ESBD_File_356073_Exhibit B_ Fire Alarm Locations.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- Fire Suppression and Related Services
- Solicitation number
- 2024-1092
- Issued by
- Travis County, Lubbock City, Texas
About this file
This document is an exhibit related to a state and local contract opportunity for fire suppression and related services in Texas. The contract opportunity seeks a proposer(s) to provide labor and materials for the maintenance, testing, inspection, repair, certification, and if necessary, replacement of existing or planned fire suppression systems across various Texas Tech University (TTU) facilities located in Travis County and Lubbock City. The exhibit provides detailed information on the location, size, and fire alarm system specifications for over 200 TTU buildings and facilities. The contract term and any renewal options are not specified.
The contract opportunity requires pricing for the requested services, but does not mention any set-asides, incumbents, funding requirements or sources, or other salient financial details. The document focuses on providing the technical specifications and service requirements for the fire suppression systems across the TTU locations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Building | Square Ft | Number of Floors | Basement/ MEZZ | Alarm Location | Type | EVAC | Weather | Knox Box Location | Fire Pump/ Riser Room | Fire Pump or Riser | FDC Location | PIV Location |
| Administration | 116,836 | 3 | 1 | Southwest entrance | FCI | Yes | Yes | Southeast entrance-south wall | North Basement | PUMP | North Outside Wall | North of Wall |
| Admin Support Center | 34,579 | 2 | N/A | West corridor by Traffic & Parking | FCI | Yes | Yes | N/A | South side 1M1 | RISER | South side | North East Side |
| Ag Education & Communications | 23,936 | 2 | N/A | East Side Main Corridor | FCI | Yes | Yes | South side | In room 102A | RISER | North East Side | North East |
| Agricultural Pavilion (Landscape Architecture) | 6,093 | 1 | N/A | East Entrance | FCI | Yes | Yes | Southwest collections Knox box | East Entrance | RISER | Northwest Corner | East Side |
| Ag Research Greenhouse | 14,992 | 1 | N/A | Main Entrance northwest side | FCI | NA | NA | N/A | East Side Mechanical Room (By Generator) | RISER | East Side | Northeast side (Road Valve) |
| Ag Science | 40,920 | 3 | N/A | 1st fl. SW Entrance/Basmt Equipment room 1M1 | FCI | Yes | Yes | Food Tech South side | N/A | N/A | N/A | N/A |
| Animal-Food Science, Livestock Arena & Meats Lab | 54,021/ 45,106 | 2 | N/A | Northeast Mechanical room new building 1M4 | FCI | Yes | NA | South entrance | Northeast Mech room 1M3 | RISER | Northeast corner | N/A |
| Architecture | 154,408 | 12 | 1B/ 1SB | 1st Floor by room 101B/Main Basement Lobby | FCI | Yes | Yes | South West entrance | SM5 inside room S08 | PUMP | North West Side 2 bank riser by Flint ST. | Northwest |
| Art | 58,825 | 1 | 1B/ 1SB | 1st floor South Entrance/ Sub Bsmt Mech Room | FCI | Yes | Yes | South entrance | Sub basement | Shared with Architector | Same as Architecture | Same as Architecture |
| Art 3-D | 43,643 | 2 | 1 | South East Lobby | FCI | Yes | Yes | Southeast main entrance | 1M1 Southwest Mech room inside room 102 | RISER | Southwest Side | Southwest side |
| (CASH) Athletic Dining | 8,877 | 1 | N/A | North East Entrance/Room 1M2 | FCI | Yes | Yes | West side by Riser Room | West Side | RISER | West Side | N/A |
| Athletic Offices South | Under Construction | |||||||||||
| Baseball Clubhouse | 24,110 | 1 | N/A | Northeast main lobby | FCI | Yes | Yes | Northeast Entrance | North west Side | RISER | Northeast parking lot | West side |
| BASF Agricultural Solutions | 31,601 | 1 | N/A | South Entrance/Inside Mech room at ICC 1M3 | FCI | Yes | Yes | South main entrance | 1M4 Northeast mech room behind gate | ? | Northeast of Loading dock | Northeast |
| BASF Seed Innovation Greenhouse | 47,510 | 1 | N/A | Northeast Entrance/Mech Room By Northeast Entrance | FCI | Yes | Yes | On Main building across the street South side | North west side | ? | Northwest Side | Northwest |
| Biology | 145,398 | 7 | 1B/1SB | West end corridor 1st floor | FCI | Yes | Yes | West end loading dock | Sub basement west side | PUMP | North west side | North Side |
| Business Administration COBA (Rawls) | 188,898 | 4 | 1 | Main: East entrance/ Main entrance North | FCI | Yes | Yes | East service drive | Basement Mech room 0M5 by center elevators | PUMP | North on entrance drive/ East loading docks | North East |
| Burkhart / Autism | 26,963 | 2 | N/A | South Lobby/Northwest mechanical room (single door outside) | FCI | Yes | Yes | Front Door | Northwest Mech room (double doors) | RISER | South side by west entryway | N/A |
| Cabinet Paint Shop | PART OF PHYSICAL PLANT | 1 | N/A | Main Entrance | Notifier | NA | NA | PART OF PHYSICAL PLANT | Inside to the left of shop main door | RISER | NE Side outside next to main door | North side of building |
| CASNR Annex | 12,626 | 1 | N/A | South Center Corridor | FCI | Yes | Yes | South East Entrance | N/A | N/A | N/A | N/A |
| CHACPS I | 70,676 | 3 | 1B/1M | 1st floor Outside Emg. Maint. Room (RM 107) | Notifier | NA | NA | Occupied 24 hrs | N/A | N/A | N/A | N/A |
| CHACPS 2 | 50,852 | 2 | 1B/1M | 1st floor behind Main desk | FCI | Yes | Yes | Occupied 24 hrs | N/A | N/A | N/A | N/A |
| Chemical Engineering | 17,226 | 2 | 1 | 1st floor west | FCI | Yes | NA | East Livermore entrance | N/A | RISER | Outside West Side - Hose Cabinets ONLY | N/A |
| Chemical Engineering Annex | 1,602 | 1 | N/A | Connected to Chemical Engineering | FCI | NA | NA | East Livermore entrance | N/A | N/A | N/A | N/A |
| Chemistry | 177,142 | 4 | 1B/1M | 1st Floor Lobby North/Main Panel in 0M3 in Basement | FCI | Yes | Yes | East side of lecture hall | OM2 | PUMP | Southwest wall | Southwest by wall |
| Child Development and Center for Addiction | 40,078 | 2 | 1 | Office areas for both/RM 1M3 Center for Addiction | FCI | Yes | Yes | West doors of Center for Addiction | Basement East Door for Center of Addiction | RISER | West Side | West side in bullpen |
| Civil Engineering | 84.047 | 2 | 1 | Main Lobby | FCI | Yes | Yes | East side by shop entrance | 0M11 | RISER | West side entrance/East Side by shop | N/A |
| Classical & Modern Languages and Literatures | 63,295 | 2 | 1 | AP South Entrance/Bsmt. Equip. Rm. 0M1 | FCI | Yes | Yes | South side | East Basement Rm 0M1 | PUMP | Southeast corner | East Side (w/ test header) |
| Creative Movement | 9,597 | 1 | N/A | North West doors | FCI | Yes | Yes | Southeast Corner | Riser in 1M2 | RISER | Southeast corner | South side |
| Credit Union | 11,472 | 2 | N/A | Riser room | Firelite/ FCI | Yes | NA | Southwest Mechanical Room | Inside Southwest Mechanical Room | RISER | Southwest wall | Southwest side of the building by the street |
| Dairy Barn | 8,063 | 2 | N/A | East Main Entrance | FCI | Yes | Yes | South east corner | West side mechnial room under stairs | RISER | North Side | North side |
| Dan Law Suites/Press box | 7,208 | 2 | N/A | West mechanical room outside by concession area | FCI | Yes | Yes | West mechanical room | West side mech room | RISER | West side parking lot | N/A |
| Development Office / Black Cultural Center | 6,153 | 1 | N/A | North main entrance area | FCI | Yes | Yes | North entrance | Southwest Mechanical room 1M3 | RISER | Northeast | East side |
| Drane Hall | 74,228 | 3 | 1 | 1st floor East/1st floor closet across Rm.127 | FCI | Yes | Yes | Northwest entrance | Basement Mechanical room West side | PUMP | N/A (West side when completed) | West Side |
| Doak Hall / Doak CC | 81,768 | 3 | 1 | 1st floor SW Entrance/Old Hall office north side | FCI | Yes | Yes | Southwest corner | SE entrance room 1M6 | RISER | South side | East side |
| East Campus Electrical Eng./Warehouse | 43,301 | 1 | N/A | West side North Wall | FCI | Yes | Yes | N/A | Southeast Door | RISER | Southeast Door | Southeast Door |
| Education Building | 84,218 | 3 | 1 | 1st floor Hallway N.E Side | FCI | Yes | Yes | Southeast corner | West side basement in 0M1 | RISER | Southwest side by basement stairs | South West |
| Electrical Engineering | 99,177 | 3 | 1 | Main Lobby (Main Panel) North Center Entrance/ South West in rm 103C | FCI | Yes | Yes | West side arch | Riser in Basement OM1 | RISER | Basement FDC West Side entrance | N/A |
| English / Philosophy/ Humanities | 105,874 | 4 | 1 | Main in 1M3 AP: 1st floor by room 109 | FCI | Yes | Yes | North entrance | Basement Mech room 0M1 | PUMP | West Corner of building | Ground valve by FDC |
| Engineering Center / Computer Center | 54,098 | 3 | 1 | 1st floor North Loading Dock | FCI | Yes | Yes | North east loading dock | Riser in Basement Rm 14AB in Office 14B | RISER | North Side entrance | Ground valve |
| Engineering Tech Lab | 20,974 | 1 | N/A | 1st Floor East by Room 106 | FCI | Yes | Yes | East side dock | Rm 106 by Fire Panel | RISER | East side | East side by parkinglot |
| Experimental Science | 113,304 | 3 | 1B/1M | 1st Floor North Lobby | FCI | Yes | Yes | N/A | Basement Mech room 0M6 | PUMP | North side entrance | N/A |
| Experimental Science 2 | 118,379 | 4 | 1B/1M | Noth East Main Lobby | FCI | Yes | Yes | South West Side by 1M3. | South West 1M3 | PUMP | South West side | South West |
| Fiber and Biopolymer Reasearch Institute | 105, 987 | 2 | N/A | Main Office RM 108 | FCI | Yes | Yes | East main entrance | Northeast Mechanical Room | RISER | Northeast wall | Off of 4th st. |
| Fishery and Wildlife | 8,654 | 2 | N/A | Southeast Main Entrance | FCI | Yes | Yes | CASNR Annex knox box | N/A | N/A | N/A | N/A |
| Food Tech | 16,905 | 2 | 1M | South Entrance Cooridor/1st Floor Equip. Rm. 1M1 | FCI | Yes | Yes | South side | N/A | N/A | N/A | N/A |
| Football Training Facility | Under Construction | |||||||||||
| Football Jones ATT East | 131,723 | 7 | 1M | East Escalator Lobby | FCI | Yes | NA | Center east by fire pump room | Fire pump and riser Center East South Mech room. | PUMP | South Side by Student Gate 6 | N/A |
| Football Jones ATT North | 7,851 | 1 | N/A | Phone equip. Rm. N.W.corner | FCI | Yes | Yes | N/A | North East Kitchen | RISER | North Side Access Road | N/A |
| Football Jones ATT West | 192,206 | 9 | N/A | Grnd.Floor Center west Fire control room | FCI | Yes | Yes | N/A | South side WM104 | PUMP | North west corner | N/A |
| Frasier Pavilion | 22,782 | 2 | N/A | North Side entrance | FCI | Yes | Yes | N/A | North West Outside Mech 136 | RISER | North East side | North West Wall |
| Goddard Range & Wildlife/ Bayer Plant Science | GRW 21,548/BCSS 25,122/ BCSW 20,500 | GRW 2/ BCSS 2/BCSW 3 | 1/1/NA | South East Entrance and North west Entrance | FCI | Yes | Yes | Northeast corner | Plant Science 1M2 | RISER | Northwest of Plant science | Southwest center of Plant Science |
| Grantham | 29,051 | 1 | N/A | North Office Door | FCI | NA | NA | N/A | N/A | N/A | N/A | N/A |
| Hazardous Chemical Storage | 1,671 | 1 | N/A | Connected to Chemical Engineering | Notifier | NA | NA | N/A | N/A | N/A | N/A | N/A |
| Holden Hall (New & Old sides) | 171,846 | 2 | 1 | Bsmt Rm 0M6 (MAIN PANEL) /SOUTH EAST SIDE (NEW) /SOUTH WEST (OLD) | FCI | Yes | Yes | East side entrance | N/A | N/A | East side entrance | N/A |
| Housing services | 23,014 | 1 | N/A | Reception office | FCI | Yes | Yes | N/A | Middle of West side | RISER | Northwest Corner | Northwest Corner |
| Human Science | 167,194 | 6 | 1 | Elevator Lobby 1st floor Tower | FCI | Yes | Yes | West breezeway | Mech room in East Side Basement | PUMP | On Akron West Side Entrance | East Entrance Next to test header. |
| Human Science Cottage | 3,769 | 2 | N/A | West Side Entry | FCI | NA | NA | N/A | N/A | N/A | N/A | N/A |
| International Cultural Center | 33,544 | 1 | N/A | Admin office area/North East Equipment Room 1M3 | FCI | Yes | Yes | N/A | 1M2 by loading dock Northest side | RISER | Northeast by loading dock | Northeast side by gas meter |
| Industrial Engineering (IMSE) | 62,616 | 2 | N/A | Mid building By Rm. 101 | FCI | Yes | Yes | South entrance | West side by loading dock/ 2nd floor riser on south west 1M5 | RISER | West side | West side loading dock |
| Innovation Hub | 44,135 | 2 | N/A | North Lobby Entrance/1st Floor East Room 1M1 | FCI | Yes | Yes | East Loading dock | East Loading Dock | RISER | Northeast corner | Northeast corner |
| Kent Hance Chapel | 7,226 | 1 | N/A | West entrance lobby | Notifier | Yes | Yes | N/A | Northwest side Mech room | RISER | West side | Northeast corner |
| Kinesiology & Sports Management | 41,662 | 1 | N/A | S.W. Lobby Entrance By Room 101 | FCI | Yes | Yes | Northwest side | Northwest side | RISER | North West Wall | N/A |
| KTTZ-TV | 7,470 | 2 | N/A | 1st Floor Maint. Rm. | Notifier | NA | NA | Main entrance east side | N/A | N/A | N/A | N/A |
| Law / Lanier PDC | 149,503 / 39,683 | Law 4 / LPDC 2 | Law 1 / LPDC N/A | Lanier North Entrance by Offices | FCI | Yes | Yes | Outside mechanical room Lanier Center | Northwest Mechanical Room | RISER | West wall | West side |
| Library | 365,046 | 6 | 1B/1BM/1M | Main entrance left stairwell | FCI | Yes | Yes | Southwest loading dock | Sub Basement mech room West loading dock | PUMP | Southeast corner by Main entrance | N/A |
| Livermoore Engineering Center | 26,517 | 2 | N/A | East side lobby | FCI | Yes | Yes | East Livermore entrance | In IMSE west side loading dock 1M5 | RISER | West side | IMSE west side loading dock |
| Lubbock Business Park Warehouse | 30,000 | |||||||||||
| Lubbock Lake Landmark Roberet Nash Interpretive | 9,619 | 1 | N/A | Main Building N.W. Door area | Notifier | NA | NA | West door employee entrance | N/A | N/A | N/A | N/A |
| Marsha Sharp Center for Student Athletics | 14,542 | 1 | N/A | Across from Room 138/North side electrical room | FCI | Yes | Yes | South entrance | Riser in South Side mech room | RISER | South side | South side |
| Maddox Engineering Research Center (MERC) | 73,764 | 2 | 1B/1BM | 1st floor by 1M2 AP East entrance | FCI | Yes | Yes | East entrance | Riser in Basement in 0M1. | RISER | West side | West side |
| Maedgen Theater | 93,271 | 2 | 1 | South East Lobby Entrance | FCI | Yes | Yes | North West Side | 1M1 | PUMP | Southeast Side | Water valve inside room 1M1 |
| Math | 71,868 | 3 | 1B/1M | Basement 0M1 AP South Main Entrance | FCI | Yes | YEs | South side entrance | Basement by dock door | PUMP | North side | North side |
| McClellan Hall | 13,275 | 2 | 1 | 1st Floor Main Entrance/MAIN PANEL IN BASEMENT | FCI | Yes | Yes | South entrance | N/A | N/A | N/A | N/A |
| Mechanical Engineering North | 81,793 | 2 | 1 | Main office | FCI | Yes | Yes | North entrance | 001M | RISER | North Side by loading dock | North Side by loading dock |
| Mechanical Engineering South | 26,877 | 2 | N/A | South West Building Lobby | FCI | Yes | Yes | Same as North | N/A | N/A | N/A | N/A |
| Media and Communication | 194,943 | 13 | 1B/1SB | South tower by rm 150 | FCI/ Notifier | Yes | Yes | West side south column | Tower basement mech rm. 0M2 | PUMP | SouthWest by Flint ST. 4 Bank riser | South west |
| Merket Alumni Center | 30,551 | 2 | 1 | Old addition hall North Door | Notifier | Yes | Yes | N/A | Riser in 1M3 | RISER | Northwest side | Northwest side |
| Museum & Natural Science | 238,555 | 2 | 1B/1M | Main Entrance By Guard & S.E. entrance of Natural Science Bldg. | FCI | Yes | Yes | South East Side | South East Side | PUMP | South East Side | South East Side |
| Music | 104,132 | 3 | 1B/1SB | South Center Main Entrance | FCI | Yes | Yes | In Student Union Knox Box | Riser in sub basement in East loading dock / Basement of Helly Hall | PUMP | East side Sprinkler & Separate Hose Cabinet Connections | East side by Akron |
| National Wind Institute | 18,191 | 2 | 1 | West entrance Lobby/Main Panel in 0M2 | FCI | Yes | Yes | West Entrance | Riser in Basement in 0M6. | RISER | North West Wall | East Entrance |
| Oilfield Technology Center | 4,575 | 1 | N/A | 101 | FCI | N/A | N/A | N/A | N/A | |||
| Parking Garage | 268,000 | 4 | N/A | Southside 1st Level Equip. Rm. | FCI | Yes | NA | N/A | N/A Dry standpipe | N/A | West Side entrance | N/A |
| Physical Plant | 90,235 | 1 | N/A | Main Hallway Middle 1st Floor | FCI | Yes | Yes | N/A | Southwest Mechanical Room | N/A | Northeast corner | Northeast corner |
| Physical Plant Annex | 2,443 | 1 | N/A | Room 100 | FCI | NA | NA | N/A | N/A | N/A | N/A | N/A |
| Psychology | 36,939 | 4 | 1 | South Main Entrance/Bsmt. Equip. Rm. B-1 | FCI | Yes | Yes | South entrance | N/A | N/A | N/A | N/A |
| Petroleum Engineering | 45,199 | 2 | N/A | Main Lobby | FCI | Yes | Yes | North mechanical room door | Northwest Mechanical Room | RISER | Northwest by street | Northwest side |
| Police Dept | 19,716 | 1 | N/A | Rm 131- Fire Marshal's Office | FCI | Yes | Yes | Occupied 24 hrs | N/A | N/A | N/A | N/A |
| Ranching Heritage Center | 38,755 | 2 | 1 | Security RM 108 / AP front desk | FCI | Yes | NA | N/A | East Mechanical Room | RISER | East of Building | East of Building |
| Ranching Heritage Shop | 4,799 | 1 | N/A | South | Notifier | NA | NA | N/A | NA | N/A | NA | NA |
| Rawls Clubhouse | 6,208 | 1 | N/A | Main Lobby | FCI | Yes | Yes | South service drive | Southwest Mechanical Room | RISER | Southwest corner | Southwest corner |
| Rawls Grounds & Maintinance | 5,815 | 1 | 1M | N/A | NA | NA | NA | N/A | N/A | N/A | N/A | N/A |
| Rawls Team facility | 3,801 | 1 | N/A | Main Lobby | FCI | Yes | Yes | South end by A/C units | South Mechanical Room | RISER | South side | South side |
| Rec Center/ Aquatic | REC 243,217 / AQ 46,072 | REC 2 / AQ 1 | REC 1 / AQ N/A | North Entrance/2nd floor main office | FCI | Yes | Yes | North entrance | Southeast corner service drive 1M6 | PUMP | Southeast on service drive | N/A |
| Rocky Johnson Softball / Women's Softball | 13,342 | 1 | N/A | Elect room 111 | FCI | Yes | Yes | Outside Electrical room North 1M2 | North east Mech room 1M2 | RISER | Northeast corner | Northeast corner |
| Science | 109,343 | 3 | 1 | Basement Room OM2 | Notifier | NA | NA | West loading dock | N/A | STANDPIPE | West Loading Docks | N/A |
| Soccer Complex Club House | 10,163 | 1 | N/A | 1M1 | FCI | Yes | Yes | Main entrance South side | West Mechanical Room 1M3 | RISER | West side/ Elevator West side | Southwest/ Elevator West |
| Soccer Gerald Myers Indoor Facility | 37,608 | 1 | N/A | West wall | FCI | Yes | Yes | Same as complex | N/A | N/A | N/A | N/A |
| Southwest Collection | 74,456 | 2 | N/A | North East Entrance/ Northwest side by Globe Rotunda | FCI | Yes | Yes | North entrance | West side mech room 1M4 | RISER | West side center | West side center |
| Sports Performance Center | 160,758 | 2 | N/A | North Main Entrance/Main: Mech room 1M1 | FCI | Yes | Yes | N/A | North East Mech room | RISER | Northeast corner | Northeast |
| Student Union | 253,680 | 3 | 1 | Mech Room 101 | FCI | Yes | Yes | North main doors | Basement South Mechanical Room | PUMP | North side wall | South side |
| Student Wellness | 43,637 | 2 | N/A | East side central outside entrance mechanical room | FireLite | Yes | Yes | East side mechanical room | South east side mechanical room | RISER | South side by street | N/A |
| Systems Office Building | 76,481 | 3 | N/A | East Door by Dock | FCI | Yes | Yes | East Dock | East Dock | PUMP | North side by loading dock entrance | East side |
| Tech Plaza | 73,437 | 6 | 1 | Main Lobby 1st floor | FCI | Yes | Yes | South main entrance | Basement 0M1 | PUMP | North side | Northeast side |
| Texas Tech Downtown Center Building | 29,357 | 2 | 1 | MP 0M1A / AP North Entrance | FCI | N/A | 0M1A | Riser | East side | N/A | ||
| Texas Tech Center for Early Head Start | 42,883 | 1 | N/A | Main Office | Northwest Corner | Riser | Northwest Corner | |||||
| Texas Tech Therapeutic Riding Teaching and Research Arena | 25,637 | 1 | N/A | AP East Doors | FCI | N/A | N/A | N/A | N/A | N/A | ||
| United Supermarket Arena | 269,306 | 3 | 1 | 1st Floor Admin Office Area/Police Room | FCI | Yes | Yes | North event staff entrance | In weight room mech closet | PUMP | Southwest side | Northwest side on Indiana Ave |
| Weeks Hall | 67,234 | 3 | 1 | North East Entrance/1st Floor Room 1M3 | FCI | Yes | Yes | N/A | 1st Floor Room 1M3 | PUMP | Remote N.E. | N/A |
| West Hall | 77,278 | 3 | 1 | 1st floor west lobby AP/ Main East Side Room 1M4 | FCI | Yes | Yes | Northwest entrance | East side Rm 145 reception closet | RISER | Northeast side | East side |
| Wiggins Complex | 88,791 | 2 | 1 | 1st floor room 1M7 Career Center / AP west & south main entrances | FCI | Yes | Yes | West entrance | West side of lower pit | RISER | North dock street level | N/A |
| Womble Basketball Center | 58,235 | 2 | N/A | Front doors on east lobby wall | FCI | Yes | Yes | West side by riser room | Southwest side | RISER | Southwest side | Southwest side by hydrant |
| Resident Halls | ||||||||||||
| Bledsoe/ Gordon | B 122,840/ G 95,160 | B 3/ G 3 | B 1/ G 1 | Sneed Office | FCI | Yes | Yes | South dining entrance | North Side by Loading Docks | SHARED PUMP | North side | North center |
| Carpenter Wells | 113,704 | 3 | N/A | Murray Office & Carpenter Commons | FCI | Yes | Yes | South main building | Commons Mechanical Room South Side | SEPERATE RISERS | South Main Entrance | N/A |
| Chitwood/ Weymouth | C 130,125/ W 119,864 | C 12/ W 12 | C 1/ W 1 | Chitwood office | FCI | Yes | Yes | North lobby doors | In Basement | SEPARATE PUMPS | Northwest side/ north side | Northwest side/ north side |
| Coleman | 123,383 | 12 | 1 | Coleman office | FCI | Yes | Yes | South Entrance West Side | In Basement | PUMP | North side | North side |
| Honors Hall | 77,292 | 5 | N/A | AP West Entrance | FCI | Yes | Yes | West Main Entrance | South Side in Mech room 1M6 | PUMP | Southwest Corner | N/A |
| Horn/ Knapp Hall | H 112,997/ K 68,624 | H 3/ K 3 | H 1/ K 1 | Horn Office | FCI | Yes | Yes | East main entrance | North Side by Loading Docks 1S4 | SHARED PUMP | North side | North center |
| Hulen/ Clement | H 100,867/ C 76,197 | H 6/ C 6 | H 1/ C 1 | Hulen Hall office | FCI | Yes | Yes | South entrance to lobby | North loading dock in pit | SHARED PUMP | North center by 18th ST. | Northwest side |
| Murray Hall | 158,723 | 4 | N/A | Murray Office | FCI | Yes | Yes | West Main Entrance in flower bed. North side | East Mechanical Closet by loading dock | PUMP | East side by loading docks | East side. North on the loading docks wall. |
| Sneed Hall | 90,704 | 3 | 1 | Sneed Office | FCI | Yes | Yes | North wall Sam's Place | North Side loading dock in Pit | PUMP | Northeast corner | North east side by University Ave. |
| Stangel/ Murdough | S 87,142/ M 118,729 | S 7/ M 7 | S 1/ M 1 | Fire alarm room 1st floor main north entrance (Glass Room) | FCI | Yes | Yes | North main entrance to Stangel | North Side loading dock west door | SHARED PUMP | East, West and South Side | N/A |
| Talkington Hall / Boston Commons | T 168372 / BC 21,790 | T 5 / BC 2 | N/A | Main office | FCI | Yes | Yes | East mechanical room door | East Mechanical Closet by loading dock | PUMP | East side by loading docks | East side |
| West Village A & B | 234,501 | 4 | N/A | Building A office | FCI | Yes | Yes | South Service drive on both buildings | East & West Mechanical rooms by service road | SHARED PUMP | South Side | South Side |
| Wall/ Gates | W 78,804/ G 96,792 | W 6/ G 6 | W 1/ G 1 | Hall office | FCI | Yes | Yes | South entrance to lobby | North Side loading docks | SHARED PUMP | North Center byu 18th ST. | Northwest side |
| Reese Campus | ||||||||||||
| Reese Bld. 250 | 53, 051 | 1 | 1 | N.E. Equip Room | Notifier | NA | NA | N/A | Main Shop Midway West Side | Riser | West Side | West Side |
| Reese Bld. 252 | 1,217 | 1 | N/A | Dry System | N/A | Out of Service | Out of Service | Out of Service | East Side | |||
| Reese Bld. 350 | 7,731 | 1 | N/A | Main Entrance | Notifier | NA | NA | N/A | Southeast Mechanical Room | Riser | Southeast Wall | Southeast Side |
| Reese Bld. 450 | 1,959 | 1 | N/A | 1M1 | FCI | N/A | N/A | N/A | N/A | N/A | ||
| Reese Bld 455 | 3,774 | 1 | N/A | West Center Door Area | Game | N/A | N/A | N/A | N/A | N/A | ||
| Reese Bld. 460 | 24,471 | 1 | N/A | Outside S. Equip. Rm. | FCI | NA | NA | N/A | West Side Mech. Room | Riser | West Side | OS&Y valve in West side Mech. Room |
| Reese Bld. 461 | 2,819 | 1 | N/A | 1M1 | FCI | N/A | N/A | N/A | N/A | N/A | ||
| Reese Bld. 551 | 6,387 | 1 | 1 Mezz | Outside Equip. Rm. Monitored by 555 | Notifier | NA | NA | N/A | N/A | N/A | N/A | N/A |
| Reese Bld. 552 | 10,576 | 1 | 1 Mezz | North West Entrance | FCI | NA | NA | N/A | Northeast mechanical room | Riser | Northeast Wall | Northeast side |
| Reese Bld. 555 | 46,426 | 2 | N/A | Northeast main door vestibule | FCI | Yes | Yes | Northeast main doors | Southeast Mechanical Room | Riser | Southeast wall | Southeast of Building |
| Reese Bld. 557 | 5,074 | 1 | N/A | Room 104 | FCI | N/A | 1M2 | Riser | East wall | South Side outside fence | ||
| Reese Bld. 790/ 545 | 3,610 | 1 | N/A | Outside W. Equip. Rm. | Notifier | NA | NA | N/A | N/A | N/A | N/A | N/A |
| GLEAMM Microgrid Research Facility | 1,191 | 1 | N/A | Room 100 | FCI | N/A | N/A | N/A | N/A | N/A |
File details come from the government source that posted it. Updated .