This document is an Addendum to a Request for Qualifications (RFQ) for a Construction Manager-at-Risk (CMR) for Project 24-205-LBH, a 2-step CMR process for a 50-bed maximum security facility in Lubbock, Texas. The RFQ was issued by the Texas Health and Human Services Commission (HHSC). The addendum includes responses to questions received, attendance rosters from pre-submittal webinars, and a HUB Subcontracting Plan (HSP) training presentation. The project will involve the design and construction of an approximately 85,000 square foot facility with various program spaces, outdoor areas, and supporting services. HHSC plans to have a Guaranteed Maximum Price (GMP) by the end of the design development phase or 50% construction documents. The CMR will be required to provide services to enable appropriate input and output from the Building Information Modeling (BIM) process.
The HSP training presentation covers the various subcontracting method options, required HSP pages, justification for self-performing work, Good Faith Effort (GFE) documentation, and other special reminders for submitting the HSP. Respondents must choose an HSP method and provide the necessary documentation. No HSP changes are allowed until after contract award. The HUB Coordinator can be contacted for active solicitation HSP questions.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum Item #1 Responses to
Questions Received
PCS 134 HHS Responses to Questions
Effective Date 06/26/2015 Version 1.00 Page 1 of 3 Revision Date 09/13/2023
Solicitation Title: Request for Qualifications (RFQ) Construction Manager-at-Risk (CMR) Two Step Process for Project 24-205-LBH, 2-Step CMR for 50-Bed Maximum Security Facility in Lubbock, Texas
Solicitation Number: HHS0013668
# Reference Question Response
1. Where do I find the attendee list for this meeting?
The attendance lists for the mandatory Pre-Submittal Conferences are provided in this Addendum No. 2.
2.
Have you uploaded the addendum for the pre-bid meetings to show who was in attendance yet? I do not see it posted…if not is there a chance that you can send that over
The attendance lists for the mandatory Pre-Submittal Conferences are provided in this Addendum No. 2.
3. Exhibit G 6.1 General Requirements: Are you looking for a separate project schedule to be attached to Exhibit G?
No, a separate Project schedule is not required.
Respondent must furnish "tentative dates of completion" for the activities shown in bold on Exhibit G, Preliminary Proposed Schedule, to the RFQ.
Refer to Exhibit G, Preliminary Proposed Schedule, which states "The activities shown in bold below must have the associated dates identified and included with the Contract and represent services to be performed pursuant to the Contract."
Version 1.00 Page 2 of 3 Revision Date 09/13/2023
# Reference Question Response
4.
RFQ Sections 3.5.1, 3.7.1
6.2 Executive Summary: Section 6.2 references Article
2, which is the Project Information and Scope. What are you looking for when you reference a “high-level overview of the Respondent’s approach to meeting the requirements?” If you would like a true project approach, how many pages would you like that to be and how would you like it tabbed in the final submittal?
Refer to Section 6.2, Executive Summary, of the RFQ which states that “Respondent shall provide in its Submittal a high-level overview of Respondent's approach to meeting the requirements contained in Article 2. Respondent must clearly demonstrate an understanding of HHSC’s goals and objectives for this Solicitation.”
There is no page limit for the Submittal. Refer to Section 3.7.1, Formatting and Page Size, of the RFQ for formatting requirements.
Version 1.00 Page 3 of 3 Revision Date 09/13/2023
# Reference Question Response
5.
RFQ Sections 3.5.1, 3.7.1
6.3 Minimum Qualification Documentation: The
information requested in 6.3 can be found in the response to 6.4 CMR Company Information. Do you want this information twice, to answer both 6.3 and 6.4, or just reference the responses in 6.4 when answering 6.3? And same question as above: how many pages would you like that to be and how would you like it tabbed in the final submittal?
Respondent must address requirements set forth in Sections 6.3, Minimum Qualification Documentation, and 6.4, CMR Company Information, of the RFQ in its Submittal.
Refer to Section 6.3, Minimum Qualification Documentation, of the RFQ which states that “Respondent shall include in its Submittal a short summary that demonstrates how Respondent meets the minimum qualifications for this Solicitation, Section 5.2.1 (Minimum Qualifications (Pass or Fail)).”
Refer to Section 6.4, CMR Company Information, of the RFQ that states “Respondent must provide satisfactory evidence of its ability to manage and coordinate the type of activities described in this Solicitation and to produce the specified services on time.” Respondent must provide information requested in Subsections 6.4.1-6.4.9 of the RFQ.
There is no page limit for the Submittal. Refer to Section 3.7.1, Formatting and Page Size which states, “Separate and label each evaluation criteria response to Article 6 of this RFQ as listed in order by section for ready reference.”
Addendum Item #2 Attendance Rosters from Pre-Submittal Webinars
Name Email Address City State Phone Organization Prime/Subcontractor/ Other
Roman Buckner roman.buckner@mcgough.com Dallas Texas 214-551-2019 McGough Construction Co., LLC Prime
Jenn Griffith jenng@lottbrothers.com Round Rock Texas 5129705130 Lott Brothers Construction Company Prime
Marty Hale marty.hale@jci.com Lubbock Texas 8066328218 Johnson Controls Subcontractor
Caitlin McFarland cmcfarland@restltx.com Texas Restl Engineers TX LLC
Savannah Ransome sransome@leelewis.com Dallas Texas 4696106108 Lee Lewis Construction, Inc. Prime Jared Roden jroden@henselphelps.com Dallas Texas 469-540-5714 Hensel Phelps Prime
Tyler Simons tsimons@leelewis.com Lubbock Texas 8064708576 Lee Lewis Construction Prime Marcie Truby marcie.truby@terracon.com Lubbock 806-500-5556 Terracon Other Will Andres will.andres@hhs.texas.gov Austin Texas 512-776-2899 HHSC Other Bob McCurdy bob.mccurdy@hhs.texas.gov Austin Texas 512-406-2534 HHSC Other Nicole Hutchison n/a Austin Texas n/a HHSC Other
Attendance Roster, Pre-Submittal Webinar #1 RFQ HHS0013668, Project 24-205-LBH, 2-Step CMR for 50-Bed Maximum Security Facility in Lubbock, Texas
Name Email Address City State Phone Organization Prime/Subcontractor/ Other
Briana Baeza bbaeza@hoar.com AUSTIN Texas 5124395070 Hoar Construction Prime
Roman Buckner roman.buckner@mcgough.com Dallas Texas 2145512019 McGough Construction Co., LLC Prime
Marty Hale marty.hale@jci.com Lubbock Texas 8066328218 Johnson Controls Subcontractor
Dominic Padilla dominicp@whiteconst.com Austin Texas 5128381757 White Construction Prime
George Zakar gzakar@hoar.com Austin Texas 602-763-7262 Hoar Construction Prime Will Andres will.andres@hhs.texas.gov Austin Texas 512-776-2899 HHSC Other Bob McCurdy bob.mccurdy@hhs.texas.gov Austin Texas 512-406-2534 HHSC Other Colin Gresham n/a Austin Texas n/a HHSC Other
Attendance Roster, Pre-Submittal Webinar #2 RFQ HHS0013668, Project 24-205-LBH, 2-Step CMR for 50-Bed Maximum Security Facility in Lubbock, Texas
Addendum Item #3 HUB Pre-Submittal
Conference Slide Deck
Historically Underutilized Business (HUB)
HUB Subcontracting Plan (HSP)
Training 01/2024
Agenda
1. HSP Method Options
2. Required HSP Pages
3. Method V: Section 3
4. GFE Attachment A
5. GFE Attachment B
6. Additional Information
7. Special Reminders
8. HUB Contact Information
Responses that do not include a completed HSP shall be
Rejected pursuant to:
TGC §2161.252(b) and
34 TAC 20.285
https://statutes.capitol.texas.gov/Docs/GV/htm/GV.2161.htm https://texreg.sos.state.tx.us/public/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=34&pt=1&ch=20&rl=285
HSP Method Options
Subcontracting Method Options
Subcontracting Method Definition
I: All HUB(s) Utilizing only Texas certified HUB(s).
See GFE Attachment A.
II: Mentor-Protégé Relationship Utilizing an approved M/P agreement. See GFE Attachment B.
III: Meeting/Exceeding HUB Goal
Subcontracting goal met by HUB(s).
See GFE Attachment A.
IV: Solicitation Method Subcontracting utilization goal not met. See GFE Attachment B:
Contact 3+ HUBs & 2 minority/trade organizations in writing.
V: Self Performing Contractor performs all work with own resources. No GFE Attachment.
HSP Required Pages Continued
All subcontracting method options require:
✓Page 1, Section 1: Respondent & Bid Information
✓Page 2, Section 2: Respondent's Subcontracting Intentions oYes – fill out part b., c., & d (if applicable) oNo – see next slide/Section 3
✓Page 3, Section 4: Affirmation signature
Click to add text
Method V: Section 3
The Prime contractor performs ALL work-related activities
➢ Equipment
➢ Materials
➢ Supplies
➢ Transportation
➢ Delivery
➢ W-2 Employees
Agency may request additional information.
GFE Attachment A
1. Contractor Name / Solicitation #
2. Subcontracting Opportunity
3. Subcontractor Selection
a. Company Name
b. TX HUB: Y/N
c. TX VID or Federal EIN #
d. % & $:
*“TBD” is NOT acceptable
Method I or III:
GFE Attachment B -
Written Notices:
*Minimum 7 Working days.
*Supporting documents (email, fax, etc.).
Method II or IV:
• 3+ "Active" Certified HUBs
• 2 Trade Org./Bus. Development Centers
GFE Attachments B -
Method II or IV:
a. Company Name
b. Texas Certified HUB (Y) or (N)
c. Texas VID or Federal EIN #
d. % & $
• Note “TBD” is NOT acceptable *Please provide justification for all Non-HUB Subcontractors
1. Contractor Name / Solicitation #
2. Subcontracting Opportunity
3. Subcontractor Selection
Additional Information
Subcontracting method options I-IV require:
• HUB Vendor Profiles on CMBL/HUB Directory
i. HUB’s VID#
ii. Contact information
iii. “A” = Active status
iv. Expiration date
• Written GFE notification (Method IV only)
1. Sent emails
2. Certified Letters
3. Fax logs *7 business days to respond
Special Reminders
❑ Review HSP Checklist for guidance.
❑ Check the Solicitation HUB Subcontracting Goal %.
❑ Choose an HSP method & provide documentation.
❑ The Commodity Book is the only resource for NIGP or class/item codes.
❑ The CMBL/HUB Directory is a resource to seek out certified active Texas HUBs.
❑ HSP Courtesy Reviews are available upon written request.
❑ No HSP changes are allowed until after contract award.
https://commbook.app.cpa.state.tx.us/ https://mycpa.cpa.state.tx.us/tpasscmblsearch/tpasscmblsearch.do
HUB Contact Information hhschuboutreach@hhs.texas.gov
(512) 406-2570
*Active solicitation HSP questions contact designated HUB Coordinator.
mailto:hhschuboutreach@hhs.texas.gov
Bob McCurdy CTCM, CTCD bob.mccurdy@hhs.texas.gov
512-406-2534 mailto:bob.mccurdy@hhs.texas.gov
Thank You
Click to add text
| HHS0013668 Questions and Answers |
| Pre-Submittal Webinar #1, RFQ HHS0013668 Attendee Report |
| Sheet1 |
| Pre-Submittal Webinar #2, RFQ HHS0013668 Attendee Report |
| Sheet1 |
| HSP 2024 HSP Training |
| Introduction |
| Slide 1: Historically Underutilized Business (HUB) |
| Agenda |
| Slide 2: Agenda |
| Slide 3 |
| HSP Participation Method Options |
| Slide 4: HSP Method Options |
| HSP Requirements |
| Slide 5: HSP Required Pages |
| Slide 6: HSP Required Pages Continued |
| Method 5: Justification Section |
| Slide 7: Method V: Section 3 |
| GFE Attachment A |
| Slide 8: GFE Attachment A |
| GFE Attachment B |
| Slide 9: GFE Attachment B - 1 of 2 |
| Slide 10: GFE Attachments B - 2 of 2 |
| Additional Information |
| Slide 11: Additional Information |
| Special Reminders |
| Slide 12: Special Reminders |
| HUB Office Contact Information |
| Slide 13 |
| Slide 14: HUB Contact Information HUB Contact Information |
| Conclusion |
| Slide 15: Thank You |
File details come from the government source that posted it. Updated .