About this file
This document is an addendum to RFP730-24030, a request for proposals from the University of Houston's Conrad N. Hilton College of Global Hospitality Leadership to create an interactive exhibit on the hospitality industry. The exhibit space is 42 by 29 feet and located in the Hilton College building. The addendum provides a question and answer session, branding information, and building blueprints. Key details include a lack of a definitive launch date, references to the branding standards available online, and details on the lobby renovation scope of work, including demolition, new finishes, furnishings, signage, and electrical work.
The contract opportunity does not provide specific pricing terms, set-asides, or funding details. However, it indicates the University of Houston is seeking proposals from vendors to design and install the interactive exhibit space as part of the broader lobby renovation project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESBD_File_352341_RFP730-24030 Addendum 2 - Proposal Deadline Extension.docx | DOCX document | |
| ESBD_File_352341_Sign in Sheet.pdf | ||
| ESBD_File_352341_Exhibits.zip | ZIP file | |
| ESBD_File_352341_RFP730-24030 Hilton Hall of Honor - Final.docx | DOCX document | |
| ESBD_File_352341_RFP730-24030 Addendum 1. Q&A.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDEMDUM 3
RFP730-24030 Hilton Hall of Honor
Q&A Addendum, branding information and Building Blueprints
1. Is there a target date for the launch of the updated Hall of Honor?
Answer: We have not set a definitive launch date for the updated Hall of Honor. The timeline will depend on the proposals received and the final contract negotiated with the selected vendor.
The branding standards are online! You can find them at https://www.uh.edu/brand/brand-identity/style-guide/
1/30/09 9:39 AMPeter M. Muller, Inc.: Contact Information
Page 1 of 1http://www.petermmullerinc.com/home.html
PETER M.
CURTAIN
MULLER, INC.
WALL CONSULTANT
Home Contact Portfolio
Project List Press
COMBINED DOMESTIC AND INTERNATIONAL EXPERIENCE IN
THE CONSTRUCTION INDUSTRY FOR OVER 50 YEARS
OWNER SERVICES
Due Dilligence Peer Reviews Facade Rehabilitation
COMPLETE SYSTEMS DESIGN
Glass & Metal Curtain Walls Specialty Facades Metal Cladding
Fixed & Operable Window Wall Combinations Storefronts Skylights
Masonry Stone on Truss Plaster Precast Concrete Panels
PROJECT SERVICES
Field Testing Proposal Review Comprehensive Specifications
Coordinated Architectural Details Subcontractor Bid Review Estimates
Mock-up Installation and Testing Shop Drawing Review Budgets
Fabrication and Field Quality Control Die and Material Sample Review
INVESTIGATIONS ON EXISTING PROBLEM WALLS
Troubleshooting
Remedial Process Development for Repairs
Expert Testimony
SHEET NUMBER
SHEET TITLE
PROJECT NUMBER
DATE
SEAL
PROJECT NAME
A1.0
1st Floor Plan and Notes
UNIVERSITY OF HOUSTON
Houston, TX
Portfolio Associates retains all copyrights as authors and owners of the design and documentation. This drawing and all related information is intended for use on the stated project and is not to be reproduced or duplicated in whole or in part.
March 4, 2009 - Issued for Bid
PUBLIC AREA RENOVATION 2009
Sept 29, 2009 - Issued for Construction
CT
CT
GENERAL NOTES
• Protect all existing work, furniture and equipment from construction operations.
• Not all miscellaneous items of cutting, patching or fitting are individually described herein. Lack of specific description of cutting, patching or fitting required to properly accommodate the scope of work shall not relieve the Contractor from responsibility to perform such work as required.
• All existing fire-rated partitions and fire blocking are to remain intact. Any fire partition that is damaged is to be replaced with like construction. Field verify.
• Protect all surfaces and finishes that are to remain adjacent to new work. Contractor is responsible for repair or replacement of damaged items that are scheduled to remain.
• All items are contractor supplied and installed unless noted otherwise. Owner supplied/contractor installed items may be noted by “OSCI”.
• Return all existing FF & E items to owner or dispose of them per the owner’s direction.
• Existing Life Safety System is to remain. All existing sprinkler heads are to be replaced with concealed heads with covers to match adjacent finishes. Adjust and relocate existing sprinkler heads/alarms as required by new construction. The general contractor is to have the system reviewed by a certified Life Safety System contractor for compliance to current codes. Any changes are to be engineered by the Life Safety contractor.
• Contractor is to provide all FF&E installation services to include tables, chairs, artwork, interior signage, and miscellaneous equipment. Window treatment install is by others.
• Contractor is to provide comprehensive clean-up upon job completion to turn the property over in “move-in” condition.
• Remove all interior signage. Install new owner supplied signage. Exterior signage is by others.
• All existing and new outlets, switch devices & cover plates to be ivory color – UNO.
• The intent of the drawings is that all items are to be installed to meet Texas Accessibility Standards for accessible items and assemblies. Lack of a specific detail or dimension does not relieve the contractor from following these codes. If any noted detail or dimension or existing condition to remain is found to be non-compliant contact the architect immediately for resolution.
• All millwork is to be constructed in accordance with AWI Custom Grade specifications. Provide shop drawings and finish samples to architect for approval.
LOBBY NOTES:
Demolition Notes:
Remove existing finishes: carpet, base, crown, trim, wallcovering, tile and any other finish that is be to replaced. No installation will be allowed over existing finishes.
Remove existing acoustical tile ceiling and gypsum soffits to be replaced with new ceiling.
Remove existing doors, frames, and hardware that are schedule to be replaced.
Remove existing walls as shown (dashed) on plan. Refer to floor plan and enlarged floor plans for locations and extent of walls to be removed. Patch and repair adjacent walls as required.
Remove window wall as shown (dashed) on plan. Refer to floor plan for dimensions of walls to be removed. Patch and repair adjacent wall.
Remove existing millwork front desk and all of front office.
Remove abandoned outlets and switchplates. Patch and repair walls.
Remove all window treatments and hardware.
Remove existing concrete circular stair.
Remove existing signage Remove existing fountain in courtyard.
Remove existing section of planter (shown on plan as dashed). Patch and repair adjacent.
Plan Notes:
1. Install new wall as noted on plan by shaded area. Wall is 3 5/8” steel studs at 16” oc with 5/8” type ‘XP’ gyp board on each side.
2. Install new sound insulating wall as noted on plan by shaded area. Wall is 3 5/8” steel studs at 16” oc. Face of lobby side is a base layer of 5/8” National Gypsum “Soundbreak” gypsum board applied vertically with 1” Type “S” screws at 24” oc. Install face layer of lobby side 5/8” type ‘XP’ gyp board on both sides of wall – install vertically (stagger joints with base layer). Fill wall cavity with unfaced 3” mineral wool insulation. Allow 3/8” space between gypsum board and floor and caulk with sound seal caulking.
3. Supply and install new aluminum and glass window wall system. WINDOW WALL – “Kawneer” TRIFAB VG 451/451T Shear Block System with 1” thick clear tempered glass. Glass color and appearance to match glass in existing 2nd floor window system. Vertical mullions and corner framing to be steel-reinforced. Finish of metal to be anodized dark bronze. Refer to plan and elevation 6/A5.7
4. Remove existing concrete decking for new slab of lobby. Remove existing exposed aggregate concrete paving to structure of garage roof below. Install new waterproof membrane at garage roof – “Carlisle” CCW-500R reinforced hot-applied liquid waterproofing membrane (full system). Depth of concrete removed to be verified with structural engineer. Refer to structural drawings for slab depth and reinforcing.
5. Saw cut border and remove slab to 2” of depth and fill. Supply and install stones (SN-06) flush with adjacent paving. Refer to floor plan for location.
6. Install porcelain floor tile. Prep floor and install “Schluter: Ditra” uncoupling, supporting, and water proof membrane before installing tile (CT-10) and (CT-11). Refer to enlarged tile detail for pattern.
7. Supply and install new hollow metal frame, door, hardware and trim. Refer to door schedule on A4.3.
8. Supply and install new veneer millwork panels (WD-02) with metal joints (MT-05) on existing wall at elevator, focal wall and column covers. Refer to elevations 3, 4, 5 & 6/A5.7.
9. Supply and install inset metal stripe (MT-01) at Elevator wall, column covers and focal wall. Refer to elevations 3, 4, 5 &
6/A5.7.
10. Prep and paint focal walls (PT-36) with special glass bead paint. Refer to plans and elevations 2/A5.7, 5/A5.7 for location.
11. Supply and install stained millwork frame (WD-02) at Lobby focal walls. Refer to elevations 2/A5.7, 5/A5.7.
12. Prep walls and apply Zinsser Shieldz Plus Mildew-Proof Commercial Wallcovering Primer and Sure Grip Plus Mildew-Proof
Commercial Wallcovering Adhesive and install owner-supplied wallcovering (WC-14).
13. Supply and install stained wood base (WD-01). Refer to detail 1/A6.3.
14. Supply and install new full height corner guards on outside corners at walls where noted. “IPC” tape-on cornerguard #3496
(90 degree) in textured finish. Color: #0234 Chamois. Refer to plan for locations.
15. Install owner-supplied inset rug and pad (FC-08) (FC-02). Carpet to be installed with double stick glued method. Install
“Schluter Schiene” metal transition edge strip at tile/carpet transition.
16. Install new stair, railings, stone and millwork trim. Second floor slab to be removed to accommodate new stairs – refer to structural drawings and enlarged details on A/3.10.
17. Patch area in second floor where existing stairs are removed. Refer to structural drawings for new slab and reinforcing.
18. Remove existing concrete benches and replace with new 10’ long cast concrete benches to match (total of 2). Benches to remain in existing position but allow opening for new ramp to driveway.
19. Remove section of planter, landscaping and benches (shown dashed on plan). Existing irrigation system to remain - protect irrigation system during construction. Patch and repair planter, including lower section wall at remaining planter. Construct new planter wall (shown shaded) to match existing. New landscaping is by owner.
20. Remove fountain (shown dashed on plan). Remove existing plumbing and cap below surface.
21. Supply and install new concrete paving as noted on plan. Saw cut at joints in areas to remain. Remove existing exposed aggregate concrete paving to structure of garage roof below. Install new waterproof membrane at garage roof – “Carlisle” CCW-500R reinforced hot-applied liquid waterproofing membrane (full system). Depth of concrete removed to be verified with structural engineer. Supply and install new reinforced concrete pavement (CN-01) and (CN-02) with control joints (noted on plan as “CJ”) and expansion joints (noted on plan as “EJ”). Refer to plan for locations. Control joints are to be saw cut to a depth of one-quarter slab thickness. Expansion joints are to be ½” wide, sealant capped and located at all of the following locations: at new/existing slab joints, at walls, planters and all vertical intersections.
22. New façade on existing wall. Façade is internally lit onyx panels (SN-07) in mirrored stainless frames with anodized aluminum trim. Provide electrical for lighting. Refer to elevation 2/A5.12 and details on sheet A6.4.
23. Existing concrete bench to remain. Clean and seal.
24. New stairs, paving, planters and ramp – refer to enlarged plan 1/A3.11 and coordinate with civil drawings.
25. Remove existing canopy and associated electrical. Patch and repair wall.
26. Prep and paint existing smooth concrete wall and soffit (PT-39). Paint existing doors to remain (PT-12). Refer to plan for location.
27. Rework existing window in metal frame. Install window film to black-out the inside view (install on exterior side of window).
Install ½” cement board on exterior grade plywood to be flush with groove in existing wall. Supply and install glass tile (GL-04) in groove of wall and continue to surface of half circle roof. Refer to elevation 3/A5.12.
28. Supply and install bellman stand. Refer to details 4,5,6,7,8/A5.12.
29. Install new owner supplied bench and secure benches to the slab. Bolt benches to slab using 8mm bolts of appropriate length.
Refer to manuf. installation instructions.
30. Existing columns at porte cochere (2) to be reworked. Supply and install metal cladding (MT-06). Refer to elevation
1/A5.12.
31. ADD ALTERNATE - Paving: Remove existing paving and install new in areas noted only. Refer to note 21.
32. ADD ALTERNATE – Student corridor: Remove section of existing meeting room and add corridor. Rework window wall to allow opening for new corridor. Install new aluminum and glass door with panic hardware. Corridor wall to be sound insulating wall (refer to Note 2). Flooring to be owner supplied carpet (FC-10) on pad (FC-02). Walls to be finished with owner supplied wallcovering (WC-15) with 4” millwork rubber base (VB-02). Ceiling to be acoustical lay-in (AC-01). Allow for four recessed can downlights (type “C”, A2.0), and two additional exit sign lights (type “L”, A2.0). Existing meeting room finishes to be replaced with identical as required for new wall. Install new aluminum and glass door with panic hardware in existing window wall in meeting room.
33. Furr-out existing elevator door alcove to flush with adjacent wall. Supply and Install new elevator call buttons and indicator panels in new locations. Call Button - “Otis” Standard Hall Station Luxury Beveled, Series 23500, Stainless Steel Finish, with red illuminated halo. Mount at 42” AF.F. to center of panel. Indicator Panel - “Otis” Hall Lantern Intermediate Luxury Beveled w/Gong, Series 23550, Stainless Steel Finish. Mount at 72” A.F.F. to center of panel. Supply and install raised and Braille floor designations on both jambs mounted at 60” A.F.F. to center of panel. Verify compatibility with existing elevators. Refer to elevation 5/A5.7 for mounting heights/locations.
34. Supply and install mirror finish stainless steel poles (MT-07) at entry feature wall. Bottom of poles to be concealed in pebble trough. Top of poles to be set in recessed coffer. Refer to elevation 2/A5.12 and details 11/A6.4 and 12/A6.4. Submit shop drawings for approval by architect.
35. Remove plants and clean out existing planter. Install new owner-supplied faux plants.
36. Install owner- supplied signage.
37. Remove existing return air louver between Men’s restroom door and wall of elevator shaft. Install new sound insulating wall aligned flush to existing. Refer to keyed note 2/A1.0. Refer to Mechanical Plans for rerouting of return air.
38. Remove existing projection room furniture and equipment. Remove existing steps and platform. Remove existing projection room window. Install soundproof wall between projection room and Los Angeles lecture hall. Refer to note 2. Match adjacent finishes on lecture room side. Finish out new Luggage Closet to back of house building standard floor, walls, and ceiling.
Existing lighting to remain. Supply and install luggage shelves.
39.-40. Not used.
Electrical Notes:
41. Provide new floor outlet locations from existing power in Lobby for seating areas. Refer to Floor Plan for locations.
42. Install new duplex outlet at 18” AFF.
43. Install owner- supplied accent lights on focal wall. Provide access panel in wood paneling for access to lights. Refer to FF&E spec book for electrical requirements. Refer to 5/A5.7 for locations.
44. Provide power for owner-supplied signage at porte cochere. Signage to be channel letters at front face and surface mounted backlit letters. Signage to be mounted by others. Refer to elevation 1/A5.12.
45. Install owner supplied freestanding LCD display panel at lobby. Supply and install floor mounted power and data wiring per manufacturer’s installation instructions. FREESTANDING PANEL- “ASI Modulex ”Ariadne 40” Flat Front Monolith.
46. Supply and install in-ground well light. Refer to fixture legend on A2.0 and plan for locations.
47. Supply and install lighting as shown. Refer to Fixture Legend for types and Floor Plan and Reflected Ceiling Plan for locations.
48. ADD ALTERNATE – Supply and install two additional recessed can lights between each column bay (match existing).
Relamp all existing recessed can lights.
49. Provide power and data outlets for owner supplied and installed registration kiosk. Verify requirements with owner.
50. Provide power and data/TV outlet for owner supplied wall mounted TV. Supply and install millwork (WD-02) frame.
Refer to elevation 3/A5.7.
51-55. Not Used.
SCALE: 1/2" = 1'-0"
Enlarged Tile Detail
E Q
E
Q
EQ. EQ.
E Q
E
Q
EQ. EQ.
E Q
E
Q
1'-4"
EQ. EQ.
1'-4"
5'-0"
2'-6"
2'-4"
4'-4" 4'-4"
8"
FRONT DESK
SUNDRIES
VESTIBULE
FRONT DESK
5/A5.7
5/A5.7
6/A5.7
A
.74
A
.7
WD
MT
CT
CT
WC
SN
SN
WC
WC
MT
MT
CT
CT
CT
CT
FC
FC
WC
WD
WD
WD
WC
WD
WD
PAD
INSET RUG
FLOOR
FLOOR
WALLCOVERING
BASE
FLOOR
FLOOR
FLOOR
FLOOR
WD
MT
PT
WD 01
WD 01
WD
PT
PT
2/A5.701
CN
CN
CN
CN
SN
CN
CN
CN
MT
MT
SN
05 05
A
.1
SN
GL
GL
A
.1
MT
D107
D106
D108
D105
D104
D
D102
D
D100
A
.1
D109
03 Q
Q
(UNDER STAIR)
CN
ADD ALT
MT
29292929
PT
GRILLES
PT
GRILLES
PT
GRILLES
N.I.C
A L
IG
N
WD
L C
WDWD
LOBBY
N.I.C
HALL OF HONOR
SAN FRANCISCO
N.I.C. LOS ANGELES
N.I.C.
MEN'S
RR
WOMEN'S
RR
N.I.C.
ERIC'S
N.I.C.
REFER TO
1/A3.11
REFER TO
1,2,3/A3.5
REFER TO
A3.0
REFER TO
1,2,3/A3.9
1/A3.10
PT
CJ CJ CJEJ
EJ
CJ
CJ CJ CJ
CJ
CJCJ
CJ
EJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ CJ CJ
CJCJ CJ
EJ
CJ CJ
CJ
CJ
EJ EJ
CJ
CJ
EJ EJ
EJ EJ
CJ
CJ
EJ
EJ EJ EJ EJ
ALIGN
ADD ALT
ADD ALT
ADD ALT: STUDENT CORRIDOR
ADD ALT
PT
PT
PT
PT
23 23
WC
WD01
MT
WD08
07 14 14
CL
RUG
REFER TO ENTRYWAY DRAWINGS
(CIVIL/LANDSCAPE)
LC
DOOR/
FOCAL WALL
ADD ALT
ADD ALT
ADD ALT
CN
33 3333
MT
MT
FC
FC
PAD
CARPET
WC WALLCOVERING
VB BASE
D
D
D
WD 02
WD
WD
WD
WD
5/A5.8
UP
UP
UP
DNUP
UP
DN
CN
ADD ALT
ADD ALT
ADD ALT
CN
ADD ALT
ADD ALT
ADD ALT
CN
ADD ALT
ADD ALT
CN
ADD ALT
ADD ALT
CN
ADD ALT
ADD ALT
ADD ALT
CN
ADD ALT
ADD ALT
MECH
LUGGAGE
CLOSET
MT
WD
WD
Q
Q
Q
Q
Q
Q
Q
Q
Q
SCALE: 1/8" = 1'-0" 11st Floor Plan
S121 1,048.19 sf
S123
383.19 sf
S121A
17.50 sf
S129B
182.38 sf
S129A
103.44 sf
S129
431.97 sf
S129C
140.52 sf
S129D
228.75 sf
S129E
131.29 sf
S133A
372.13 sf
S137
414.97 sf
S137A
271.80 sf
S137B
129.98 sf
S139
468.12 sf
S143
192.80 sf
S147
198.06 sf
S128E
79.39 sf
S182
108.77 sf
S128C
84.84 sf
885.00 sf
199L 1,270.33 sf
1,208.29 sf
199G
596.38 sf
S131A
201.63 sf
S131B
53.56 sf S135
45.31 sf
S131 1,425.98 sf
S110
248.19 sf
S115D
255.44 sf
S115C
103.15 sf
S125 1,425.98 sf
S125A
201.63 sf
S125B
53.56 sf
S127
45.31 sf
S119
52.71 sf
S149 1,910.00 sf
S130
745.20 sf
S126N
311.00 sf
S126M
343.02 sf
S126L
154.81 sf
S126K
92.67 sf
S126J
112.13 sf
S126H
106.88 sf
S126G
108.75 sf
S126F
213.75 sf
S126E
129.25 sf
S126D
322.75 sf
S126B
20.45 sf
S126
598.00 sf
S126P
12.60 sf
S126A
22.88 sf
S126C
551.69 sf
S120
247.13 sf
S124
21.00 sf
S118
340.88 sf
S122
551.94 sf
S112
536.50 sf
S112D
107.64 sf
S112C
95.76 sf
S116 2,110.08 sf
S132A
70.40 sf
S116A
72.16 sf
S132B
128.68 sf
S132
649.87 sf
S134
787.75 sf
S171 1,166.77 sf
S106A
411.77 sf
S106C
133.72 sf
S106B
109.64 sf
S108
231.15 sf
S115 1,025.81 sf
S115B
358.59 sf
S115A
387.62 sf
S104 2,340.19 sf
S113
194.69 sf
S151
815.26 sf
S105
380.00 sf
S105B
282.26 sf
S102
222.36 sf
S103
222.36 sf
S111A
150.00 sf
S111
798.62 sf
S109C
370.50 sf
S109
194.25 sf
S109E
13.12 sf
S109F
13.13 sf
S109D
31.13 sf
S109B
507.12 sf
S109A
114.75 sf
S107
632.50 sf
S170 1,159.08 sf
S101
930.65 sf
S101B
87.71 sf
S101A
87.71 sf
S100 2,231.12 sf
S190
356.54 sf
S128D
105.00 sf
S128A
93.48 sf
S128B
45.23 sf
S128
322.62 sf
S191 1,017.38 sf
S100A
243.00 sf
S100B
243.00 sf
167A
363.82 sf
167B
295.15 sf
795.72 sf
167C
207.56 sf
400.44 sf
199F
682.72 sf
47.74 sf
188.39 sf
251.14 sf
299.20 sf
87.40 sf 195
70.00 sf
199J
881.78 sf
111.58 sf
289.75 sf
171A
80.00 sf
171Z
55.12 sf
289.23 sf
171B
41.59 sf
174A
400.44 sf
658.17 sf
194.19 sf
143A
288.64 sf
157.94 sf
199H
288.20 sf
771.97 sf
156.54 sf
172A
38.02 sf
164A
52.07 sf
137.32 sf
1,708.03 sf182
62.03 sf
30.00 sf
30.00 sf
30.00 sf 157
238.90 sf
199A
756.73 sf
282.37 sf
S192 1,017.38 sf
199E
182.66 sf
S181
53.62 sf
S180
53.62 sf
199S 4,021.48 sf
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
XXX
XXX
X X
X
X
X X
X X
X
X
X X
X X
X X
X X
X X
X
X X
X X
X
X
X X
X X
X X
X X
X X
X
X X
X X
X X
X
X
X X
X X
X
X
X X
X X
X X
X X
X X
X
X X
X X
X
X
X X
X X
X X
X X
X X
X
X X
X X
199EA
32.78 sf
D1
137.34 sf
E1
115.44 sf
F1
221.27 sf
G1
227.09 sf
A1
131.29 sf
B1
113.44 sf
S101C
195.00 sf
S145
373.77 sf
S141
100.54 sf
S114A
67.38 sf
S114 1,695.81 sf
S112A
10.00 sf
S133B
636.51 sf
PORTE
COCHERE
RAMP RAMP
COURTYARD
L101
162.78 sf
102B
58.83 sf
102A
147.03 sf
3,940.25 sf
689.79 sf
104A
475.46 sf
104B
130.30 sf
104C
130.00 sf
104D
130.45 sf
C104
633.61 sf
L102
184.58 sf
223.20 sf
220.91 sf
104E
127.38 sf
104G
137.70 sf
104H
170.51 sf
104J
233.24 sf
104L
122.90 sf
104M
124.92 sf
104N
159.40 sf
104P
98.72 sf
104Q
10.08 sf
104R
17.35 sf
104T
13.08 sf
646.13 sf
140A
846.60 sf
L152
643.93 sf
L150
358.41 sf
L151 1,336.65 sf
137.04 sf
84.01 sf
154A
42.67 sf
182.66 sf
61.09 sf
H1
217.99 sf
L100
437.22 sf
199K
350.39 sf
199N 2,413.45 sf
2,618.96 sf
199D 1,236.04 sf
199B 1,249.06 sf
182.78 sf
233.61 sf
J1
212.30 sf
E11
50.00 sf
E12
43.75 sf
S116
S104
S131
S125
C1
63.77 sf
61.89 sf
104K
117.25 sf
104F
128.54 sf
102C
122.97 sf
971.92 sf
1,189.76 sf
S117
S117
157.53 sf
104S
104S
104.37 sf
155C
155C
455.30 sf
155A 155A53.36 sf
155155
2,035.80 sf
230.70 sf
AutoCAD SHX Text
AutoCAD SHX Text 20'
AutoCAD SHX Text 40'
AutoCAD SHX Text 60'
AutoCAD SHX Text N
AutoCAD SHX Text
FACILITIES PLANNING AND CONSTRUCTION
AutoCAD SHX Text
UNIVERSITY OF HOUSTON SYSTEM
AutoCAD SHX Text
CAMPUS:
AutoCAD SHX Text
DATE ISSUED:
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text
LEVEL:
AutoCAD SHX Text Conrad N. Hilton, College of Hotel and Restaurant Management
AutoCAD SHX Text
AutoCAD SHX Text
CHC
AutoCAD SHX Text
AutoCAD SHX Text
UH
AutoCAD SHX Text 01/10/2023
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
ABBREVIATION:
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
SHEET:
S003
1,381.41 sf
S000
90.08 sf
S006
141.21 sf
S002
98.00 sf
S001
67.67 sf
S005
70.42 sf
S004
285.24 sf
AutoCAD SHX Text
AutoCAD SHX Text 20'
AutoCAD SHX Text 40'
AutoCAD SHX Text 60'
AutoCAD SHX Text N
AutoCAD SHX Text
FACILITIES PLANNING AND CONSTRUCTION
AutoCAD SHX Text
UNIVERSITY OF HOUSTON SYSTEM
AutoCAD SHX Text
CAMPUS:
AutoCAD SHX Text
DATE ISSUED:
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text
LEVEL:
AutoCAD SHX Text Conrad N. Hilton, College of Hotel and Restaurant Management
AutoCAD SHX Text
AutoCAD SHX Text
CHC
AutoCAD SHX Text G
AutoCAD SHX Text
UH
AutoCAD SHX Text 09/02/2021
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
ABBREVIATION:
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
SHEET:
| 590_A2.1_1986 |
| 590_A2.1_1989 |
| 590_A-6_1971 |
| 590_A-7_1971 |
| 590_AS1.03_2012 |
| 590_PublicArea_A1.0_2009 |
| 590-CHC-01 |
| Sheets and Views |
| RedBook |
| 590-CHC-G |
| Sheets and Views |
| RedBook |
File details come from the government source that posted it. Updated .