cost including site conditions, code requirements, drawings, specifications, addenda, and any other Contract Documents, and no claim will be made due to any increase in wage scales, material prices, taxes, insurance, cost indexes or any other factors affecting the construction industry or this project except as expressly allowed in Owner’s maintenance contract.
1.2 ADDENDA
Undersigned acknowledges receipt of Addendum No. through
1.3 CONTRACTOR’S OTHER SUPPORTING ENCLOSURES
A. Undersigned has enclosed the following (Check YES or NO):
1. Separate letter containing any “Qualification” related to its Quotation. YES NO
2. Separate Substitution Proposal. YES NO
1.4 PROPOSED MODERNIZATION INSTALLATION SCHEDULE
A. Undersigned contractor submits the following completion schedule for project. Bidders are instructed to add additional rows to the following schedule grid to accommodate job specific phasing.
PHASE # PHASE DURATION
(WEEKS)
1 Engineering Surveys
2 Submittal Preparation
3 Client Approval Period
4 Engineering, Procurement and Fabrication
5 In Truss Modernization Escalators #C38-40
6 In Truss Modernization Escalators #C44-46
7 In Truss Modernization Escalators #C 47-48
8 In Truss Modernization Escalators #C49-51
9 In Truss Modernization Escalators #C52-54
10 Replacement of Escalators #C55-56
11 Replacement of Escalators #C57-58
12 In Truss Modernization Escalators #C59-60
13 Total Project Duration
1.5 CONTRACTOR PROPOSED MODERNIZATION COMPONENTS AND TECHNOLOGY
A. Undersigned Contractor will utilize the following modernization technology for the projects and submits these systems for approval. Upon acceptance of these systems by Purchaser/Consultant, no substitutions shall be made without written approval of Consultant.
2026 Lerch Bates Inc.
00310 - 5
Modernization Systems and Components
Proposed Model Description/Vendor
Escalator
Other
Other
Other
Other
1.6 CONTRACTOR’S LIST OF SUBCONTRACTORS
A. The undersigned Contractor will utilize the following subcontractors for major components of work and submits these firms for approval. Upon acceptance of these Sub-Contractors by Purchaser/Consultant, no substitutions shall be made without written approval of Consultant.
Subcontractor Name Type of Work
Electrician
General Contractor
1.7 SUBMISSION AND ACCEPTANCE OF QUOTATIONS
A. Undersigned Contractor agrees to Purchaser’s right to reject any and all quotations without explanation.
B. Undersigned Contractor declares that preparation and submission of quotations herein contained do not obligate Purchaser or Consultant in any way.
C. Undersigned Contractor agrees and understands that Purchaser assumes no obligation to enter into a Contract.
1.8 ALTERNATES
A. State net sum to be added to or deducted from Stipulated Sum (Base Quotation) in event any Alternate Quotation is accepted.
B. Submit Alternate Quotations by filling in blank spaces provided herein.
C. Purchaser reserves right to accept or reject any or all Alternates.
2026 Lerch Bates Inc.
00310 - 6
D. Provide lump sum price for all alternates as described below and in Section 01030, Alternates.
ALTERNATE 1: Escalator Monitoring System
DOLLARS $
ALTERNATE 2:
DOLLARS $
1.9 CONTRACTOR SIGNATURE
DATE:
SIGNED:
PRINT NAME:
TITLE:
NAME OF FIRM:
STATE LICENSE NO.:
LEGAL ADDRESS: ORGANIZED AS A (MARK ONE):
INDIVIDUAL
PARTNERSHIP
CORPORATION
UNDER STATE LAW OF
TELEPHONE:
(SEAL)
SECTION 00800
PART 1 - GENERAL
1.1 DEFINITION OF TERMS
1.2 CONSULTANT’S STATUS
1.3 CONTRACT
1.4 MEASUREMENTS AND DRAWINGS
1.5 CODES AND ORDINANCES
1.6 CONTRACTOR’S INSURANCE
1.7 PURCHASER INSURANCE
1.8 TAXES, OLD AGE PENSIONS AND UNEMPLOYMENT INSURANCE
1.9 LABOR LAWS
1.10 PATENTS
1.11 ASSIGNMENTS
1.12 ADVERTISING
1.13 PROTECTION OF WORK AND PROPERTY
1.14 ACCIDENT REPORTS
1.15 STORAGE OF MATERIALS
1.16 REMOVAL OF EQUIPMENT AND RUBBISH
1.17 MATERIALS AND WORKMANSHIP
1.18 SUPERVISION
1.19 ROUTINE BUSINESS
1.20 CHANGES AND EXTRA WORK
1.21 PAYMENTS
1.22 PAYMENT WITHHELD
1.23 LIENS AND AFFIDAVITS
1.24 CLAIMS FOR EXTRA COST
1.25 DELAYS AND EXTENSION OF TIME
1.26 PERMITS
PART 2 - SPECIAL CONDITIONS
2.1 PROGRESS OF WORK
Georgia World Congress Center #C 38-40, 44-60
2026 Lerch Bates Inc.
00800 - 1
SECTION 00800
SUPPLEMENTAL CONDITIONS
PART 1 - GENERAL
1.1 DEFINITION OF TERMS
A. Term ELEVATOR CONSULTANT or CONSULTANT as used herein refers to Lerch Bates Inc. (Lerch Bates).
B. PURCHASER as used herein refers to The Georgia World Congress Center.
C. The term CONTRACT or CONTRACT DOCUMENTS as used herein consists of the Agreement, Conditions of Contract, Specifications, Addenda, Drawings if included, and Alternates if accepted.
D. CONTRACTOR or ESCALATOR CONTRACTOR as used herein refers to any persons, partners, firm, or corporation having a contract with Purchaser to furnish labor and materials for the execution of work required.
E. CONTRACT AWARD as used herein refers to Purchaser’s verbal or written award for work required.
F. SUBCONTRACTOR as used herein refers to any persons, partners, firm, or corporation having a contract with Contractor to furnish labor and materials for the execution of work required.
G. As used in these Contract Documents “provide” shall be understood to mean “furnish and install.”
H. As used in these Contract Documents “retain or reuse existing” shall be understood to mean restore existing components or parts to like-new condition.
I. Words in the singular shall include the plural whenever applicable or context so indicates.
J. All technical terms in these Contract Documents have their definition given in latest edition of American National Standard Safety Code for Elevators, Dumbwaiters, Escalators, and Moving Walks ASME A17.1.
and A17.2.
1.2 CONSULTANT’S STATUS
A. Consultant shall act as Purchaser’s and/or Building Management’s representative on all matters pertaining to required work. Consultant shall interpret Contract Documents, analyze Contractor’s quotations, review Contractor suggested alternates, review all submittals of Contractor, approve billings, review technical details and construction procedure, perform work progress reviews and review and test completed work for compliance with Contract Documents prior to acceptance of work by Purchaser.
B. Field Review Scheduling: Schedule progress and final work reviews with Consultant. Reply promptly, in writing, to corrective work indicated on Consultant’s progress and/or final review reports, indicating status and schedule for completion. Consultant anticipates scheduled site review appointments will be met. Contractor’s price will be reduced to reimburse Consultant at its normal billing rates for appointments not kept or for additional follow up reviews required due to Contractor’s gross non-compliance with previous review requirements.
2026 Lerch Bates Inc.
00800 - 2
1.3 CONTRACT
A. Contract includes all engineering, labor, tools and material required to complete the work in every respect. Contractor is cautioned to familiarize itself with existing site conditions and to include all incidental work that might occur or be required during the work. After Contract has been awarded, verbally or in writing, no extra charges will be allowed for any labor or material necessary to complete required work whether exactly described in these specifications herein or not, as long as such work, labor, and material are required to accomplish desired effect and results.
B. Any discrepancies or ambiguities found in Contract Document or drawings shall be reported to the Consultant prior to Contractor’s quotation submittal.
1.4 MEASUREMENTS AND DRAWINGS
A. Drawings or measurements included with Contract Documents are for convenience of Contractor.
Complete responsibility for detailed dimensions lies with Contractor. Contractor shall verify all dimensions with the actual onsite conditions. Where work of Contractor is to join another trade, Contractor’s shop drawings shall show actual dimensions and method of joining work of those trades.
1.5 CODES AND ORDINANCES
A. All work covered by these Contract Documents is to be done in full accord with national code, state and local codes, ordinances, and escalator safety orders as are in effect at time of Contract award. All requirements of local Building Department and fire jurisdiction are to be fulfilled by Contractor and its Subcontractors. Also see Section 01040, Article 1.01.
1.6 CONTRACTOR’S INSURANCE
A. Contractor shall take out and maintain during the life of this Contract Worker’s Compensation Insurance with statutory limits set by the State of Georgia laws for protection of its employees.
B. Contractor shall carry a comprehensive general liability policy including completed operations blanket contractual broad form property damage, and Purchaser’s and Contractor’s protective liability in a casualty or liability insurance company acceptable to Purchaser. Insurance policy shall fully protect Contractor, its Subcontractors, Purchaser, and Consultant from all loss and liability. Refer to Purchaser Terms and Conditions provided.
C. Prior to commencing work, Contractor shall secure required insurance, at its sole cost, and submit certificate of confirmation naming indemnified parties as additional insured. Said policies, including an endorsement which states that such insurance will not be cancelled or materially changed unless Purchaser is given thirty (30) days notice, in writing, of the intention of said insurer to cancel or change any such policy. In the event Property is owned by a joint venture or other multi-party entity, all joint venture partners or parties with an equity interest in the ownership shall be named as additional insureds. Contractor’s insurance shall be primary to any applicable loss. With Purchaser’s prior approval, an Owners & Contractors Protective Liability (OCPL) Policy may be substituted for commercial general liability coverage. Please refer to the attached appendix that states the project specific insurance requirements.
D. Contractor shall file with Purchaser a certificate of insurance from its insurance company, stating that such insurance is being carried and that Purchaser will be notified at least 10 days prior to any cancellation of said insurance.
2026 Lerch Bates Inc.
00800 - 3
1.7 PURCHASER INSURANCE
A. Purchaser’s insurance policy covers work and equipment in place in building and approved and accepted by Consultant and Purchaser. All material and equipment stored on site and not actually installed is not included in Purchaser’s policy and such material and equipment shall be covered under Contractor’s Property Damage Insurance.
1.8 TAXES, OLD AGE PENSIONS AND UNEMPLOYMENT INSURANCE
A. Contractor’s quotations for required work, materials and equipment shall include all local, state, and federal occupational and sales taxes, luxury taxes, excise taxes, federal and state old age pensions, unemployment insurance contributions, and any other similar taxes and contributions in effect at time of award of Contract, verbally or in writing. Contractor shall be liable for aforementioned taxes whether or not specifically included in his quotation or in final Contract Document. In event additional sales or use taxes are imposed after award of Contract, such sales or use taxes are to be paid, in addition to original Contract amount, by Purchaser to Contractor, who in turn is to pay them to proper authorities.
Reciprocally, if any of above mentioned taxes or contributions in effect at time of award of Contract should be revoked before consummation of Contract, Contractor shall rebate Purchaser amount of taxes included in original quotation and Contract. Where required by law, amount of the tax is to be specifically stated in Contractor’s quotation; however, failing to do so will not relieve Contractor from responsibility for assumption of these taxes.
1.9 LABOR LAWS
A. Contractor and its Subcontractors performing work under this Contract shall comply with applicable provisions of all federal, state, and local labor laws.
1.10 PATENTS
A. Contractor shall save and hold harmless Purchaser and its officers, agents, servants, employees, and Consultant from liability of any nature or kind on account of any patented or unpatented invention, process, article, or appliance manufactured or used in performance of Contract, including its use by Purchaser including all cost and expenses for defending any suits unless otherwise specifically stipulated in Contract Documents.
B. Licenses which may be required for completion of required work are to be obtained and paid for by the Contractor.
1.11 ASSIGNMENTS
A. Neither party to this Contract shall assign Contract or sublet it as a whole without written consent of other party, nor shall Contractor assign any payment due him or to become due to him hereunder without previous written consent of Purchaser.
2026 Lerch Bates Inc.
00800 - 4
1.12 ADVERTISING
A. Advertising privileges will be retained by Purchaser. It is the duty of Contractor to keep premises free from posters, signs, decorations, etc., unless specifically approved by Purchaser.
1.13 PROTECTION OF WORK AND PROPERTY
A. Contractor shall continuously maintain adequate protection of all its work from damage and shall protect Purchaser property from injury or loss arising out of this Contract. Contractor shall make good any such damages, injury, or loss, except such as may be directly caused by agents, subcontractors, or employees of the Purchaser. Contractor shall provide all barricades required to protect open wellways per OSHA regulations. Design of barricades in public areas shall be approved by Purchaser prior to fabrication and installation. Contractor shall submit barricade plan with bid submission. Intent is for contractor to provide 8’-0’’ tall “Mall Form” barricades – or approved equal – at upper and lower ends of escalator units. Complete protection and blocked visibility from the running adjacent escalator.
Prior to work being conducted each unit shall be enclosed the entire length of the incline to obstruct view. Contractor shall supply carpet tape, foam padding, and Masonite on all finished flooring where material is stored and work is conducted. Contractor should coordinate deliveries with the GWCC staff.
B. Escalator modules shall be designed for ease of delivery with rubber caster wheels that can be discarded following the delivery of each applicable product.
C. Design and delivery of each “module” shall accommodate site specific limitations including but not limited to the following:
1. Semi-Truck accessible delivery dock with 42’’ tall dock.
2. Freight Elevator with 12,000 lb. capacity.
a. Freight Elevator interior clear dimensions are approximately 21’-5’’ deep by 9’-8’’ wide by 10’-0’’ tall.
b. Freight serves landings levels 1-5.
3. Interior/ Back of House corridors have limited turning radius of approximately 6’-8’’ widths.
4. Standard commercial doors.
D. If Contract includes work which would be disruptive during normal business operations, or would be dangerous to building occupants, said work shall be performed during hours as building management dictates. Examples of such work include, without limitation, saw cutting of concrete, jack hammering, welding, metal cutting, pouring concrete, erecting steel or hoisting equipment over occupied portions of the building, or performing tests requiring all escalators in a group. Contractor shall perform such work at times coordinated with the building management based on the facility’s event schedule. These services as well as the items listed in this paragraph shall be performed at times coordinated with the building management based on the facility’s event schedule: All final testing and life safety testing.
E. Contractor shall install a suitable protective covering on all finished floors whether marble, wood, carpet or other, in areas where work is being performed. No material handling equipment shall be permitted on or over finished floors unless said floors have been protected in a manner approved by building management.
F. Portable fire extinguishers shall be provided throughout Contractor’s area of work and shall be placed so as to be accessible at all times. Extinguishers shall be multi-purpose dry chemical type, provided on a basis of one 2A-20BC rated unit for each 3,000 square feet of floor area. Extinguishers will remain property of Contractor.
2026 Lerch Bates Inc.
00800 - 5
G. Contractor shall at all times maintain work areas so all portions are accessible to fire department personnel and apparatus. Fire hydrants and fire department connections to building sprinkler systems must be kept free from obstruction at all times.
H. Contractor shall strictly supervise any welding, metal cutting or other operations employing open flame work. All welding and cutting equipment shall be safely arranged and all combustibles in vicinity of any work being performed shall either be removed or protected by a noncombustible cover. Welding or cutting shall be attended by an assistant or fire watchman who is equipped with at least one 2A-20BC rated multi-purpose dry chemical fire extinguisher. Fire watchman will maintain strict surveillance during entire welding or cutting operation and extinguish flying sparks or burning slag. After welding or cutting operation fire watchman shall thoroughly search entire area for remnants of smoldering materials before he is released from his duty. Any welding or other operation employing open flame in any portion of building shall be scheduled with and receive approval of Purchaser. Hot work permits shall be scheduled and approved with Owner.
I. Contractor shall keep noise level below 80 dBA level during normal building hours. When it is necessary to produce noise above this level, Contractor shall advise building management of such needs and times will be scheduled as directed. The Contractor shall anticipate and schedule excessive noise generating procedures and include allowance for same in its quotation and schedule. Anything above 80 dBA shall be conducted in previously listed off hours.
1.14 ACCIDENT REPORTS
A. In the event of accidents of any kind, Contractor shall furnish Purchaser with copies of all accident reports. Reports shall be sent without delay and at same time that they are forwarded to any other parties.
1.15 STORAGE OF MATERIALS
A. Contractor shall confine storage of materials on job site to limits approved by Purchaser and shall not unnecessarily encumber premises or overload any portion of building with materials to a greater extent than structure design load. All material supplied including tools and job boxes shall be confined within Contractors barricaded area.
1.16 REMOVAL OF EQUIPMENT AND RUBBISH
A. Contractor shall remove and properly dispose of all rubbish as fast as it accumulates including all existing parts and components not retained, keeping building and premises clean during progress of work and leave premises at completion in a condition acceptable to the Purchaser. Store parts and components identified by Consultant as useful for maintenance of units not being modernized as directed by Purchaser. All other parts and components not retained shall become property of Contractor. Dumpster shall be located in the loading dock area.
B. Contractor shall be responsible for storing existing escalator parts and components on site that are identified by Consultant and/or purchaser. At a minimum, Motors & Gearbox are to be retained from both existing escalators, Controllers are to be retained existing escalators, all steps assemblies are to be retained and stored. Contractor to supply pallets for all retained components and shrink wrapped for ground freight shipping. Storage for retained components should be stored at designated storage area as defined by purchaser.
2026 Lerch Bates Inc.
00800 - 6
1.17 MATERIALS AND WORKMANSHIP
A. All materials and equipment furnished shall be new and best quality. Installation shall be accurate, workmanlike, and subject to approval of Consultant. All materials and equipment provided shall conform to regulations of enforcement bodies having jurisdiction. Contractor shall furnish material samples for approval.
1.18 SUPERVISION
A. Contractor shall assign a competent Project Manager, superintendent, and on-site foreman for project satisfactory to Purchaser and Consultant. Such persons shall represent Contractor and all instructions given to them shall be binding as if given to Contractor.
1.19 ROUTINE BUSINESS
A. After award of Contract, all business relating to required work shall be transacted through Consultant, unless otherwise directed.
1.20 CHANGES AND EXTRA WORK
A. Purchaser may at any time make changes to Contract Documents, plans and drawings, omit work, or require additional work by Contractor. For such additional work performed hereunder, Purchaser shall pay Contractor on the basis of a mutually agreed lump sum. See Article 1.25 for method of computing lump sum cost of additional work. Contractor shall make no additions, changes, alterations, or omissions, or perform extra work, without receipt of written authorization of Purchaser.
1.21 PAYMENTS
A. Unless otherwise agreed, Contractor shall submit monthly applications for payment together with necessary data, information, waivers, and affidavits to Consultant. Consultant shall review data for accuracy and forward such applications to Purchaser for payment. Information shall be submitted with payment request and work progress forms.
B. Applications for payments are to cover 90% of the value of labor performed and material installed and delivered during the preceding month or materials delivered to Contractor’s storage facility.
C. Balance (retention) shall be paid by Purchaser upon final acceptance of entire work by Consultant and Purchaser and after performance guarantees have been satisfactorily demonstrated. See Section 01700, Article 1.02, D-G.
D. Contractors Payment Schedule is agreed to mirror the following:
1. 25% Downpayment due at the award of contract.
2. 35% Material Payment due upon delivery.
3. 30% Progress Payment.
4. 10% Retainage Due at the completion of all work and at the satisfaction of owner.
1.22 PAYMENT WITHHELD
A. Purchaser and/or Consultant may withhold approval of payment on any Contractor request to such extent as may be necessary to protect Purchaser from loss on account of:
2026 Lerch Bates Inc.
00800 - 7
1. Believed negligence on part of Contractor to execute the work properly or fail to perform any provision of Contract. Purchaser, after 15 days’ written notice to Contractor, may without prejudice to any other remedy he may have, make good such deficiencies and may deduct its cost from the overall Contract sum.
2. Claims filed or reasonable evidence indicating probable filing of claims by other Contractors or Subcontractors.
3. Failure of Contractor to make proper payments to its material suppliers or Subcontractors for material and labor.
4. A reasonable doubt that required work can be completed by Contractor for balance then unpaid or in Contract time frame.
5. Contractor’s damage to building or another Contractor.
B. When the above grounds are removed, payment shall be made in full, less retention.
1.23 LIENS AND AFFIDAVITS
A. Neither final payment nor any part of billing retention shall become due until Contractor shall deliver to Purchaser a complete release of all liens arising out of this Contract or receipts marked paid in full in lieu thereof. In addition, Contractor shall furnish an affidavit to Purchaser that, so far as he has knowledge or information, releases, or receipts include all labor and materials for which a lien could be filed. If any lien remains unsatisfied after all payments are made by Purchaser, Contractor shall refund to Purchaser all monies the latter may be compelled to pay in discharging such a lien, including all costs and reasonable attorney’s fees.
1.24 CLAIMS FOR EXTRA COST
A. Contractor claims for extra cost due to additions or changes to required work shall be submitted to Consultant in writing within a reasonable time after such additions or changes identified or are requested and in any event before proceeding with required work. No such claim shall be valid unless so made. Maximum charge for additions/changes to work shall be Contractor cost +10% for overhead and profit. Contractors cost shall be verifiable from actual supplier invoices, purchase orders, time tickets, etc.
1.25 DELAYS AND EXTENSION OF TIME
A. If Contractor progress is delayed due to acts of Purchaser or Consultant, acts of other Contractors, fire, floods, strikes or other casualties beyond the control or without fault or negligence of Contractor, time for completion of the work shall be extended for a period determined by Consultant to be equivalent to time of such delay. Contractor must notify Consultant, in writing, of such delay within 48 hours after delay commences, or no extension of time will be granted. Extension of time without written request within said period on one or more occasions shall not be deemed a waiver of provisions of this article.
1.26 PERMITS
A. Contractor shall obtain and pay for or cause its Subcontractor to obtain and pay for all permits required to complete required work. In addition, Contractor shall arrange, schedule, and pay for or cause its Subcontractors to arrange, schedule and pay for all required final inspections by state, local or independent certified inspecting authorities necessary for issuance of all required Purchaser utilization permits in regard to completed work.
2026 Lerch Bates Inc.
00800 - 8
PART 2 - SPECIAL CONDITIONS
2.1 PROGRESS OF WORK
A. Upon award, verbally or in writing, Contractor shall reconfirm in writing, starting and completion schedule including equipment delivery dates based upon the information submitted on its quotation form, Section 00310.
B. Contractor shall submit in writing monthly reports with payment request, including current equipment delivery dates and anticipated completion dates for individual units and groups of units.
C. Project Manual: Upon award, verbally or in writing, Contractor shall prepare three project manuals neatly bound in a three ring binder. One manual shall be retained by Contractor, one provided to Purchaser and one provided to Consultant. The manuals shall contain the following information and sections identified in an index with numbered divisions.
1. Project Specification, revised if required to indicate basis of award. (While maintaining original text and clearly identifying revision.)
2. Contractor completed Bid Form, specification Section 00310. Include copy of original submission and any revisions.
3. Alternate quotations indicating Purchaser acceptance or rejection.
4. Purchaser’s executed Contract.
5. Initial project schedule with estimated versus actual milestone dates. Include schedule revisions.
6. Project payment requests including verification of payment and lien releases.
7. Code acceptance.
8. Purchaser’s temporary acceptance documents
9. Purchaser’s final acceptance documents.
10. Consultants progress review comments and requirements.
11. Consultant’s final Contract review comments and requirements.
12. Shop drawing submittals, including sets with review remarks.
13. As built drawings, including control wiring diagrams.
14. Maintenance Agreement, Owner Supplied
D. A second manual shall include the identical section numbers and shall be identified and utilized for general correspondence on these subjects. Additional sections shall include correspondence not specifically identified by one of these sections. An index in front of this section shall number and identify source of correspondence and subject.
E. Contractor shall maintain all six manuals in an up-to-date condition. Prior to final payment, Contractor shall deliver to Purchaser the documents in Items 1, 2,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .