ESBD_540973_1784647017143_Attachment G – Cost Breakdown .pdf

PDF 109 KB Posted

Attached to
RFP-26-02-JBSA-Fiber Optic Cabling Installation Services-Lackland (149th Fighter Wing)
Solicitation number
26-03
Issued by
Bexar County, Texas

About this file

This is a Cost Breakdown attachment for a fiber optic cabling installation services contract at JBSA Lackland Air Force Base in Texas, issued under Solicitation FA301626Q0108 for the 149th Fighter Wing (FOC 149 FW). The document provides a standardized cost structure template for contractor proposals, outlining the major cost categories and labor components required for the project scope.

The cost breakdown template is organized into five primary cost categories: allied support and civil engineering costs, equipment installation and hardware expenses, program management and engineering labor, installation craft labor and support personnel costs, and travel expenses for program management, installation, and engineering staff. The form includes line items for contractor bond requirements if construction is involved, with designated fields for man-hours and corresponding dollar amounts across all cost categories. The document serves as the cost proposal framework that bidders must complete and submit with their proposals, allowing for standardized evaluation and comparison of contractor pricing for the fiber optic cabling installation project at the Lackland location.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base / Location Name:

Subject:

JBSA Lackland AFB, TX

FOC 149 FW

FA301626Q0108Solicitation#:

Date:

Contractor Man Hours

PROGRAM/ ENGINEERING INSTALL COSTS

Allied Support (Civil Engr):

Equipment

Installation Hardware

Equipment Rental

Equipment/HW Total:

Engineering

Program Management

Installation (Craft Labor)

Other (CAD, Tech Writer, Office Admin)

Labor Total:

Engineering Travel

PM Travel

Installation Travel

Travel Total:

____% Contractor Bond if construction

Total $I

Cost Breakdown

Text1:
Text2:
Text3:
Text4:
Text5:
Text6:
Text7:
Text8:
Text9:
Text10:
Text11:
Text12:
Text13:
Text14:
Text15:
Text16:
Text17:
Text18:
Text19:
Text20:
Text21:
Text22:
Text23:
Date24_af_date:

File details come from the government source that posted it. Updated .