This document is an Addendum #1 to a Request for Proposal (RFP) issued by the University of North Texas (UNT) for a Construction Manager at Risk (CMAR) contract to construct a new residence hall on the UNT main campus. The change in the RFP clarifies that the relevant experience required is in the construction of residence halls within the last five years, not science laboratories or science and technology buildings. The project is anticipated to be completed in multiple phases, with the initial phase constructing approximately 600 beds and a possible second phase of approximately 400 beds. The substantial completion date for the project is expected to be March 2026.
The contract opportunity is located in Denton County and the City of Denton, Texas. Potential respondents are required to acknowledge the addendum by initialing the Proposal Form.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE: October 17, 2023
TO: Potential Respondents
FROM: Carrie Stoeckert—Construction Contract Expeditor III
SUBJECT: Addendum #1
RFP769-24-23-01-2307CS
UNT Residence Hall CMAR
This Addendum is being issued as there is a change to the Request for Proposal (RFP) that was originally posted as follows:
The change to the section are as noted below:
What was Published:
In Section 002400-1 Scope for Proposal, Required Information, Criterion A 1:
Relevant experience on similar projects that includes experience in construction of science laboratory or Science and Technology buildings within the last five (5) years.
NOTE: the following is incorrect in this paragraph---includes experience in construction of science and laboratory or Science and Technology buildings within the last five (5) years
The required information should be:
Relevant experience on similar projects that includes experience in construction of residence halls within the last five
(5) years.
Please initial the acknowledgement of the Addenda on the Proposal Form.