This document is a Bid Proposal for the American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase 1 Project, which is being solicited by the City of Killeen, located in Killeen, Texas, Llano County. The project generally consists of installing approximately 3,500 linear feet of 24-inch C-900 DR 18 PVC waterline, a 215 linear foot bore using a 36-inch ductile iron pipe for a Union Pacific Railroad, and all associated pipe and miscellaneous work. The bid proposal provides detailed line items for the various construction activities, including quantities, units, and unit prices. No response date, due date, or award date is specified.

The bid proposal includes pricing information, noting that depending on unit prices, requirements, and approved budgeted funds, quantities may be reduced or increased during the contract period. The general contractor must self-perform a minimum of 51% of the work. The pricing schedule covers general conditions, water improvements, and miscellaneous improvements, with a total base bid amount provided at the end.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO. DESCRIPTION QTY UNIT UNIT PRICE SUB-TOTAL

GENERAL CONDITIONS

Mobilization, Permits and Project Incidentals (10% Maximum of Total Bid)

1 LS $ -

2 Bonding & Insurance (2.5% Maximum of Total Bid) 1 LS $ -

3 Stormwater Pollution & Prevention Plan 1 LS $ -

Stormwater Pollution & Prevention Plan Implementation

1 LS $ -

Testing of Improvements, including but not limited to all testing required for acceptance of the water improvements, and all material, labor, equipment and incidentals, complete and in place.

1 LS $ -

Coordination of Utility Installation with Private Utility Companies

1 LS $ -

7 Trench Safety Plan 1 LS $ -

8 Confined Space Plan & Implementation 1 LS $ -

9 Traffic Control Plan 1 LS $ -

10 Traffic Control Implementation 1 LS $ -

Permittee Construction Information Sign, including all signage, anchorage, installation, removal, and all material, labor, equipment, and incidentals, complete and in place

8 EA $ -

UPRR Coordination including by not limited to Safety Training, Flagging, Observation, Track Monitoring, Liability Insurance, as required within the UPRR Pipeline Agreement

1 LS $ -

SUBTOTAL - GENERAL CONDITIONS $ -

WATER IMPROVEMENTS

Grout Fill & Cap Existing 16" Water Line to be Abandoned, including all necessary installation of caps on existing water line, thrust block, dewatering of existing line, excavation, gravel trench backfill, surface replacement, and all material, labor, equipment, and incidentals, complete and in place

27 LF $ -

Grout Fill & Cap Existing 24" Water Line to be Abandoned, including all necessary installation of caps on existing water line, thrust block, dewatering of existing line, excavation, gravel trench backfill, surface replacement, and all material, labor, equipment, and incidentals, complete and in place

135 LF $ -

PRICING INFORMATION

NOTE: Depending on unit prices, requirements and approved budgeted funds, quantities may be reduced or increased during the contract period.

THE CONTRACTOR IS RESPONSIBLE FOR ALL MATH, CALCULATIONS, AND FORMULAS

American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase I

BID PROPOSAL

Removal of Existing Grout Filled, Abandoned Waste Water Line (All Sizes)(All Depths) and Disposal Offsite, including any necessary excavation, removal, installation of select fill, compaction, and all material, labor, equipment and incidentals, complete and in place.

419 LF $ -

Existing Gate Valve (All Sizes) to be Removed and Delivered to the City of Waco,, including necessary excavation, dewatering, plugging of existing water lines, disposal of valve box, placement of low strength concrete in excavation, transpiration and delivery to City Facilities, and all material, labor, equipment, and incidentals, complete and in place.

1 EA $ -

Connection to existing 8" water line, including necessary pothole investigation, special fittings, spool pieces, thrust blocking, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

2 EA $ -

Connection to existing 16" water line, including necessary pothole investigation, special fittings, spool pieces, thrust blocking, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

Connection to existing 24" water line, including necessary pothole investigation, special fittings, spool pieces, thrust blocking, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

3 EA $ -

8" C-900 DR 18 PVC Restrained Joint Water Line (All Depths) (Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

44 LF $ -

8" C-900 DR 18 PVC Restrained Joint Water Line (All Depths) (Off Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place

20 LF $ -

16" C-900 DR 18 PVC Restrained Joint Water Line (All Depths) (Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

33 LF $ -

24" C-900 DR 18 PVC Water Line (All Depths) (Off Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place

2100 LF $ -

American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase I

24" C-900 DR 18 PVC Restrained Joint Water Line (All Depths) (Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

519 LF $ -

24" C-900 DR 18 PVC Restrained Joint Water Line (All Depths) (Off Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place

710 LF $ -

24" C-900 DR 18 PVC Restrained Joint Water Line installed in 36" Steel Encasement Pipe (All Depths) including tracer wire, installation of utility and all material, labor, equipment, and incidentals complete and in place

215 LF $ -

30" C-900 DR 18 PVC Restrained Joint Water Line (All Depths) (Off Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place

35 LF $ -

36" Steel Encasement Pipe installed by Dry Bore (All Depths) including necessary excavation, construction of bore pits, jacking of encasement pipe, and all material, labor, equipment, and incidentals complete and in place

215 LF $ -

30" X 24" DIP Tee, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

24" X 24" DIP Tee, including necessary excavation, thrust blocking, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

2 EA $ -

24" X 16" DIP Tee, including necessary excavation, thrust blocking, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

24" X 8" DIP Tee, including necessary excavation, thrust blocking, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

24" X 6" DIP Tee, including necessary excavation, thrust blocking, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

24" - 45° DIP Bend, including necessary excavation, connection to water line, spool pieces, thrust blocking, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

23 EA $ -

American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase I

24" - 22 1/2° DIP Bend, including necessary excavation, connection to water line, spool pieces, thrust blocking, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

3 EA $ -

24" - 11 1/4° DIP Bend, including necessary excavation, connection to water line, spool pieces, thrust blocking, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

11 EA $ -

8" - 45° DIP Bend, including necessary excavation, connection to water line, spool pieces, thrust blocking, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

2 EA $ -

30" x 24" DIP Reducer, including necessary excavation, connection to water line, spool pieces, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

30" DIP Cap, including necessary excavation, connection to water line, spool pieces, thrust blocking, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

24" DIP Cap, including necessary excavation, connection to water line, spool pieces, thrust blocking, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

30" Resilient Seat Gate Valve, including necessary excavation, connection to water line, thrust blocking, tracer wire, thrust blocking, valve box and lid, and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

24" Resilient Seat Gate Valve, including necessary excavation, connection to water line, thrust blocking, tracer wire, thrust blocking, valve box and lid, and all material, labor, equipment, and incidentals complete and in place

6 EA $ -

16" Resilient Seat Gate Valve, including necessary excavation, connection to water line, thrust blocking, tracer wire, thrust blocking, valve box and lid, and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

8" Resilient Seat Gate Valve, including necessary excavation, connection to water line, thrust blocking, tracer wire, thrust blocking, valve box and lid, and all material, labor, equipment, and incidentals complete and in place

3 EA $ -

4" Air Release & Vacuum Valve (Off Street), including service tap, service, line, valve vault, appurtenances, vent, vent enclosure, and all material, labor, equipment, and incidentals complete and in place

4 EA $ -

American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase I

Fire Hydrant Assembly, including necessary excavation, embedment, 6" DIP Fire Line, 6" Resilient Seat Gate Valve, valve box and lid, Gradlock, gravel trench backfill, and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

Unreinforced Concrete Cap, including necessary excavation, placement of material, and all material, labor, equipment and incidentals, complete and in place

10 LF $ -

Trench Safety Implementation, including all necessary material, labor, equipment, training and incidentals complete and in place

3461 LF $ -

SUBTOTAL - WATER IMPROVEMENTS $ -

MISCELLANEOUS IMPROVEMENTS

Existing Concrete Curb and Gutter to Be Removed and Replaced, including necessary saw cutting, removal transportation and disposal, forming, reinforcement, dowels, placement of concrete, curing, and all material, labor, equipment and incidentals complete and in place

67 LF $ -

Class 'A' Surface Replacement, including all necessary preparation, sawcutting of existing pavement, subgrade compaction, reinforcement, forming, installation of asphalt, connection to existing concrete pavement, cleanup and all material, labor, equipment and incidentals complete and in place

231 LF $ -

Class 'F' Surface Replacement Solid Block Sod, including all necessary preparation, installation of salvaged topsoil, watering, and all material, labor, equipment and incidentals complete and in place

288 LF $ -

Class 'F' Surface Replacement Hydromulch Seeding, including all necessary preparation, installation of salvaged topsoil, watering, and all material, labor, equipment and incidentals complete and in place

3109 LF $ -

Provide 2" depth HMAC Milling and disposal offsite, including all HMAC sawcutting, sweeping, dust control, installation of temporary traffic striping, hauling and disposal of millings, and all material, labor, equipment, and incidentals, complete and in place

2958 SF $ -

2" HMAC Type "D" including application of spray applied underseal or TRAIL, including all surface preparation, installation, necessary temporary traffic striping, and all material, labor, equipment, and incidentals complete and in place

2958 SF $ -

Installation of Reflective Pavement Markings and Markers(All Types), including all necessary surface preparation, removal of temporary striping, and all material, labor, equipment, and incidentals, complete and in place

1 LS $ -

American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase I

Existing Concrete Drive Approach to Be Removed and Replaced, including necessary saw cutting, removal transportation and disposal, forming, reinforcement, dowels, placement of concrete, curing, and all material, labor, equipment and incidentals complete and in place

219 SF $ -

Existing Concrete Flume to Be Removed and Replaced, including necessary saw cutting, removal transportation and disposal, forming, reinforcement, dowels, placement of concrete, curing, and all material, labor, equipment and incidentals complete and in place

106 SF $ -

Existing Concrete Overflow Weir to Be Removed and Replaced, including necessary saw cutting, removal transportation and disposal, forming, reinforcement, dowels, placement of concrete, curing, and all material, labor, equipment and incidentals complete and in place

1 LS $ -

Removal & Replacement of Existing Fence (all Types), including removal and disposal of existing wire, posts, foundations, installation of new posts, foundations, necessary bracing, wire and all material, labor, equipment and incidentals complete and in place

20 LF $ -

Adjustment of Valve Box and Lid to final grade and installation of reinforced concrete diamond, including all necessary sawcutting of pavement, adjustment and all material, labor, equipment, and incidentals, complete and in place

12 EA $ -

Furnish and Install Galvanized Steel Delineator Post and Signage(All Types), including all material, labor, equipment, and incidentals, complete and in place

4 EA $ -

SUBTOTAL - MISCELLANEOUS IMPROVEMENTS $ -

TOTAL BASE BID AMOUNT -$

American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase I

THIS COMPLETE FORM MUST BE SUBMITTED WITH BID

SIGNATURE PAGE

SUBCONTRACTOR TYPE OF WORK

FIRM NAME:

BY:

TITLE:

ADDRESS:

Contractor acknowledges and agrees that the official TOTAL AMOUNT OF BID is determined by multiplying the unit bid prices by the respective estimated quantities shown in this bid proposal and then totaling all of the extended amounts.

Extended amounts SHOULD NOT be rounded up or down. All dollar amounts should be either written legibly or typed.

Any mistakes should be rewritten and initialed by the Contractor.

The General Contractor must self perform a minimum of 51% of the work in the awarded contract.

I WILL USE THE FOLLOWING SUBCONTRACTORS FOR THIS WORK:

American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase I