This is Addendum No. 1 to Bid 26-30, a construction solicitation issued by the City of Huntsville, Texas, for Multi-Site NRCS EWP Funded Repairs. The project encompasses multiple sites requiring vegetation removal, rock/rip-rap relocation, pipe installation, concrete headwall construction, select fill placement, and stormwater pollution prevention plan (SWPPP) compliance. Bidders were required to attend a mandatory site visit on August 11, 2026, to be eligible for consideration. The bid closing date is August 25, 2026, at 2:00 P.M. Central Standard Time, with full project completion required by October 30, 2026. Prospective bidders must submit the entire 41-page contract document package and acknowledge receipt of this addendum with an authorized signature on the form provided. Email submissions are not permitted.
Key modifications clarified in this addendum address project specifications and submission requirements. Project completion is fixed at October 30, 2026, superseding the original 90-day liquidated damages clause. Payment is processed within 30 days of receipt of a complete and proper invoice submitted to accountspayable@huntsvilletx.gov, with vendors required to include a current W-9 form to facilitate processing. Proof of active SAM.gov registration is required as part of the proposal package. Bidders are responsible for calculating quantities of materials such as rip-rap and select fill based on area measurements provided in project documentation and included estimates. The contractor must follow SWPPP best management practices and all applicable federal, state, and local stormwater requirements throughout the project duration. Questions should be directed to Lucy Gonzalez, Procurement Manager, at purchasing@huntsvilletx.gov or (936) 291-5495.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESBD_544124_1785280963556_Bid NO. 26-30 Multi-Site NRCS EWP Funded Repairs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 3 Bid # 26-33
ADDENDUM #1
Title Bid Number Closing Date Issued Date
Multi-Site NRCS EWP
Funded Repairs
26-30
August 25, 2026, at 2:00 P.M.
Central Standard Time
August 18, 2026
TO ALL PROSPECTIVE BIDDERS:
The information contained in this Addendum supersedes information contained in the Contract Documents to the extent indicated. All information contained in the Contract Documents remain in full force and effect unless specifically modified herein. All Respondents shall acknowledge the receipt of the Addendum in the space provided on this Addendum Form and submit this form with your bid packet. Failure to do so will result in Respondent disqualification.
The attention of all prospective Respondents is directed to the following modifications for the above referenced project.
Questions and Answers Question No. 1: If available, would it be possible to get the Mandatory Site Visit sign in sheet for the
"Multi-Site NRCS EWP Funded Repairs" project?
Answer: Yes, See Attachment A.
Question No. 2: Is the whole package(all 41 pages) to be submitted or does pages 1,7,31-34,37-40 suffice?
Answer: Entire packet to insure all documents are included.
Question No. 3: Are email submissions allowed?
Answer: No.
Question No. 4: On Page 8, “Liquidated Damages”
I know it was discussed that 10/30/26 was the absolute completion date but, the aforementioned paragraph. Says that the project must completed within 90 days from the date of award?
Answer: Full completion is 10/30/26. Please disregard liquidated Damages section.
Question No. 5: Does the debris and clearing have to be carried to the landfill or can it be deposited on the creek banks Downstream and/or upstream to help prevent further erosion?
Answer: Vegetation shall be removed. Existing rock/rip-rap may be relocated.
Question No. 6: Please confirm that payment will be made in 30 days from the date a proper invoice is emailed to accountspayable@huntsvilletx.gov?
Answer: Payment is generally processed within 30 days of receipt of a complete and proper invoice submitted to accountspayable@huntsvilletx.gov. Please also include a current W-9 to ensure the vendor information in the City’s system is up to date and to help facilitate prompt payment.
City of Huntsville
1212 Ave. M
Huntsville, TX 77320
Lucy Gonzalez, CTCM, CTCD
Procurement Manager
Telephone: (936) 291-5495
Email: purchasing@huntsvilletx.gov mailto:accountspayable@huntsvilletx.gov mailto:purchasing@huntsvilletx.gov
Page 2 of 3 Bid # 26-33
Question No. 7: Is proof of active SAM.gov registration required as part of the proposal package or just before award?
Answer: Yes.
Question No. 8: Is this solicitation for a construction contract or a design services contract?
Answer: Construction.
Question No. 9: Our team previously visited the project sites but was unable to attend the site visit held on
August 11. Could you please confirm whether a prior site visit satisfies the site visit requirement, or if attendance at the August 11 site visit was mandatory in order to submit a response?
Answer: The August 11th Site Visit was Mandatory and only those who attended will be considered.
Question No. 10: Please confirm access for all projects.
Answer: Access was shown during site visit.
Question No. 11: For project 1: 7th Street: Please confirm Pipe Diameter, Pipe elevation at discharge and drop inlet dimensions.
Answer: Like size to existing on site.
Question No. 12: For project 1: 7th street, please confirm dimensions of concrete headwall.
Answer: Like size to existing on site.
Question No. 13: For all projects, please confirm quantity of Rip Rap required or dimensions of area to be covered.
Answer: The area was provided in each project. Estimates were included. Vendors should make their own calculations for quantities.
Question No. 14: For project 1: 7th street, please confirm quantity of select fill or dimensions of fill area.
Answer: The area was provided for each project. Estimates were included. Vendors should make their own calculations for quantities.
Question No. 15: What are the SWPPP requirements for each project?
Answer: The contractor shall follow SWPPP best management practices and all applicable federal, state, and local stormwater requirements throughout the duration of the project.
Question No. 16: Is a NOI required for each project?
Answer: No.
Question No. 17: What conversion factor was used to get from square yards to tons of Rip Rap?
Answer: Answer: The area was provided in each project. Estimates were included. Vendors should make their own calculations for quantities.
Page 3 of 3 Bid # 26-33
Please include signed copy of Addendum with submitted Solicitation Packet.
Responder Name: ____________________________________________________________________
Address: ___________________________________________________________________________
Telephone Number: ________________________ ________________________________
Printed Name of Contact
Fax Number: _____________________________
Email Address: ____________________________ ________________________________