ESBD_File_344229_2024.01.09 - LSCPA Madison Monroe - Addendum No. 1 (final).pdf
PDF 891 KB Posted
- Attached to
- RFQ/P for CMR - Madison Monroe Educational Bldg. Renovation at Lamar State College-Port Arthur
- Solicitation number
- 758-24-04019
- Issued by
- Jefferson County, Port Arthur City, Texas
About this file
This document is an Addendum to a Request for Qualifications and Proposals (RFQ/P) for a Construction Manager-at-Risk (CMR) for the Madison Monroe Educational Building Renovation project at Lamar State College-Port Arthur in Port Arthur, Texas. The RFQ/P was posted on December 7, 2023 by the Texas State University System. The addendum provides details on the mandatory pre-submittal conference held on January 4, 2024, and answers to questions received from potential respondents. Key details include that the project is currently in the Design Development stage, the building will be vacant at the start of construction, and the Owner will provide Builder's Risk insurance coverage.
The related state and local contract opportunity is for the selection of a CMR firm for the Madison Monroe Educational Building Renovation project at Lamar State College-Port Arthur in Port Arthur, Texas. The contract will be awarded by the Texas State University System on behalf of Lamar State College-Port Arthur. The project scope, requirements, and submission details are provided in the RFQ/P.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(i)
(ii)
REQUEST FOR QUALIFICATIONS & PROPOSALS
FOR
CONSTRUCTION MANAGER-AT-RISK
FOR
LAMAR STATE COLLEGE-PORT ARTHUR
PORT ARTHUR, TEXAS
MADISON MONROE EDUCATIONAL
BUILDING RENOVATION
RFQ/P No.:
758-24-04019
Notice To All Respondents:
The following is Addendum No. 1 to the Request for Qualifications & Proposals (RFQ/P)
ESBD Posting No. 758-24-04019 was posted on December 7, 2023
Prepared By:
Donna Bryce, Senior Contract Administrator
The Texas State University System
601 Colorado Street
Austin, TX 78701 - 512-463-1808
Donna.Bryce@tsus.edu
Addendum No. 1 Issued January 9, 2024
Addendum No. 1 - RFQ/P for Construction Manager-At-Risk (posted 01/09/2024) Madison Monroe Educational Building Renovation at Lamar State College-Port Arthur
RFQ/P No. 758-24-04019
I. GENERAL:
A. The mandatory Pre-Submittal Conference was held on January 4, 2024, at the Ruby Fuller Building location on the Lamar State College-Port Arthur (LSCPA) campus. The Attendance Sign-In Sheets are included as part of this Addendum along with the following questions and answers presented in response to this solicitation:
1. Question: What is the scoring breakdown between qualifications and proposals?
Answer: Per Section 3 of the RFQ/P, “Qualifications shall constitute up to Fifty Percent (50%) of the total Respondent evaluation score.” Per Paragraph
4.2 of the RFQ/P, “The Proposal shall constitute up to Fifty Percent (50%) of the total Respondent evaluation score”.
2. Question: Is Builder’s Risk by Owner?
Answer: Per paragraph 1.18 of the RFQ/P, “The Owner intends to provide Builders Risk insurance coverage for this Project.”
3. Question: What stage of design is the project currently in?
Answer: The project is currently in the Design Development (DD) stage. The DD submittal is slated to be presented at the May 2024 Board of Regents meeting per the schedule attached in the RFQ/P.
4. Question: How much of the surrounding site is available for contractor use (laydown/storage/etc.)?
Answer: There is an open grassy area at the exterior entrance of the building that can be utilized by the contractor. Note that the campus will remain open during construction.
5. Question: Will the parking lot near the Wilson building be accessible to the Contractor?
Answer: The parking lot near the Wilson building is not owned by LSCPA.
The construction manager would need to make arrangements with the parking lot’s owner, independent of this project, to utilize this space.
6. Question: Will the building be vacant at construction start or is relocation by
CMR?
Answer: The building will be vacant by the time the Notice to Proceed for construction is issued. Relocation of building contents will be by LSCPA.
Note, however, that the IT server room on the first floor must remain in operation throughout construction and must be protected from construction activities.
7. Question: Does Ruby Fuller share the same generator as Madison Monroe?
Answer: Ruby Fuller is on a different generator than the Madison Monroe Educational Building.
8. Question: Is the DX unit that is located at the exterior of the building for the IT server room?
Answer: Yes, this DX unit serves as the supplemental unit for the IT server room, with the main unit located on the roof.
9. Question: Is storage of building contents by Owner?
Answer: Storage of building contents will be by LSCPA.
Attachments:
(1) Pre-Submittal Attendance Sign-In Sheets
- END OF ADDENDUM NO. 1 -