This is an Excel pricing sheet for a Request for Bid (RFB 2026-025) submitted by a bidder for the Speegleville Road Improvements - Riverside Lift Station Improvements Project (60WA2303A) in Texas. The project encompasses comprehensive lift station rehabilitation and associated infrastructure improvements, including site clearing and preparation, trench and confined space safety planning and implementation, stormwater pollution prevention planning and implementation, and utility locating. The scope of work includes lift station rehabilitation covering demolition, surface replacement, seeding, chain link fencing, gates, pumps, wet well rehabilitation, structures, piping, fittings, valves, concrete work, and water service installations. Additional work includes electrical service installation from Heart of Texas Electric Cooperative's pad-mounted transformer with a complete electrical and control system, SCADA and instrumentation hardware and installation, emergency standby generator relocation, and sanitary sewer flow control with temporary bypass systems. The bid proposal includes a contingency allowance of $50,000.00 for general conditions and requires trench safety implementation at 25 linear feet.
The pricing sheet is structured with line items for general conditions and lift station improvements, with unit prices and total amounts to be completed by the bidder. The document references Special Project Provisions regarding mobilization and bonds and insurance percentage requirements, indicating that certain costs are calculated as percentages rather than fixed amounts. The bid proposal format indicates compliance with project manual requirements and drawing specifications, with all work to be furnished, installed, tested, and accepted in place. The sheet notes the involvement of T.B.P.E. Registration No. 8053, suggesting professional engineering oversight or licensing requirements for the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Proposal
| Bid Proposal for |
| Speegleville Road Lift Station Improvements (60WA2303A) |
| Includes Addendum of . |
Item Description Quantity Unit Unit Price Total Amount
| 1.00 | GENERAL CONDITIONS | ||||
| 1.01 | MOBILIZATION (PER PERCENTAGE REQUIREMENTS SET FORTH IN SPECIAL PROJECT PROVISIONS) | 1 | LS | ||
| 1.02 | BONDS AND INSURANCE (PER PERCENTAGE REQUIREMENTS SET FORTH IN SPECIAL PROJECT PROVISIONS) | 1 | LS | ||
| 1.03 | SITE CLEARING/PREPARE RIGHT-OF-WAY | 1 | LS | ||
| 1.04 | TRENCH SAFETY PLAN | 1 | LS | ||
| 1.05 | CONFINED SPACE PLAN | 1 | LS | ||
| 1.06 | CONFINED SPACE PLAN IMPLEMENTATION | 1 | LS | ||
| 1.07 | STORMWATER POLLUTION PREVENTION PLAN | 1 | LS | ||
| 1.08 | STORMWATER POLLUTION PREVENTION PLAN IMPLEMENTATION | 1 | LS | ||
| 1.09 | LOCATE EXISTING UNDERGROUND UTILITIES AND VERIFY SIZE, ORIENTATION, AND ELEVATION OF THE UTILITIES PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES | 1 | LS | ||
| 1.10 | CONTINGENCY ALLOWANCE | 1 | LS | $50,000.00 | $50,000.00 |
| SUBTOTAL GENERAL CONDITIONS | |||||
| 2.00 | LIFT STATION IMPROVEMENTS | ||||
| 2.01 | TRENCH SAFETY IMPLEMENTATION | 25 | LF | ||
| 2.02 | ALL WORK IN REGARDS TO THE LIFT STATION REHABILITATION INCLUDING, BUT NOT LIMITED TO DEMOLITION, SURFACE REPLACEMENT, SEEDING, CHAIN LINK FENCE, GATES, PUMPS, WET WELL REHABILITATION, STRUCTURES, PIPING, FITTINGS, VALVES, CONCRETE, WATER SERVICE AND ASSOCIATED PIPING AS SHOWN ON THE DRAWINGS AND REQUIRED BY THE PROJECT MANUAL; FURNISHED, INSTALLED, OPERATING, COMPLETE, TESTED AND ACCEPTED IN PLACE | 1 | LS | ||
| 2.03 | ALL WORK IN REGARDS TO PROVIDING ELECTRICAL SERVICE FROM THE HEART OF TEXAS ELECTRIC COOPERATIVE PAD MOUNTED TRANSFORMER AND A FULLY OPERATIONAL ELECTRICAL AND CONTROL SYSTEM TO THE PROPOSED SPEEGLEVILLE ROAD LIFT STATION INCLUDING BUT NOT LIMITED TO COORDINATION WITH ELECTRIC COMPANY, INSTALLATION OF ALL WIRING, CONDUIT, RACKS, PANELS, STARTERS, LIGHTING, GROUNDING, SENSORS, TRANSFER SWITCHES AND FLOAT CONTROLS AS SHOWN ON THE DRAWINGS AND REQUIRED BY THE PROJECT MANUAL; FURNISHED, INSTALLED, OPERATING, COMPLETE, TESTED AND ACCEPTED IN PLACE | 1 | LS | ||
| 2.04 | ALL WORK IN REGARDS TO PROVIDING ALL SCADA AND INSTRUMENTATION (EXCLUDING PROGRAMMING) FOR THE PROPOSED SPEEGLEVILLE ROAD LIFT STATION INCLUDING BUT NOT LIMITED HARDWARE/WIRING, ANTENNA, TOWER, BASE, INSTALLATION AND COORDINATION WITH THE PROGRAMMER; FURNISHED, INSTALLED, OPERATING, COMPLETE, TESTED AND ACCEPTED IN PLACE | 1 | LS | ||
| 2.05 | ALL WORK IN REGARDS TO RELOCATING THE EXISTING ON-SITE EMERGENCY STANDBY GENERATOR AS SHOWN ON THE DRAWINGS AND REQUIRED BY THE PROJECT MANUAL; FURNISHED, INSTALLED, OPERATING, COMPLETE, TESTED AND ACCEPTED IN PLACE | 1 | LS | ||
| 2.06 | SANITARY SEWER FLOW CONTROL / TEMPORARY BYPASS SYSTEM | 1 | EA | ||
| SUBTOTAL WASTEWATER IMPROVEMENTS |
Total Base Bid