ESBD_File_347956_Addendum No. 1_RFB No. 24-1339 Stainless Steel for Gate 5 Pier Plate Walls.pdf

PDF 369 KB Posted

Attached to
Stainless Steel for Gate 5 Pier Plate Walls
Solicitation number
24-1339
Issued by
Palo Pinto County, Texas

About this file

This document is an Addendum No. 1 issued by the Brazos River Authority (BRA) for Stainless Steel for Gate 5 Pier Plate Walls under RFB No. 24-1339. The addendum clarifies that the BRA will not accept a partial bid, and that the country of melt for the stainless steel material must be in the U.S. The solicitation is for the supply of stainless steel materials, including 500 feet each of 2" x 2" x 1/4" tubing, 1/2" x 1-3/4" flat bar, and 2" x 2" x 3/8" angle, as well as 24 plates at 5' x 10' x 1/2" thick. The bid must remain valid for a minimum of 14 business days after the bid opening date, and the installation will be performed by BRA personnel.

The contract opportunity is located in Palo Pinto County, Texas. No information is provided regarding pricing terms, set asides, incumbents, funding requirements or sources, or any other salient details beyond the scope of work and material specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 1

Brazos River Authority

January 25, 2024

Addendum No. 1

Stainless Steel for Gate 5 Pier Plate Walls RFB No. 24-1339

It is the responsibility of the Respondent to assure and guarantee by acknowledging the receipt of this Addendum in the Bid that the Respondent has received the Addendum in its entirety, and that the Respondent accepts all conditions contained herein.

Questions and Answers

Q1: We are unable to furnish all materials. Will you accept a partial bid?

A1: No, a partial bid will not be accepted.

Q2: Please clarify the domestic requirement in the scope. Can the material components or melt be furnished by a foreign mill, but final product is constructed or fabricated in the U.S.?

A2: No, country of melt must be in the U.S.

Sincerely, Allison Sheeler Purchasing Agent