This is a Project Overview and Scope of Work document for the LSCS Montgomery-University Center Roof Replacement, a state and local contract opportunity in Texas. The project requires complete roof replacement and associated renovation work at the Montgomery Campus University Center. The scope includes removal of the existing roofing system down to the lightweight insulating concrete deck, repair of the existing roof deck as required, installation of a new modified bitumen roofing system, replacement and modification of roofing components including flashings, coping, wall panels, and counter flashings, and all work necessary to provide a complete, watertight roofing assembly. Additional work includes demolition and substrate preparation, removal and reinstallation of the lightning protection system, removal of abandoned penetrations, installation of polyisocyanurate insulation and cover board, utility and equipment modifications to raise or lower items as necessary to achieve minimum 8-inch flashing heights, installation of walk pads at designated high-traffic areas, and final cleanup.
The contract deliverables require the contractor to provide manufacturer and contractor warranties upon project completion. The document does not specify pricing terms, response dates, due dates, site visits, bidder meetings, award dates, contract terms, set asides, incumbent information, or funding sources and amounts. All labor, materials, equipment, and supervision necessary for project completion must be provided by the contractor, with work coordinated to minimize disruption to rooftop utilities, piping, and equipment.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 1: PROJECT OVERVIEW AND SCOPE OF WORK
The Contractor shall provide all labor, materials, equipment, and supervision necessary for the roof replacement and related renovation work at the Montgomery Campus – University Center. The project includes complete removal of the existing roofing system down to the existing lightweight insulating concrete deck, repair of the existing roof deck as required, installation of a new modified bitumen roofing system, replacement and modification of associated roofing components, and all related work necessary to provide a complete, watertight roofing assembly, including manufacturer and contractor warranties.
SECTION 2: DETAILED REQUIREMENTS
2.1 Project Management & Pre-Construction
• General Scope: Provide all labor, materials, equipment, and supervision necessary to complete the roof replacement and associated renovation work.
• Coordination: Coordinate work required to modify, raise, lower, or relocate rooftop utilities, piping, equipment, and other items affecting installation of the new roofing system.
• Warranty Requirements: Provide all specified manufacturers and contractor warranties upon project completion.
2.2 Demolition & Substrate Preparation
• Existing Roof Removal: Remove and properly dispose of existing roofing, insulation board, and sheet metal down to the existing lightweight insulating concrete deck on designated roof areas.
• Lightning Protection: Remove and reinstall or replace the existing lightning protection system.
• Roof Deck Repairs: Inspect and repair the existing roof deck as necessary.
• Abandoned Penetrations: Remove abandoned rooftop equipment and penetrations and repair the roof deck accordingly.
• Base Insulation: Mechanically fasten base insulation into the existing metal form deck.
2.3 Roofing System Installation
• Insulation System: Install successive layers of flat and tapered polyisocyanurate insulation and cover board set in foam adhesive.
• Roofing Membrane: Install a new two-ply modified bitumen membrane roofing system.
• Membrane Flashings: Install new modified bitumen membrane flashings at parapet walls, rise walls, and curbs.
• Pipe Supports: Install new pipe supports at designated locations.
• Edge Flashing: Install new sheet metal edge flashing at roof perimeters.
• Coping & Cap Flashings: Install sheet metal coping and cap flashings on parapet walls.
• Wall Panels: Install new preformed metal wall panels on parapet walls.
• Counter Flashings: Install new sheet metal counter flashings at curbs, penetrations, and walls.
• Expansion Joints: Install new expansion joint material at designated locations.
• Utility & Equipment Modifications: Raise, lower, or modify utility lines, piping, equipment, or other items affecting installation of the new roofing system.
• Curb Modifications: Raise curbs and equipment as necessary to achieve a minimum flashing height of 8 inches (200 mm) above the finished roof.
• Expansion Joint Curbs: Raise expansion joint curbs as necessary to achieve a minimum flashing height of 8 inches (200 mm) above the finished roof and install sheet metal covers.
• Walk Pads: Install walk pads at roof access points, around serviceable equipment, and in other designated high-traffic areas.
2.4 Finishing and Cleanup
• Final Installation: Complete all roofing components and associated work required to provide a fully functional roofing system.
• Project Completion: Complete all work necessary for final acceptance of the roofing installation.
SECTION 3: DELIVERABLES AND COMPLIANCE
• Warranties:
o Provide the specified manufacturer's warranty for the completed roofing system.
o Provide the specified contractor warranty for the completed roofing installation.
| SECTION 1: PROJECT OVERVIEW AND SCOPE OF WORK |
| SECTION 2: DETAILED REQUIREMENTS |
| 2.1 Project Management & Pre-Construction |
| 2.2 Demolition & Substrate Preparation |
| 2.3 Roofing System Installation |
| 2.4 Finishing and Cleanup |
SECTION 3: DELIVERABLES AND COMPLIANCE