ESBD_File_347942_09-21313-addendum1.pdf
PDF 13 MB Posted
- Attached to
- SLBC 09-380421313 New Marlin AEM Facility
- Solicitation number
- 09-380421313
- Issued by
- Falls County, Texas
About this file
This document is an addendum related to a state and local contract opportunity from the Texas Department of Transportation (TxDOT) for the construction of a new Marlin AEM Facility in Marlin, Texas. The project is estimated to cost $10,386,659.40 and requires a $100,000 bid guaranty/bid bond. A pre-bid meeting and site visit are scheduled for January 30, 2024, with RFI questions due on February 6, 2024 and bids due on March 5, 2024 at 1:00 PM CT. The bid location is the TxDOT State Headquarters in Austin, Texas. Beginning September 1, 2023, all bids must be submitted via the Bonfire platform. A HUB Subcontracting Plan (HSP) is required for this project, which has an estimated cost greater than or equal to $100,000.
The addendum outlines the required proposal package contents, including the contract documents, standard conditions, project specifications, plans, third-party ethics training, and HUB instructions. The contract will not be awarded to any contractor, firm, or subcontractor currently debarred from bidding on TxDOT projects. The Texas Transportation Commission reserves the right to reject any and all proposals, and all bids received will be retained and not returned to bidders.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO: 1 - issued by the
LOCATION: 5092 HIGHWAY 7 EAST
CITY/ST: MARLIN, TEXAS 76661
SITE NO.: 099642
BLDG NO.: 098205
ESTIMATED COST:
BID GUARANTY or BID BOND:
PRE-BID DATE, TIME: JANUARY 30, 2024 @ 11:00 AM CT
BID DATE, TIME: MARCH 5, 2024 @ 1:00 PM CT
BIDS MUST BE RECEIVED BY: NOON (12:00 PM) FOR 1:00 PM READING
Project by the: TEXAS DEPARTMENT OF TRANSPORTATION
SUPPORT SERVICES DIVISION (SSD), FACILITIES PLANNING & MANAGEMENT
6230 EAST STASSNEY LANE, AUSTIN, TEXAS 78744
ADDENDUM NO. 1 IS ATTACHED WITH THIS NOTIFICATION.
Available to download from: Electronic State Business Daily (ESBD) Use Agency 601 for Requisition Number:
TxDOT Plans Online https://www.txdot.gov/business/letting‐bids/plans‐online.html
TxDOT Facilities Letting https://www.txdot.gov/business/suppliers‐vendors/facilities‐projects‐letting.html
NOTE:
NOTICE TO BIDDERS:
ADDENDUM NO. 1
This Addendum forms a part of the Contract Documents and modifies the original Project Drawings and Specifications dated January 5, 2024.
No changes to COST or TIME.
Also included are responses to questions identified during the RFI period.
Total pages to this Addendum including cover pages: 41
PROJECT ID #:
COUNTY:
DISTRICT:
OFFICIAL DATE OF ADDENDUM:
NEW MARLIN AEM FACILITY
TEXAS DEPARTMENT OF TRANSPORTATION
09-380421313
February 15, 2024 construed that each bidder’s proposal is submitted with full knowledge of all modifications and supplemental data specified herein.
INCOMPLETE PROPOSAL PACKAGE 1 (CONTRACT DOCUMENTS) WILL BE REJECTED
RECEIPT OF THIS ADDENDUM IN PROPOSAL PACKAGE 1 (CONTRACT DOCUMENTS), "ADDENDUM ACKNOWLEDGMENT" SHEET
FALLS
WACO
FAILURE TO ACKNOWLEDGE RECEIPT OF AN ADDENDUM WILL RESULT IN THE BID NOT BEING READ.
by this Addendum shall remain in effect as a part of the Contract Documents.
$10,386,659.40 $100,000.00 http://www.txsmartbuy.com/sp
09-380421313
THIS ADDENDUM SHALL BECOME AN OFFICIAL PART OF THE PLANS AND SPECIFICATIONS AND BIDDERS SHALL ACKNOWLEDGE
Contract Documents, this Addendum shall govern and take precedence. Work not specifically deleted, modified, changed or altered at the same time and incorporated therewith. Where provisions of the following supplementary data differ from those of the original This Addendum shall be considered as part of the Contract Documents for the above mentioned project as though it had been issued
Bidders are hereby notified that they shall make any necessary adjustment(s) in their estimates based on this Addendum. It will be
Addendum No. 1
Date: 2/14/2024
Project: TxDOT Marlin AEM Facility 5092 Highway 7 East Marlin, Texas 76661
Owner: Texas Department of Transportation Waco District (09) Project Number: 09 3804 21 313
From: Haddon + Cowan Architects Collaborative 2301 E. Riverside Dr, Building A, Suite 80 Austin, Texas 78741
To: Prospective Bidders Architect's Project No.: 21-2031
This Addendum forms a part of the Contract Documents and modifies the original documents dated 01/05/2023.
Addendum Number #1 issued February 14, 2024, with amendments and additions noted below.
Addendum Summary:
This Addendum consists of:
1. Revised drawings referenced in the Bidder RFIs
2. Revised Specs referenced in the Bidder RFIs
Drawings:
Cover Sheet
• Added TDLR Registration TABS Number
G1.08 – PHASE IV / V
• Revised note No. 3 to clarify Bidder RFI regarding the Scope of Work for the fuel island, fuel tanks, and systems
A2.02 – SHOP FLOOR PLAN NORTH
• Added 2-4x4 HSS columns at each overhead door location
A2.03 – SHOP FLOOR PLAN SOUTH
• Added 2-4x4 HSS columns at each overhead door location
A8.09 – SECTION DETAILS
• Detail 2 Revised to reflect 4x12 Tube steal supporting overhead door
• Detail 3 Revised to reflect 4x4 HSS columns added to frame overhead doors
S1.02 – SHOP FOUNDATION PLAN NORTH
• Added 2-4x4 HSS columns at each overhead door location
S1.03 – SHOP FOUNDATION PLAN SOUTH
• Added 2-4x4 HSS columns at each overhead door location
S2.02 – SHOP ROOF FRAMING PLAN NORTH
• Revised “LOW T/BEAM” heights and changed from W sections to HSS
• Added note to reflect connection to columns (10/S8.03)
S2.03 – SHOP ROOF FRAMING PLAN SOUTH
• Revised “LOW T/BEAM” heights and changed from W sections to HSS
• Added note to reflect connection to columns (10/S8.03)
S5.02 – FOUNDATION DETAILS
• Added detail 10 to reflect connection for HSS framing at overhead doors
S8.03 – STEEL FRAMING DETAILS
• Added detail 10 to reflect connection of overhead door framing to columns
E2.01 – OFFICE ELECTRICAL POWER PLAN
• Revised duplex outlet to quad outlet in offices and updated Keyed Notes 1 & 4 to include:
“CONTRACTOR IS RESPONSIBLE FOR WIRING THE FURNITURE SYSTEMS AND MAKING FINAL
CONECTIONS.”
E2.02 – SHOP ELECTRICAL POWER PLAN NORTH
• Updated receptacle and added keynote 5 to West wall of Mechanic Office 122
• Added Keynote 5 to Sheet
E2.05 – FUEL STATION ELECTRICAL POWER PLAN, SPECIAL SYSTEMS & SCHEDULE
• Revised OPW TANK MONITORING SYSTEM SCHEDULE
E4.05 – ELECTRICAL SCHEDULES
• Revised Schedule for LP-1 for revisions to outlets on E2.01
E4.07 – ELECTRICAL SCHEDULES
• Revised Schedules for LP-3 & LP-4-2 for revisions to outlets on E2.02
T2.01 – TECHNOLOGY OFFICE FLOOR PLAN
• Update key note 11 at office to coordinate with the electrical revisions on sheet E2.01 and E2.02
• Updated keynote 11 to clarify who is responsible for installing data cable in the workstations
• Removed flex conduit keynote 11 from two locations on the west wall of DROP-IN WORKSTATIONS
T2.02 – TECHNOLOGY SHOP FLOOR PLAN NORTH
• Updated keynote 11 to clarify who is responsible for installing data cable in the workstations
• Changed location of data outlets in MECHANIC OFFICE 122
Specifications:
08 33 23 – Overhead Coiling Doors – Updated wind load requirements per Bidder RFI
11 10 00 – Fuel Dispensing System – Update tank monitor manufacture revision per Bidder RFI
End of Addendum No. #1
Bidder RFI Responses
Date: 2/14/2024
Project: TxDOT Marlin AEM Facility 5092 Highway 7 East Marlin, Texas 76661
Owner: Texas Department of Transportation Waco District (09) Project Number: 09 3804 21 313
From: Haddon + Cowan Architects Collaborative 2301 E. Riverside Dr, Building A, Suite 80 Austin, Texas 78741
To: Prospective Bidders Architect's Project No.: 21-2031
Instructions: The following are RFIs with included responses
1. Will the existing fueling equipment be left on-site or will this become the property of the awarded fuel contractor?
o Remove existing fuel island, concrete paving & pads, dispensing pumps & grease rack structures and associated electrical and plumbing not related to the fuel tank system above grade. The removal of the fuel tanks and associated systems below grade is not in the contract. TxDOT will remove tanks and associated underground systems. Coordinate with TxDOT District and TxDOT Environmental for coordination of removal.
Refer to Addendum No. 1 – Delta No. 1, 2/14/2024 sheet G1.08.
o Fuel tank and system will remain the property of TxDOT.
2. Will the emergency generator be tied into the fueling system?
o Yes, refer to E2.05 and E3.01
3. What building will the fuel system tank monitor and controls be located and what building will the electrical panel for the system be located?
o Fuel system tank monitor and controls be located Mech Office 122 (ref E2.02) and electrical panel ref E2.03
4. Will the existing asset works fuel management system be reused or will the state furnish a new system?
o The existing asset works fuel management system will be salvaged and re-purposed for the new fuel station. (ref FS1.01, General Notes, Item No. 7)
5. Will the fuel system contractor be responsible for the removal of the existing underground storage tanks and equipment?
o Refer to Bidder RFI response No. 1
6. Who is removing the temporary offices?
o TxDOT will remove the temporary offices
7. How much time should be allowed for TxDOT to install temp offices and make utility connections?
o 40 days
8. Overhead coiling door spec (08 33 23). Section 1.5 A specs a standard 20 psf wind load, however 1.5 B calls for impact ratings. Should there be an increase in wind rating to match the impact rating, or should we quote a non-impact-rated door?
o Delete item 1.5B Impact Test for Flying Debris
Refer to Addendum No. 1 – Delta No. 1, 2/14/2024 spec section 08 33 23.
9. The Plans call out the OPW Site Sentinel Tank Monitor which has been replaced with the ProGauge LX Plus. Please confirm that the equipment schedule for the Tank Monitor listed on page E2.05 is incorrect and needs to be updated to reflect the correct Tank Monitor currently offered o Yes, the OPW shall be changed to the ProGauge LX
Refer to Addendum No. 1 – Delta No. 1, 2/14/2024 sheet E2.05 & spec section 11 10 00
10. The New Equipment Shed is supposed to be turned over in Phase 1. The Shed gets power from IPC- 2 which is located in the office building. Is the Equipment Shed intended to have power during Phase 1? If so, where is the power coming from?
o Contractor is to provide temp power to the New Equipment Shed from the Wash Bay
11. Please provide structural details for supporting overhead door 119A o Provide a pair of HSS4x4x1/4 to support each overhead door (all overhead doors). The column will have a welded connection to a base plate at the foundation. The column will connect to the WF beam above with a welded angle with a slotted hole.
Refer to Addendum No. 1 – Delta No. 1, 2/14/2024 Sheet A2.02, A2.03, 2/A8.09, 3/A8.09, & S1.02, S1.03, S2.02, S2.03, 10/S5.02, & 10/S8.03.
12. Please provide a spec for the temporary road. Who is removing the temporary road? In what Phase is it removed?
o There is no new material for the temporary road, the current paving and road mill will be used as the temporary driveway. The contractor is to remove the area of the temporary roadway to allow for new grading and paving.
GENERAL NOTES
1. WORK SHALL CONFORM TO THE CONSTRUCTION DOCUMENTS & APPLICABLE BUILDING CODES (INCLUDING FEDERAL & STATE CODES, ORDINANCES, REGULATIONS, ETC.) CONSTRUCTION DOCUMENTS INCLUDE DRAWINGS & SPECIFICATIONS
PLUS ANY ADDENDA TO THE AFOREMENTIONED.
2. CONSTRUCTION DOCUMENTS ARE INTENDED TO INCLUDE ITEMS NECESSARY TO CONVEY DESIGN INTENT OF THE WORK. MANUFACTURERS' INSTRUCTIONS SHALL BE CONSIDERED AS PART OF THE SPECIFICATIONS WHETHER INCLUDED
OR NOT IN THE SPECIFICATION MANUAL.
3. PERIODIC SITE VISITS BY OWNER'S REPRESENTATIVE SHALL NOT BE CONSTRUED AS SUPERVISION OF MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES FOR CONSTRUCTION, NOR IMPLY RESPONSIBILITY FOR PROVIDING A SAFE PLACE FOR PERFORMANCE OF WORK BY CONTRACTOR OR CONTRACTOR'S EMPLOYEES, OR EMPLOYEES OF SUPPLIERS, OR FOR ACCESS, VISITS, USE, WORK, TRAVEL, OR OCCUPANCY BY ANY PERSON.
4. CONTRACTOR IS RESPONSIBLE FOR CONTINUOUS SECURITY AT AFFECTED OPENINGS FOR THE DURATION OF THE CONSTRUCTION CONTRACT. COORDINATE SECURITY STATUS CHANGES W/ DISTRICT REPRESENTATIVE PRIOR TO
IMPLEMENTING CHANGES.
5. CONTRACTOR SHALL:
-VERIFY DIMENSIONS & FIELD CONDITIONS BEFORE PROCEEDING.
-NOTIFY ARCHITECT OF FIELD CONDITIONS REQUIRING DEVIATIONS FROM CONSTRUCTION DOCUMENTS BEFORE
THE CONSTRUCTION OF ANY MODIFICATION.
-PROVIDE ADEQUATE BRACING & SHORING AS NECESSARY UNTIL PERMANENT SUPPORTS & STIFFENERS ARE
INSTALLED.
-IMMEDIATELY REPAIR OR REPLACE DAMAGED OR DEFECTIVE WORK TO THE APPROVAL OF (AND AT NO
ADDITIONAL COST TO) THE OWNER
-NOTIFY ARCHITECT & APPROPRIATE INSPECTORS AT CRITICAL CONSTRUCTION MILESTONES IN ORDER TO OBTAIN
NECESSARY APPROVALS & INSPECTIONS PRIOR TO COMMENCEMENT OF SUBSEQUENT WORK.
-TAKE REASONABLE PRECAUTIONS FOR THE SAFETY OF, AND PROVIDE REASONABLE PROTECTION TO PREVENT
DAMAGE, INJURY OR LOSS TO:
a) EMPLOYEES & ALL OTHER AFFECTED PERSONS
b) ALL WORK, MATERIALS & EQUIPMENT
c) OTHER PROPERTY AT SITE OR ADJACENT THERETO.
-UPON COMPLETION OF THE WORK, REMOVE MATERIALS, TOOLS & EQUIPMENT AND LEAVE SITE IN A CONDITION
ACCEPTABLE TO OWNER.
S
S
F
T A
T
O E
A X
ET
T
SI
G
E R
DER
E
E
TI
HCRA
T C
M I C H
A E L D .
H A
D D O N
18020
Support Services Division / Facilities Planning & Management
COPYRIGHT 2023 TEXAS DEPTARTMENT OF TRANSPORTATION
6230 E. Stassney Lane Austin, Texas 78744-3147 c
VICINITY MAP
INDEX OF DRAWINGS
PROJECT:
Project Manager:
CIVIL: LANDSCAPE: ARCHITECTURE: STRUCTURE: ELECTRICAL: HVAC & PLUMBING:
G E
N E
R A
T E
D O
N
REF SHEET G0.01 FOR SHEET LIST
IT & SECURITY:
ELECTRIC VEHICLE
CHARGING:
Matt Thrasher, Regional Director
901 South Mopac Building 1 Suite 300 Austin, TX 78746 Phone: (512) 200-7310 E-Mail: matt.thrasher@combs-group.com
John Marsac, P.E.
3701 Executive Center Dr Suite 257 Austin, TX 78731
Phone: (512) 735-9219 E-Mail: johnm@tgwengineers.com
FUEL STATION:
Nicholas McDonald
11700 Katy Fwy Suite 250 Houston, TX 77079
Phone: (713) 335-1900 E-Mail: nicholas.mcdonald@hdrinc.com
/1
/2
:3 :2
A
M C
U s e rs
\c h o lb e c k \D o c u m e n ts
\T X
D O
T M a rl in
M a in te n a n c e B u ild in g s c h o lb e c k .r v t
M A
R L
IN
A
E M
F A
C
IL
IT
Y
P R
O J E
C T
N U
M B
E R
PROJECT NUMBER: 09 3804 21 313
SITE # 099642
BUILDING # 098205, 098206, 098207, 098208
Krunal Chaudhari, PE, FPE
Lisa Leal-Tate
(737) 465 - 2895 lisa.lealtate@txdot.gov
MARLIN AEM FACILITY
Paul Davila, PEKris Swanson, PE, SEMichael D Haddon, AIAPat Dean, R.L.A.Megan McPherson, P.E.
Phone: (512) 374-9120 E-mail: mhaddon@haddoncowan.com
Phone: (512) 535-7303 E-mail: patdean@carrillodean.com
Phone: (737) 787-7120 E-mail:
megan.mcpherson@kimley-horn.com
Phone: (512) 685-2900 E-mail: krunal.chaudhari@hdrinc.com
Phone: (210) 841-2800 E-mail: paul.davila@hdrinc.com
Phone: (512) 472-9797 E-mail: kswanson@dci-engineers.com
Haddon+Cowan Architects 2301 E. Riverside Dr.
Building A, Suite 80 Austin, TX 78741
Carillo Dean Landscape Architecture 7500 West Highway 71 Suite 200 Austin, TX 78735
Kimley Horn 5301 Southwest Pkwy Building 2, Suite 100 Austin, TX 78735
DCI Engineers 515 S. Congress Ave.
Suite 600 Austin, TX 78704
HDR Engineering, Inc.
710 Hesters Crossing Suite 150 Round Rock, Texas 78681
HDR Engineering, Inc.
710 Hesters Crossing Suite 150 Round Rock, Texas 78681
5092 HIGHWAY 7 EAST, MARLIN, TX, 76661
01/05/2023
PROJECT
LOCATION
NORTH
THIS PROJECT INCLUDES...
SITEWORK, UTILITIES AND SEPTIC SYSTEM, SITE LIGHTING, C-CURE SECURITY SYSTEM, CHAIN LINK FENCING AND GATES, SITE-WIDE GENERATOR, LAWN IRRIGATION & LANDSCAPING, ASPHALT/CONCRETE DRIVES, PARKING & STRIPING, NEW FUEL TANKS & MONITORING SYSTEM, IT/DATA SYSTEMS, WATER RECYCLING SYSTEM, GPS MONUMENT, TXDOT SIGN MONUMENT, NEW MAINTENANCE OFFICE, SHOP & WASH BAY BUILDING, NEW EQUIPMENT SHED, NEW FUEL ISLAND WITH CANOPY AND OTHER ITEMS AS IDENTIFIED THROUGHOUT THE PLANS AND SPECIFICATIONS.
OFFICE BUILDING #098205 4,080 SQFT.
SHOP BUILDING #098207 8,727 SQFT.
EQUIPMENT SHED #098206 5,000 SQFT.
NEW FUEL STATION #098208 1,000 SQFT.
TOTAL SCOPE: 18,708 SQFT.
TOTAL STAFF: 15 FTEs
SCOPE OF WORK:
BUILDING SUMMARY: TDLR REGISTRATION:BUILDING CODES:
INTERNATIONAL BUILDING CODE IBC - 2018
AMERICANS W/ DISABILITIES ACT ADAAG - 2010
TEXAS ACCESSIBILITY STANDARDS TAS - 2012
INTERNATIONAL ENERGY CODE IECC - 2018
INTERNATIONAL MECHANICAL CODE IMC - 2018
ASHRAE ASHRAE 62.1 - 2016
INTERNATIONAL PLUMBING CODE IPC - 2018
INTERNATIONAL FUEL GAS CODE IFGC - 2018
NATIONAL ELECTRIC CODE NEC - 2023
NATIONAL FIRE CODE NFPA 1 - 2015
NATIONAL LIFE SAFETY CODE NFPA 101 - 2015
TxDOT STANDARD SPECS FOR ... STREETS - 2014
FALLS COUNTY, TX
WICHITA
FALLS
BEAUMONT
PARIS
ATLANTA
BRYAN
BROWNWOOD
AMARILLO
ABILENE
CHILDRESS
FORT
WORTH
CORPUS
CHRISTI
DALLAS
EL PASO
HOUSTON
LAREDO
LUBBOCK
LUFKIN
ODESSA
SAN
ANGELO
SAN
ANTONIO
YOAKUM
WACO
TYLER
PHARR
WACO DISTRICT (09)
TABS2024011507
0' 10' 20' 40' 80'
PROPERTY LINE
EXISTING
BRINE TANKS
TO REMAIN
STATE HIGHWAY 7
S73°19'13"W 411.61'
EXISTING
SPREADER RACK
TO REMAIN
EXISTING SALT
SHED TO REMAIN
UGEUGE
NORTH
PROPERTY LINE
EXISTING EMULSION
TANK TO REMAIN
EXISTING
RADIO TOWER
TO REMAIN
EXISTING RADIO
TOWER SUPPORT
BUILDING TO REMAINEXISTING
EQUIPMENT
BAYS TO REMAIN
EXISTING BRINE
ROOM TO REMAIN
EXISTING PORTABLE
MATERIAL SHED TO
REMAIN
W
W W
W W
W
W
W
W
W
W
UG
E
U G
E
UGE
U G E
U G
E
UGE
UGE
UGE
U G
E
U G
E
O H
E
O H
E
O H
E
O H
E
O H
E
UGE
W W
W W
W W
W W
UG
T
U G
T
U G
E
UGEUGE
U G
T U G
E
U G
E
UGE UGE
U G
E
U G
E
UGE
U
G E
UGE UGE
UGE
UGT
W
GAS
UGE
U G
E
U G
E
U G
E
U G
E
W
W
U G
E U
G E
UGE
W W
W W
UGE
WW
WW
UGE
UGT
U G
T
U G
T
UGT
U G
T
U G
T
UGT
EQUIPMENT SHED
FROM PHASE I
PHASE IV / V SECURE OPERATIONS
PHASE IV / V TXDOT
CONSTRUCTION OPERATIONS
DRIVEWAY #1 DRIVEWAY #2
W W
PHASE IV / V SECURE OPERATIONS
PHASE IV / V TXDOT
CONSTRUCTION OPERATIONS
U G
E
G A
S G
A S
G A
S
UGE
U G
E
UGE
UGE
W W
W W
UGE
UG
E
U G
E
UGT
U G
E
PHASE IV / V TXDOT
CONSTRUCTION OPERATIONS
EXISTING GPS ANTENNA TO
REMAIN - PROTECT DURING
PHASED CONSTRUCTION
SITE NOTES
THE INTENT OF THESE PHASING DIAGRAMS IS TO ALLOW TXDOT TO BE
ABLE TO PERFORM OPERATIONS CONTINUOUSLY THROUGHOUT THE
DURATION OF CONSTRUCTION. THIS INCLUDES CONTINUOUS UTILITY
SERVICES AND VEHICULAR ACCESS TO OFFICES, EQUIPMENT AREAS AND
TRUCK SERVICE AREAS. THE GC IS RESPONSIBLE FOR REVIEWING THE
PROPOSED PHASING AND COORDINATING CONSTRUCTION SEQUENCING
AND SCHEDULING TO ACCOUNT FOR TXDOT'S CONTINUED OPERATION.
COORDINATE WITH TXDOT REPRESENTATIVES TO MINIMIZE CONFLICTS
AND TO FACILITATE OWNER'S OPERATIONS.
1. CONTRACTOR USE OF SITE AND PREMISES
A. ACCESS TO SITE: CONTRACTOR WILL HAVE RESTRICTED ACCESS TO
THOSE AREAS OF EACH PHASING PLAN THAT ARE DESIGNATED
FOR TXDOT OCCUPANCY. ANY WORK REQUIRED TO CROSS INTO
THE TXDOT-OCCUPIED AREA OF THE SITE WILL HAVE TO BE
COORDINATED WITH TXDOT PRIOR TO COMMENCEMENT OF WORK.
B. ARRANGE USE OF SITE AND PREMISES TO ALLOW TxDOT
OCCUPANCY.
C. PROVIDE ACCESS TO AND FROM SITE AS REQUIRED BY LAW.
D. MAINTAIN EMERGENCY SITE ENTRANCES AND EXITS DURING
CONSTRUCTION.
E. DO NOT OBSTRUCT ROADWAYS, SIDEWALKS, OR OTHER PUBLIC
WAYS WITHOUT APPROVAL FROM TXDOT IN WRITING.
F. EXISTING BUILDING SPACES MAY NOT BE USED FOR STORAGE.
G. UTILITY OUTAGES AND SHUTDOWN:
i. LIMIT SHUTDOWN OF UTILITY SERVICES TO 24 HOURS AT A TIME, ARRANGED AT LEAST 2 WEEKS IN ADVANCE WITH TXDOT.
H. PREVENT ACCIDENTAL DISRUPTION OF UTILITY SERVICES TO OTHER
BUILDINGS ON SITE.
2. GC IS TO COORDINATE ROUGH AND FINISH GRADING BETWEEN
ADJACENT PHASED AREAS TO ACCOMMODATE FUTURE PHASED
WORK.
3. ANY UTILITIES NOT NOTED SPECIFICALLY ARE TO REMAIN IN
OPERATION FOR THE DURATION OF PHASE I WORK.
4. GC TO COORDINATE SWITCH OVER OF UTILITIES BETWEEN PHASES TO
ENSURE MINIMAL DISRUPTIONS TO TXDOT SERVICES.
5. REFER TO CONSTRUCTION DOCUMENTS FOR ADDITIONAL DETAILS.
PHASE IV / V
PHASE IV - THE INTENT OF PHASE IV IS TO COMPLETE THE REMAINDER OF
THE CONSTRUCTION WORK IN THE AREAS OCCUPIED BY TXDOT IN
PHASES I,II AND III.
01 - MODIFY EXISTING CONSTRUCTION FENCING TO ACCOMMODATE
PHASE IV WORK.
02 - INSTALL THE REMAINING UTILITY INFRASTRUCTURE AND PROVIDE
CONNECTIONS TO PREVIOUSLY INSTALLED WORK.
03 - REMOVE EXISTING FUEL ISLAND & GREASE RACK STRUCTURES AND
ASSOCIATED ELECTRICAL AND PLUMBING NOT REALTED TO THE FUEL
TANK SYSTEM. THE REMOVAL OF THE FUEL TANKS AND ASSOCAITED
SYSTEM IS NOT IN CONTRACT. TXDOT WILL REMOVE TANKS AND
ASSCOAITED SYSTEMS. COORDINATE WITH TXDOT AND TXDOT
ENVIRONMENTAL FOR COORDINATION OF REMOVAL.
04 - COMPLETE ENTRY AND DRIVE SITEWORK.
05 - REMOVE TEMPORARY OFFICE AND ASSOCIATED UTILITY
CONNECTIONS.
06 - INSTALL AND CONNECT NEW GENERATOR FOR RADIO TOWER
OPERATIONS
07 - REMOVE EXISTING SIGN SHOP AFTER NEW SHOP BUILDING IS
CONSTRUCTED
PHASE V - REMOVE EXISTING CONSTRUCTION FENCING AND MAKE FINAL
UTILITY AND SITEWORK CONNECTIONS. COORDINATE ACCESS FOR THIS
WORK WITH TXDOT CONTINUING OPERATIONS.
S
S
F
T A
T
O E
A X
ET
T
SI
G
E R
DER
E
E
TI
HCRA
T C
M I C H
A E L D .
H A
D D O N
18020
THIS DRAWING CREATED FOR PRODUCTION ON 22"x34" SHEET SIZE. DO NOT SCALE PRINTS.
G E
N E
R A
T E
D O
N
REVISIONS:
COPYRIGHT 2023c
Texas of Transportation Department
R
/1
/2
:5 :1
P
M
1 Addendum No. 1 2/14/2024
C
U s e rs
\m h a d d o n \D o c u m e n ts
\T X
D O
T M a rl in
M a in te n a n c e B u ild in g s M
IK
E
H A
D D
O N
.r v t
G1.08
M A
R L
IN
A
E M
F A
C
IL
IT
Y
H
IG
H W
A Y
E
A S
T
M A
R L
IN
T
X
P R
O J E
C T
N O
DRAWN BY: CH
ISSUED: 01/05/2023
W A
C O
D
IS
T R
IC
T
F A
L L S
C O
U N
T Y
PHASE IV / V - PLAN
CHECKED BY: MC
01/05/2023
1" = 60'-0"
SITE PLAN - PHASE IV / V
MECHANIC
OFFICE
MATERIAL /
SHOP STORAGE
WOMEN'S TOILET
/ LOCKER ROOM
MEN'S TOILET /
LOCKER ROOM
ELECTRICAL
SIGN ROOM
A5.04
MATCHLINE
REF A2.01
12' - 2" 7' - 8" 12' - 11" 7' - 5" 7' - 7" 33' - 0"
LINE OF SHOP
ROOF ABOVE
LINE OF SHOP
ROOF ABOVE
JANITOR'S
CLOSET
123A
81' - 8"
A7.02
A7.02
A7.03
5' - 1" 6' - 11" 19' - 4" 7' - 8"
5' - 2" 5' - 10" 8' - 0" 4' - 4" 8' - 0"
A6.02
LINE OF BREEZEWAY
ROOF ABOVE
HH
1.1
1.1
6.1
6.1
6.3
6.3
9.1
9.1
LL
JJ
8.1
8.14.1
4.1
MATCHLINE
REF A2.01
MATCHLINE
REF A2.03
MATCHLINE
REF A2.03
D1E1
E2
E2
D2
E1
A8.04
SIM.
A8.07
SIM.
A8.05
3.1
3.1
123A
E111
E112
E
E
E
E
E
E
5E127
119A
A8.05
6" 9' - 11" 12' - 10" 17' - 4" 16' - 3" 24' - 5"
6"
G R
ID
O P
E N
IN
G
16' - 2" 3' - 4" 6' - 8" 3' - 0" 7' - 2" 3' - 4" 4' - 1" 3' - 4"
1' - 4"
3' - 4" 28' - 11"
OVERALL SLAB DIMENSION
GRID
BUILDING
OPENING
E
D
MECHANICAL
E1
E1
E1
E1
E2
E2
E1
E1
3' - 4"
A
E1
E1
E2
E1
B U
IL
D
IN
G
O P
E N
IN
G
STORAGE
A .0
A .0
E2
6"
3' - 2" 13' - 3" 8' - 0"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
CORRIDOR
125A
EE123
EE124
LINE OF BREEZEWAY
ROOF ABOVE
B U
IL
D
IN
G
BOLLARD, TYP -
REF 2/S1.04
R1
R
R
A A
EMERGENCY
ESCAPE HATCH
EMERGENCY
ESCAPE HATCH
R ABV
R ABV
R ABV
R ABV
E1
R ABV
R RATED
RATED
A A
R1 ABV
K K
E128
A7.04
A8.10
A8.10
SIM.
A9.05
A9.05
DASHED LINE INDICATES
EXTENT OF PLYWOOD WALL
COVERING, TYP
A8.04
A8.06
A8.06
A8.05
A8.03
SIM.
A8.07
SIM.
A8.04
SIM.
PRE-FINISHED
MTL
DOWNSPOUT
PRE-FINISHED
MTL
DOWNSPOUT
PRE-FINISHED
MTL
DOWNSPOUT
D
OH
RAISED CONC
SLAB - REF A2.06
FOR DIMENSIONS
KEY PLAN
NORTH
MATCHLINE MATCHLINE
MATCHLINE MATCHLINE
0' 1' 15'5' 10'
FLOOR PLAN NOTES
1. CONTRACTOR IS RESPONSIBLE FOR CONTINUOUS SECURITY AT
AFFECTED OPENINGS FOR THE DURATION OF THE COSNTRUCTION
CONTRACT. COORDINATE SECURITY STATUS CHANGES W/ DISTRICT
REPRESENTATIVE PRIOR TO IMPLEMENTING CHANGES.
2. INFORMATION CONCERNING EXISTING CONDITIONS IS SUITABLE FOR
PREPARATION OF THE DRAWINGS & GIVEN FOR THE CONTRACTOR'S
CONVENIENCE.
3. ARCHITECT DOES NOT GUARANTEE ACCURACY OF SUCH EXISTING
INFORMATION. IT IS CONTRACTOR'S RESPONSIBILITY TO INFORM
HIMSELF & NECESSARY OFFICIALS AS TO THE CONDITIONS AFFECTING
THE WORK.
4. DIMENSIONS GIVEN ARE TO FACE OF FRAMING, UNLESS INDICATED
OTHERWISE.
5. WHERE CONSTRUCTION FEATURES EXIST, VERIFY DIMENSIONS WITH
FIELD CONDITIONS
6. FOR GYPSUM BOARD EXTERIOR CORNERS, PROVIDE:
- STANDARD PROFILE CORNER BEADS FOR CORNERS NOT
RECEIVING MILLWORK WRAP
- 3/8" RADIUS BULLNOSE CORNER BEADS WHERE NOTED AS "RND."
7. FOR DOORS & WINDOWS, VERIFY:
- 6-IN. OFFSET FROM ADJACENT WALL FOR TRIM CLEARANCE
- QUANTITIES, SIZES & FEATURES BEFORE ORDERING
- ROUGH-OPENING SIZES BEFORE FRAMING.
8. FOR RESTROOMS:
- PROVIDE APPROPRIATE ACOUSTICAL-RATED ASSEMBLIES FOR
WALLS & CEILINGS.
- REFER TO SHEETS G1.2-3 FOR REQUIRED BLOCKING LOCATIONS
AT GRAB BARS & TOILET PAPER DISPENSER.
9. STAIRS SHALL CONFORM TO CURRENT INTERNATIONAL BUILDING
CODE STANDARDS:
- RISER HEIGHT = 7-IN. (MAX.)
- TREAD DEPTH = 11-IN. (MIN.)
- VARIATION BETWEEN ADJACENT STAIRS = 3/8-IN. (MAX.)
10. STAIRS RUNS WITH (4+) RISERS SHALL BE CONSTRUCTED WITH
CONTINUOUS HANDRAILS THAT CONFORM TO THE FOLLOWING:
- HEIGHT = 34-IN. (MAX.) ABOVE TREAD NOSING
- SEPARATION = 1-1/2-IN. (MIN.) BETWEEN RAIL & WALL / GUARD RAIL
- TERMINATIONS RETURN TO WALL OR HAVE ROUNDED CAPS OR
BENDS.
11. COORDINATE SITE FLATWORK, SIDEWALKS, PORCHES, RAMPS ETC. TO
MEET CURRENT VERSION OF TEXAS ACCESSIBILITY STANDARDS &
OTHER CODE REQUIREMENTS.
12. COORDINATE ALL TRADES TO ENSURE COMPLETE & WORKING
INSTALLATIONS.
13. NOTIFY ARCHITECT OF ANY DISCREPANCIES.
14. INTERIOR WALLS ARE TYPE "A" UNO. REF A8.01 FOR PARTITION TYPES.
15. REF A9.01 FOR FINISH PLAN
REF A9.02 FOR WINDOW SCHEDULE
REF A9.03 FOR DOOR SCHEDULE
AIR QUALITY / ENERGY NOTES
1. LIMIT AIR INFILTRATION INTO CONDITIONED AND/OR OCCUPIED SPACES
BY SEALING, CAULKING, GASKETING, AND/OR WEATHER-STRIPPING
THE FOLLOWING:
- EXTERIOR JOINTS AROUND WINDOWS & DOOR FRAMES
- OPENINGS BETWEEN EXTERIOR WALLS & FOUNDATIONS
- OPENINGS BETWEEN EXTERIOR WALLS & ROOF
- OPENINGS AT PENETRATIONS OF UTILITIES THROUGH EXTERIOR
FLOORS, WALLS AND/OR ROOFS
- ALL OTHER SUCH OPENINGS IN THE BUILDING ENVELOPE.
2. PROVIDE AN APPROPRIATELY-SIZED SPOT EXHAUST FAN IN EACH
RESTROOM & KITCHENETTE.
3. PROVIDE IC-RATED RECESSED LIGHTING FIXTURES WHERE ADJACENT
TO INSULATION OTHER THAN CLOSED-CELL SPRAY FOAM.
NEW PARTITION TO BE CONSTRUCTED
DOOR
FLOOR PLAN LEGEND
NEW CMU PARTITION TO BE CONSTRUCTED
NOTE: REF 1/A8.01 FOR PARTITION TYPES
1-HR RATED WALL
2-HR RATED WALL
CONCRETE PAVING
2-HR RATED WALL
S
S
F
T A
T
O E
A X
ET
T
SI
G
E R
DER
E
E
TI
HCRA
T C
M I C H
A E L D .
H A
D D O N
18020
THIS DRAWING CREATED FOR PRODUCTION ON 22"x34" SHEET SIZE. DO NOT SCALE PRINTS.
G E
N E
R A
T E
D O
N
REVISIONS:
COPYRIGHT 2023c
Texas of Transportation Department
R
/1
/2
:5 :0
P
M
1 Addendum No. 1 2/14/2024
C
U s e rs
\m h a d d o n \D o c u m e n ts
\T X
D O
T M a rl in
M a in te n a n c e B u ild in g s M
IK
E
H A
D D
O N
.r v t
A2.02
M A
R L
IN
A
E M
F A
C
IL
IT
Y
H
IG
H W
A Y
E
A S
T
M A
R L
IN
T
X
P R
O J E
C T
N
DRAWN BY: CH
ISSUED: 01/05/2023
W A
C O
D
IS
T R
IC
T
F A
L L S
C O
U N
T Y
SHOP FLOOR PLAN NORTH
CHECKED BY: MC
01/05/2023
3/16" = 1'-0"
SHOP BUILDING PLAN
A5.04
A .0
VEHICLE
MAINTENANCE
BAYS
AIR
COMPRESSOR
126LAB AREA
LINE OF SHOP
ROOF ABOVE
LINE OF SHOP
ROOF ABOVE
18' - 0" 12' - 1" 7' - 0" 35' - 2"
1' - 1"
3' - 4" 21' - 8" 3' - 4"
1' - 8"
3' - 4" 4' - 1"
1.1
1.1
6.1
6.1
6.3
6.3
9.1
9.1
LL
MM
PP
RR
5.1 8.1
8.1
8.2
8.2
4.1
4.1
MATCHLINE
REF A2.02
D2
A8.04
SIM.
A8.07
SIM.
NN
3.1
3.1
E127 E112
E116
E117
E
E
E
E
E
E
E
E
E
119A
E
A7.02
A7.02
A7.03
A7.03
HERBICIDE
STORAGE
NUCLEAR
STORAGE
GAUGE ROOM
9 12
E
81' - 8"
8' - 0" 16' - 0"
R1
6" 9' - 11" 12' - 10" 17' - 4" 16' - 3" 15' - 11" 4' - 3" 4' - 3" 6"
OVERALL
GRID
OPENING
E123
R1 A1
OVERALL
GRID
OPENING
BUILDING
6" 9' - 11" 12' - 10" 14' - 9" 2' - 6" 16' - 3" 15' - 11" 4' - 3" 4' - 3" 6"
B U
IL
D
IN
G
O P
E N
IN
G
G R
ID
B U
IL
D
IN
G
O P
E N
IN
G
G R
ID
81' - 8"
D
A8.04
SIM.
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
1' - 10"
R1
R1
LINE OF SHOP
ROOF ABOVE
LINE OF LOW
ROOF ABOVE
LINE OF LOW
ROOF ABOVE
A
A8.10
A8.10
DASHED LINE INDICATES
EXTENT OF PLYWOOD WALL
COVERING, TYP
DASHED LINE INDICATES
EXTENT OF PLYWOOD WALL
COVERING, TYP
A8.05
SIM.
A8.05
SIM.
A8.05
SIM.
A8.04
SIM.
A8.05
SIM.
E
A8.06
A8.06
A8.09
A8.07
A8.04
SIM.
F V
FV
F V
FV
12' - 0"
3' - 1"
BOLLARD, TYP -
REF S1.04
BOLLARD, TYP -
REF S1.04
NL
L
L
L L
5' - 0"
6' - 6" 3' - 7"
L1
KEY PLAN
NORTH
MATCHLINE MATCHLINE
MATCHLINE MATCHLINE
0' 1' 15'5' 10'
FLOOR PLAN NOTES
1. CONTRACTOR IS RESPONSIBLE FOR CONTINUOUS SECURITY AT
AFFECTED OPENINGS FOR THE DURATION OF THE COSNTRUCTION
CONTRACT. COORDINATE SECURITY STATUS CHANGES W/ DISTRICT
REPRESENTATIVE PRIOR TO IMPLEMENTING CHANGES.
2. INFORMATION CONCERNING EXISTING CONDITIONS IS SUITABLE FOR
PREPARATION OF THE DRAWINGS & GIVEN FOR THE CONTRACTOR'S
CONVENIENCE.
3. ARCHITECT DOES NOT GUARANTEE ACCURACY OF SUCH EXISTING
INFORMATION. IT IS CONTRACTOR'S RESPONSIBILITY TO INFORM
HIMSELF & NECESSARY OFFICIALS AS TO THE CONDITIONS AFFECTING
THE WORK.
4. DIMENSIONS GIVEN ARE TO FACE OF FRAMING, UNLESS INDICATED
OTHERWISE.
5. WHERE CONSTRUCTION FEATURES EXIST, VERIFY DIMENSIONS WITH
FIELD CONDITIONS
6. FOR GYPSUM BOARD EXTERIOR CORNERS, PROVIDE:
- STANDARD PROFILE CORNER BEADS FOR CORNERS NOT
RECEIVING MILLWORK WRAP
- 3/8" RADIUS BULLNOSE CORNER BEADS WHERE NOTED AS "RND."
7. FOR DOORS & WINDOWS, VERIFY:
- 6-IN. OFFSET FROM ADJACENT WALL FOR TRIM CLEARANCE
- QUANTITIES, SIZES & FEATURES BEFORE ORDERING
- ROUGH-OPENING SIZES BEFORE FRAMING.
8. FOR RESTROOMS:
- PROVIDE APPROPRIATE ACOUSTICAL-RATED ASSEMBLIES FOR
WALLS & CEILINGS.
- REFER TO SHEETS G1.2-3 FOR REQUIRED BLOCKING LOCATIONS
AT GRAB BARS & TOILET PAPER DISPENSER.
9. STAIRS SHALL CONFORM TO CURRENT INTERNATIONAL BUILDING
CODE STANDARDS:
- RISER HEIGHT = 7-IN. (MAX.)
- TREAD DEPTH = 11-IN. (MIN.)
- VARIATION BETWEEN ADJACENT STAIRS = 3/8-IN. (MAX.)
10. STAIRS RUNS WITH (4+) RISERS SHALL BE CONSTRUCTED WITH
CONTINUOUS HANDRAILS THAT CONFORM TO THE FOLLOWING:
- HEIGHT = 34-IN. (MAX.) ABOVE TREAD NOSING
- SEPARATION = 1-1/2-IN. (MIN.) BETWEEN RAIL & WALL / GUARD RAIL
- TERMINATIONS RETURN TO WALL OR HAVE ROUNDED CAPS OR
BENDS.
11. COORDINATE SITE FLATWORK, SIDEWALKS, PORCHES, RAMPS ETC. TO
MEET CURRENT VERSION OF TEXAS ACCESSIBILITY STANDARDS &
OTHER CODE REQUIREMENTS.
12. COORDINATE ALL TRADES TO ENSURE COMPLETE & WORKING
INSTALLATIONS.
13. NOTIFY ARCHITECT OF ANY DISCREPANCIES.
14. INTERIOR WALLS ARE TYPE "A" UNO. REF A8.01 FOR PARTITION TYPES.
15. REF A9.01 FOR FINISH PLAN
REF A9.02 FOR WINDOW SCHEDULE
REF A9.03 FOR DOOR SCHEDULE
AIR QUALITY / ENERGY NOTES
1. LIMIT AIR INFILTRATION INTO CONDITIONED AND/OR OCCUPIED SPACES
BY SEALING, CAULKING, GASKETING, AND/OR WEATHER-STRIPPING
THE FOLLOWING:
- EXTERIOR JOINTS AROUND WINDOWS & DOOR FRAMES
- OPENINGS BETWEEN EXTERIOR WALLS & FOUNDATIONS
- OPENINGS BETWEEN EXTERIOR WALLS & ROOF
- OPENINGS AT PENETRATIONS OF UTILITIES THROUGH EXTERIOR
FLOORS, WALLS AND/OR ROOFS
- ALL OTHER SUCH OPENINGS IN THE BUILDING ENVELOPE.
2. PROVIDE AN APPROPRIATELY-SIZED SPOT EXHAUST FAN IN EACH
RESTROOM & KITCHENETTE.
3. PROVIDE IC-RATED RECESSED LIGHTING FIXTURES WHERE ADJACENT
TO INSULATION OTHER THAN CLOSED-CELL SPRAY FOAM.
NEW PARTITION TO BE CONSTRUCTED
DOOR
FLOOR PLAN LEGEND
NEW CMU PARTITION TO BE CONSTRUCTED
NOTE: REF 1/A8.01 FOR PARTITION TYPES
1-HR RATED WALL
2-HR RATED WALL
CONCRETE PAVING
2-HR RATED WALL
ACCESSORIES KEYNOTES
S
S
F
T A
T
O E
A X
ET
T
SI
G
E R
DER
E
E
TI
HCRA
T C
M I C H
A E L D .
H A
D D O N
18020
THIS DRAWING CREATED FOR PRODUCTION ON 22"x34" SHEET SIZE. DO NOT SCALE PRINTS.
G E
N E
R A
T E
D O
N
REVISIONS:
COPYRIGHT 2023c
Texas of Transportation Department
R
/1
/2
:2 :5
A
M
1 Addendum No. 1 2/14/2024
C
U s e rs
\c h o lb e c k \D o c u m e n ts
\T X
D O
T M a rl in
M a in te n a n c e B u ild in g s c h o lb e c k .r v t
A2.03
M A
R L
IN
A
E M
F A
C
IL
IT
Y
H
IG
H W
A Y
E
A S
T
M A
R L
IN
T
X
P R
O J E
C T
N
DRAWN BY: CH
ISSUED: 01/05/2023
W A
C O
D
IS
T R
IC
T
F A
L L S
C O
U N
T Y
SHOP FLOOR PLAN SOUTH
CHECKED BY: MC
01/05/2023
3/16" = 1'-0"
SHOP BUILDING PLAN
L EMERGENCY SHOWER & EYEWASH, REF PLUMBING
L1 FIRE EXTINGUISHER CABINET. MOUNT CENTER OF HANDLE AT 48" AFF.
REF DETAIL 10/A6.01
N DRINKING FOUNTAINS, REF PLUMBING
FOUNDATION -
REF STRUCT
GROUT FILL
2" AIR GAP
R-5 RIGID INSUL
FLEXIBLE MEMBRANE
FLASHING
SS FLASHING
WEEP
WEATHER BARRIER
1/2" EXT
SHEATHING
R-13 BATT INSUL
5/8" GWB
BASE AS SCHED
7"
MASONRY TIE
GROUT - TYP.
VAPOR BARRIER
FINISH GRADE -
REF CIVIL
6" MTL STUD FRAMING
STONE VENEER
3 1/2"
STONE VENEER
2" AIR GAP
R-5 RIGID INSUL
WEATHER
BARRIER
1/2" EXT
SHEATHING
STANDING SEAM
MTL ROOF SYSTEM
1/2" EXT
SHEATHING
R-25 RIGID INSUL
R-13 BATT INSUL
STL STRUCT -
REF STRUCT
#30 FELT
GROUT - TYP.
METAL SOFFIT PANEL
ON STUD FRAMING
MASONRY TIE
6" MTL STUD
FRAMING
MTL DECK
1/2" EXT
SHEATHING
WEATHER
BARRIER
1/2" EXT
SHEATHING
6" MTL STUD FRAMING
R-13 BATT INSUL
STANDING SEAM
MTL ROOF SYSTEM
R-25 RIGID INSUL
1/2" EXT
SHEATHING
METAL DECK
METAL SOFFIT PANEL
ON STUD FRAMING
JOIST SEAT -
REF STRUCT
#30 FELT
R-5 RIGID INSUL
AIR GAP
STL JOIST
EXTENSION -
REF STRUCT
STONE VENEER
GROUT - TYP.
MASONRY TIE
STL STRUCT -
REF STRUCT
1/2" EXT
SHEATHING
SEAL SHEATHING
TO DECK, TYP
BACKER ROD
AND SEALANT
FINISH FLOOR
0' - 0"
PAVING -
REF CIVIL
JAMB
TRIM BEYOND
OVERHEAD
COILING DOOR
WALL BEYOND
OVERHEAD DOOR
BOTTOM SEAL
1 1/2" x 1 1/2" STL
ANGLE - REF STRUCT
/2
5 3/4" 9 1/4"
NEW ELECTRIC
OVERHEAD
COILING DOOR
16" O.C. VERT FOR WITDTH
OF OPENING - COORD W/
MFG INSTALLATION FOR
DOOR MOUNTING
PRE-FINISHED
MTL FLASHING
STRUCT STL -
REF STRUCT
FLEXIBLE MEMBRANE
FLASHING
M-PANEL SIDING
ON Z-CLIPS
MTL END
CLOSURE
MTL TRIM
1/2" EXT
SHEATHING
R-5 RIGID INSUL
WEATHER BARRIER
1/2" EXT
SHEATHING
6" MTL STUD FRAMING
R-13 BATT INSUL
JAMB
TRIM BEYOND
1 1/2" x 1 1/2" STL
ANGLE - REF STRUCT
HEADPLATE
STL COLUMN IN
WALL BEYOND -
REF STRUCT
STL PLATE -
REF STRUCT
BLOCKING AS REQ'D
MTL PANEL SIDING
ELECTRIC OVERHEAD
COILING DOOR
SLOPE THRESHOLD
TO DRAIN
EDGE OF SLAB
MTL END CLOSURE
MEMBRANE FLASHING
WEATHER BARRIER
9 1/4"
1/2" EXT
SHEATHING STL COLUMN -
REF STRUCT
6" MTL STUD FRAMING
FINISH AS SCHED
S
S
F
T A
T
O E
A X
ET
T
SI
G
E R
DER
E
E
TI
HCRA
T C
M I C H
A E L D .
H A
D D O N
18020
THIS DRAWING CREATED FOR PRODUCTION ON 22"x34" SHEET SIZE. DO NOT SCALE PRINTS.
G E
N E
R A
T E
D O
N
REVISIONS:
COPYRIGHT 2023c
Texas of Transportation Department
R
/1
/2
:4
:4
A
M
1 Addendum No. 1 2/14/2024
C
U s e rs
\c h o lb e c k \D o c u m e n ts
\T X
D O
T M a rl in
M a in te n a n c e B u ild in g s c h o lb e c k .r v t
A8.09
M A
R L
IN
A
E M
F A
C
IL
IT
Y
H
IG
H W
A Y
E
A S
T
M A
R L
IN
T
X
P R
O J E
C T
N
DRAWN BY: CH
ISSUED: 01/05/2023
W A
C O
D
IS
T R
IC
T
F A
L L S
C O
U N
T Y
SECTION DETAILS
CHECKED BY: MC
01/05/2023
3" = 1'-0"
STONE @ GRADE
3" = 1'-0"
STONE @ ROOF
3" = 1'-0"
STONE @ ROOF
3" = 1'-0"
OVERHEAD DOOR SILL
3" = 1'-0"
OVERHEAD DOOR DETAIL
3" = 1'-0"
OVERHEAD DOOR JAMB
81'-5"
HSS6x6x1/2
HSS6x6x1/2 HSS5 1/2x5 1/2x1/2
HSS5 1/2x5 1/2x1/2
5" CONC SLAB ON GRADE
W/ #4 @ 12"OC EW CTRD
PER PLAN NOTES
T/SLAB = 0'-0"
MATCHLINE
PER S1.01
MATCHLINE
PER S1.03
8" CMU WALL
(FULLY GROUTED) W/
#5 @ 8"OC VERT & #4
@ 16"OC HORIZ, TYP AT
STORM SHELTER
24"DP MAT FTG W/
#8T&B @ 12"OC EW
W/ STD HOOK EA END
F4.0
S5.04
S5.04
S5.04
S5.04
S5.02
TYP
F8.0F8.0
H
J
K
L
1.1 4.1 6.1 6.3 8.1 9.1
9'-11"
S5.03
S5.03
GB1
S5.03
G B
S5.03
S5.04
7/S3.01
G B
HSS5 1/2x5 1/2x1/2HSS5 1/2x5 1/2x1/2HSS5 1/2x5 1/2x1/2HSS5 1/2x5 1/2x1/2
HSS5 1/2x5 1/2x1/2 HSS5 1/2x5 1/2x1/2
HSS5 1/2x5 1/2x1/2
HSS6x6x1/2
9'-11" 12'-10" 6'-11" 9'-4" 15'-11"
80'-9"
6/S3.01
6.23.1
17'-4" 8'-6"
S5.04
TYP
NON BEARING CMU
WALLS, REINF PER STRUCT
GENERAL NOTES, TYP
1/S3.01
C J
CJ
S5.01
HSS6x6x1/2
F8.0 /S
.0
TYP
S5.03
1"BP, TYP UNO
S5.03
2'-3 3/4"
/4
/8
1'-6"⌀x36"DP
BOLLARD SLEEVE
PER 2/S1.04, TYP
3"
F4.0 F4.0 F4.0 F4.0 F4.0 F4.0 F4.0
F4.0
F4.0
6"
HSS4x4x1/4 4
/8
S5.01
4" CONC PAD
REF MECH FOR LOCATION
AND SIZE TYP
HSS4x4x1/4
HSS4x4x1/4
5'-0" 2'-10"
S5.03
6"
TYP
4" CONC PAD
REF MECH FOR LOCATION
AND SIZE TYP
TYP
TYP
TYP
1'-3"
HSS4x4x1/4
HSS4x4x1/4
HSS4x4x1/4
HSS4x4x1/4
HSS4x4x1/4
HSS4x4x1/4 4 3/4" 6'-7 1/4"
/4
/4
/4
TYP
1"
5/8"
1. STRUCTURAL GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS AND LEGEND PER S0.01, S0.02, S0.03 AND
S0.04.
2. VERIFY ALL DIMENSIONS AND ELEVATIONS WITH THE ARCHITECTURAL DRAWINGS.
3. CONTRACTOR SHALL LOCATE AND VERIFY THE FOLLOWING WITH OTHERS PRIOR TO POURING CONCRETE: ALL
DOOR OPENINGS IN FOUNDATION WALLS; DRAINS AND SLOPES; BLOCKOUTS FOR PLUMBING, SPRINKLERS AND
HVAC]. ALL DUCTS, CHASES AND PIPES PER MECHANICAL, PLUMBING, ELECTRICAL AND SPRINKLER DRAWINGS.
4. TOP OF SLAB (T/SLAB) ELEVATION ASSUMED 0'-0". FOR ACTUAL T/SLAB ELEVATION REFER TO CIVIL AND
ARCHITECTURAL DRAWINGS. PROVIDE 6 MIL VAPOR BARRIER BELOW SLAB AT INTERIOR SPACES. PROVIDE
FREE-DRAINING GRANULAR FILL PER GEOTECH REPORT.
5. TYPICAL TOP OF INTERIOR (T/INTERIOR) FOOTING & GRADE BEAM ELEVATION = -0'-8", UNO.
6. ALL FOOTINGS AND SLABS TO BEAR ON STRUCTURAL FILL. SUBGRADE PREPARATION, STRUCTURAL FILL, DRAINAGE SYSTEM, AND OTHER REQUIREMENTS PER GEOTECH REPORT AS NOTED IN THE STRUCTURAL
GENERAL NOTES.
7. CJ INDICATES CONTROL JOINT PER PLAN.
8. SEE S2.04 FOR STROM SHELTER
9. TYPICAL DETAILS PER:
S5.01 TYPICAL FOUNDATION DETAILS
S9.01 TYPICAL CMU DETAILS
10. = NON BEARING CMU WALL
= BEARING CMU WALL
= MAT FOUNDATION
FOUNDATION PLAN NOTES:
0' 5' 15' 30' 50'
KEY PLAN
NORTH
MATCHLINE MATCHLINE
MATCHLINE MATCHLINE
N
THIS DRAWING CREATED FOR PRODUCTION ON 22"x34" SHEET SIZE. DO NOT SCALE PRINTS.
G E
N E
R A
T E
D O
N
REVISIONS:
COPYRIGHT 2023c
Texas of Transportation Department
R
NOT FOR REGULATORY
APPROVAL, PERMITTING,
OR CONSTRUCTION
SUBMITTAL
/1
/2
:5 :1
P
M
1 Addendum No.1 2/14/2024
C lo c a lr e v it \S tr u c t-
-0
-R a s u s a n X
X H
.r v t
S1.02
M A
R L
IN
A
E M
F A
C
IL
IT
Y
H
IG
H W
A Y
E
A S
T
M A
R L
IN
T
X
P R
O J E
C T
N
-3
-2
-3
DRAWN BY: LK
ISSUED: 01/05/24
W A
C O
D
IS
T R
IC
T
F A
L L S
C O
U N
T Y
100%
CHECKED BY: NR
SHOP FOUNDATION PLAN NORTH
GRADE BEAM SCHEDULE
TYPE WIDTH DEPTH CONT REINF TIES NOTES
GB1 1'-6" 2'-0" (3) #6T&B #3 @ 12"OC
GB2 2'-0" 2'-0" (4) #6T&B #3 @ 12"OC
SCALE: 3/16" = 1'-0"
SHOP FOUNDATION PLAN NORTH
SPREAD FOOTING SCHEDULE
TYPE
SIZE
REINFORCING COMMENTSLENGTH WIDTH DEPTH
F3.0 3'-0" 3'-0" 2'-0" (5) #5 EW T&B
F4.0 4'-0" 4'-0" 2'-0" (7) #5 EW T&B
F8.0 8'-0" 8'-0" 2'-0" (14) #5 EW T&B
F8.0x4.0 8'-0" 4'-0" 2'-0" (14) #5 TRANSV & (7)
#5 LONGIT T&B
F9.0x4.0 9'-0" 4'-0" 2'-0" (16) #5 TRANSV & (7)
#5 LONGIT T&B
F11.0x4.0 11'-0" 4'-0" 2'-0" (20) #5 TRANSV & (7)
#5 LONGIT T&B
1 Addendum No. 1 2/14/2024
5" CONC SLAB ON GRADE
W/ #4 @ 12"OC EW CTRD
PER PLAN NOTES
T/SLAB = 0'-0"
(2) #4 x 48" DIAG
CTRD, TYP
34'-0" 9'-2"
/8
HSS5 1/2x5 1/2x1/2
HSS5 1/2x5 1/2x1/2
MATCHLINE
PER S1.02
1.1 4.1 5.1 6.1 6.3 8.1 8.2 9.1
M
N
P
R
G B
S5.03
S5.03
S5.03
S5.03
S5.02
HSS5 1/2x5 1/2x1/2
HSS5 1/2x5 1/2x1/2 HSS5 1/2x5 1/2x1/2
HSS4x4x1/4 HSS4x4x1/4
HSS4x4x1/4
HSS5 1/2x5 1/2x1/2
HSS5 1/2x5 1/2x1/2
HSS4x4x1/4
HSS5 1/2x5 1/2x1/2
HSS4x4x1/4
HSS4x4x1/4
HSS4x4x1/4
HSS5 1/2x5 1/2x1/2
HSS5 1/2x5 1/2x1/2
GB1
S5.03
S5.03
G B
S5.03
80'-9"
9'-11" 12'-10" 14'-9" 2'-6" 16'-3" 15'-11" 4'-3" 4'-3"
HSS5 1/2x5 1/2x1/28/S3.01
3/S3.01
1/S3.02
3.1
C J
CJ
S5.01
F8.0
HSS6x6x1/2
1"BP, TYP UNO
GB1
G B
G B
S5.03
S5.03
2'-3 3/4"2'-3 3/4"
/4
/4
/4
/4
/8
/4
/4
/4
/4
1'-6"⌀x36"DP
BOLLARD SLEEVE
PER 2/S1.04, TYP
/2
G B
G B
G B
F4.0
F4.0F4.0F4.0
F4.0F4.0
F4.0 F4.0
F11.0x4.0
F9.0x4.0
F4.0
F4.0 F4.0
F4.0
4" CONC PAD
REF MECH FOR
LOCATION AND
SIZE TYP
6"
T Y
P
S5.03
TYP
TYP
1'-3"
TYP
1'-3"
TYP
6"
4"
6" 6
HSS4x4x1/4
HSS4x4x1/4
HSS4x4x1/4
/2
/2
HSS4x4x1/4
HSS4x4x1/4
/2
/2
/8
HSS4x4x1/4
/4
HSS4x4x1/4
HSS4x4x1/4
/4
/8
HSS4x4x1/4
/4
HSS4x4x1/4
HSS4x4x1/4
/2
/2
HSS4x4x1/4
HSS4x4x1/4
/2
/2
HSS4x4x1/4
/8
TYP
1"
1. STRUCTURAL GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS AND LEGEND PER S0.01, S0.02, S0.03 AND
S0.04.
2. VERIFY ALL DIMENSIONS AND ELEVATIONS WITH THE ARCHITECTURAL DRAWINGS.
3. CONTRACTOR SHALL LOCATE AND VERIFY THE FOLLOWING WITH OTHERS PRIOR TO POURING CONCRETE: ALL
DOOR OPENINGS IN FOUNDATION WALLS; DRAINS AND SLOPES; BLOCKOUTS FOR PLUMBING, SPRINKLERS AND
HVAC. ALL DUCTS, CHASES AND PIPES PER MECHANICAL, PLUMBING AND ELECTRICAL.
4. TOP OF SLAB (T/SLAB) ELEVATION ASSUMED 0'-0". FOR ACTUAL T/SLAB ELEVATION REFER TO CIVIL AND
ARCHITECTURAL DRAWINGS. PROVIDE 10 MIL VAPOR BARRIER BELOW SLAB AT INTERIOR SPACES. PROVIDE
FREE-DRAINING GRANULAR FILL PER GEOTECH REPORT.
5. TYPICAL TOP OF INTERIOR (T/INTERIOR) FOOTING & GRADE BEAM ELEVATION = -0'-8", UNO.
6. ALL FOOTINGS AND SLABS TO BEAR ON STRUCTURAL FILL. SUBGRADE PREPARATION, STRUCTURAL FILL, DRAINAGE SYSTEM, AND OTHER REQUIREMENTS PER GEOTECH REPORT AS NOTED IN THE STRUCTURAL
GENERAL NOTES.
7. CJ INDICATES CONTROL JOINT PER PLAN.
8. PAD SIZE AND BOLLARD LOCATIONS BEING DEPENDENT ON SIZE OF TANK PROVIDED AND MAY REQUIRE
RESIZING.
9. TYPICAL DETAILS PER:
S5.01 TYPICAL FOUNDATION DETAILS
FOUNDATION PLAN NOTES:
0' 5' 15' 30' 50'
KEY PLAN
NORTH
MATCHLINE MATCHLINE
MATCHLINE MATCHLINE
N
THIS DRAWING CREATED FOR PRODUCTION ON 22"x34" SHEET SIZE. DO NOT SCALE PRINTS.
G E
N E
R A
T E
D O
N
REVISIONS:
COPYRIGHT 2023c
Texas of Transportation Department
R
NOT FOR REGULATORY
APPROVAL, PERMITTING,
OR CONSTRUCTION
SUBMITTAL
/1
/2
:5 :2
P
M
1 Addendum No.1 2/14/2024
C lo c a lr e v it \S tr u c t-
-0
-R a s u s a n X
X H
.r v t
S1.03
M A
R L
IN
A
E M
F A
C
IL
IT
Y
H
IG
H W
A Y
E
A S
T
M A
R L
IN
T
X
P R
O J E
C T
N
-3
-2
-3
DRAWN BY: LK
ISSUED: 01/05/24
W A
C O
D
IS
T R
IC
T
F A
L L S
C O
U N
T Y
100%
CHECKED BY: NR
SHOP FOUNDATION PLAN SOUTH
SCALE: 3/16" = 1'-0"
SHOP FOUNDATION PLAN SOUTH
GRADE BEAM SCHEDULE
TYPE WIDTH DEPTH CONT REINF TIES NOTES
GB1 1'-6" 2'-0" (3) #6T&B #3 @ 12"OC
GB2 2'-0" 2'-0" (4) #6T&B #3 @ 12"OC
SPREAD FOOTING SCHEDULE
TYPE
SIZE
REINFORCING COMMENTSLENGTH WIDTH DEPTH
F3.0 3'-0" 3'-0" 2'-0" (5) #5 EW T&B
F4.0 4'-0" 4'-0" 2'-0" (7) #5 EW T&B
F8.0 8'-0" 8'-0" 2'-0" (14) #5 EW T&B
F8.0x4.0 8'-0" 4'-0" 2'-0" (14) #5 TRANSV & (7)
#5 LONGIT T&B
F9.0x4.0 9'-0" 4'-0" 2'-0" (16) #5 TRANSV & (7)
#5 LONGIT T&B
F11.0x4.0 11'-0" 4'-0" 2'-0" (20) #5 TRANSV & (7)
#5 LONGIT T&B
1. STRUCTURAL GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS AND LEGEND PER S0.01, S0.02, S0.03 AND
S0.04.
2. VERIFY ALL DIMENSIONS AND ELEVATIONS WITH THE ARCHITECTURAL DRAWINGS.
3. ALL DUCTS, CHASES AND PIPES SHALL BE PER MECHANICAL, PLUMBING AND ELECTRICAL.
4. INDICATES TOP OF STEEL (T/STL) ELEVATION (T/STL = B/DECK) UNO; AT GIRDERS SUPPORTING
OPEN WEB STEEL JOISTS (T/STL) = -2 1/2" FOR BEARING SEAT DEPTH. STEEL JOISTS SHALL BE EQUALLY SPACED, TYPICAL UNO.
5. METAL DECK PER PLAN AND STRUCTURAL GENERAL NOTES. DECK ATTACHMENT REQUIREMENTS PER
STRUCTURAL GENERAL NOTES.
6. TYPICAL ROOF DECK OVERHANG TO BE 6" FROM CENTERLINE OF BEAM, UNO.
7. ROOF JOISTS ARE TO BE REVIEWED FOR ADDITIONAL LOADS FROM MECHANICAL UNITS AND PIPING.
CONTRACTOR TO PROVIDE THE TRUSS/JOIST SUPPLIER WITH A DRAWING SHOWING THE LOCATION AND
SUPPORT CONDITIONS FOR ALL MECHANICAL, ELECTRICAL, PLUMBING AND SPRINKLER LOADS. ROOF
TRUSS/JOIST SUPPLIER IS RESPONSIBLE FOR ADDITIONAL FRAMING REQUIRED TO SUPPORT MECHANICAL
EQUIPMENT, DUCTS, ELECTRICAL EQUIPMENT, PLUMBING AND FIRE PROTECTION.
8. BRACED FRAME MEMBER SIZES PER ELEVATIONS.
9. CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY SHORING.
10. NUMBERS INDICATED ON PLAN ADJACENT TO JOIST CALLOUT SHOWN THUS: (400/200) INDICATES TOTAL LOAD
AND LIVE LOAD (IN PLF) FOR WHICH JOISTS ARE TO BE DESIGNED BY OTHERS.
11. ROOF JOISTS TO BE DESIGNED FOR A NET UPLIFT LOAD OF 30 PSF. ROOF JOIST OVERHANGS TO BE DESIGNED
FOR A NET UPLIFT OF 40 PSF, UNO.
12. ROOF JOISTS AND GIRDER TRUSSES ARE TO BE REVIEWED FOR ADDITIONAL LOADS FROM MECHANICAL UNITS
AND PIPING. ADDTIONAL LOADING REQUIREMENTS PER PLAN. CONTRACTOR TO PROVIDE THE TRUSS/JOIST
SUPPLIER WITH A DRAWING SHOWING THE LOCATION AND SUUPORT CONDITIONS FOR ALL MECHANICAL, ELECTRICAL, PLUMBING AND SPRINKLER LOADS. ROOF TRUSS/JOIST SUPPLIER IS RESPONSIBLE FOR
ADDITIONAL FRAMING REQUIRED TO SUPPORT MECHANICAL EQUIPMEN, DUCTS, ELECTRICAL EQUIPMENT, PROFFESSIONAL ENGINEER PER THE STRUCTURAL GENERAL NOTES.
13. DESIGN JOIST SEAT EXTENSION FOR AN ULTIMATE WIND UPLIFT FORCE OF 70 PSF.
14. TYPICAL DETAILS PER:
S8.01 TYPICAL STEEL DETAILS
ROOF FRAMING PLAN NOTES:
T/STL=X'-X"
W12x14 W12x14
SLOPE DN
PER ARCH
SLOPE DN
PER ARCH
W x C
/2
(T /B
E A
M
/2
W x
(T /B
E A
M
W x
(T /B
E A
M
W x C
/2
(T /B
E A
M
W12x14
W x
H
IG
H
(T /B
E A
M
W x C
/2
(T /B
E A
M
/2
MATCHLINE
PER S2.01
MATCHLINE
PER S2.03
1.5B B20 METAL DECK
PER PLAN NOTES
TYP AT ROOF
T/DECK = VARIES
JOIST EXTENSION
PER JOIST
MFR TYP
H
J
K
L
1.1 4.1 5.1 6.1 6.3 8.1 8.2 9.1
9'-11" 12'-10" 14'-9" 2'-6" 6'-11" 9'-4" 15'-11" 4'-3" 4'-3"
80'-9"
W x
(T /B
E A
M
HSS12x6x1/2
(T/BEAM=16'-7 1/2")
W12x14 W12x14 W12x14
18K6 (180/100)18K6 (180/100)
JOIST EXTENSION
PER JOIST
MFR TYP
6/S3.01 7/S3.01
1/S3.01
W12x14 (LOW)
(T/BEAM=11'-4")
W12x14 (LOW)
(T/BEAM=11'-4")
W12x14 (LOW)
(T/BEAM=11'-4")
6.23.1
SLOPE DN
PER ARCH
SLOPE DN
PER ARCH
S8.02
4 TYP
S8.02
TYP
S8.02
TYP
S8.02
W x C
/2
(T /B
E A
M
18K6 (180/100)18K6 (180/100)
W x C
/2
(T /B
E A
M
/2 ")18K6 (180/100) 18K6 (180/100)
/S
.0
W x
H
IG
H
(T /B
E A
M
S8.03
T/STL = VARIES,
-2 1/2" BELOW B/DECK
S8.02
HSS2 1/2x2 1/2x5/16
6"
S8.02
S8.02
HSS2 1/2x2 1/2x5/16
OUTRIGGERS @ 36"OC TYP
6"
6"
HSS2 1/2x2 1/2x5/16 6"
FRAMING FOR ROOFTOP MECH UNITS
WHERE IT OCCURS. COORDINATE ALL
MECH DIMENSIONS AND LOCATIONS
PRIOR TO INSTALLATION OF FRAMING.
SEE DETAILS ON SHEET S8.04, TYP
H S
S x x
/8 L
O W
(T /B
E A
M
H S
S x x
/8 L
O W
(T /B
E A
M
CONN PER
6/S8.03 AT
HIGH STL TYP
5'-0" 2'-10"
1'-8 1/8"
S8.03
W x
(T /B
E A
M
S8.03
HSS2 1/2x2 1/2x5/16
TYPHSS2 1/2x2 1/2x5/16
TYP
S2.02
S2.02
CONN PER 10/S8.03
AT LOW STL SIM
CONDITION TYP
HSS12x4x3/8 (LOW)
(T/BEAM=13'-0")
0' 5' 15' 30' 50'
H
1.1
1.5B B20 METAL DECK
PER PLAN NOTES
TYP AT ROOF
T/DECK = 9'-0 1/2"
S8.01
S8.01
S8.01
HSS COL PER
PLAN TYP
TYP
H
5'-3 7/8"
M
A X
HSS4x4x3/8
TYP
1.5B B20 METAL DECK
PER PLAN NOTES
TYP AT ROOF
T/DECK = 9'-0 1/2"
S8.01
4 S8.01
HSS COL PER
PLAN TYPS8.01
TYP
KEY PLAN
NORTH
MATCHLINE MATCHLINE
MATCHLINE MATCHLINE
N
THIS DRAWING CREATED FOR PRODUCTION ON 22"x34" SHEET SIZE. DO NOT SCALE PRINTS.
G E
N E
R A
T E
D O
N
REVISIONS:
COPYRIGHT 2023c
Texas of Transportation Department
R
NOT FOR REGULATORY
APPROVAL, PERMITTING,
OR CONSTRUCTION
SUBMITTAL
/1
/2
:5 :2
P
M
1 Addendum No.1 2/14/2024
C lo c a lr e v it \S tr u c t-
-0
-R a s u s a n X
X H
.r v t
S2.02
M A
R L
IN
A
E M
F A
C
IL
IT
Y
H
IG
H W
A Y
E
A S
T
M A
R L
IN
T
X
P R
O J E
C T
N
-3
-2
-3
DRAWN BY: LK
ISSUED: 01/05/24
W A
C O
D
IS
T R
IC
T
F A
L L S
C O
U N
T Y
100%
CHECKED BY: NR
SHOP ROOF FRAMING PLAN NORTH
SCALE: 3/16" = 1'-0"
SHOP ROOF FRAMING PLAN NORTH
SCALE: 1/4" = 1'-0"
CANOPY FRAMING PLAN
SCALE: 1/4" = 1'-0"
CANOPY FRAMING PLAN
W12x14
W12x14W12x14
W12x14
(T/BEAM=12'-0")
W12x14
(T/BEAM=13'-3")
SLOPE DN
PER ARCH
W12x30W12x30
SLOPE DN
PER ARCH
SLOPE DN
PER ARCH
SLOPE DN
PER ARCH
SLOPE DN
PER ARCH
W x
C
/4
(T /B
E A
M
W x
C
/4
(T /B
E A
M
/2
W12x14
16K3
16K3
W x
H
IG
H
(T /B
E A
M
/2
W x
H
IG
H
(T /B
E A
M
MATCHLINE
PER S2.02
JOIST EXTENSION
PER JOIST
MFR TYP
1.5B B20 METAL DECK
PER PLAN NOTES
TYP AT ROOF
T/DECK = VARIES
JOIST
EXTENSION
PER JOIST
MFR TYP
JOIST EXTENSION
PER JOIST
MFR TYP
1.1 4.1 5.1 6.1 6.3 8.1 8.2 9.1
M
N
P
R
W12x14 W12x14 W12x14
18K6 (180/100) 18K6 (180/100)
W12x14
80'-9"
22'-9" 14'-9" 18'-9" 15'-11" 4'-3" 4'-3"
8/S3.01
3/S3.01
1/S3.02
6.23.1
W12x14 (LOW)
(T/BEAM=15'-10")
S8.02
S8.02
TYP
S8.02
TYP
S8.02
S8.02
TYP
S8.02
S8.02
S8.02
18K6 (180/100)18K6 (180/100) 18K6 (180/100)
W x
H
IG
H
(T /B
E A
M
W x
C
/4
(T /B
E A
M
/2
W30x99 C=1/2"
W x
C
/4
(T /B
E A
M
W x
C
/4
16K3W12x19 (HIGH)
(T/BEAM=13'-7")
W x
H
IG
H
(T /B
E A
M
/2
W x
H
IG
H
(T /B
E A
M
/2
CONN PER
6/S8.03 AT
HIGH STL TYP
E
Q S
P A
C E
S E
Q S
P A
C E
S E
Q S
P A
C E
S
16K3
T/STL = VARIES - 2 1/2" BELOW B/DECK
HSS2 1/2x2 1/2x5/16
HSS2 1/2x2 1/2x5/16 HSS2 1/2x2 1/2x5/16
OUTRIGGER @ 36"OC TYP
W x
(T /B
E A
M
S8.02
6"
6"
S8.02
W x
(T /B
E A
M
HSS2 1/2x2 1/2x5/16
W12x14
(T/BEAM=12'-0")
S8.02
S8.03
HSS2 1/2x2 1/2x5/16
T/STL = VARIES - 2 1/2" BELOW B/DECK
T/STL = VARIES - 2 1/2"
BELOW B/DECK
S8.03
18K6 (180/100)
6"
6"
3'-5 3/4" 3'-2"
W x C
/4
(T /B
E A
M
V a ri e s
16K316K3
HSS12x4x3/8 (LOW)
(T/BEAM=11'-0")
HSS2 1/2x2 1/2x5/16
H S
S x x
/8 L O
W
(T /B
E A
M
H S
S x x
/8 L O
W
(T /B
E A
M
H S
S x x
/8 L O
W
(T /B
E A
M
H S
S x x
/8 L O
W
(T /B
E A
M
H S
S x x
/8 L O
W
(T /B
E A
M
FRAMING FOR ROOFTOP MECH UNITS
WHERE IT OCCURS. COORDINATE ALL
MECH DIMENSIONS AND LOCATIONS
PRIOR TO INSTALLATION OF FRAMING.
SEE DETAILS ON SHEET S8.04, TYP
6" 6"
W x
H
IG
H
(T /B
E A
M
H S
S x x
/8 L O
W
(T /B
E A
M
CONN PER
6/S8.03 AT
HIGH STL TYP
CONN PER 10/S8.03
AT LOW STL SIM
CONDITION TYP
1. STRUCTURAL GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS AND LEGEND PER S0.01, S0.02, S0.03 AND
S0.04.
2. VERIFY ALL DIMENSIONS AND ELEVATIONS WITH THE ARCHITECTURAL DRAWINGS.
3. ALL DUCTS, CHASES AND PIPES SHALL BE PER MECHANICAL, PLUMBING AND ELECTRICAL.
4. INDICATES TOP OF STEEL (T/STL) ELEVATION (T/STL = B/DECK) UNO; AT GIRDERS SUPPORTING
OPEN WEB STEEL JOISTS (T/STL) = -2 1/2" FOR BEARING SEAT DEPTH. STEEL JOISTS SHALL BE EQUALLY SPACED, TYPICAL UNO.
5. METAL DECK PER PLAN AND STRUCTURAL GENERAL NOTES. DECK ATTACHMENT REQUIREMENTS PER
STRUCTURAL GENERAL NOTES.
6. TYPICAL ROOF DECK OVERHANG TO BE 6" FROM CENTERLINE OF BEAM, UNO.
7. ROOF JOISTS ARE TO BE REVIEWED FOR ADDITIONAL LOADS FROM MECHANICAL UNITS AND PIPING.
CONTRACTOR TO PROVIDE THE TRUSS/JOIST SUPPLIER WITH A DRAWING SHOWING THE LOCATION AND
SUPPORT CONDITIONS FOR ALL MECHANICAL, ELECTRICAL, PLUMBING AND SPRINKLER LOADS. ROOF
TRUSS/JOIST SUPPLIER IS RESPONSIBLE FOR ADDITIONAL FRAMING REQUIRED TO SUPPORT MECHANICAL
EQUIPMENT, DUCTS, ELECTRICAL EQUIPMENT, PLUMBING AND FIRE PROTECTION.
8. BRACED FRAME MEMBER SIZES PER ELEVATIONS.
9. CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY SHORING.
10. NUMBERS INDICATED ON PLAN ADJACENT TO JOIST CALLOUT SHOWN THUS: (400/200) INDICATES TOTAL LOAD
AND LIVE LOAD (IN PLF) FOR WHICH JOISTS ARE TO BE DESIGNED BY OTHERS.
11. ROOF JOISTS TO BE DESIGNED FOR A NET UPLIFT LOAD OF 30 PSF. ROOF JOIST OVERHANGS TO BE DESIGNED
FOR A NET UPLIFT OF 40 PSF, UNO.
12. ROOF JOISTS AND GIRDER TRUSSES ARE TO BE REVIEWED FOR ADDITIONAL LOADS FROM MECHANICAL UNITS
AND PIPING. ADDTIONAL LOADING REQUIREMENTS PER PLAN. CONTRACTOR TO PROVIDE THE TRUSS/JOIST
SUPPLIER WITH A DRAWING SHOWING THE LOCATION AND SUUPORT CONDITIONS FOR ALL MECHANICAL, ELECTRICAL, PLUMBING AND SPRINKLER LOADS. ROOF TRUSS/JOIST SUPPLIER IS RESPONSIBLE FOR
ADDITIONAL FRAMING REQUIRED TO SUPPORT MECHANICAL EQUIPMEN, DUCTS, ELECTRICAL EQUIPMENT, PROFFESSIONAL ENGINEER PER THE STRUCTURAL GENERAL NOTES.
13. DESIGN JOIST SEAT EXTENSION FOR AN ULTIMATE WIND UPLIFT FORCE OF 70 PSF.
14. TYPICAL DETAILS PER:
S8.01 TYPICAL STEEL DETAILS
ROOF FRAMING PLAN NOTES:
T/STL=X'-X"
0' 5' 15' 30' 50'
KEY PLAN
NORTH
MATCHLINE MATCHLINE
MATCHLINE MATCHLINE
N
THIS DRAWING CREATED FOR PRODUCTION ON 22"x34" SHEET SIZE. DO NOT SCALE PRINTS.
G E
N E
R A
T E
D O
N
REVISIONS:
COPYRIGHT 2023c
Texas of Transportation Department
R
NOT FOR REGULATORY
APPROVAL, PERMITTING,
OR CONSTRUCTION
SUBMITTAL
/1
/2
:5 :2
P
M
1 Addendum No.1 2/14/2024
C lo c a lr e v it \S tr u c t-
-0
-R a s u s a n X
X H
.r v t
S2.03
M A
R L
IN
A
E M
F A
C
IL
IT
Y
H
IG
H W
A Y
E
A S
T
M A
R L
IN
T
X
P R
O J E
C T
N
-3
-2
-3
DRAWN BY: LK
ISSUED: 01/05/24
W A
C O
D
IS
T R
IC
T
F A
L L S
C O
U N
T Y
100%
CHECKED BY: NR
SHOP ROOF FRAMING PLAN SOUTH
SCALE: 3/16" = 1'-0"
SHOP ROOF FRAMING PLAN SOUTH
CL COL
C L C
L
1"Ø GROUT HOLE
(OPTIONAL)
COL PER PLAN
CMU OR CONC WALL
WHERE OCCURS
PER PLAN
1"Ø GROUT HOLE
(OPTIONAL)
COL PER PLAN
COL PER PLAN
(4) 3/4"Ø THRD RODS W/
HEX NUTS & WASHERS UNO
1"± NON-SHRINK GROUT, MIN
CMU OR CONC WALL
WHERE OCCURS
PER PLAN
AB LOCATION WHERE
ADJACENT WALL OCCURS
CONC FTG PER PLAN
P E
R P
L A
N
M
IN
U N
O
T Y
P
C
L R
PLAN - INTERIOR COLUMN
PLAN - EDGE COLUMN
ELEVATION
"F"
SIZE PER
TABLE 1 TYP
"F"
SIZE PER
TABLE 1 TYP
TACK WELD
NUT TO AB
T Y
P
/2
TYP
1 1/2"
T Y
P
/2
T Y
P
/2
1 1/2"
C L C
L
CLR
1/2" BP PER PLAN
BP PER PLAN
TABLE 1
BASEPLATE
THICKNESS
3/8" , 1/2"
5/8" , 3/4"
> = 7/8"
"F"
FILLET
SIZE
3/16"
1/4"
5/16"
TYP
1 1/2"
T Y
P
/2
WALL OCCURS
1/4" CLR WHERE
T/FTG
PER PLAN
PLAN
T/SLAB
PER PLAN
MULTIPLE COLUMNS
TYP
1 1/2"
T Y
P
/2
T Y
P
/2
CL BP
C L C
O L
C L C
O L
C L C
O L
BP PER PLAN
"F"
SIZE PER
TABLE 1 TYP
T Y
P
/2
T Y
P
/2
CL BP
C L C
O L
C L C
O L
C L B
P
TYP
1 1/2"
1"Ø GROUT HOLE
(OPTIONAL)
P L A
N
P E
R
P L A
N
P E
R
P L A
N
P E
R
P L A
N
P E
R P
E R
P L A
N
P E
R P
L A
N
PER PLAN
COL PER PLAN
INFILL CONC PER TYP
CONTROL JOINT DETAILS
SOG & REINF PER PLAN
REINF PER PLAN
1"± NON-SHRINK GROUT
GRID
T Y
P
C
L R
BP & AB'S PER 10/S5.02
CL COL & FTG
T/SLAB
PER PLAN
VAPOR BARRIER
PER PLAN NOTES
T/FTG
PER PLAN
#4 x 24"
24" @ 12"OC
REINF PER PLAN
P E
R P
L A
N
SOG & REINF
PER PLAN
T/SLAB
PER PLAN
#4 x @ 12"OC 24"
24"
C L R
GRID
VAPOR BARRIER
PER PLAN NOTES
T/FTG
PER PLAN
(2) ADDL #5 AT MID-DEPTH
OF BEAM
PER PLAN
SLOPE
PER ARCH
CL
HSS COL PER ARCH
REINF PER PLAN
SOG & REINF
PER PLAN
T/SLAB
PER PLAN
FIN GRADE
STONE VENEER
PER ARCH
GRID
#4 x 24"
24" @ 12"OC
VAPOR BARRIER
PER PLAN NOTES
T/FTG
PER PLAN
9 1/2"
GB BEYOND, GB
REINF TO BE CONT
THRU FTG, OMITTED
FOR CLARITY
BP & AB'S PER
10/S5.02
P E
R P
L A
N
PER PLAN
COL PER PLAN
INFILL CONC PER TYP
CONTROL JOINT DETAILS
SOG & REINF PER PLAN
REINF PER PLAN
1"± NON-SHRINK GROUT
GRID
BP & AB'S PER 10/S5.02
CL COL & FTG
T/SLAB
PER PLAN
VAPOR BARRIER
PER PLAN NOTES
T/FTG
PER PLAN
9"
#4 x 24"
24" @ 12"OC
SLOPE
PER ARCH
CFS WALL PER ARCH
REINF PER PLAN
SOG & REINF
PER PLAN
T/SLAB
PER PLAN
FIN GRADE
STONE VENEER
PER ARCH
GRID
#4 24"
24" @ 12"OC
VAPOR BARRIER
PER PLAN NOTES
T/FTG
PER PLAN
(2) ADDL #5 AT MID-DEPTH
OF BEAM
6"
#3 x @ 12"OC
W/ (2) #4 CONT
HORIZ
P E
R P
L A
N
2" 2"
PER PLAN
9 1/2"
SOG & REINF
PER PLAN
T/SLAB
PER PLAN
GB BEYOND, GB
REINF TO BE CONT
THRU FTG,
OMITTED FOR
CLARITY
P E
R P
L A
N
T/FTG
PER PLAN
CONC FTG &
REINF PER PLAN
PER PLAN
C L R
PL3/4x12x1'-0"
W/(4) 3/4"x8" WHS
(9" GAGE)
#4 x @ 12"OC 24"
24"
COL PER PLAN
GRID
PER PLAN
1/4
VAPOR BARRIER
PER PLAN NOTES
2"
THIS DRAWING CREATED FOR PRODUCTION ON 22"x34" SHEET SIZE. DO NOT SCALE PRINTS.
G E
N E
R A
T E
D O
N
REVISIONS:
COPYRIGHT 2023c
Texas of Transportation Department
R
NOT FOR REGULATORY
APPROVAL, PERMITTING,
OR CONSTRUCTION
SUBMITTAL
/1
/2
:5 :2
P
M
1 Addendum No.1 2/14/2024
C lo c a lr e v it \S tr u c t-
-0
-R a s u s a n X
X H
.r v t
S5.02
M A
R L
IN
A
E M
F A
C
IL
IT
Y
H
IG
H W
A Y
E
A S
T
M A
R L
IN
T
X
P R
O J E
C T
N
-3
-2
-3
DRAWN BY: LK
ISSUED: 01/05/24
W A
C O
D
IS
T R
IC
T
F A
L L S
C O
U N
T Y
100%
CHECKED BY: NR
SCALE: 1" = 1'-0"
TYPICAL BASEPLATE TO FOUNDATION
CONNECTION - HSS COLUMN
(05030M) SCALE: 3/4" = 1'-0"
INTERIOR SPREAD FOOTING
AT STEEL COLUMN
(03005)SCALE: 3/4" = 1'-0"
SLAB TRANSITION AT BUILDING PERIMETER
(03160)
FOU…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .