About this file

This document is an addendum to RFP730-24030, a request for proposals from the University of Houston's Conrad N. Hilton College of Global Hospitality Leadership to create an interactive exhibit on the hospitality industry. The exhibit space is 42 by 29 feet and located in the Hilton College building. The addendum provides a question and answer session, branding information, and building blueprints. Key details include a lack of a definitive launch date, references to the branding standards available online, and details on the lobby renovation scope of work, including demolition, new finishes, furnishings, signage, and electrical work.

The contract opportunity does not provide specific pricing terms, set-asides, or funding details. However, it indicates the University of Houston is seeking proposals from vendors to design and install the interactive exhibit space as part of the broader lobby renovation project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDEMDUM 3

RFP730-24030 Hilton Hall of Honor

Q&A Addendum, branding information and Building Blueprints

1. Is there a target date for the launch of the updated Hall of Honor?

Answer: We have not set a definitive launch date for the updated Hall of Honor. The timeline will depend on the proposals received and the final contract negotiated with the selected vendor.

The branding standards are online! You can find them at https://www.uh.edu/brand/brand-identity/style-guide/

1/30/09 9:39 AMPeter M. Muller, Inc.: Contact Information

Page 1 of 1http://www.petermmullerinc.com/home.html

PETER M.

CURTAIN

MULLER, INC.

WALL CONSULTANT

Home Contact Portfolio

Project List Press

COMBINED DOMESTIC AND INTERNATIONAL EXPERIENCE IN

THE CONSTRUCTION INDUSTRY FOR OVER 50 YEARS

OWNER SERVICES

Due Dilligence Peer Reviews Facade Rehabilitation

COMPLETE SYSTEMS DESIGN

Glass & Metal Curtain Walls Specialty Facades Metal Cladding

Fixed & Operable Window Wall Combinations Storefronts Skylights

Masonry Stone on Truss Plaster Precast Concrete Panels

PROJECT SERVICES

Field Testing Proposal Review Comprehensive Specifications

Coordinated Architectural Details Subcontractor Bid Review Estimates

Mock-up Installation and Testing Shop Drawing Review Budgets

Fabrication and Field Quality Control Die and Material Sample Review

INVESTIGATIONS ON EXISTING PROBLEM WALLS

Troubleshooting

Remedial Process Development for Repairs

Expert Testimony

SHEET NUMBER

SHEET TITLE

PROJECT NUMBER

DATE

SEAL

PROJECT NAME

A1.0

1st Floor Plan and Notes

UNIVERSITY OF HOUSTON

Houston, TX

Portfolio Associates retains all copyrights as authors and owners of the design and documentation. This drawing and all related information is intended for use on the stated project and is not to be reproduced or duplicated in whole or in part.

March 4, 2009 - Issued for Bid

PUBLIC AREA RENOVATION 2009

Sept 29, 2009 - Issued for Construction

CT

CT

GENERAL NOTES

• Protect all existing work, furniture and equipment from construction operations.

• Not all miscellaneous items of cutting, patching or fitting are individually described herein. Lack of specific description of cutting, patching or fitting required to properly accommodate the scope of work shall not relieve the Contractor from responsibility to perform such work as required.

• All existing fire-rated partitions and fire blocking are to remain intact. Any fire partition that is damaged is to be replaced with like construction. Field verify.

• Protect all surfaces and finishes that are to remain adjacent to new work. Contractor is responsible for repair or replacement of damaged items that are scheduled to remain.

• All items are contractor supplied and installed unless noted otherwise. Owner supplied/contractor installed items may be noted by “OSCI”.

• Return all existing FF & E items to owner or dispose of them per the owner’s direction.

• Existing Life Safety System is to remain. All existing sprinkler heads are to be replaced with concealed heads with covers to match adjacent finishes. Adjust and relocate existing sprinkler heads/alarms as required by new construction. The general contractor is to have the system reviewed by a certified Life Safety System contractor for compliance to current codes. Any changes are to be engineered by the Life Safety contractor.

• Contractor is to provide all FF&E installation services to include tables, chairs, artwork, interior signage, and miscellaneous equipment. Window treatment install is by others.

• Contractor is to provide comprehensive clean-up upon job completion to turn the property over in “move-in” condition.

• Remove all interior signage. Install new owner supplied signage. Exterior signage is by others.

• All existing and new outlets, switch devices & cover plates to be ivory color – UNO.

• The intent of the drawings is that all items are to be installed to meet Texas Accessibility Standards for accessible items and assemblies. Lack of a specific detail or dimension does not relieve the contractor from following these codes. If any noted detail or dimension or existing condition to remain is found to be non-compliant contact the architect immediately for resolution.

• All millwork is to be constructed in accordance with AWI Custom Grade specifications. Provide shop drawings and finish samples to architect for approval.

LOBBY NOTES:

Demolition Notes:

Remove existing finishes: carpet, base, crown, trim, wallcovering, tile and any other finish that is be to replaced. No installation will be allowed over existing finishes.

Remove existing acoustical tile ceiling and gypsum soffits to be replaced with new ceiling.

Remove existing doors, frames, and hardware that are schedule to be replaced.

Remove existing walls as shown (dashed) on plan. Refer to floor plan and enlarged floor plans for locations and extent of walls to be removed. Patch and repair adjacent walls as required.

Remove window wall as shown (dashed) on plan. Refer to floor plan for dimensions of walls to be removed. Patch and repair adjacent wall.

Remove existing millwork front desk and all of front office.

Remove abandoned outlets and switchplates. Patch and repair walls.

Remove all window treatments and hardware.

Remove existing concrete circular stair.

Remove existing signage Remove existing fountain in courtyard.

Remove existing section of planter (shown on plan as dashed). Patch and repair adjacent.

Plan Notes:

1. Install new wall as noted on plan by shaded area. Wall is 3 5/8” steel studs at 16” oc with 5/8” type ‘XP’ gyp board on each side.

2. Install new sound insulating wall as noted on plan by shaded area. Wall is 3 5/8” steel studs at 16” oc. Face of lobby side is a base layer of 5/8” National Gypsum “Soundbreak” gypsum board applied vertically with 1” Type “S” screws at 24” oc. Install face layer of lobby side 5/8” type ‘XP’ gyp board on both sides of wall – install vertically (stagger joints with base layer). Fill wall cavity with unfaced 3” mineral wool insulation. Allow 3/8” space between gypsum board and floor and caulk with sound seal caulking.

3. Supply and install new aluminum and glass window wall system. WINDOW WALL – “Kawneer” TRIFAB VG 451/451T Shear Block System with 1” thick clear tempered glass. Glass color and appearance to match glass in existing 2nd floor window system. Vertical mullions and corner framing to be steel-reinforced. Finish of metal to be anodized dark bronze. Refer to plan and elevation 6/A5.7

4. Remove existing concrete decking for new slab of lobby. Remove existing exposed aggregate concrete paving to structure of garage roof below. Install new waterproof membrane at garage roof – “Carlisle” CCW-500R reinforced hot-applied liquid waterproofing membrane (full system). Depth of concrete removed to be verified with structural engineer. Refer to structural drawings for slab depth and reinforcing.

5. Saw cut border and remove slab to 2” of depth and fill. Supply and install stones (SN-06) flush with adjacent paving. Refer to floor plan for location.

6. Install porcelain floor tile. Prep floor and install “Schluter: Ditra” uncoupling, supporting, and water proof membrane before installing tile (CT-10) and (CT-11). Refer to enlarged tile detail for pattern.

7. Supply and install new hollow metal frame, door, hardware and trim. Refer to door schedule on A4.3.

8. Supply and install new veneer millwork panels (WD-02) with metal joints (MT-05) on existing wall at elevator, focal wall and column covers. Refer to elevations 3, 4, 5 & 6/A5.7.

9. Supply and install inset metal stripe (MT-01) at Elevator wall, column covers and focal wall. Refer to elevations 3, 4, 5 &

6/A5.7.

10. Prep and paint focal walls (PT-36) with special glass bead paint. Refer to plans and elevations 2/A5.7, 5/A5.7 for location.

11. Supply and install stained millwork frame (WD-02) at Lobby focal walls. Refer to elevations 2/A5.7, 5/A5.7.

12. Prep walls and apply Zinsser Shieldz Plus Mildew-Proof Commercial Wallcovering Primer and Sure Grip Plus Mildew-Proof

Commercial Wallcovering Adhesive and install owner-supplied wallcovering (WC-14).

13. Supply and install stained wood base (WD-01). Refer to detail 1/A6.3.

14. Supply and install new full height corner guards on outside corners at walls where noted. “IPC” tape-on cornerguard #3496

(90 degree) in textured finish. Color: #0234 Chamois. Refer to plan for locations.

15. Install owner-supplied inset rug and pad (FC-08) (FC-02). Carpet to be installed with double stick glued method. Install

“Schluter Schiene” metal transition edge strip at tile/carpet transition.

16. Install new stair, railings, stone and millwork trim. Second floor slab to be removed to accommodate new stairs – refer to structural drawings and enlarged details on A/3.10.

17. Patch area in second floor where existing stairs are removed. Refer to structural drawings for new slab and reinforcing.

18. Remove existing concrete benches and replace with new 10’ long cast concrete benches to match (total of 2). Benches to remain in existing position but allow opening for new ramp to driveway.

19. Remove section of planter, landscaping and benches (shown dashed on plan). Existing irrigation system to remain - protect irrigation system during construction. Patch and repair planter, including lower section wall at remaining planter. Construct new planter wall (shown shaded) to match existing. New landscaping is by owner.

20. Remove fountain (shown dashed on plan). Remove existing plumbing and cap below surface.

21. Supply and install new concrete paving as noted on plan. Saw cut at joints in areas to remain. Remove existing exposed aggregate concrete paving to structure of garage roof below. Install new waterproof membrane at garage roof – “Carlisle” CCW-500R reinforced hot-applied liquid waterproofing membrane (full system). Depth of concrete removed to be verified with structural engineer. Supply and install new reinforced concrete pavement (CN-01) and (CN-02) with control joints (noted on plan as “CJ”) and expansion joints (noted on plan as “EJ”). Refer to plan for locations. Control joints are to be saw cut to a depth of one-quarter slab thickness. Expansion joints are to be ½” wide, sealant capped and located at all of the following locations: at new/existing slab joints, at walls, planters and all vertical intersections.

22. New façade on existing wall. Façade is internally lit onyx panels (SN-07) in mirrored stainless frames with anodized aluminum trim. Provide electrical for lighting. Refer to elevation 2/A5.12 and details on sheet A6.4.

23. Existing concrete bench to remain. Clean and seal.

24. New stairs, paving, planters and ramp – refer to enlarged plan 1/A3.11 and coordinate with civil drawings.

25. Remove existing canopy and associated electrical. Patch and repair wall.

26. Prep and paint existing smooth concrete wall and soffit (PT-39). Paint existing doors to remain (PT-12). Refer to plan for location.

27. Rework existing window in metal frame. Install window film to black-out the inside view (install on exterior side of window).

Install ½” cement board on exterior grade plywood to be flush with groove in existing wall. Supply and install glass tile (GL-04) in groove of wall and continue to surface of half circle roof. Refer to elevation 3/A5.12.

28. Supply and install bellman stand. Refer to details 4,5,6,7,8/A5.12.

29. Install new owner supplied bench and secure benches to the slab. Bolt benches to slab using 8mm bolts of appropriate length.

Refer to manuf. installation instructions.

30. Existing columns at porte cochere (2) to be reworked. Supply and install metal cladding (MT-06). Refer to elevation

1/A5.12.

31. ADD ALTERNATE - Paving: Remove existing paving and install new in areas noted only. Refer to note 21.

32. ADD ALTERNATE – Student corridor: Remove section of existing meeting room and add corridor. Rework window wall to allow opening for new corridor. Install new aluminum and glass door with panic hardware. Corridor wall to be sound insulating wall (refer to Note 2). Flooring to be owner supplied carpet (FC-10) on pad (FC-02). Walls to be finished with owner supplied wallcovering (WC-15) with 4” millwork rubber base (VB-02). Ceiling to be acoustical lay-in (AC-01). Allow for four recessed can downlights (type “C”, A2.0), and two additional exit sign lights (type “L”, A2.0). Existing meeting room finishes to be replaced with identical as required for new wall. Install new aluminum and glass door with panic hardware in existing window wall in meeting room.

33. Furr-out existing elevator door alcove to flush with adjacent wall. Supply and Install new elevator call buttons and indicator panels in new locations. Call Button - “Otis” Standard Hall Station Luxury Beveled, Series 23500, Stainless Steel Finish, with red illuminated halo. Mount at 42” AF.F. to center of panel. Indicator Panel - “Otis” Hall Lantern Intermediate Luxury Beveled w/Gong, Series 23550, Stainless Steel Finish. Mount at 72” A.F.F. to center of panel. Supply and install raised and Braille floor designations on both jambs mounted at 60” A.F.F. to center of panel. Verify compatibility with existing elevators. Refer to elevation 5/A5.7 for mounting heights/locations.

34. Supply and install mirror finish stainless steel poles (MT-07) at entry feature wall. Bottom of poles to be concealed in pebble trough. Top of poles to be set in recessed coffer. Refer to elevation 2/A5.12 and details 11/A6.4 and 12/A6.4. Submit shop drawings for approval by architect.

35. Remove plants and clean out existing planter. Install new owner-supplied faux plants.

36. Install owner- supplied signage.

37. Remove existing return air louver between Men’s restroom door and wall of elevator shaft. Install new sound insulating wall aligned flush to existing. Refer to keyed note 2/A1.0. Refer to Mechanical Plans for rerouting of return air.

38. Remove existing projection room furniture and equipment. Remove existing steps and platform. Remove existing projection room window. Install soundproof wall between projection room and Los Angeles lecture hall. Refer to note 2. Match adjacent finishes on lecture room side. Finish out new Luggage Closet to back of house building standard floor, walls, and ceiling.

Existing lighting to remain. Supply and install luggage shelves.

39.-40. Not used.

Electrical Notes:

41. Provide new floor outlet locations from existing power in Lobby for seating areas. Refer to Floor Plan for locations.

42. Install new duplex outlet at 18” AFF.

43. Install owner- supplied accent lights on focal wall. Provide access panel in wood paneling for access to lights. Refer to FF&E spec book for electrical requirements. Refer to 5/A5.7 for locations.

44. Provide power for owner-supplied signage at porte cochere. Signage to be channel letters at front face and surface mounted backlit letters. Signage to be mounted by others. Refer to elevation 1/A5.12.

45. Install owner supplied freestanding LCD display panel at lobby. Supply and install floor mounted power and data wiring per manufacturer’s installation instructions. FREESTANDING PANEL- “ASI Modulex ”Ariadne 40” Flat Front Monolith.

46. Supply and install in-ground well light. Refer to fixture legend on A2.0 and plan for locations.

47. Supply and install lighting as shown. Refer to Fixture Legend for types and Floor Plan and Reflected Ceiling Plan for locations.

48. ADD ALTERNATE – Supply and install two additional recessed can lights between each column bay (match existing).

Relamp all existing recessed can lights.

49. Provide power and data outlets for owner supplied and installed registration kiosk. Verify requirements with owner.

50. Provide power and data/TV outlet for owner supplied wall mounted TV. Supply and install millwork (WD-02) frame.

Refer to elevation 3/A5.7.

51-55. Not Used.

SCALE: 1/2" = 1'-0"

Enlarged Tile Detail

E Q

E

Q

EQ. EQ.

E Q

E

Q

EQ. EQ.

E Q

E

Q

1'-4"

EQ. EQ.

1'-4"

5'-0"

2'-6"

2'-4"

4'-4" 4'-4"

8"

FRONT DESK

SUNDRIES

VESTIBULE

FRONT DESK

5/A5.7

5/A5.7

6/A5.7

A

.74

A

.7

WD

MT

CT

CT

WC

SN

SN

WC

WC

MT

MT

CT

CT

CT

CT

FC

FC

WC

WD

WD

WD

WC

WD

WD

PAD

INSET RUG

FLOOR

FLOOR

WALLCOVERING

BASE

FLOOR

FLOOR

FLOOR

FLOOR

WD

MT

PT

WD 01

WD 01

WD

PT

PT

2/A5.701

CN

CN

CN

CN

SN

CN

CN

CN

MT

MT

SN

05 05

A

.1

SN

GL

GL

A

.1

MT

D107

D106

D108

D105

D104

D

D102

D

D100

A

.1

D109

03 Q

Q

(UNDER STAIR)

CN

ADD ALT

MT

29292929

PT

GRILLES

PT

GRILLES

PT

GRILLES

N.I.C

A L

IG

N

WD

L C

WDWD

LOBBY

N.I.C

HALL OF HONOR

SAN FRANCISCO

N.I.C. LOS ANGELES

N.I.C.

MEN'S

RR

WOMEN'S

RR

N.I.C.

ERIC'S

N.I.C.

REFER TO

1/A3.11

REFER TO

1,2,3/A3.5

REFER TO

A3.0

REFER TO

1,2,3/A3.9

1/A3.10

PT

CJ CJ CJEJ

EJ

CJ

CJ CJ CJ

CJ

CJCJ

CJ

EJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ

CJ CJ CJ

CJCJ CJ

EJ

CJ CJ

CJ

CJ

EJ EJ

CJ

CJ

EJ EJ

EJ EJ

CJ

CJ

EJ

EJ EJ EJ EJ

ALIGN

ADD ALT

ADD ALT

ADD ALT: STUDENT CORRIDOR

ADD ALT

PT

PT

PT

PT

23 23

WC

WD01

MT

WD08

07 14 14

CL

RUG

REFER TO ENTRYWAY DRAWINGS

(CIVIL/LANDSCAPE)

LC

DOOR/

FOCAL WALL

ADD ALT

ADD ALT

ADD ALT

CN

33 3333

MT

MT

FC

FC

PAD

CARPET

WC WALLCOVERING

VB BASE

D

D

D

WD 02

WD

WD

WD

WD

5/A5.8

UP

UP

UP

DNUP

UP

DN

CN

ADD ALT

ADD ALT

ADD ALT

CN

ADD ALT

ADD ALT

ADD ALT

CN

ADD ALT

ADD ALT

CN

ADD ALT

ADD ALT

CN

ADD ALT

ADD ALT

ADD ALT

CN

ADD ALT

ADD ALT

MECH

LUGGAGE

CLOSET

MT

WD

WD

Q

Q

Q

Q

Q

Q

Q

Q

Q

SCALE: 1/8" = 1'-0" 11st Floor Plan

S121 1,048.19 sf

S123

383.19 sf

S121A

17.50 sf

S129B

182.38 sf

S129A

103.44 sf

S129

431.97 sf

S129C

140.52 sf

S129D

228.75 sf

S129E

131.29 sf

S133A

372.13 sf

S137

414.97 sf

S137A

271.80 sf

S137B

129.98 sf

S139

468.12 sf

S143

192.80 sf

S147

198.06 sf

S128E

79.39 sf

S182

108.77 sf

S128C

84.84 sf

885.00 sf

199L 1,270.33 sf

1,208.29 sf

199G

596.38 sf

S131A

201.63 sf

S131B

53.56 sf S135

45.31 sf

S131 1,425.98 sf

S110

248.19 sf

S115D

255.44 sf

S115C

103.15 sf

S125 1,425.98 sf

S125A

201.63 sf

S125B

53.56 sf

S127

45.31 sf

S119

52.71 sf

S149 1,910.00 sf

S130

745.20 sf

S126N

311.00 sf

S126M

343.02 sf

S126L

154.81 sf

S126K

92.67 sf

S126J

112.13 sf

S126H

106.88 sf

S126G

108.75 sf

S126F

213.75 sf

S126E

129.25 sf

S126D

322.75 sf

S126B

20.45 sf

S126

598.00 sf

S126P

12.60 sf

S126A

22.88 sf

S126C

551.69 sf

S120

247.13 sf

S124

21.00 sf

S118

340.88 sf

S122

551.94 sf

S112

536.50 sf

S112D

107.64 sf

S112C

95.76 sf

S116 2,110.08 sf

S132A

70.40 sf

S116A

72.16 sf

S132B

128.68 sf

S132

649.87 sf

S134

787.75 sf

S171 1,166.77 sf

S106A

411.77 sf

S106C

133.72 sf

S106B

109.64 sf

S108

231.15 sf

S115 1,025.81 sf

S115B

358.59 sf

S115A

387.62 sf

S104 2,340.19 sf

S113

194.69 sf

S151

815.26 sf

S105

380.00 sf

S105B

282.26 sf

S102

222.36 sf

S103

222.36 sf

S111A

150.00 sf

S111

798.62 sf

S109C

370.50 sf

S109

194.25 sf

S109E

13.12 sf

S109F

13.13 sf

S109D

31.13 sf

S109B

507.12 sf

S109A

114.75 sf

S107

632.50 sf

S170 1,159.08 sf

S101

930.65 sf

S101B

87.71 sf

S101A

87.71 sf

S100 2,231.12 sf

S190

356.54 sf

S128D

105.00 sf

S128A

93.48 sf

S128B

45.23 sf

S128

322.62 sf

S191 1,017.38 sf

S100A

243.00 sf

S100B

243.00 sf

167A

363.82 sf

167B

295.15 sf

795.72 sf

167C

207.56 sf

400.44 sf

199F

682.72 sf

47.74 sf

188.39 sf

251.14 sf

299.20 sf

87.40 sf 195

70.00 sf

199J

881.78 sf

111.58 sf

289.75 sf

171A

80.00 sf

171Z

55.12 sf

289.23 sf

171B

41.59 sf

174A

400.44 sf

658.17 sf

194.19 sf

143A

288.64 sf

157.94 sf

199H

288.20 sf

771.97 sf

156.54 sf

172A

38.02 sf

164A

52.07 sf

137.32 sf

1,708.03 sf182

62.03 sf

30.00 sf

30.00 sf

30.00 sf 157

238.90 sf

199A

756.73 sf

282.37 sf

S192 1,017.38 sf

199E

182.66 sf

S181

53.62 sf

S180

53.62 sf

199S 4,021.48 sf

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X

X

XXX

XXX

X X

X

X

X X

X X

X

X

X X

X X

X X

X X

X X

X

X X

X X

X

X

X X

X X

X X

X X

X X

X

X X

X X

X X

X

X

X X

X X

X

X

X X

X X

X X

X X

X X

X

X X

X X

X

X

X X

X X

X X

X X

X X

X

X X

X X

199EA

32.78 sf

D1

137.34 sf

E1

115.44 sf

F1

221.27 sf

G1

227.09 sf

A1

131.29 sf

B1

113.44 sf

S101C

195.00 sf

S145

373.77 sf

S141

100.54 sf

S114A

67.38 sf

S114 1,695.81 sf

S112A

10.00 sf

S133B

636.51 sf

PORTE

COCHERE

RAMP RAMP

COURTYARD

L101

162.78 sf

102B

58.83 sf

102A

147.03 sf

3,940.25 sf

689.79 sf

104A

475.46 sf

104B

130.30 sf

104C

130.00 sf

104D

130.45 sf

C104

633.61 sf

L102

184.58 sf

223.20 sf

220.91 sf

104E

127.38 sf

104G

137.70 sf

104H

170.51 sf

104J

233.24 sf

104L

122.90 sf

104M

124.92 sf

104N

159.40 sf

104P

98.72 sf

104Q

10.08 sf

104R

17.35 sf

104T

13.08 sf

646.13 sf

140A

846.60 sf

L152

643.93 sf

L150

358.41 sf

L151 1,336.65 sf

137.04 sf

84.01 sf

154A

42.67 sf

182.66 sf

61.09 sf

H1

217.99 sf

L100

437.22 sf

199K

350.39 sf

199N 2,413.45 sf

2,618.96 sf

199D 1,236.04 sf

199B 1,249.06 sf

182.78 sf

233.61 sf

J1

212.30 sf

E11

50.00 sf

E12

43.75 sf

S116

S104

S131

S125

C1

63.77 sf

61.89 sf

104K

117.25 sf

104F

128.54 sf

102C

122.97 sf

971.92 sf

1,189.76 sf

S117

S117

157.53 sf

104S

104S

104.37 sf

155C

155C

455.30 sf

155A 155A53.36 sf

155155

2,035.80 sf

230.70 sf

AutoCAD SHX Text

AutoCAD SHX Text 20'

AutoCAD SHX Text 40'

AutoCAD SHX Text 60'

AutoCAD SHX Text N

AutoCAD SHX Text

FACILITIES PLANNING AND CONSTRUCTION

AutoCAD SHX Text

UNIVERSITY OF HOUSTON SYSTEM

AutoCAD SHX Text

CAMPUS:

AutoCAD SHX Text

DATE ISSUED:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

LEVEL:

AutoCAD SHX Text Conrad N. Hilton, College of Hotel and Restaurant Management

AutoCAD SHX Text

AutoCAD SHX Text

CHC

AutoCAD SHX Text

AutoCAD SHX Text

UH

AutoCAD SHX Text 01/10/2023

AutoCAD SHX Text

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

ABBREVIATION:

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

SHEET:

S003

1,381.41 sf

S000

90.08 sf

S006

141.21 sf

S002

98.00 sf

S001

67.67 sf

S005

70.42 sf

S004

285.24 sf

AutoCAD SHX Text

AutoCAD SHX Text 20'

AutoCAD SHX Text 40'

AutoCAD SHX Text 60'

AutoCAD SHX Text N

AutoCAD SHX Text

FACILITIES PLANNING AND CONSTRUCTION

AutoCAD SHX Text

UNIVERSITY OF HOUSTON SYSTEM

AutoCAD SHX Text

CAMPUS:

AutoCAD SHX Text

DATE ISSUED:

AutoCAD SHX Text

NUMBER:

AutoCAD SHX Text

LEVEL:

AutoCAD SHX Text Conrad N. Hilton, College of Hotel and Restaurant Management

AutoCAD SHX Text

AutoCAD SHX Text

CHC

AutoCAD SHX Text G

AutoCAD SHX Text

UH

AutoCAD SHX Text 09/02/2021

AutoCAD SHX Text

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

ABBREVIATION:

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

SHEET:

590_A2.1_1986
590_A2.1_1989
590_A-6_1971
590_A-7_1971
590_AS1.03_2012
590_PublicArea_A1.0_2009
590-CHC-01
Sheets and Views
RedBook
590-CHC-G
Sheets and Views
RedBook