ESBD_File_336428_ASU MALL LIGHTING - 100 PERCENT SPECS 09-13-23.pdf

PDF 4 MB Posted

Attached to
ASU Mall Lighting
Solicitation number
22-002CS
Issued by
Tom Green County, San Angelo City, Texas

About this file

This document is a file related to a state and local contract opportunity for the "ASU Mall Lighting" project, which is being managed by Angelo State University located in Texas.

The project scope includes furnishing new lighting for the ASU Mall area, such as removing existing concrete light pole bases, poles and fixtures, and providing and installing new light poles, light pole bases, lights, light pole mounted receptacles, lighting control systems, conduit pathways for security systems, a new electrical panel, and associated conduit, wiring, trenching, backfill, and directional boring work. The project is being procured through a Competitive Sealed Proposal contract. The document provides details on the project meetings, submittals, quality requirements, testing and inspection services, and construction facilities and temporary controls required for the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

Mall Lighting TOC-1 Table of Contents Angelo State University

DIVISION 01 - GENERAL REQUIREMENTS

01 0010 Summary of Work 01 0100 Special Conditions 01 0200 Schedule of Alternates 01 0300 Schedule of Allowances 01 0950 Reference Standards 01 2000 Project Meetings 01 2500 Substitution Procedures 01 2900 Payment Procedures 01 3000 Submittals 01 3100 Project Management and Coordination 01 4000 Quality Requirements 01 4523 Testing and Inspection Services 01 5000 Construction Facilities and Temporary Controls 01 5500 Angelo State University Operating Policies and Procedures 01 5800 Exterior Construction Project Signage 01 5800-A Exterior Construction Project Signage Sample 01 6000 Materials 01 7000 Contract Close-out Requirements 01 7123 Field Engineering 01 7300 Cutting and Patching

DIVISION 02 - EXISTING CONDITIONS

02 2010 Site Preparation

DIVISION 03 – CONCRETE

03 1000 Concrete Forming 03 2000 Concrete Reinforcing 03 3000 Cast-in-Place Concrete 03 3500 Concrete Finishing

DIVISION 04 - MASONRY

04 0513 Masonry Mortaring 04 2000 Unit Masonry 04 7200 Cast Stone Masonry

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 9200 Joint Sealers

DIVISION 09 - FINISHES

09 9100 Painting

09-12-23

TABLE OF CONTENTS

Table of Contents TOC-2 Mall Lighting

DIVISION 31 - EARTHWORK

31 2200 Grading 31 2300 Excavation and Fill

DIVISION 32 – SITE IMPROVEMENTS

32 1313 Concrete Paving 32 9300 Trees Shrubs and Ground Coverings

END OF TABLE OF CONTENTS

Mall Lighting Project 01 0010-1 Summary of Work

SECTION 01 0010

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project description.

2. Work by Others.

3. Work sequence.

4. Owner occupancy.

5. Future work.

6. Contractor’s use of site and premises.

7. Owner furnished Products.

1.2 PROJECT DESCRIPTION

A. Project consists of furnishing new lighting for the ASU Mall area as shown in the drawings. This consists of the following (this list is not all inclusive):

a. Removing existing concrete light pole bases, poles and fixtures.

b. Providing and installing new light poles, light pole bases and lights.

c. Providing and installing new light pole mounted receptacles.

d. All lighting control systems required by the Contract Documents.

e. Providing and installing conduit pathways for the security systems.

f. Providing and installing a new electrical panel.

g. All conduit, wiring, trenching, backfill, directional boring and labor required to accomplish the scope identified in the drawings and specifications.

h. Temporary facilities include fencing, temporary lighting and sanitary facilities. Portable toilets rented by the Contractor and cleaned on a weekly or as-needed basis by the Contractor and situated within the approved, fenced staging area. Fencing of the site and tree protection shall conform to the Contract Documents. Temporary fencing shall also be installed around any areas where work is being performed. The Contractor shall furnish temporary lighting for all areas where the lighting has been rendered inoperable as a result of this scope of work. Tower lights are acceptable. Temporary lighting levels shall have a minimum of a 2fc average and shall be acceptable to the University. .

i. Refer to the other specification sections, drawings and contract documents for additional requirements.

B. Work includes site construction, and electrical.

C. The Project will be constructed under a Competitive Sealed Proposal contract.

1.3 COORDINATION WITH OTHER CONSTRUCTION CONTRACTS

A. Contractor shall coordinate with Owner’s IT/Networking Contractor.

1.4 CONTRACTOR’S USE OF SITE AND PREMISES

A. Contractor shall have shared use of immediate site and premises for execution of the Work (within fencing boundary, set with Owner's direction).

B. Before start of work, Contractor shall conduct a Construction kick-off meeting to summarize work sequence, contact information, safety and emergency requirements and logistics plans. Meeting shall be attended by ASU FPC, appropriate staff and design professional.

C. The Contractor’s use of premises is restricted to the designated work area and approved staging areas. Equipment and/or materials must be stored inside the work area or designated staging area with lockable gates.

Mall Lighting Project 01 0010-2 Summary of Work

D. The sidewalks and immediate vicinity surrounding the mall will remain in use by students, faculty, and the public during construction. Contractor is responsible to provide necessary construction fencing and barricades to ensure the safety of pedestrians.

E. In the event that portions of the mall need to be closed for a period of time, Contractor is responsible for providing adequate detour routing.

F. Contractor shall maintain site security during the period of construction by installation and maintenance of construction barricades and perimeter fencing, gates, and other means.

G. Work hours: Normal working hours are 8:00 am – 5:00 pm; Monday – Friday.

H. Contractor and subcontractor worker vehicles shall be parked in designated paved areas within the project site or as permitted by ASU. Utility vehicles may be parked near ongoing operations provided pedestrian pathways and vehicle travel-ways are not obstructed.

I. A Hot Work Permit is required for any cutting, welding or heat gun work. No open flame torch work will be allowed. The permit will be issued by the FPC Project Manager to the Contractor and will be good through completion of work. The Contractor will be responsible for ensuring that all workers and subcontractors follow permit conditions.

J. Temporary facilities include fencing and sanitary facilities. Portable toilets rented by the Contractor and cleaned on a weekly or as-needed basis by the Contractor and situated within the approved, fenced staging area. Fencing of the site and tree protection shall conform to the Contract Documents.

1.5 OWNER FURNISHED PRODUCTS

A. Products that will be furnished and paid for by Owner are as follows:

1. Furniture and freestanding equipment (that can be easily moved).

2. Fiber, IT and Data equipment will be provided and installed by others. Contractor is responsible to coordinate with installers.

B. Owner's Responsibilities:

1. Arrange for and deliver necessary Shop Drawings, Product Data and Samples to Contractor.

2. Arrange and pay for product delivery and equipment delivery to site, in accordance with

Progress Schedule.

C. Contractor’s Responsibilities:

1. Designate delivery date for each product in Progress Schedule.

2. Review Shop Drawings, Product Data and Samples. Submit to Architect with notification of any discrepancies or problems anticipated in use of product.

3. Receive and unload products at site.

4. Promptly inspect products jointly with Owner; record shortages, damage, and defective items.

5. Handle products at site, including uncrating and storage.

6. Protect products from exposure to elements and from damage.

7. Assemble, install, connect, adjust, and finish products, as stipulated in respective specification section.

8. Repair or replace any items damaged by Contractor.

PART 2 PRODUCTS

Not used

PART 3 EXECUTION

END OF SECTION

Mall Lighting 01 0100-1 Special Conditions

SECTION 01 0100

SPECIAL CONDITIONS

1.01 RELATED DOCUMENTS

Drawings and general provisions of Contract, Uniform General Conditions and Supplementary General Conditions, and Division-1 Specification sections, apply to this section.

1.02 LOCATION AND SCOPE OF THE PROJECT

A. The project is located on the Angelo State University campus, San Angelo, Texas.

B. Scope as described in 01 0010 � Summary of Work.

1.03 RELATED REQUIREMENTS

A. Instructions to Proposers

B. Agreement Forms

C. Uniform General Conditions and Supplementary General Conditions

1.04 EQUAL OPPORTUNITY CLAUSE

Attention is called to the Equal Opportunity Clause applicable to this project and included in the Specifications.

1.05 EXAMINATION OF FIELD CONDITIONS

The Contractor shall take field measurements and verify field conditions and shall carefully compare these field measurements and conditions and other information known to the Contractor with the Contract Documents before commencing work. Errors, inconsistencies, or omissions discovered shall be reported to the Design Professional before proceeding with the work.

1.06 ADDENDA

Any addenda issued in writing by the Design Professional prior to the proposal closing time shall be covered by the proposal. In closing the Contract such addenda will become a part thereof and modify these Specifications and/or the Drawings accordingly. Verbal changes in the work as shown or described, will not be binding.

1.07 START OF WORK

The contractor will commence work on or after a date to be specified in a written "Notice to Proceed" by the Institution.

1.08 COORDINATION

All contractors and subcontractors on the project shall coordinate their work with each other, advising on work schedules, equipment locations, etc.

1.09 DRAWINGS AND SPECIFICATIONS

Mall Lighting 01 0100-2 Special Conditions

A. The drawings and specifications are intended to describe and provide for a finished and complete piece of work, and all work must meet the requirements of all the applicable and governing laws, ordinances, rules and regulations of the locality.

B. No extra compensation will be allowed for oversight of any such requirements, except by written order issued by Angelo State University.

C. Should any doubt arise regarding Drawings or Specifications, clarification shall be requested of Angelo State�s Representative or the Design Professional. Failure to do so will not relieve the Contractor from the responsibility to complete the work to Angelo State�s satisfaction.

1.10 MEASUREMENTS

Before ordering any material or doing any work, the Contractor shall verify all measurements of the work and shall be responsible for the correctness of same; any difference which may be found shall be submitted to the Design Professional for consideration before proceeding with the work.

1.11 PROTECTION OF EXISTING FACILITIES

A. The Contractor shall take precautions to protect existing facilities and features within the designated construction limits and along the access to the construction site.

B After materials, equipment and machinery are installed, properly protect all work until the several portions thereof are accepted.

C. Any damage from whatever cause shall be made good by the Contractor without cost to the Institution, whether the repair is made with his own materials and labor or by others under his directions.

1.12 REFERENCE STANDARDS

A. For products specified by association or trade standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.

B. The date of the standard is that in effect as of the proposal closing date, except when a specific date is specified.

C. Obtain copies of standards when required by Contract Documents. Maintain a copy at job site during progress of the specific work.

1.13 MANUFACTURER'S DIRECTIONS

All manufacturer's articles, materials and equipment shall be applied, installed, connected, erected, secured, used, cleaned, and put in operation as recommended, directed or specified by the manufacturer, for the type of installation called for.

1.14 ITEMS SPECIFIED BY TRADE NAME

Reference to items by specific trade name is made as a basis of quality and function. Equivalent items may be used instead; however, the right of determining such quality shall remain with the Institution's representative. The terms "similar to", "or equal" or similar phases shall be interpreted similarly.

Mall Lighting 01 0100-3 Special Conditions

1.15 SUBSTITUTIONS

Substitutions of any materials other than those specifically called for shall be submitted to the Design Professional and Angelo State for approval.

1.16 SAFETY REQUIREMENT

Refer to Article 7 of the Uniform General Conditions and the Supplementary General Conditions.

1.17 REPAIR OF DAMAGE

The Contractor shall be responsible for any loss or damage caused contractor�s workmen or subcontractors to the work or materials, to tools and the equipment of one another, to adjacent property and persons, and shall make good any loss, damage or injury without cost to Angelo State University.

1.18 CLEANING

The Contractor shall promptly remove from the building, lot, sidewalks, and streets all rubbish and dirt due to the work done under this contract. At the completion of work, completely clean the areas in which work has been done, including glass and leave the building thoroughly cleaned and ready for occupancy. All construction debris shall be removed.

1.19 REMOVAL OF DEBRIS

The Contractor shall remove from the Campus and dispose of all unused materials and debris created by this construction. The Contractor is to keep the streets and construction area free of rubbish and debris. Grass and weeds within the construction fence are to be kept mowed. The site shall comply with the City Code and Environmental Safety regulations.

The Contractor shall broom the streets during the excavation and filling process so that all spillage is removed as the work progresses.

1.20 WRITTEN GUARANTEE

In addition to the requirements of the Uniform General Conditions and Supplementary General Conditions, the Contractor shall submit to Angelo State University a Written Guarantee, prior to release of final payment, on a form approved by the Design Professional and Angelo State University for the work, materials and equipment for a one year period.

1.21 SITE OBSERVATION, MATERIALS TESTING AND SPECIAL INSPECTIONS

Site observation during excavation and/or compaction of subgrades and engineered fills will be performed by ASU�s Consultant. Material testing and special inspections required to determine compliance with the Technical Specifications of the project will be performed by an independent certified testing laboratory retained and paid for by ASU.

Mall Lighting 01 0100-4 Special Conditions

1.22 STORMWATER POLLUTION PREVENTION PLAN

Contractor shall arrange for preparation of a Storm Water Pollution Plan (SWPPP) by a qualified preparatory entity and submit the SWPPP to ASU for review. The SWPPP shall comply with the most recent rules for complying with requirements of state and federal laws.

The Contractor shall maintain a copy of the SWPPP on site throughout the course of construction. The Contractor shall implement all requirements of the SWPPP. During the course of construction, the Contractor�s designated, qualified employee shall make regular inspections of BMP�s and record observations as per the SWPPP.

1.23 EQUIPMENT CLEANUP

Prior to entering the Worksite, the Contractor shall thoroughly clean all tools and equipment

1.21 DELAYS AND EXTENSION OF TIME

A. In addition to the provisions of Article 9 of the Uniform General Conditions and Supplementary General Conditions, the following provisions shall apply:

1. In reference to Article 9, the number of days of measurable precipitation for the following months shall be considered normal weather days for San Angelo, Texas. No time extension for weather delays will be given unless the number indicated is exceeded.

San Angelo

January 2 days July 2 days

February 3 days August 3 days

March 3 days September 3 days

April 2 days October 4 days

May 5 days November 2 days

June 4 days December 2 days

Section 01 0200

Schedule of Alternates

Schedule of Alternates

Mall Lighting Angelo State University

01 0200-1

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to this section.

1.02 DESCRIPTION OF REQUIREMENTS

A. Coordinate related work and modify or adjust adjacent work as required to ensure that work affected by each accepted alternate is complete and fully integrated into the project.

B. A "Schedule of Alternates" is included at the end of this section. Specification sections referenced in the Schedule contain requirements for materials and methods necessary to achieve the work described under each alternate.

C. Include as part of each alternate, miscellaneous devices, appurtenances and similar items incidental to or required for a complete installation whether or not mentioned as part of the alternate.

1.03 SCHEDULE OF ALTERNATES

A. A Schedule of Alternates is included at the end of this section. Specification sections referenced in the Schedule contain requirements for materials and methods necessary to achieve the work described under each alternate. It is the responsibility of the Contractor, working with the Design Professional to verify and ensure that, as part of each alternate, miscellaneous devices, appurtenances and similar items incidental to or required for a complete installation, whether or not mentioned on the construction documents, are included in the delivery of each awarded alternate(s).

A. Schedule of Alternates.

ADD Alternate No. 1:

Mall area just north of the Henderson Library (ends at the northern edge of the Administration Building). Refer to the drawings for the alternate boundaries and requirements. The Contractor shall provide a breakout for the pricing in this scope of work.

ADD Alternate No. 2:

Mall area just north of the Houston Harte University Center (Post Office, Bookstore and Snack Bar). Refer to the drawings for the alternate boundaries and requirements. The Contractor shall provide a breakout for the pricing in this scope of work.

Mall Lighting 01 0300-1 Schedule of Allowances

SECTION 01 0300

SCHEDULE OF ALLOWANCES

1.01 RELATED DOCUMENTS

Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to this section.

1.02 CONTINGENCY ALLOWANCE

A. Contingency allowance shall be used only as directed for Angelo State University's purposes, and only by prior written approval which designates amount to be charged to contingency allowance.

B. Contractor's related costs are not included in the contract sum (other than allowance itself) for work so ordered to be charged to contingency allowance.

C. Angelo State University will NOT pay a mark-up for Overhead/Profit for changes from the Contingency Allowance.

D. At time of project close-out, unused amounts remaining in the contingency allowance shall be credited to Owner by change order.

1.03 SCHEDULE OF ALLOWANCE

A. Contract Allowance Number One (1): Include a contingency allowance of $50,000.00 (fifty thousand dollars) for any work deemed necessary by ASU for the completion of the scope of work shown in the contract documents. This allowance shall not be spent without ASU’s prior written approval.

B. Contract Allowance Number Two (2): Include a contingency allowance of $5,000.00 (five thousand dollars) for replacing mature trees and or shrubs. This allowance shall not be spent without ASU’s prior written approval.

C. Contract Allowance Number Three (3): Include a contingency allowance of $50,000.00 (fifty thousand dollars) for potential irrigation system damage. This allowance shall not be spent without ASU’s prior written approval.

Mall Lighting 01 0950-1 Reference Standards

SECTION 01 0950

REFERENCE STANDARDS

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to this section.

1.02 STANDARDS

A. Reference to standards, codes, Specifications, recommendations and regulations refer to the latest edition or printing prior to date of issue of the Contract Documents.

B. Applicable portions of standards listed that are not in conflict with Contract Documents are hereby made a part of the Specifications.

C. Modifications or exceptions to Standards shall be considered as amendments and unmodified portions shall remain in full effect. In cases of discrepancies between standards, the more stringent requirements shall govern.

D. Copies of Standards: Each entity engaged in construction on the Project is required to be familiar with industry standards applicable to its construction activity. Copies of applicable standards are not bound with the Contract Documents.

a. Where copies of standards are needed to perform a required construction activity, the Contractor shall obtain copies directly from the publication source.

1.03 SCHEDULE OF STANDARDS

AA Aluminum Association 1525. Wilson Boulevard,Suite 600, Arlington, VA 22209 703-3582960 fax 703-358-2961 http://www.aluminum.org/

AABC Associated Air Balance Council 1518 K St., NW Washington, DC 20005 (202) 737-0202 http://www.aabchq.com/

AAMA American Architectural Manufacturers Assoc.

1827 Walden Office Square, Suite 550 Schaumburg, IL 60173-4268 Phone: (847) 303-5664 Fax: (847) 303-5774 http://www.aamanet.org/

AAN American Association of Nurserymen 1250 I St., NW, Suite 500 Washington, DC 20005 (202) 789-2900

Mall Lighting 01 0950-2 Reference Standards

ANLA American Nursery and Landscape Association 1000 Vermont Avenue, NW, Suite 300 Washington D.C. 20005 � 4914 202-789-2900 http://www.anla.org/index.htm

AASHTO American Association of State Highway and Transportation Officials 444 North Capitol St., Suite 225 Washington, DC 20001 (202) 624-5800 http://www.transportation.org/

ACI American Concrete Institute 38800 Country Club Dr. Farmington Hills, MI 48331 USA Phone: 248-848-3700 Fax: 248-848-3701 http://www.aci-int.org/general/home.asp

ACIL American Council of Independent Laboratories 1629 K St., NW Washington, DC 20006

(202) 887-5872 http://www.acil.org/

ACPA American Concrete Pipe Assoc.

1303 West Walnut Hill Lane, Suite 305 Irving, Texas 75038-3008 Phone (972) 506-7216 Fax (972) 506-7682 http://www.concrete-pipe.org

ADC Air Diffusion Council 1901 N. Roselle Road, Suite 800 Schaumburg, Illinois 60195 Tel: (847) 706-6750 Fax: (847) 706-6751 http://www.flexibleduct.org/

AI Asphalt Institute 2696 Research Park Drive Lexington, KY 40512-4052 (606) 288-4960 http://www.asphaltinstitute.org/ai_pages/Seminars/index.asp

AIA American Institute of Architects 1735 New York Ave., NW Washington, DC 20006 (202) 626-7300 http://www.aia.org/

AIHA American Industrial Hygiene Assoc.

P 2700 Prosperity Ave., Suite 250 Fairfax, VA 22031

(703) 849-8888 http://www.aiha.org/Content

Mall Lighting 01 0950-3 Reference Standards

AISC American Institute of Steel Construction One East Wacker Drive, Suite 3100 Chicago, IL 60601-2001 (312) 670-2400 http://www.aisc.org/

AISI American Iron and Steel Institute 1140 Connecticut Ave., NW Suite 705 Washington, D.C. 20036 202.452.7100 http://www.steel.org//AM/Template.cfm?Section=Home

AITC American Institute of Timber Construction 7012 S. Revere Parkway Suite 140 Centennial, CO 80112 Phone: (303) 792-9559

FAX: (303) 792-0669

http://www.aitc-glulam.org/

ALI Associated Laboratories, Inc.

500 S. Vermont St.

Palatine, IL 60067

(800) 685-0026 http://www.associatedlabs.org/

ALSC American Lumber Standards Committee P.O. Box 210 Germantown, MD 20875 (301) 972-1700 http://www.alsc.org/

AMCA Air Movement and Control Assoc.

30 W. University Drive Arlington Heights, IL 60004-1893 (847) 394-0150 http://www.amca.org/

ANSI American National Standards Institute 1819 L Street, NW, 6th Fl.

Washington, DC, 20036 Tel: 202.293.8020 Fax: 202.293.9287 http://www.ansi.org/

APA American Plywood Assoc.

7011 So. 19th, Tacoma, WA 98466 Tel: (253) 565-6600 Fax: (253) 565-7265 http://www.apawood.org/

ARI Air Conditioning and Refrigeration Institute 4100 North Fairfax Drive, Suite 200 Arlington, Virginia 22203

(703) 524-8800

(703) 528-3816 FAX

http://www.ari.org/

Mall Lighting 01 0950-4 Reference Standards

ARMA Asphalt Roofing Manufacturers Assoc.

Public Information Department 1156 - 15th Street, NW., Suite 900 Washington, DC 20005 Tel: 202 / 207-0917 / Fax: 202 / 223-9741 http://www.asphaltroofing.org/

ASA Acoustical Society of America 2 Huntington Quadrangle, Suite 1NO1 Melville, NY 11747-4502 Phone: (516) 576-2360 Fax: (516) 576-2377 http://asa.aip.org/

ASC Adhesive and Sealant Council 7979 Old Georgetown Road, Suite 500 | Bethesda, Maryland 20814 Phone: (301) 986-9700 | Fax: (301) 986-9795 http://www.ascouncil.org/

ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers 1791 Tullie Circle, NE Atlanta, GA 30329 Phone: (404) 636-8400 Fax: (404) 321-5478 http://www.ashrae.org/

ASME American Society of Mechanical Engineers Three Park Avenue New York, NY 10016-5990 800-843-2763 (U.S/Canada) http://www.asme.org/

ASPE American Society of Plumbing Engineers 8614 Catalpa Avenue, Suite 1007 Chicago, IL 60656-1116 Phone: (773) 693-ASPE (2773) Fax: (773) 695-9007 http://www.aspe.org/

ASSE American Society of Sanitary Engineering 901 Canterbury, Suite A Westlake, OH 44145 Phone - 440.835.3040 / FAX - 440.835.3488 http://www.asse-plumbing.org/

ASTM American Society for Testing and Materials 100 Barr Harbor Drive, West Conshohocken, Pennsylvania, 19428-2959 USA Phone: (610) 832-9500 Fax: (610) 832-9555 http://www.astm.org

Mall Lighting 01 0950-5 Reference Standards

AWCMA American Window Covering Manufacturers Assoc.

355 Lexington Ave, 17th Floor New York, NY 10017 Phone: (212) 297-2122 / Fax: (212) 370-9047 http://www.wcmanet.org

AWI Architectural Woodwork Institute 46179 Westlake Drive, Suite 120 Potomac Falls, VA 20165 phone 571-323-3636 / fax 571-323-3630 http://www.awinet.org/

AWPA American Wood-Preservers' Assoc.

P.O. Box 361784 Birmingham, AL 35236-1784 Telephone: 205-733-4077 http://www.awpa.com/

AWPB American Wood Preservers Bureau 4 E. Washington St.

Newnan, GA 30263 (404) 254-9877

AWS American Welding Society 50 N.W. LeJeune Road, Miami, Florida 33126 Phone: 800-443-9353 or 305-443-9353 http://www.aws.org/w/a/

BHMA Builders' Hardware Manufacturers Assoc.

355 Lexington Ave., 15th Floor New York, NY 10017 Tel: (212) 297-2122 / Fax: (212) 370-9047 http://www.buildershardware.com/

BIA The Brick Industry Association 1850 Centennial Park Drive, Suite 301, Reston, VA 20191 Phone: 703.620.0010 Fax: 703.620.3928.

http://www.bia.org/

BIFMA Business and Institutional Furniture Manufacturers Assoc.

2680 Horizon Drive, SE / Suite A-1 Grand Rapids, MI 49546-7500 Phone: 616-285-3963 / Fax: 285-3765 http://www.bifma.org/

CFFA Chemical Fabrics & Film Association, Inc.

c/o Thomas Associates, Inc.

1300 Sumner Ave.

Cleveland, OH 44115-2851 (216) 241-7333 http://www.chemicalfabricsandfilm.com/index.html

Mall Lighting 01 0950-6 Reference Standards

Mall Lighting 01 0950-7 Reference Standards

CISCA Ceiling and Interior Systems Construction Assoc.

5700 Old Orchard Road, 1st Floor Skokie, IL 60077 (708) 965-2776 http://www.cisca.org/

CISPI Cast Iron Soil Pipe Institute 5959 Shallowford Road, Suite 419 Chattanooga, TN 37421 Phone: (615) 892-0137 / Fax: 423-892-0817 http://www.cispi.org/

CRI Carpet and Rug Institute P.O. Box 2048 Dalton, GA 30722 (404) 278-3176 Phone: 706-278-3176 Fax: 706-278-8835 http://www.carpet-rug.org/

CRSI Concrete Reinforcing Steel Institute 933 North Plum Grove Road Schaumburg, IL 60173-4758 Phone: 847.517.1200 / Fax: 847.517.1206 http://www.crsi.org/

CTIOA Ceramic Tile Institute of America 12061 Jefferson Blvd Culver City, CA 90230-6219 Phone: (310) 574-7800 / Fax: (310) 821-4655 http://www.ctioa.org/

DHI Door and Hardware Institute 14150 Newbrook Dr., Suite 200 Chantilly, VA 20151 Telephone: 703.222.2010 / Fax: 703.222.2410 http://www.dhi.org/

ETL ETL Testing Laboratories, Inc.

P.O. Box 2040 Route 11, Industrial Park Cortland, NY 13045 (607) 753-6711 http://www.etl.com/

ECDS Energy Conservation Design Standards for New State Buildings State Energy Conservation Office Texas Facilities Committion P.O. Box 13047 Austin, TX 78711-3047

FGMA Flat Glass Marketing Assoc.

The Flat Glass Marketing Association, Glass Tempering Association, and members of the Laminators Safety Glass Association consolidated to form the Glass Association of North America.

2495 SW Wanamaker Drive, Suite A Topeka, KS 66614 Phone: (785) 271-0208 / Fax: (785) 271-0166 http://www.glasswebsite.com/publications/default.asp

Mall Lighting 01 0950-8 Reference Standards

FM Factory Mutual Global 1151 Boston-Providence Turnpike P.O. Box 9102 Norwood, MA 02062 (617) 762-4300

GA Gypsum Association 810 First St., NE, #510, Washington DC, 20002 Phone: 202-289-5440; Fax: 202-289-3707 http://www.gypsum.org/

HMA Hardwood Manufacturers Assoc.

400 Penn Center Blvd., Suite 530 Pittsburgh, PA 15235 Phone - (412) 829-0770 Fax - (412) 829-0844 http://www.hmamembers.org/

HPMA Hardwood Plywood Manufacturers Assoc. (Formerly HPMA) 1825 Michael Farraday Drive Reston, VA 20190 Phone: (703) 435-2900 / Fax: (703) 435-2537 http://www.hpva.org/

IBC International Building Code International Code Council 500 New Jersey Ave., NW, 6th Floor Washington, DC 20001-2070

IBD Institute of Business Designers 341 Merchandise Mart Chicago, IL 60654 (312) 647-1950

ICC International Code Council 500 New Jersey Avenue, NW, 6th Floor, Washington, DC 20001

[P] 1-888-ICC-SAFE (422-7233); [F] (202) 783-2348;

http://www.iccsafe.org/

IECC International Energy Conservation Code http://www.iccsafe.org/

IEEE Institute of Electrical and Electronic Engineers 3 Park Avenue, 17th Floor New York, N.Y., 10016-5997 USA Phone: 212 419 7900 / Fax: 212 752 4929 http://www.ieee.org/portal/site

IESNA Illuminating Engineering Society of North America 120 Wall Street, Floor 17 New York, NY 10005 tel: 212-248-5000 / fax: 212-248-5017/18 http://www.iesna.org/

IFC International Fire Code http://www.iccsafe.org/

Mall Lighting 01 0950-9 Reference Standards

IGCC Insulating Glass Certification Council c/o ETL Testing Laboratories, Inc.

PO Box 9 Henderson Harbor, NY 13651 Phone: (315) 646-2234 / Fax: (315) 646-2297 http://www.igcc.org/

ILI Indiana Limestone Institute of America 400 Stone City Bank Bldg.

Bedford, Indiana 47421 Phone: 812-275-4426

FAX: 812-279-8682

http://www.iliai.com/

IPC International Plumbing Code http://www.iccsafe.org/

ISA Instrument Society of America 67 Alexander Drive, Research Triangle Park, NC 27709 USA Phone (919) 549-8411 | FAX (919) 549-8288 http://www.isa.org/

LIA Lead Industries Association, Inc.

Sparta, New Jersey http://leadinfo.com

LPI Lightning Protection Institute 25475 Magnolia Drive P.O. Box 99 Maryville, MO 64468

(800) 488-6864 http://www.lightning.org/

MBMA Metal Building Manufacturer's Assoc.

1300 Sumner Ave Cleveland, OH 44115-2851 Phone: (216) 241-7333 / Fax: (216) 241-0105 http://www.mbma.com/

MCAA Mechanical Contractors Association of America 1385 Piccard Drive Rockville, MD 20850 Phone: 301-869-5800 / Fax: 301-990-9690 http://www.mcaa.org/

MFMA Maple Flooring Manufacturers' Assoc.

60 Revere Drive, Suite 500 Northbrook, IL 60062 Phone: 888 480-9138 / Fax: 847 480-9282 http://www.maplefloor.org/

Mall Lighting 01 0950-10 Reference Standards

MIA Marble Institute of America 28901 Clemens Rd, Ste 100, Cleveland, OH 44145 T: 440-250-9222 · F: 440-250-9223 http://www.marble-institute.com/

ML/SFA Metal Lath/Steel Framing Assoc.

(A Division of the National Association of Architectural Metal Manufacturers) 800 Roosevelt Rd.. Bldg. C, Suite 312 Glen Ellyn, IL 60137 Telephone: (630) 942-6591 / Fax: (630) 790-3095 http://www.naamm.org/index.html

NAAMM National Association of Architectural Metal Manufacturers 800 Roosevelt Rd.. Bldg. C, Suite 312 Glen Ellyn, IL 60137 Telephone: (630) 942-6591 / Fax: (630) 790-3095 http://www.naamm.org/index.html

NAIMA North American Insulation Manufacturers Assoc.

44 Canal Center Plaza, Suite 310 Alexandria, VA 22314 Phone: (703) 684-0084 / Fax: (703) 684-0427 http://www.naima.org/

NAPA National Asphalt Pavement Assoc.

NAPA Building 5100 Forbes Blvd.

Lanham, MD 20706

888-HOT-MIXX (468-6499)

http://www.hotmix.org/

NCMA National Concrete Masonry Assoc.

13750 Sunrise Valley Drive Herndon, VA 20171-4662 Phone: 703.713.1900 / Fax: 703.713.1910 http://www.ncma.org/

NEC National Electrical Code (from NFPA)

NECA National Electrical Contractors Assoc.

3 Bethesda Metro Center, Suite 1100 Bethesda, MD 20814 Phone: (301) 657-3110 | Fax: (301) 215-4500 http://www.necanet.org/

NEII National Elevator Industry, Inc.

1677 County Route 64 P.O. Box 838 Salem, New York 12865-0838 Tel. 518-854-3100 / Fax. 518-854-3257 http://www.neii.org/

Mall Lighting 01 0950-11 Reference Standards

NEMA National Electrical Manufacturers Assoc.

1300 North 17th Street, Suite 1752 Rosslyn, Virginia 22209 Phone: (703) 841-3200 / Fax: (703) 841-5900 http://www.nema.org/

NFPA National Fire Protection Assoc.

1 Batterymarch Park Quincy, Massachusetts USA 02169-7471 Tel: (617) 770-3000 / Fax: +1 617 770-0700 http://www.nfpa.org/

AF&PA American Forest & Paper Association (Formerly National Forest Products Association NFPA).

1111 Nineteenth Street, NW, Suite 800, Washington, DC 20036 Phone: 1-800-878-8878, 1-202-463-2700 http://www.afandpa.org/

NHLA National Hardwood Lumber Assoc.

6830 Raleigh-LaGrange Road Memphis, TN 38184-0518 (901) 377-1818 http://www.natlhardwood.org/

NLGA National Lumber Grades Authority #302 � 960 Quayside Drive, New Westminster, BC V3M 6G2 CANADA Tel: (604) 524-2393 / Fax: (604) 524-2893 http://www.nlga.org/

NPA National Particleboard Assoc.

18928 Premiere Court Gaithersburg, MD 20879-1569

301/670-0604 FAX 301/840-1252

http://www.pbmdf.com/

NPCA National Paint and Coatings Assoc.

1500 Rhode Island Ave., NW Washington, DC 20005 Phone: (202) 462-6272 / Fax: (202) 462-8549 http://www.paint.org/index.htm

NRCA National Roofing Contractors Assoc.

10255 W. Higgins Rd., Suite 600 Rosemont, IL 60018-5607 Phone (708) 299-9070 / Fax: (847) 299-1183 http://www.nrca.net/

NTMA National Terrazzo and Mosaic Assoc.

201 North Maple, Suite 208 Purcellville, VA 20132 Phone: 540-751-0930 / 800-323-9736 Fax: 540-751-0935 http://www.ntma.com/

Mall Lighting 01 0950-12 Reference Standards

NWWDA National Wood Window and Door Assoc.

1400 E. Touhy Ave., Des Plaines, IL 60018 Tel. (800) 223-2301/ Fax: (708) 299-1286

PCA Portland Cement Assoc.

5420 Old Orchard Road Skokie, IL 60077 Phone: (847) 966-6200 / Fax: (847) 966-8389 http://www.cement.org/

PCI Precast/Prestressed Concrete Institute 209 W. Jackson Blvd. #500 Chicago, IL 60606 Tel. (312) 786-0300 / Fax: 312-786-0353 http://www.pci.org/intro.cfm

RFCI Resilient Floor Covering Institute 401 East Jefferson Street, Suite 102 Rockville, Maryland 20850 Telephone: 301-340-8580 / Fax: 301-340-7283 http://www.rfci.com/index.htm#

RMA Rubber Manufacturers Assoc.

1400 K St., NW, Suite 900 Washington DC 20005 (202) 682-4800 http://www.rma.org/

SDI Steel Deck Institute P.O. Box 25 Fox River Grove, IL 60021 phone: 847-458-4647 / fax: 847-458-4648 http://www.sdi.org/

S.D.I. Steel Door Institute The Steel Door Institute is managed by:

Wherry Associates 30200 Detroit Road Cleveland, OH 44145-1967 phone: 440.899.0010 / fax: 440.892.1404 http://www.steeldoor.org/

SECO State Energy Conservation Office LBJ State Office Building 111 E. 17th Street, Room 1114 Austin, TX 78701 Phone: (512) 463-1931 / FAX: (512) 475-2569 http://www.seco.cpa.state.tx.us/

SGCC Safety Glazing Certification Council PO Box 730 Sackets Harbor, NY 13685 Phone: (315) 646-2234 / (315) 646-2297 http://www.sgcc.org/

Mall Lighting 01 0950-13 Reference Standards

SIGMA Sealed Insulating Glass Manufacturers Assoc.

401 N. Michigan Chicago, IL 60611 (312) 644-6610 http://www.sigmaonline.org

SJI Steel Joist Institute 3127 Mr. Joe White Avenue Myrtle Beach, SC 29577-6760 Phone: (843) 626-1995 / Fax: (843) 626-5565 http://www.steeljoist.org/

SMACNA Sheet Metal and Air Conditioning Contractors National Association 4201 Lafayette Center Drive Chantilly, Virginia 20151-1209 Tel (703) 803-2980 - Fax (703) 803-3732 http://www.smacna.org/

SPIB Southern Pine Inspection Bureau P.O. Box 10915 Pensacola, Fl. 32524-0915 Office: (850) 434-2611 Fax: (850) 433-5594 http://www.spib.org/

SPRI Single Ply Roofing Institute 77 Rumford Avenue, Suite 3B Waltham, MA 02453 Phone: 781-647-7026 � Fax: 781-647-7222 http://www.spri.org/

TCA Tile Council of America 100 Clemson Research Blvd.

Anderson, SC 29625 Phone: 864-646-8453 / Fax: 864-646-2821 http://www.tileusa.com/profile_main.htm

TIMA Thermal Insulation Manufacturers Assoc.

29 Bank Street Stamford, CT 06901 (203) 324-7533 (Standards now issued by NAIMA, http://www.naima.org/)

UFAC Upholstered Furniture Action Council Box 2436 High Point, NC 27261 (919) 885-5065 http://www.ufac.org/

UL Underwriters Laboratories, Inc.

333 Pfingsten Road Northbrook, IL 60062-2096 USA

Phone: 847-272-8800 / Fax: 847-272-8129 http://www.ul.com/

WSFI Wood and Synthetic Flooring Institute 4415 W. Harrison St., Suite 242-C Hillside, IL 60162 (708) 449-2933

Mall Lighting 01 0950-14 Reference Standards

WWPA Western Wood Products Assoc.

522 SW Fifth Ave. Suite 500, Portland, Oregon 97204-2122 Tel: 503-224-3930 | Fax: 503-224-3934 http://www.wwpa.org/

W.W.P.A. Woven Wire Products Assoc.

2515 N. Nordica Ave.

Chicago, IL 60635 (312) 637-1359 http://www.wovenwire.org/

1.04 GOVERNMENT AGENCIES

CPSC Consumer Product Safety Commission 4330 East West Highway Bethesda, MD 20814 General Information: (301) 504-7923 M-F 8:00 am - 4:30 pm ET Fax: (301) 504-0124 and (301) 504-0025 http://www.cpsc.gov/

CS Commercial Standard (U.S. Department of Commerce)

1401 Constitution Ave., NW

Washington, DC 20230

Phone: (202) 482-2000 http://www.commerce.gov/

DOC U.S. Department of Commerce

1401 Constitution Ave., NW

Washington, DC 20230

Phone: (202) 482-2000 http://www.commerce.gov/

EPA Environmental Protection Agency 1445 Ross Avenue (maps)Suite 1200 Dallas, Texas 75202

(214) 665-6444 http://www.epa.gov/

FS Federal Specification (from GSA) Specifications Unit (WFSIS) 7th and D St., SW Washington, DC 20407 (202) 708-9205 http://apps.fss.gsa.gov/pub/fedspecs/search.cfm

GSA General Services Administration 1800 F Street, NW Washington, DC 20405 (202) 708-5082 http://www.gsa.gov/Portal/gsa/ep/home.do?tabId=0

Mall Lighting 01 0950-15 Reference Standards

GSC Texas Building and Procurement Commission 1711 San Jacinto Austin, TX 78701

(512) 463-6363 http://www.tbpc.state.tx.us/

NIST National Institute of Standards and Technology 100 Bureau Drive, Stop 1070, Gaithersburg, MD 20899-1070 Phone: (301) 975-NIST (6478) or TTY (301) 975-8295 http://www.nist.gov/

OSHA Occupational Safety and Health Administration Federal Office Building 1205 Texas Avenue, Room 806 Lubbock, Texas 79401 Phone: (806) 472-7681 (7685) / Fax: (806) 472-7686 http://www.osha.gov/

PS Product Standard of NBS (U.S. Department of Commerce) Washington, DC 20230 (202) 482-2000 http://www.thenbs.com/products/default.asp

USDA U.S. Department of Agriculture 1400 Independence Ave., S.W.

Washington, DC 20250

(202) 447-2791 http://www.usda.gov/wps/portal/usdahome

Mall Lighting 01 2000-1 Project Meetings

SECTION 01 2000

PROJECT MEETINGS

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to this section.

B. Section 01700 Contract Close-out Requirements for specific requirements on preparation of material/data to be turned over at Close-out Meeting.

1.02 GENERAL

A. A preconstruction Conference will be arranged immediately after signing the Owner-Contractor Agreement and prior to start of any work. The Conference will be attended by the Contractor, the Architect, and the Owner. The purpose shall be to review procedures related to smooth progress of the work and to review other items that require clarification. Processing and distribution of all documents and correspondence related to the Contract will be established.

1.03 SUMMARY

A. This Section specifies administrative and procedural requirements for project meetings including but not limited to:

1. Pre-Proposal Meeting

2. Pre-Construction Conference

3. Pre-Installation Conference

4. Progress Meetings

5. Close-out Meeting

1.04 PRE-CONSTRUCTION CONFERENCE

A. Prior to commencing construction, the Project Manager shall schedule a meeting to review all aspects of the Construction Project. The time of the Pre-Construction Conference and the attendees shall be determined by the Project Manager.

B. The following is a tentative agenda for the Pre-Construction Conference:

1. Critical Work sequencing

2. Designation of responsible personnel

3. Procedures for processing submittals, substitutions, applications for payment, proposal requests, change letters and Contract Close-out procedures

4. Parking and access to the site

5. Office, storage areas and temporary facilities

6. Utility information and coordination

7. Testing procedures

8. Procedures for maintaining record documents

9. Safety and Health Program

10. Site Security

11. SWPPP Safety

C. Minutes of the Pre-Construction Conference will be kept and distributed to all attendees and to all Construction Coordinating Team members and User's representatives not present at the meeting.

Mall Lighting 01 2000-2 Project Meetings

1.05 PRE-INSTALLATION CONFERENCES

A. The Contractor will conduct and document pre-installation meetings for all specification divisions. Angelo State University FP&C will participate in the pre-installation meetings and shall be given (1) week advance notice of intent to start installation of any building component. ASU representatives must be permitted to perform a pre-installation inspection of materials and equipment, to be present throughout the installation process, observe installation techniques for compliance with plans and specifications, and to participate in the final inspection. The Contractor shall provide the Project team documentation from the pre-installation meeting, including but not limited to: thorough understanding of Project plans and specifications, review of addendums and RFI�s, submittal approvals, mock �up requirements, testing requirements, owner training requirements, safety concerns and precautions, warranty requirements, ASU OPP�s, and SWPPP requirements

1.06 PROGRESS MEETINGS

A. The Project Manager shall schedule, at regular intervals, progress meetings to discuss and monitor the construction project. The Project Manager shall determine the meeting times and required attendees.

B. Reporting: Minutes of the Progress Meeting shall be kept and distributed to all attendees and to the Construction Coordinating Team members and User's representatives not present at the meeting.

1.07 CLOSE-OUT MEETING

A. When the FP&C Project Manager and Design Professional determines that a project, including all punch list items, has been substantially completed and an acceptance date established, a formal project close-out meeting will be scheduled and attended by the following:

1. FP&C Project manager

2. Design Professional representatives

3. Contractor�s Project Manager and Superintendent at a minimum

4. Angelo State University Construction Coordinating Team representatives

5. User representatives

6. Major subcontractors

B. At the close-out meeting, upon documentation of exceptions and assignment of completion responsibilities, at a minimum, the following material/data will be released by the Project Manager to the User and/or Physical Plant personnel:

1. Certification of Punch List completion

2. Certification of TAB and Commissioning completion

3. Complete marked-up construction drawings for A/E and established distribution date for as-built drawings

4. Three copies of complete operation and maintenance manuals (as specified) for but not limited to the following; mechanical, electrical, plumbing, elevator, IT, roofing systems, access control, including approved submittals of all items

5. Keys assigned to the Contractor and checked out from the Lock Shop

6. All warranty documents for all items and work associated with the project, including any extended warranties for roofing and other items as may have been specified for the project. A tabular list shall accompany the warrantee documents showing the date the warrantee started and the date the warrantee expires. If an extended warrantee is provided for the project and the terms include proration, the list shall indicate the dates of the prorations.

7. Roofing system warranties or bonds.

Mall Lighting 01 2000-3 Project Meetings

8. Other items, as defined by the contract documents, necessary for the User to operate and maintain the completed project

9. Signed receipts showing previous delivery to the responsible Angelo State department of spare parts, extra stock and/or test equipment required by the contract documents

10. Complete record of project changes to establish as-built conditions of the project as represented in the as-built documents

11. Itemized list of all warranty items and a letter defining any exceptions to warranty procedures

12. Names and 24-hour telephone numbers of contractor representatives for warranty work

13. Product information/technical data and manufacturer's maintenance recommendations for carpets, trash receptacles, floor seals and finishes

C. Reporting: Minutes of the Project Close-out meeting will be kept by the Contractor and any exceptions to the above will be recorded. Suspense dates for completion of exceptions will also be established to ensure expeditious completion. Copies of the minutes will be forwarded to all attendees.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

Mall Lighting 01 2500-1 Substitution Procedures

SECTION 01 2500

SUBSTITUTION PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Product Substitution Procedures.

1.2 GENERAL

A. Definition: Proposal by Contractor to use manufacturer, product, material, or system different from one required in Contract Documents.

B. Do not substitute Products unless a substitution request has been approved by Architect.

C. Substitutions during Bidding: Refer to Instructions to Bidders.

D. Architect will consider substitution requests within 30 days after award of Contract. After initial 30 day period, substitutions requests will be considered only due to non-availability of a specified Product through no fault of Contractor.

E. In case of non-availability of a specified Product notify Architect in writing as soon as non-availability becomes apparent.

1.3 SUBSTITUTION REQUESTS

A. Submit substitution requests on copy of form bound into Project Manual.

B. Document specified product and proposed substitution with complete data, including:

1. Product identification, including name and address of manufacturer.

2. Product description, performance and test data, and reference standards.

3. Sample, if requested.

4. Description of any anticipated effect that acceptance of proposed substitution will have on

Progress Schedule, construction methods, or other items of Work.

5. Description of any differences between specified product and proposed substitution.

6. Difference in cost between specified product and proposed substitution.

C. Burden of proof for substantiating compliance of proposed substitution with Contract Document requirements remains with Contractor.

D. A request constitutes a representation that the Contractor:

1. Has investigated the proposed Product and determined that it meets or exceeds the quality level of the specified Product.

2. Will provide the same warranty for the substitution as for the specified Product.

3. Will coordinate installation and make changes to other Work that may be required for the Work to be complete with no additional cost to Owner.

4. Waives claims for additional costs or time extension that may subsequently become apparent.

5. Will reimburse Owner for design services associated with re-approval by authorities or revisions to Contract Documents to accommodate the substitution.

E. Substitutions will not be considered if:

1. They are indicated or implied on Shop Drawings or other submittals without submittal of a substitution request.

2. Approval will require substantial revision of Contract Documents without additional compensation to Architect.

F. Submit electronically in Adobe PDF format.

Substitution Procedures 01 2500-2 Mall Lighting

G. Architect will notify Contractor of approval or rejection of each Substitution Request.

PART 2 PRODUCTS

Not used

PART 3 EXECUTION

Mall Lighting 01 2900-1 Payment Procedures

SECTION 01 2900

PAYMENT PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Schedule of Values.

2. Applications for Payment.

B. Related Sections:

1. Section 01 7700 - Closeout Procedures.

1.2 SCHEDULE OF VALUES

A. General:

1. Submit a Schedule of Values to Architect at least 20 days prior to submitting first Application for

Payment.

2. Upon request of Architect, furnish additional data to support values given that will substantiate their correctness.

3. Approved Schedule of Values will be used as basis for reviewing Contractor Applications for

Payment.

B. Form and Content:

1. Format: AIA Document G703 - Continuation Sheet of Application and Certification for Payment.

Contractor standard electronic media format.

2. Use Table of Contents of Project Manual as basis of format for listing costs of Work.

3. List installed value of component parts of Work in sufficient detail to serve as basis for computing values for progress payments.

4. Include separate line items for:

a. Site mobilization.

b. Bonds and insurance.

c. Contractor overhead and profit.

5. For items on which payment will be requested for stored materials, break down value into:

a. Cost of materials, delivered and unloaded, with taxes paid.

b. Total installed value.

6. For each line item that has a value of more than $40,000.00, break down costs to list major products or operations under each item.

7. Total of costs listed in Schedule shall equal Contract Sum.

C. Submit electronically in Adobe PDF format.

D. Review and Resubmittal:

1. After initial review by Architect, revise and resubmit if required.

2. Revise and resubmit along with next Application for Payment when a Change Order is issued.

List each Change Order as a new line item.

1.3 APPLICATIONS FOR PAYMENT

A. Preparation:

1. Format: AIA Document G702 - Application and Certification for Payment, supported by AIA

Document G703 - Continuation Sheet. Contractor standard electronic media format.

2. Prepare required information in typewritten format or on electronic media format.

3. Use data from reviewed Schedule of Values. Provide dollar value in each column for each line item representing portion of work performed.

Payment Procedures 01 2900-2 Mall Lighting

4. List each authorized Change Order as a separate line item, listing Change Order number and dollar value.

5. Prepare Application for Final Payment as specified in Section 01 7700.

B. Waivers of Lien:

1. Along with the each Application for Payment, submit waivers of lien from Contractor and each

Subcontractor or…