ESBD_File_336316_04_TWU_East Campus Drainage - Narrative.pdf
PDF 2 MB Posted
- Attached to
- East Campus Infrastructure
- Solicitation number
- RFP-731-24-001-CJ
- Issued by
- Denton County, Denton City, Texas
About this file
This document is a civil narrative that provides supplemental information for a state and local contract opportunity in Denton County and the city of Denton, Texas. The project scope includes the installation of new storm sewer piping, rehabilitation of an existing drainage ditch, construction of a new runoff reservoir, installation of new box culverts, sidewalks, lighting, and security poles, and the removal and relocation of existing fiber optics and copper cabling. Specifically, the narrative details the construction of approximately 750 linear feet of 6-foot wide reinforced concrete sidewalk, the installation of blue security poles and lighting along the new sidewalk and existing path, the removal of a vehicular bridge and extension of 4-4'x3' box culverts by approximately 85 linear feet, and the construction of an additional 2,800 linear feet of 6-foot wide reinforced concrete sidewalk along the proposed east parking loop.
The document does not provide details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient commercial information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TWU East Campus Drainage and Parking
CIVIL NARRATIVE
The purpose of this narrative is to provide supplemental information not included in the preliminary set issued for this project and dated June 30, 2023.
Description of additional items
1. Construct 6’ wide reinforced concrete sidewalk south of the future TWU Health Science Center.
The sidewalk will connect to the existing concrete path on site. The length of this sidewalk will be approximately 750 LF. Refer to sketch below.
2. Provide blue security poles and lighting along the new sidewalk and existing path to the North.
The spacing for the security poles will be between 400 and 700 feet.
3. Remove vehicular bridge and abutments in front of future TWU HSC site. Extend 4-4’x3’ box culverts by approximately 85 LF north and install headwall and slope protection. The access drive will be constructed over the culvert extension.
TWU East Campus Drainage and Parking
09.07.23
Civil Narrative
4. Construct 6’ wide reinforced concrete sidewalk along the proposed east parking loop. The length of this sidewalk will be approximately 2800 LF.
5. Additional earthwork/grading will be required for these sidewalks to comply with ADA and TAS requirements.
6. Sidewalk will be 5” thick, 3,500psi with no.3 bars at 12” O.C.
File details come from the government source that posted it. Updated .