ESBD_572849_1793398843116_SOL_PST_RFP_26R0010816.pdf

PDF 394 KB Posted

Attached to
Conroe Roof Replacement
Solicitation number
405-26R0010816
Issued by
Texas

About this file

Summary

This is a Request for Proposal (RFP) issued by the Texas Department of Public Safety (DPS) for roof replacement services at the DPS Conroe District Office in Conroe, Texas. The solicitation (405-26R0010816) requests comprehensive roofing services including removal of existing roofing and installation of new roofing, insulation, sheet-metal components, gutters, sealants, and associated accessories to create a fully functional, weather-resistant roof system. Vendors must submit electronic responses by 5:00 P.M. Central Time on December 8, 2026, to DPS_Solicit_Response@dps.texas.gov or via the DPS Online Bid Room. A mandatory pre-proposal site visit is scheduled for November 13, 2026, at 11:00 A.M. at 2 Hilbig Road, Conroe, Texas 77301. The anticipated contract award date is January 22, 2027. The initial contract term commences on the effective date and expires one year from that date, with continuation subject to DPS funding availability. Respondents must address four pricing items: the base roof replacement project and three optional add-alternates (building envelope sealant replacement, pressure washing, and metal repainting), with all pricing inclusive of labor, materials, overhead, and profit.

Pricing must be submitted on the Mandatory Pricing Schedule in the specified format. No minimum compensation is guaranteed under the contract, and DPS will not make payments until the Contract Monitor approves the work. Respondents must provide evidence of financial resources and ability to perform, including audited financial statements or alternative financial documentation. A 10 percent retainage is reserved from final payment until all work is accepted and warranty documentation is provided. Performance bonds exceeding $100,000 and payment bonds exceeding $25,000 are required before work commences. Contractors must comply with prevailing wage rates under Texas Government Code Chapter 2258 and provide proof of workers' compensation insurance. Criminal history background checks at the contractor's expense are mandatory for all project personnel. The solicitation includes a Historically Underutilized Business (HUB) requirement, with vendors able to demonstrate good faith effort through self-performance or an approved Subcontracting Plan. Evaluation criteria include technical requirements (40 points), vendor performance indicators and financial capability (30 points), and cost (30 points), with award based on best value to DPS.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF PUBLIC SAFETY OF THE STATE OF TEXAS

SOLICITATION NO.

405-26R0010816

TYPE OF SOLICITATION

NEGOTIATED - REQUEST FOR

PROPOSAL (RFP)

DATE ISSUED

10/30/2026 Conroe Roof Replacement

Vendor must submit electronic responses no later than 5:00 P.M. Central Time on 12/08/2026 to the following address or via the DPS Online Bid Room.

DPS_Solicit_Response@dps.texas.gov Attention: 405-26R0010816

DPS is not currently accepting any in-person solicitation responses. DPS will only accept electronic responses received by the date and time indicated in this document.

FOR INFORMATION CONTACT:

Carolyn Caro, CTCM, CTCD

Contract Administrator

PHONE: (512) 424-7871

EMAIL: Carolyn.caro@dps.texas.gov

GRP_PCS_Construction@dps.texas.gov

RESPONSE (Respondent must fully complete)

DISCOUNT FOR PROMPT PAYMENT: 10 DAYS

20 DAYS

30 DAYS

___ DAYS

NAME AND ADDRESS

OF RESPONDENT:

RESPONSE DATE

EMAIL AND TELEPHONE NO. (Include area code)

NAME AND TITLE OF AUTHORIZED REPRESENTATIVE

CERTIFICATION, DISQUALIFICATION, AND REMEDIES

By submitting a response, Vendor represents and warrants that all statements, certifications, and information submitted in response to this solicitation are true, current, complete, and accurate.

DPS may pursue and enforce any available remedies against Vendor for making false statements, including disqualifying the Vendor's response, immediately canceling any Contract awarded to Vendor, or recommending State of Texas debarment.

TERM, PRICING, AND FUNDING

The initial contract term commences on the effective date stated in the signing document, or purchase order and expires one year from that effective date.

DPS will not allow changes after Date of Award to terms or pricing during Contract term. The continuation of the Contract for any period is subject to the availability of DPS's funding source for the Contract.

mailto:Carolyn.caro@dps.texas.gov mailto:GRP_PCS_Construction@dps.texas.gov

Page 2 of 33 Version 2.5 | Rev. 08/13/2026

TABLE OF CONTENTS

SECTION A—DEFINITIONS

SECTION B—SERVICES AND PRICES

B.1 PRICING REQUIREMENTS

B.2 INVOICE REQUIREMENTS

B.3 PAYMENTS

B.4 MANDATORY PRICING SCHEDULE

SECTION C - STATEMENT OF WORK

C.1 INTRODUCTION

C.2 SCOPE

C.3 RESPONDENT INFORMATION AND RESPONSE REQUIREMENTS

C.3.2 PROJECT PHASING, SITE ACCESS, AND CONTINUITY OF OPERATIONS

REQUIREMENTS

C.4 PROJECT SCHEDULE AND PLAN

C.5 TRANSITION

C.6 DPS PERSONNEL

C.7 VETERAN HEROES UNITED IN BUSINESS (VETHUB) PARTICIPATION

C.8 INSURANCE REQUIRED UNDER THE CONTRACT

C.9 BONDS REQUIRED UNDER THIS CONTRACT

C.10 WARRANTY CALL RESPONSE TIME

C.11 RETAINAGE

C.12 WAGE RATES

C.13 UNIFORM GENERAL CONDITIONS FOR CONSTRUCTION PROJECTS

C.14 CRIMINAL HISTORY BACKGROUND CHECK

C.15 GENERAL CONFIDENTIALITY REQUIREMENTS

C.16 PROJECT MANAGEMENT REQUIREMENTS

SECTION D—INSTRUCTIONS, CONDITIONS, AND NOTICES TO RESPONDENTS

D.1 RESPONSE PREPARATION INSTRUCTIONS

D.2 SOLICITATION ADDENDA

Page 3 of 33 Version 2.5 | Rev. 08/13/2026

D.3 LATE SUBMISSIONS, CHANGES, AND WITHDRAWALS OF RESPONSES

D.4 RESPONSE ACCEPTANCE PERIOD

D.5 CONTRACT AWARD

D.6 DPS's RIGHTS

D.7 RESPONSE SUBMISSION INSTRUCTIONS

D.8 PRESENTATIONS

D.9 DISCUSSION AND CORRESPONDENCE

D.10 SUBMISSIONS SUBJECT TO THE TEXAS PUBLIC INFORMATION ACT

D.11 AGENCY POSTING OF CONTRACTS

D.12 ANTICIPATED SCHEDULE OF EVENTS

D.13 PRE-PROPOSAL SITE VISIT

SECTION E—EVALUATION CRITERIA

SECTION F—LIST OF EXHIBITS

Page 4 of 33 Version 2.5 | Rev. 08/13/2026

SECTION A—DEFINITIONS

The following terms and acronyms used in the Contract have the meanings given in this section unless the context indicates otherwise.

"Business Day" means Monday through Friday except for federal, state, and legal holidays observed by the State of Texas.

"Business Hours" means 8:00 a.m. to 5:00 p.m. Central Time.

"Contract" means this formal, written, and legally enforceable agreement between DPS and Contractor.

"Contractor" means the individual, business entity, or organization awarded the Contract. In the context of submitting a response, "Contractor" also means "Respondent" and "Vendor."

"Date of Award" means the date the Contract is fully executed.

"Days" means calendar days unless otherwise specified.

"DPS" means the Department of Public Safety of the State of Texas, a state agency in the executive branch created under Tex. Gov't Code Ch. 411.

"Fiscal Year" means any of the one-year periods beginning September 1 and ending August 31 used for annual budgetary purposes by the State of Texas.

"Parties" means Contractor and DPS.

"Respondent" means the individual, business entity, or organization that submits a response in response to this solicitation with intent to contract with DPS.

"Vendor" means the individual, business entity, or organization at any stage in the procurement or contracting process (prior to response, during response, and after contract award).

Page 5 of 33 Version 2.5 | Rev. 08/13/2026

SECTION B—SERVICES AND PRICES

B.1 PRICING REQUIREMENTS

B.1.1 Pricing Instructions

A. Respondent must submit proposed pricing on the Mandatory Pricing Schedule that includes all costs, fees, licenses, and all expenses for Contractor's delivery and performance of the commodities or services requested. The final negotiated, contracted pricing and payment structure will represent Contractor's sole compensation under the Contract. DPS guarantees no minimum compensation under the Contract.

B. DPS will negotiate pricing prior to award of the Contract if the pricing offered appears that it may not be best value to DPS.

C. Contractor must deliver and provide the commodities and services described in compliance with all requirements of the Contract on a no minimum, as needed, as requested basis. Notwithstanding anything else to the contrary in the Contract, DPS will not make any payments of any amount to Contractor or any other entity or person, and Contractor will not submit any invoices, until Contractor has received approval from DPS's Contract Monitor specifically stating that DPS accepts the commodities or services and Contractor is authorized to submit an invoice. If DPS does not accept the commodities or services, the Contract will involve no payments of any type for any amount.

B.1.2 Financial Rating Report, Financial Resources, and Ability to Perform

A. Upon request, Respondent must provide evidence of its financial resources and its ability to provide the commodities or perform the services for which Respondent is submitting a response. This includes information Respondent believes is pertinent to demonstrate its financial capability, financial solvency, and capacity to fulfill the requirements of this solicitation.

B. Evidence of financial stability include providing audited financial statements for each of the last two years of Respondent's operations or, in the alternative, financial statements compiled, reviewed and attested by an independent certified public accountant or certified public accounting firm. Respondents may submit a copy of its Dun & Bradstreet (D&B) Business Information Report. If a D&B Report is submitted the report must include Respondent's Viability Score and the Portfolio Comparison Score or similar ratings.

C. In lieu of providing financial statements in its Proposal, a Respondent may provide a statement regarding the Respondent's financial stability and viability to perform under any resulting contract. If Respondent elects this approach rather than audited financial statements, the Respondent must submit a statement, with appropriate supporting

Page 6 of 33 Version 2.5 | Rev. 08/13/2026 documentation, sufficiently detailed to demonstrate financial solvency, and to verify the capacity to fulfill the requirements of this solicitation.

D. Respondent must provide information and any other financial information reasonably requested by DPS consistent with the services provided by Respondent or otherwise required by the then applicable DPS policies for similar contracts.

E. Selected Contractor must also submit to the Contract Administrator its financial rating information within 120 days after the end of Contractor's fiscal year.

F. DPS reserves the right to investigate and determine the financial integrity and responsibility of a Respondent and to reject a response on the grounds of Respondent's lack of financial soundness, or if DPS reasonably concludes, after reviewing the information submitted by Respondent as well as all other relevant information obtained by DPS, that significant issues exist that could jeopardize Respondent's full and timely performance. DPS also reserves this same right throughout the life of the Contract, including before executing any optional renewal with Contractor.

B.2 INVOICE REQUIREMENTS

A. Invoices are Contractor's billing for commodities or services rendered. DPS will pay

Contractor based on itemized invoices submitted to and approved by DPS. The invoices must be itemized and clearly identify the actual commodities and services provided.

B. Contractor's invoice must include the following: the Contract/Purchase Order number, the remittance address, and any prompt payment discount offered. Contractor must email the invoice to the Contract Monitor listed in the Contract and to apinvoices@dps.texas.gov.

The State of Texas will not incur any penalty for late payment if the invoice fails to conform to the requirements of this section or if Contractor did not email the invoice to the appropriate email addresses identified in this section.

B.3 PAYMENTS

A. DPS recommends that Vendor receive payments by electronic funds transfer (EFT), also known as direct deposit. If Vendor elects to be set up for direct deposit payment, Vendor must submit a completed Direct Deposit Authorization Form (74-176).

B. Regardless as to whether Direct Deposit is chosen, Vendor must submit a completed Application for Texas Identification Number (AP-152) and Request for Taxpayer Identification Number and Certifications Form (W-9) with its response.

C. If Vendor has previously submitted a completed Direct Deposit Authorization Form and Request for Taxpayer Identification Number and Certifications Form to DPS for another separate contract, Vendor is not required to submit another form.

mailto:apinvoices@dps.texas.gov

Page 7 of 33 Version 2.5 | Rev. 08/13/2026

B.4 MANDATORY PRICING SCHEDULE

Respondent must submit pricing within the Pricing Schedule Exhibit replicating, as necessary, in this exact format.

Item No.

Description Quantity UOM Price

1 DPS Conroe Office Roof Replacement Project as per SOW– Price inclusive of all Costs, Labor, Materials, Overhead, and Profit.

1 JOB $

Item No.

Additional Considerations Quantity UOM Price

2 Add Alternate No. 1– Replacement of Building Envelope Sealants as indicated on Drawing R1.01 Overall Roof Plan of SOW – (Price inclusive of all Costs, Labor, Materials, Overhead, and Profit.)

1 JOB $

3 Add Alternate No. 2– Pressure Wash as indicated on Drawing R1.01 Overall Roof Plan of SOW – (Price inclusive of all Costs, Labor, Materials, Overhead, and Profit.)

1 JOB $

4 Add Alternate No. 3– Repaint Metal as indicated on Drawing R1.01 Overall Roof Plan of SOW - (Price inclusive of all costs, Labor, Materials, Overhead, and Profit.)

1 JOB $

Page 8 of 33 Version 2.5 | Rev. 08/13/2026

SECTION C - STATEMENT OF WORK

C.1 INTRODUCTION

The Texas Department of Public Safety is formally soliciting proposals from qualified contractors for all necessary supervision, labor, materials, and equipment to replace the roofing at the office in Conroe, Texas. The project scope includes the removal of existing roofing and the installation of new roofing, insulation, sheet-metal components, gutters, sealants, and associated accessories to ensure a fully functional, weather-resistant roof system.

C.2 SCOPE

Please refer to Exhibit F.7, Statement of Work for requirements.

C.3 RESPONDENT INFORMATION AND RESPONSE REQUIREMENTS

C.3.1 Firm Qualifications, Company History, And Experience

A. Overview

The Respondent must provide detailed information demonstrating the firm’s qualifications, organizational history, and cumulative experience performing construction projects of similar scope, size, and complexity.

B. Company History

a. The year your firm was established and the number of years it has operated under current ownership.

b. An overview of the company’s organizational structure and core areas of construction expertise.

c. A summary of your company's growth, major milestones, and relevant background, including background concerning removing and installing generator systems.

d. Details regarding your capacity to manage multiple and simultaneous projects in occupied environments.

C. Project Experience

a. Detail your firm’s experience with projects of comparable size, scope, and complexity, including modified bitumen and metal roof replacements.

b. Detail your experience working in an environment that operates 24 hours a day/7 days a week with personnel working in the facility, including your ability to maintain continuity of work in such an environment with minimal disruption to facility personnel.

c. Detail the firm’s experience working in an occupied school, campus, or public environment.

d. Detail the firm’s experience collaborating with city, county, state, or federal entities.

Page 9 of 33 Version 2.5 | Rev. 08/13/2026

e. List of licenses and certifications.

f. Provide a comprehensive list of all subcontractors proposed for this project, detailing their specific roles, responsibilities, and relevant experience on projects of comparable size, scope, and complexity.

D. Representative Projects

a. Provide a list of at least five representative projects completed within the last ten

(10) years that demonstrate the firm’s experience with similar scope, size, and complexity. For each project, include:

i. Project name and owner

ii. Scope of work and key technical elements

iii. Contract value and completion date

iv. Project schedule performance (on time, early, or delayed)

v. Owner reference with current contact information

E. Key Personnel Experience

a. Names and roles of the proposed Project Manager, Superintendent, and other key personnel.

b. Detailed summary of each individual’s lifetime experience with projects involving similar scope, size, and complexity.

c. Relevant certifications, training, or manufacturer credentials.

C.3.2 PROJECT PHASING, SITE ACCESS, AND CONTINUITY OF OPERATIONS REQUIREMENTS

A. Overview

The Department of Public Safety (DPS) will continue normal operations, administrative functions, and facility‑based activities throughout the duration of the project. The Contractor shall plan, schedule, coordinate, and execute all work in a manner that maintains safe, continuous, and reliable access to occupied buildings during construction. The Contractor shall prepare and implement a detailed Project Phasing and Continuity of Operations Plan to guarantee safe DPS occupancy, ongoing and uninterrupted facility operations, and uninterrupted site traffic.

B. Contractor Responsibilities

The Contractor must provide a detailed narrative, schedule, and supporting documentation describing how the project will be executed in phases while maintaining facility availability. At a minimum, the Contractor’s plan must address the following:

i. Construction Phasing Strategy and Work Sequencing:

1. Develop a multi‑phase construction plan and phasing schedule that divides the work into logical and functional steps, including work done after hours and on weekends.

Page 10 of 33 Version 2.5 | Rev. 08/13/2026

2. Identify which areas will be under construction, which areas will remain accessible, and the duration of each phase.

3. Identify plans for pre-construction assessments, identification of physical protection measures, and noise/vibration monitoring and mitigation.

4. Identify plans and standards related to daily housekeeping and site cleanliness, including daily cleanup, securing tools and materials, stormwater or runoff controls, hazardous material handling, removal of debris, and necessary posts and marking (i.e. – designated work areas and pedestrian and vehicle pathways).

5. Provide a narrative explaining how weather (including contingency planning for weather delays), equipment lead times, curing times, contingency float for critical path tasks, and manufacturer installation specifications will influence the phasing approach.

6. A Gantt-style schedule showing each demolition and construction phase, duration, and dependencies with a completion date of 8/31/2027.

7. Describe proposed quality control, inspection, testing, and documentation of compliance with specification procedures for the project.

ii. Communication and Coordination Protocols

1. Designate a single point of contact responsible for coordinating daily and weekly activities with DPS.

2. Provide a communication plan that includes weekly look‑ahead schedules, progress updates, and notification procedures for any changes affecting the project baseline or critical paths.

3. Participate in regular coordination meetings with DPS staff to review progress, upcoming work, and operational impacts.

4. Establish a clear process allowing DPS personnel to request immediate or temporary access to the work area outside of regular construction schedules.

5. Identify change management procedures, including how potential changes will be communicated, evaluated, approved, and documented.

6. Define a clear escalation process with 24/7 contact information for addressing urgent site issues, safety concerns, or emergency logistical conflicts.

C. Deliverables

a. The Contractor must provide the following as part of their proposal:

i. Comprehensive Project Phasing and Continuity of Operations Plan

ii. Phased Site Utilization Plan, including diagrams

iii. Phased Construction Schedule, including critical path

iv. Safety and Access Control Plan

v. Communication and Coordination Plan

vi. Contingency and Risk Mitigation Plan

vii. Training and Testing plan as per Statement of Work.

Page 11 of 33 Version 2.5 | Rev. 08/13/2026

viii. Provide cutsheets/specification sheets for the major equipment. Refer to SOW for requirements.

D. Additive Work Items (Add Alternatives)

a. For purposes of this solicitation, the term Additive Work Items refers to optional, discrete elements of work that have been architecturally designed or otherwise defined and may be incorporated into the Project if funding remains available after award of the Base Scope of Work.

b. Respondents must provide detailed pricing for each Additive Work Item identified in this solicitation. Pricing must be submitted in the format prescribed and must include all labor, materials, equipment, overhead, and any other costs necessary for full performance of the Additive Work Item.

c. Additive Work Items are provided for planning and budgeting purposes only.

Selection of Additive Work Items, if any, will not occur in the order presented and will be based on DPS project needs, funding availability, and the outcome of negotiations with the selected Respondent. Accordingly;

i. Pricing for Additive Work Items is required for informational, budgeting, and negotiation purposes,

ii. Additive Work Item pricing will not be evaluated or scored as part of the proposal evaluation process and will not be included in the calculation of best value for award.

iii. DPS makes no guarantee that any Additive Work Item will be authorized, negotiated, or incorporated into the final contract.

d. DPS reserves the right, at its sole discretion, to negotiate the inclusion, exclusion, modification, scope, sequencing, or pricing of Additive Work Items with the selected Respondent prior to or after contract award, provided such negotiations are consistent with applicable law and the terms of this solicitation.

C.4 PROJECT SCHEDULE AND PLAN

Respondent must include in its response a draft project plan detailing how Respondent will provide or implement the requirements of this solicitation. The draft project plan must detail how Respondent would address the following phases:

1. A description of the project organization;

2. A breakdown and detailed description of the different deliverables;

3. Expected dependencies, caveats, or risks that exist within the project plan and schedule;

4. A schedule and work plan for the different deliverables of the project;

5. A Gantt chart illustrating a high-level timeline for the project, including task start and end dates and dependencies;

6. Delegation of duties to each party for each of the tasks;

7. Information regarding maintenance and support, along with standard project management components such as a risk management plan and a change management plan;

9. The methodology Respondent will employ to ensure the schedule is met; and

Page 12 of 33 Version 2.5 | Rev. 08/13/2026

10. Provision or implementation of goods or services by the required dates, and subsequently provide support of these goods or services.

C.5 TRANSITION

In the event that DPS awards a subsequent competitive solicitation to a new contractor or if DPS decides to perform the work itself, Contractor must work with DPS and any new contractor to smoothly and seamlessly transition the contract. Contractor will develop a transition plan upon request by DPS. DPS must approve the transition plan before implementation. DPS will not release the final invoice until Contractor returns all Work to

DPS.

C.6 DPS PERSONNEL

C.6.1 DPS's Contract Administrator

A. The Contract Administrator for administration of the Contract is Carolyn Caro.

B. The telephone number for the Contract Administrator is 512-424-7871.

C. The email address is Carolyn.caro@dps.texas.gov and GRP_PCS_Construction@dps.texas.gov.

The Contract Administrator is the representative of DPS's Procurement and Contract Services responsible for the general administration of the Contract, negotiation of any changes, and issuance of written amendments to the Contract.

If DPS and Contractor agree to amend the Contract, DPS will issue a written amendment signed by authorized signatories of the Parties.

C.6.2 DPS's Contract Monitor

A. The Contract Monitor for the Contract is Dinah Eghan-Wiafe.

B. The telephone number for the Contract Monitor is 346-244-3360.

C. The email address is dinah.eghan-wiafe@dps.texas.gov.

The Contract Monitor is not authorized to make any representations or commitments of any kind on behalf of DPS or the State of Texas.

C.7 VETERAN HEROES UNITED IN BUSINESS (VETHUB) PARTICIPATION

A. 34 Tex. Admin. Code § 20.282: An Historically Underutilized Business (HUB) is a business that is certified by the comptroller because it has not exceeded the size standards established by §20.294 of this title, maintains its principal place of business in Texas, and is:

mailto:Carolyn.caro@dps.texas.gov mailto:GRP_PCS_Construction@dps.texas.gov mailto:dinah.eghan-wiafe@dps.texas.gov

Page 13 of 33 Version 2.5 | Rev. 08/13/2026

a. a corporation formed for the purpose of making a profit in which at least 51% of all classes of the shares of stock or other equitable securities are owned by one or more qualifying owners;

b. a sole proprietorship created for the purpose of making a profit that is 100% owned, operated, and controlled by a qualifying owner;

c. a partnership formed for the purpose of making a profit in which 51% of the assets and interest in the partnership is owned by one or more qualifying owners;

d. a joint venture in which each entity is described by subparagraphs (A), (B), (C), or (E) of this paragraph;

e. a supplier contract between an entity described by subparagraphs (A), (B), (C), or (D) of this paragraph and a prime contractor under which the HUB is directly involved in the manufacture or distribution of the supplies or materials or otherwise warehouses and ships the supplies; or

f. a business other than described in subparagraphs (B), (C), (D), and (E) of this paragraph, which is formed for the purpose of making a profit and is otherwise a legally recognized business organization under the laws of the State of Texas, provided that at least 51% of the assets and 51% of any classes of stock and equitable securities are owned by one or more qualifying owners.

B. Vendors may use the self-performing method to demonstrate a good faith effort for any subcontracting opportunity by indicating that it intends to fulfill the entire contract, including each subcontracting opportunity, with its own equipment, supplies, materials, and employees. Vendor must complete the applicable sections within the Subcontracting Plan (SP) and submit as part of its response.

C. Vendor must submit a complete SP meeting the good faith effort and supported by the required forms with the response.

D. A courtesy review of a Vendor's completed SP is optional and is available to assist Vendors. This courtesy review may only identify possible deficiencies. The final SP determination may only be provided at the time of the final submission of the SP with the Solicitation Response. To request a courtesy review, submit the completed SP including all supporting documentation in accordance with the directions provided in the SP Exhibit. SPs received after the "Courtesy Review of SP" deadline in the Solicitation's Schedule of Events or deadlines established in subsequent Addenda, will not be reviewed and will be returned to the requestor.

E. Vendor must submit an SP as part of its response and must comply with implementation of the SP. Contractor must seek written approval from DPS prior to making any modifications to its SP.

F. Vendor must provide notice to all subcontractors of their selection as a subcontractor for this Contract. The notice will specify, at a minimum, DPS's name, the name of the Contract Administrator, this Contract's assigned contract number, the subcontracting

Page 14 of 33 Version 2.5 | Rev. 08/13/2026 opportunity the subcontractor will perform, the approximate dollar value of the subcontract, and the expected percentage of this Contract's total value that the subcontract represents. A copy of the notice will be provided to the HUB Office no later than ten business days after the effective date of this Contract.

G. Contractor must make a good faith effort to comply with all state HUB requirements under Tex. Gov't Code Chapter 2161 and the administrative rules, as applicable.

Contractor must also comply with its approved Subcontracting Plan (SP).

H. Contractor must submit to the HUB Office on a monthly basis (by the fifth day of the following month) the Prime Vendor Progress Assessment Report (PAR).

C.8 INSURANCE REQUIRED UNDER THE CONTRACT

Unless otherwise specified in this Contract, DPS's Standard Terms and Conditions or any other exhibit or attachment, Contractor will acquire and maintain, for the duration of this Contract, insurance coverage necessary to ensure this Contract's proper performance and cover any potential liabilities with financially sound and reputable insurers licensed by the Texas Department of Insurance, in the type and amount customarily carried within the industry or as determined by DPS. Contractor will provide evidence of insurance upon request by DPS.

If any policy is determined by DPS to be deficient and does not comply with the terms of this Contract, Contractor will secure such additional coverage as required by DPS, law, regulation, or customary practice. If coverage expires during the term of this Contract, Contractor must produce renewal certificates for each type of coverage.

C.9 BONDS REQUIRED UNDER THIS CONTRACT

Bonds will be required from Contractor before commencing any work as follows:

A. For a contract in excess of $100,000.00 a performance bond will be executed in the amount of the contract conditioned upon the faithful performance of the work in accordance with the plans, specifications, and contract documents. Said bond will be solely for the protection of the state.

B. For a contract in excess of $25,000.00 a payment bond will be executed in the amount of the contract, solely for the protection of all claimants supplying labor and material.

C. Any bids submitted will include the cost of any applicable bond. Costs will be included in the base Bid and will not be itemized separately.

If a bond is required, Bidder will be notified in writing. DPS must receive the bond within ten calendar days and must reference the solicitation number. Work may not begin until the bond is received and the Contractor is provided a Notice to Proceed Exhibit.

Page 15 of 33 Version 2.5 | Rev. 08/13/2026

C.10 WARRANTY CALL RESPONSE TIME

DPS requires Contractor to respond to any warranty call concerning this project within a 48-hour time period. For any warranty call issued, Contractor will have five days or an agreed-upon timeframe to replace defective products after receipt of notification by DPS that a warranty issue exists.

C.11 RETAINAGE

DPS reserves the right to withhold 10% retainage from final payment until all work is accepted by DPS and warranty or equipment operation and maintenance documents are in hand (if applicable). This includes required original Contractor provided installation letters on its letterhead, applicable material manufacturer industry standard warranties, any equipment operation and maintenance manuals, or other project inclusive documentation for the respective trades associated with this project.

C.12 WAGE RATES

DPS is the contracting agency for this state-funded project. The following statute requires any contracting agency to specify the generally prevailing rate of wages in contracts that are bid.

a) Gov’t Code Chapter 2258. Prevailing wage rates pursuant to the requirements of this statute. If applicable, DPS has ascertained the attached rates located as an exhibit are paid to various classifications of workers in the locality of this project.

b) The hourly rate for legal holiday and overtime work will be not less than 1½ times the base hourly rate.

A contractor or subcontractor who violates this section must pay to the state or a political subdivision of the state on whose behalf the contract is made, $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the contract. Tex. Gov’t Code Chapter 2258 prevailing wage rate can be viewed at the following:

http://www.statutes.legis.state.tx.us/Docs/GV/htm/GV.2258.htm.

C.13 UNIFORM GENERAL CONDITIONS FOR CONSTRUCTION PROJECTS

The Contract incorporates by reference the Texas Facilities Commission’s Uniform General Conditions (UGC) in its current version and as may be subsequently amended. The UGC may be viewed at http://www.tfc.state.tx.us/divisions/facilities/prog/construct/formsindex/.

http://www.statutes.legis.state.tx.us/Docs/GV/htm/GV.2258.htm http://www.tfc.state.tx.us/divisions/facilities/prog/construct/formsindex/

Page 16 of 33 Version 2.5 | Rev. 08/13/2026

C.14 CRIMINAL HISTORY BACKGROUND CHECK

A. Contractor's project personnel must submit to a fingerprint-based Criminal History Background Investigation, at Contractor's expense. To facilitate this Criminal History Background Investigation, each person must complete DPS Contractor Background Information form (HR-22), which DPS will provide.

B. If required under the Contract, Contractor will not allow personnel who have not submitted to and successfully completed DPS fingerprint-based Criminal History Background Investigation and who do not otherwise maintain a DPS security clearance to work on the Contract. DPS has the right to prevent Contractor's personnel from gaining access to DPS building(s) and computer systems if DPS determines that such personnel do not pass the background check or fail to otherwise maintain DPS security clearance.

C. When required, Contractor's Project Manager will provide the following to DPS Contract Monitor no later than ten days of executing the Contract:

a) the completed Contractor Background Information form (HR-22) for all proposed personnel; and

b) acceptable fingerprints for all proposed personnel.

D. Throughout the term of the Contract, DPS may require Contractor personnel to submit to an annual DPS fingerprint-based Criminal History Background Investigation to DPS.

E. Throughout the term of the Contract, Contractor will promptly notify DPS of any activity or action by Contractor's personnel that may affect that individual's ability to continue to work under the Contract.

C.15 GENERAL CONFIDENTIALITY REQUIREMENTS

A. All information provided by DPS to Contractor, created by Contractor, or overheard, seen, or otherwise obtained by Contractor in performing the obligations under the Contract is confidential and may not be used by Contractor or disclosed to any person or entity, unless such use or disclosure is required for Contractor to perform work under the Contract. The requirements in this section also apply to subcontractors. The obligations of this section do not apply to information that Contractor can demonstrate:

1) Is publicly known at the time of disclosure or subsequently becomes publicly known through no fault of Contractor;

2) Contractor discovered, learned, or created independently by Contractor or by a rightfully possessing and disclosing third party or by any other legitimate means;

3) Is required to be disclosed by law or final order of a court of competent jurisdiction or regulatory authority, but Contractor must furnish prompt written notice of such

Page 17 of 33 Version 2.5 | Rev. 08/13/2026 required disclosure and will reasonably cooperate with DPS at DPS's cost and expense, in any effort made by DPS to seek a protection order or other appropriate protection of its confidential information.

B. Contractor must notify DPS in writing of any unauthorized release of confidential information within four hours of when Contractor knows or should have known of such unauthorized release.

C. Contractor must notify affected parties in writing of any unauthorized release of confidential information within two business days of when Contractor knows or should have known of any unauthorized release of confidential information obtained from affected parties.

D. Contractor must maintain all confidential information in confidence during the term of the Contract and after the expiration or earlier termination of the Contract.

E. If Contractor has any questions or doubts as to whether particular material or information is confidential information, Contractor must obtain the prior written approval of DPS prior to using, disclosing, or releasing such information.

F. Contractor acknowledges that DPS's confidential information is unique and valuable, and that DPS may have no adequate remedy at law if Contractor does not comply with its confidentiality obligations under the Contract. Therefore, DPS will have the right, in addition to any other rights it may have, to seek in any Travis County court of competent jurisdiction temporary, preliminary, and permanent injunctive relief to restrain any breach, threatened breach, or otherwise to specifically enforce any confidentiality obligations of Contractor if Contractor fails to perform any of its confidentiality obligations under the Contract.

G. Contractor must immediately return to DPS all confidential information when the

Contract terminates, at such earlier time as when the confidential information is no longer required for the performance of the Contract or when DPS requests that such confidential information be returned.

H. Information, documentation, and other material in connection with the Contract, including Contractor's response, may be subject to public disclosure under the Tex.

Gov't Code Chapter 552.

I. The FBI and DPS have computer security requirements. Contractor's and subcontractor's employees working on this assignment must sign and submit appropriate agreements and abide by these security requirements, within five days of DPS's request.

Page 18 of 33 Version 2.5 | Rev. 08/13/2026

C.16 PROJECT MANAGEMENT REQUIREMENTS

C.16.1 Project Management Standards

Contractor must comply with DPS standards and requirements during project implementation as they are outlined by DPS's project manager.

Contractor's systems must comply with DPS standards and requirements when there is a need to migrate from a Contractor-hosted infrastructure to a DPS-hosted infrastructure.

DPS follows the Project Management Body of Knowledge (PMBOK), which is the global standard for project management. Alternative methodologies for project management may be utilized by the Contractor, as agreed upon in writing.

The documents listed below, and any other documents requested by DPS must be delivered to the project manager during project implementation upon Contract award.

DPS will review all documents that Contractor delivers to DPS. Contractor must update all documents throughout the project lifecycle and provide updates to DPS upon demand.

Before final acceptance, Contractor must provide the final version of all documents.

Contractor must host, at a minimum, a weekly team status meeting and provide meeting minutes within 12 hours of the meeting unless a different frequency is agreed upon in writing.

Contractor must provide a weekly status report by Thursday at 5:00 P.M. CT and prior to any holiday unless a different frequency is agreed upon in writing. The weekly status report must include the project accomplishments, issues, goals for next week, project milestones, and identified risks with a mitigation plan.

C.16.2 PM DELIVERABLES

Contractor must conduct, within ten business days from contract award, a project kickoff meeting that is the first meeting held with stakeholders and team members to define the project deliverables and activities.

During the project, Contractor must provide the deliverables described in this section within the period specified in the project schedule or as required by the DPS Project Manager.

The project schedule must contain all of the information listed below and determine the duration of project activities necessary for DPS and Contractor to complete the project.

The project schedule is a work-in-progress document and Contractor must update and maintain it weekly. Contractor must deliver the project schedule and project plan within

Page 19 of 33 Version 2.5 | Rev. 08/13/2026 ten business days of the project kickoff meeting (or as agreed upon by both parties), and must include all identified and agreed upon deliverables in writing.

A. Project Schedule—This schedule defines the timeline for the project and must include the following details, unless a modification is agreed upon in writing:

1. Revision date of Project Schedule

2. A detailed list of tasks

3. All key project deliverables

4. Ownership of task (listing the resource(s) that will address each task)

5. An estimate of the amount of work for each task in hours

6. An estimate of the duration of time (from start to finish) for each task in days

7. Resources assigned to each task

8. Projected start and finish dates for each task

9. Dependencies between tasks

10. Dependencies on external entities

11. Project milestone indicators

B. Project Plan—This document defines the plan to carry out the project and must contain the following information, unless a modification is agreed upon in writing:

1. Approach for Discovery and Design

2. Implementation Methodology

3. Project Overview Description

4. Roles and Responsibilities Matrix that identifies who is responsible, accountable, consulted, informed and approver for all project deliverables

5. Communication Plan that defines how communication will be conducted, with who, when and how often

6. Escalation Plan that defines the process for informing leadership

7. Milestone Schedule

8. Project Assumptions, Project Dependencies and Project Constraints

9. Requirements Development and Management Plan, which describes how the work of requirements development and management will be conducted for a specific program or project

10. Defect Management Plan including how defects/issues will be tracked and escalated

11. Risk Management Plan that includes Risk Identification, Risk Assessment, Risk Mitigation Plan, Risk Mitigation Implementation, Monitor and Control

12. As a supporting document to the Risk Management Plan, a Risk Register must be provided which includes a list of all the risks, date risk raised, description of risk, importance of risk (high, medium, minor based on probability), owner of the risk, status of the risk, description of the status, description of the mitigation, date of closure, reason for closure

Page 20 of 33 Version 2.5 | Rev. 08/13/2026

13. Quality Management Plan that identifies how quality expectations and measurements for the project will be met

14. Operations and Transition Plan that identifies the transition of knowledge for the project or product to the operations or support team. Include activities and timelines for transferring the knowledge to the appropriate support teams

15. Project Close Out that identifies the process or activities associated with finalizing the hand off of the project deliverables to the business team and completing the administrative aspects of closing the project

Page 21 of 33 Version 2.5 | Rev. 08/13/2026

SECTION D—INSTRUCTIONS, CONDITIONS, AND NOTICES TO RESPONDENTS

D.1 RESPONSE PREPARATION INSTRUCTIONS

A. These instructions are designed to help ensure the Respondent submits all relevant information in its response.

B. As designated in the cover page of this solicitation, responses must be received no later than the deadline established in this solicitation, and submitted via the email address stated or the DPS Online Bid Room utilizing the procedures in the DPS Online Bid Room Vendor Exhibit. DPS encourages the use of the DPS Online Bid Room for respondents' convenience. Submission through both methods is not required.

C. Responses must be prepared in accordance with these instructions providing all required information in the format specified.

D. Failure of a response to show compliance with these instructions and submit all documentation may be grounds for considering the response non-responsive unless stated otherwise within this solicitation.

E. Responses must use a sans serif 12-point font (such as Arial or Calibri) on an 8-1/2" x 11" format (except for graphic information being requested). Respondent's response must be paginated, contain a full table of contents, and have component sections clearly identified.

F. Respondent must ensure that its response is clearly labeled.

G. Respondent must submit only material directly pertinent to the requirements of this solicitation. Extraneous narrative, elaborate brochures, uninformative public relations material, and other similar documents may not be submitted.

H. Respondent must submit all pertinent information directly within its response, information submitted as an internet link is considered non-responsive. Respondent must submit documentation or information within the response.

D.2 SOLICITATION ADDENDA

A. No later than the established solicitation deadline, Respondents must acknowledge receipt of all solicitation addenda by returning the addenda, identifying the addenda number and date.

B. Respondent's failure to timely acknowledge addenda may subject its response to rejection.

Page 22 of 33 Version 2.5 | Rev. 08/13/2026

D.3 LATE SUBMISSIONS, CHANGES, AND WITHDRAWALS OF RESPONSES

A. DPS will not consider any response received at the designated email address or DPS Online Bid Room after the specified date and time.

B. Respondent cannot amend its response and DPS will not accept an amended response after closing date and time. If Respondent wants to amend its response, Respondent must amend prior to the closing date and time.

C. Respondent must clearly identify any alterations made before closing time through its authorized representative.

D. Alterations made before closing time will be initialed by Respondent or its authorized representative.

E. No responses can be withdrawn after closing date and time without approval by DPS.

Should a Respondent, after closing time, request its response be withdrawn, Respondent must email the request to the Contact Administrator listed in the solicitation.

F. DPS is not responsible for submissions delivered to DPS after the date and time stated on page 1 of this solicitation. It is the Respondent's responsibility to ensure that it submits, and that DPS receives, its complete response timely. DPS recommends that Respondent submit their complete response well in advance of the due date and time stated on page 1 of this solicitation.

G. DPS takes no responsibility for electronic responses that are captured, blocked, filtered, quarantined, or otherwise prevented from reaching the proper destination server by any DPS anti-virus or other security software. Therefore, DPS recommends confirming receipt.

H. Submission via the DPS Online Bid Room will receive submission confirmation through the system. If confirmation is received through the DPS Online Bid Room, no additional confirmation of receipt is required.

D.4 RESPONSE ACCEPTANCE PERIOD

A. All responses will be valid for 180 days after the solicitation opening date and will constitute an irrevocable response to DPS for the 180-day period.

B. Such period may be extended beyond the 180 days upon mutual written agreement of both parties.

Page 23 of 33 Version 2.5 | Rev. 08/13/2026

D.5 CONTRACT AWARD

DPS may award one or more Contract resulting from this solicitation to the responsible Respondent, whose response is best value under the evaluation criteria in this solicitation.

D.6 DPS'S RIGHTS

A. DPS may:

1. reject any or all responses if such action is in the public interest;

2. accept other than the lowest priced response; and

3. waive minor informalities and minor irregularities in responses received.

B. Waiver of deviations in any response will not constitute a modification of this solicitation and will not preclude DPS from asserting all rights against Respondent for failure to fully comply with all terms and conditions of this solicitation. Copyrighted responses are unacceptable and are subject to being considered non-responsive. DPS reserves the right to make any corrections or include additional requirements in the resulting contract prior to issuance which are necessary for DPS compliance, as an agency of the State of Texas, with all state and federal requirements. DPS reserves the right to consider any response non-responsive which asserts any copyright on any DPS-created form which is specifically designated by this solicitation to be a form that will be completed and included in a response submitted in response to this solicitation.

C. DPS reserves the right to reject any one response or all responses or portions of responses submitted in response to this solicitation.

D. The submission of a response has the effect of waiving proprietary rights or confidentiality.

E. All responses and any content provided by the Respondent are considered the property of DPS for use for the life of any resulting contract as determined by DPS with respect to the scope of the project.

F. DPS is not liable for any costs or damages that may be incurred by Respondents or in the preparation, formulation, or presentation of a response.

G. In case of ambiguity or lack of clarity, DPS may adopt such interpretations as may be advantageous to DPS.

H. DPS reserves the right to withdraw this solicitation at any time for any reason.

I. DPS reserves the right to award no contract and to solicit additional responses at a later time.

Page 24 of 33 Version 2.5 | Rev. 08/13/2026

J. DPS incurs no obligation regarding this solicitation unless and until a contract is fully executed by the parties. However, all responses received by DPS will remain confidential until the evaluation process is complete.

K. DPS will not hold a public response opening event.

D.7 RESPONSE SUBMISSION INSTRUCTIONS

D.7.1 Volume One – Contract Forms and Required Response Information

This section will contain the following completed contract sections with authorized representative signatures, where applicable:

A. Addenda, if applicable;

B. Information and Certifications Form;

C. Financial Rating and Solvency Information, if applicable;

D. A Redacted Solicitation and Contract response, if applicable;

E. Direct Deposit Authorization Form (74-176), completed if choosing direct deposit as a possible payment option;

F. Request for Taxpayer Identification Number and Certifications (W-9);

G. Application for Texas Identification Number (AP-152); and

H. Documentation from the appropriate state entity that indicates that Respondent is properly certified to conduct business in the State of Texas (e.g., The Certificate of Existence from the Texas Secretary of State and the Certificate of Account Status from the Comptroller of Public Accounts).

D.7.2 Volume Two – Information Section

A. Cover Page: List name and address of Respondent, date of response, solicitation identifier, and signature of authorized official.

B. Introduction: Clear expression of who Respondent is, to include an outline of organizational capabilities, goals, project management process approach, business process management design, other previous accolades, and a listing of all subcontractors.

C. Information Sheet: Including all information required of Respondent and any subcontractors.

1. Name and address (including telephone number) of Respondent and all subcontractors.

Page 25 of 33 Version 2.5 | Rev. 08/13/2026

2. Business form of Respondent and its subcontractors (e.g., corporation, partnership).

3. Date and state of incorporation.

4. Names and addresses of principal officers, directors, or partners.

5. A résumé of key personnel who will be providing services in any resulting contract, both Respondent and subcontractor employees. These résumés should include the percentage of time each person will dedicate to any resulting contract. The response will include key project personnel as follows:

i. Demonstrated experience in providing the services requested in this solicitation for each key project personnel.

ii. Résumés for key personnel assigned to any resulting contract will include:

project management experience, supervisory experience, business process experience, application languages, hardware installation abilities, software upgrade experience, programming skills/abilities, data formats for each qualifying project.

1) Name

2) Title (current)

3) Education

4) Experience…