This is an Exhibit F Scope of Work document prepared for the Luin State Supported Living Center (LFSSLC) in Texas, outlining comprehensive asbestos abatement services. The facility, located at 6844 North US Highway 69 in Luin, Texas, requires a qualified vendor to inspect, contain, remove, and dispose of asbestos-containing materials (ACM). The scope of work encompasses all aspects of asbestos abatement, including project supervision, site cleanup, material disposal, and compliance with applicable permits and licenses. Services will be performed on an as-needed basis between 8:00 AM and 5:00 PM, with the Maintenance Plant Manager serving as the point of contact for scheduling inspections and coordinating work activities. The vendor must respond to inspection requests according to HHS scheduling requirements and provide detailed plans covering decontamination areas, work sequencing, safety procedures, and disposal methodologies prior to commencing any abatement activities.
The contract requires the vendor to maintain complete responsibility for worker and site safety, including protection of employees, facility visitors, and adjacent area occupants, with all associated costs borne by the contractor. The vendor must supply all necessary equipment and temporary facilities, including adequate ventilation systems maintaining continuous negative air pressure of 0.02 inches of water, personnel decontamination units with specified room configurations, and equipment decontamination stations. Specific technical requirements address temporary containment with critical and contaminated barriers, signage in English and Spanish, HEPA filtration systems with 99.97% efficiency ratings, wet cleaning and decontamination procedures, and removal protocols for pipe insulation and cement fiber board. All documentation prepared by or furnished to the vendor becomes the property of HHS, though the vendor may obtain copies at their own expense. Work outside regular business hours requires approval from the Plant Manager and will be compensated at an hourly rate specified in the pricing schedule.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit F - Scope of Work
Lu�in State Supported Living Center Asbestos Abatement Services
1. Introduc�on
Lu�in State Supported Living Center (LFSSLC) requires asbestos abatement services to inspect, contain, remove, and dispose of asbestos containing materials (ACM). The vendor will be responsible for supervision, clean up, and disposal, and must have all applicable permits, licenses, and insurance coverage.
LFSSLC, located at 6844 North US Highway 69, Lu�in, Texas will require asbestos abatement as needed.
2. General Requirements
Vendor will:
• Inspect, contain, remove, and dispose of asbestos containing materials;
• Perform an inspec�on of work areas upon no�fica�on from HHS. No�fica�on will be made to the vendor’s point of contact stated on the purchase order;
• Respond to request for inspec�on to meet HHS schedule/�ming requirements;
• Provide a detailed plan that will include the loca�on and layout of decontamina�on areas, sequencing of asbestos abatement work, methods to be used to assure safety to anyone visi�ng the site, and a disposal plan for removing the ACM contaminated debris from the site;
• Comply with all applicable state, federal, and local regula�ons, including those governing work prac�ces, transporta�on and disposal of asbestos waste materials.
• Ensure the protec�on of workers, visitors to the site, and individuals in areas adjacent to the site.
• The Contractor shall be responsible for the safety of themselves, their employees, and any authorized personnel, and will bear all associated cost.
• Provide temporary u�lity connec�ons to exis�ng building u�li�es or provide temporary facili�es necessary to carry out the work.
3. Temporary Containment
Upon no�fica�on by HHS, the Contractor will prepare temporary containment of approved work areas.
Signage:
• Provide warning signs in English and Spanish mee�ng regulatory requirements
• Place the signage in areas personnel will have adequate �me to take precau�ons
• Signage will not be in view of the general public inside or outside of the work areas
• Preliminary signage in public areas will read “CAUTION – CONSTRUCTION AREA –
KEEP OUT”
• Provide visual barriers between preliminary signs and required signage as necessary to prevent undue public view of required signage
Cri�cal Barriers:
• Decontaminate surfaces in areas to receive cri�cal barriers with a High Efficiency
Par�culate Air(HEPA) vacuum and wet wiping prior to installa�on of cri�cal barrier
• Separate the work area from other por�ons of the building and/or the exterior with plas�c shee�ng, 4 mil (min) thickness, sealing perimeter and seams with adhesive tape and/or spray adhesive
• Individually seal ven�la�on openings, wall mounted fixtures, doorways, windows, and openings into/from the work area with adhesive tape or with plas�c shee�ng, 6 mil (min) thickness secured in place with adhesive tape and/or spray adhesive
Contaminated Barriers:
• Provide containment barriers on surfaces that are not scheduled to be removed
• Provide a minimum of two individual layers of plas�c shee�ng, 6 mil (min) each, turned up walls at least twelve inches on floor areas. Seal seams using both spray adhesive and adhesive tape. Locate seams in top layer at a minimum of six feet from, or at right angles to, seams in the botom layer
• Provide a minimum of one layer of plas�c shee�ng, 4 mil (min), on walls and ceiling areas. Seal perimeters and seams, including the joining with the floor shee�ng, with spray adhesive and adhesive tape
Emergency Exits:
• Arrange exit doors so that they are secure from outside the work area but permits exi�ng from the work area
• Mark outline of door on containment barriers with luminescent paint or tape at least one inch wide
• Hang a razor knife suitable for cu�ng through containment barriers on a string beside the outline
• Tape or paint with luminescent pain the work “EXIT” inside the outline in leters at least six inches and one inch wide
View Windows:
• Provide a twelve-inch square by 1/8-inch-thick (min) clear plas�c view window or windows into containment area to allow view to full extent possible
Drop Cloth:
• Provide on the floor and wall areas a drop cloth, a single layer of plas�c shee�ng (6 mil on floor, 4 mil on wall) in work areas during removal opera�ons. Turn floor drop cloth up walls at least eighteen inches. Overlap wall drop cloth twelve inches at floor. Seal seams using both spray adhesive and adhesive tape
• Install drop cloth at the beginning of each work shi�. Drop cloth need only be sufficient coverage of work of that shi�. Remove drop cloth at end of each work shi� or as work in an area is completed. Keep material on sheet con�nuously wet un�l bagged
Walkways:
• Install walkways of 6 mil plas�c shee�ng between ac�ve removal areas and decontamina�on units to protect containment barriers from tracked material • Install walkways at the beginning of and remove at the end of each work shi�
4. Ven�la�on System:
The vendor will supply an adequate number of air filtra�on exhaust ven�la�on units.
Construc�on:
• The ven�la�on units will be constructed of steel or other durable materials able to withstand damage from rough handling and transporta�on. Provide cabinet widths to accommodate doorways. Cabinet will be factory sealed to prevent material from being released during use, transport, or maintenance. Access to and replacement of air filters will be from intake end. Unit will be mounted on castors or wheels.
• Rate capacity of fan according to usable air moving capacity under actual opera�ng condi�ons
• The final filter will be HEPA type. Provide filter media folded into closely pleated panels. Completely seal the filter media edges with a structurally rigid filter housing to form a �ght seal. Each filter will be cer�fied by the manufacturer to have an efficiency of not less than 99.97% when challenged with 0.3 um dioctyl phthalate par�cles
• Pre-filters are required to prolong the opera�ng life of the HEPA filter. Two stages of pre-filtra�on are required. Pre-filters will be installed on or in the intake grid of the unit and held in place with a special housing or clamps
• Each unit will be equipped with a Magnehelic gauge or manometer to measure the pressure drop across filters and indicate when filters have become loaded and need to be changed. A table indica�ng the usable air handling capacity for various sta�c pressure readings on the Magnehelic gauge will be affixed near the gauge for reference, or the Magnehelic reading indica�ng at what point the filters should be changed, no�ng the Cubic Feet per Minute (CFM) air delivery at that point
• Each unit will have an elapsed hour meter to show the total accumulated hours of opera�on
• Each unit will have a lockout to prevent the fan from opera�ng without a HEPA filter.
Units will be equipped with an automa�c shutdown system to stop the fan in the event of a major rupture in the HEPA filter or blocked air discharge
• Warning lights are required to indicate normal opera�on, excess pressure drop across the filters and inadequate pressure drop
Provide a fully opera�onal ven�la�on system with the work area maintaining con�nuously a pressure differen�al across the work area containment of 0.02 inches of water.
Prepara�on of Work Area:
• Provide sufficient number of fully opera�on ven�la�on units to provide the equivalent of a minimum of one air change every twelve minutes, within the contained work area
• Provide a sufficient number of ven�la�on units needed by dividing the ven�la�on requirement (CFM) above by the capacity of ven�la�on units used. Capacity of a unit for purposes of this calcula�on is the capacity in cubic feet per minute with fully loaded filters indicated on the unit’s labeled opera�ng characteris�cs
• Locate ven�la�on units so that makeup air enters the work are primarily through decontamina�on facili�es and traverses work area as much as possible. Posi�on the ven�la�on units at a maximum distance from the work access opening or other makeup air sources
• Place exhaust end of unit or exhaust duct through an opening in the containment barrier or wall and vent to exterior of building. Thoroughly seal opening against unit or duct
Opera�on of System during Abatement:
• Operate system con�nuously to maintain a constant reduced air pressure un�l decontamina�on of the work area is complete. Do not turn off units at the end of the work shi� or when abatement opera�ons temporarily stop. If failure of ven�la�on system occurs, immediately stop abatement work and do not resume un�l system is fully opera�ng
• Start removal work at a loca�on farthest from the ven�la�on units and proceed toward the ven�la�on units
• Operate system con�nuously during encapsula�ng procedures
• At comple�on of removal work, allow ven�la�on system to operate to purge the work area with clean makeup air and to remove airborne fibers that may have been generated during removal work
Dismantling the Ven�la�on System:
• Before removal of units from work area, remove and dispose of pre-filters as fungi
(mold) contaminated, clean and seal unit intake and exhaust openings with 6 mil plas�c shee�ng, decontaminate exterior of units and seal en�re unit, except rolling assembly, with 6 mil plas�c shee�ng
5. Pre-Cleaning and Decontamina�on:
This work includes decontamina�on of areas prior to construc�on of Temporary Containment.
Wet Cleaning:
• Accomplish wet cleaning during decontamina�on with lint free towels. Wipe surface once and re-fold to a fresh face of cloth. Proceed in this manner un�l all available surfaces of towel have been used. Dispose of towel as contaminated waste
HEPA Vacuum Cleaning
• Remove small debris with the HEPA vacuum. HEPA vacuum surfaces of pieces too large to be removed by the suc�on of the HEPA vacuum. Pick up such pieces and place in the botom of a disposal bag. Place pieces in bag without dropping and avoiding unnecessary disturbance of material. HEPA vacuum area three feet beyond the loca�on in which visible debris was found. Vacuum in two direc�ons each at right angles to the other.
• HEPA vacuum surfaces in the room star�ng with the ceiling, then vacuum star�ng at the top of the walls and working downward to the floor. Next begin at the corner of the floor farthest from work area entrance and work towards the entrance. HEPA vacuum the floor using a floor atachment with rubber floor seals and adjustable floor to atachment height. Adjust the height so that the rubber seals just touch the floor if carpeted and are within 1/16 inch of hard surface floors. Vacuum the floor in parallel passes with each pass overlapping the previous by one half the width of the floor atachment. At the comple�on of one cleaning, vacuum the floor a second �me at right angles to the first.
6. Decontamina�on Units:
Construc�on:
• Construct air�ght walls and ceilings using plas�c shee�ng, 6 mil (min) thick. Atach to exis�ng building components or to a temporary framework.
• Use a minimum of two layers of plas�c shee�ng, 6 mil (min) thick to cover floors. Use only translucent or clear plas�c shee�ng to cover floors.
• Fabricate curtained doorways from two overlapping layers of plas�c shee�ng with openings at a minimum of three feet wide. Configure so that shee�ng overlaps adjacent surfaces. Weight sheets at botom so that they quickly close a�er being released. Put arrows on sheets to indicate the direc�on of overlap and/or travel.
Provide a minimum of four feet between entrance and exit of any room. Atach top and right side of outer sheet to doorway frame. Atach top and le� side of inter sheet to doorway frame.
• If the decontamina�on unit is located within an area with workers overhead, provide the top of the unit with a minimum of ¼ inch hardboard or ½ inch plywood “ceiling” with plas�c shee�ng, 6 mil (min) in thickness, covering the top of the “ceiling”
• Where the decontamina�on unit is within view of occupied areas, provide visual barriers of opaque plas�c shee�ng or other suitable material so that work privacy is maintained, and work procedures are not visible to building occupants
• Where the area adjacent to the decontamina�on unit is accessible to building occupants, construct a solid barrier on the public side of the shee�ng to protect the shee�ng. Construct barrier with wood or metal framing covered with a minimum of ¼ inch thick hardboard or ½ inch thick plywood. Where a solid barrier is provided, shee�ng need not be opaque.
Personnel Decontamina�on Unit:
• Provide a Personnel Decontamina�on Unit consis�ng of a seral arrangement of connected rooms or spaces, with a minimum of a Changing Room, Air Lock Space, Shower Room, and Equipment Room. Require persons, without excep�on, to pass through this Decontamina�on Unit for entry into and exit from the Work Area. Do not allow parallel routes for entry or exit. Provide temporary ligh�ng within Decontamina�on Units as necessary
• Post emergency numbers clearly in Changing Room (Clean Room) the telephone numbers and loca�ons of emergency services including, but not limited to, fire, ambulance, doctor, hospital, police, power company, telephone company
• Post an approximately twenty inches by fourteen inches manufactured danger sign at each entrance to the Work Area displaying the following general legend, and as required by applicable regula�ons
• Provide a changing room that is physically and visually separated from the rest of the building for the purpose of changing into protec�ve clothing. Locate so that access to Work Area from Changing Room is through Shower Room. Separate Changing Room from other building areas by curtained doorway. Require workers to remove street clothes in this room, dress in clean disposable coveralls, and don respiratory protec�ons equipment. Do not allow fungi (mold) contaminated items to enter this room. Maintain floor of Changing Room dry and clean at all �mes. Damp wipe surfaces a�er each shi� change with a disinfectant solu�on. Provide a con�nuously adequate supply of disposable bath towels. Provide storage facili�es per employee as required with addi�onal facili�es for OWNER and an�cipated visitors.
• Provide a shower room completely water�ght opera�onal shower to be used for transit by cleanly dressed workers heading for the Work Area from the Changing Room, or for showering by workers headed out of Work Area a�er undressing in the Equipment Room.
• Construct room by providing a Shower Pan and Shower Walls in a configura�on that will cause water running down walls to drip into pan. Provide Shower Head and Controls at convenient loca�on securely atached to shower wall.
• Provide splash-proof entrances to Changing and Equipment Rooms with two curtained doorways. Provide hot and cold water and drainage, as necessary for a complete and operable shower. Provide adequate hot water supply for number of persons using shower facili�es. Provide a freely draining floor in shower pan at minimum one inch from top of pan. Provide a soap and shampoos dish and a con�nuously adequate supply of soap and shampoo, and splash into the Changing or Equipment Rooms. Provide Sump Pump to pump wastewater through filters to drain. Change filters as necessary to maintain efficiency. Clean debris from shower pans daily.
• The Equipment Room (dirty room) is a change and transit area for workers.
Separate this room from the Work Area by a plas�c shee�ng curtained doorway.
Require work equipment, footwear and addi�onal contaminated work clothing to be le� in Equipment Room. Remove and dispose of drop cloth a�er each shi�. Wet wipe surfaces in Equipment Room a�er each shi� change.
Personnel Decontamina�on Sequence:
• Worker shall enter Changing Room, remove street clothing, put on clean disposable coveralls and respirator, and pass through the Shower Room into the Equipment Room. Addi�onal clothing and equipment le� in Equipment Room needed by the worker shall be put on in the Equipment Room. Worker will then proceed to Work Area.
• Before leaving the Work Area, require the worker to remove gross contamina�on and debris from overalls and feet. The worker will then proceed to the Equipment Room and remove disposable clothing. Removed disposable clothing shall be placed in a disposal bag for disposal. Respiratory protec�on equipment will not be removed. A�er showering, the worker will proceed to the Changing Room and dress in either new coveralls for another entry or street clothing if leaving.
Equipment Decontamina�on Units:
• The vendor may provide an Equipment and Bag-out Decontamina�on Unit consis�ng of a serial arrangement of rooms (Wash Down Sta�on, Washroom, Holding Room, Clean Room) for removal of equipment and material form Work Area.
• Personnel will not enter or exit Work Area through Equipment Decontamina�on Unit.
• Provide a wash down sta�on enclosed completely water�ght shower unit loca�on in the Work Area just outside Washroom as an equipment, bag and container cleaning sta�on. Construct shower by providing a Shower Pan and Shower Walls in a configura�on that will cause water running down walls to drip into pan. Provide suitable type of fixtures and controls for washing equipment, bags, and containers.
Provide splash-proof entrance to Work Area with curtained doorway. Provide a freely draining floor in shower pan at minimum one inch from top of pan. Provide Sump Pump to pump wastewater through filters to drain. Change filters as necessary to maintain efficiency. Clean debris from shower pans on a daily basis.
• Provide Washroom for cleaning of equipment, bags, and containers passed from the Work Area. Construct Washroom of adequate size and located so that equipment, bags, and containers can be wiped clean and passed to the Holding Room. Separate this room from the Wash Down Sta�on by a curtained doorway.
• Provide Holding Room as a drop loca�on for equipment, bags, and containers passed from the Washroom. Size and locate so that equipment, bags, and containers cannot be passed directly from the Washroom through the Holding Room to the Clean Room. Separate Holding Room form the adjacent rooms by curtained doorways.
• Provide Clean Room to isolate the Holding Room from the building or exterior. Size and locate to provide access to the Holding Room. Separate Clean Room from the building or exterior by a curtained doorway.
Equipment Decontamina�on Sequence:
• Remove equipment, bags, and containers from Work Area through the Equipment
Decontamina�on Unit according to the following procedure. At Wash Down Sta�on, thoroughly wash equipment, bags, and containers and pass items into Washroom.
At Washroom, wet clean equipment, bags, and containers and pass items into Holding Room. Workers will not enter the Holding Room from the Washroom.
• Enter Holding Area from Clean Room and remove decontaminated items through the Clean Room. Worker will not enter the Washroom form the Holding Room.
• Clean debris and residue from inside of Decontamina�on Units on a daily basis. Wet wipe or wash surfaces when necessary to maintain sanitary condi�ons. If the Changing Room of the Personnel Decontamina�on Unit or the Clean Room or Holding Room becomes contaminated, abandon the Decontamina�on Unit and erect a new Decontamina�on Unit. The former Unit may be used as an inner sec�on of the new “Dirty Room.”
7. Removal of Asbestos Containing Materials
We�ng Agents:
• Amended Water: Provide water to which a surfactant has been added. Use a mixture of surfactant and water which results in we�ng of the ACM and retarda�on of fiber release during disturbance of the material equal to or greater than that provided by the use of one ounce of a surfactant consis�ng of 50% polyoxymethylene ester and 50% polyoxymethylene ether mixed in five gallons of water.
• Removal Encapsulant: Provide a penetra�ng type encapsulant designed specifically for removal of ACM. Use material which results in we�ng of the ACM and retarda�on of fiber release during disturbance of the material equal to or greater than that provided by the use of one ounce of a surfactant consis�ng of 50% polyoxymethylene ester and 50% polyoxymethylene ether mixed in five gallons of water.
• Disposal Bags: Provide single layer, 6 mil (min) thickness, leak-�ght, manufactured polyethylene bags. Provide bags with Department of Transporta�on (DOT) marking Aspect Ra�o (ARQ), ASBESTOS, NA 2212” and diamond shaped figure with black stripes on tope half and A9” on the botom half.
• Disposal Containers: Provide manufactured rigid plas�c or coated cardboard drums or boxes, lead-�ght, with mechanically sealed lids specifically intended for disposal of asbestos-containing waste materials. Containers manufactured to meet more stringent disposal requirement will be acceptable.
• Disposal Bag Labels: Provide labels with OWNER’s name, project site address and the following warning, and in accordance with regulatory requirements.
DANGER
CONTAINS ASBESTOS FIBERS
AVOID CREATING DUST
CANCER AND LUNG DISEASE HAZARD
AVOID BREATHING AIRBORNE ASBESTOS
General Removal Criteria:
• Apply we�ng agents in strict accordance with manufacturer’s instruc�ons.
Thoroughly wet material to be removed prior to disturbance to reduce fiber dispersal in the air. Accomplish we�ng by a fine spray (mist) of we�ng agent (amended water or removal encapsulant) applied with airless spray equipment. Saturate material sufficiently to wet to the substrate without causing excess dripping. Allow adequate �me for we�ng agent to penetrate material thoroughly. Spray material repeatedly during the removal work to maintain a con�nuously wet condi�on.
• Perforate outer covering of material which has been painted or jacketed in order to allow penetra�on of we�ng agent, or where necessary, carefully strip away while simultaneously spraying amended water or removal encapsulant on the installa�on to minimize dispersal of asbestos fibers into the air.
• Mist work area con�nuously with amended water as necessary to reduce airborne fiber levels. Apply mist with airless spray equipment.
• The use of compressed air or other non-airless type equipment will not be permited.
• Remove saturated material in manageable quan��es. Do not allow material to dry out.
• Control the descent of staging or floor below. If over twenty feet use drop chute to contain material through descent.
• Thoroughly clean substrate, removing remaining residue using s�ff bristled brush, pressure washer, or combina�on of methods to provide effec�ve results.
Pipe Insula�on Removal Criteria:
• Wet and remove material as indicated above
• Cut bands holding preformed pipe insula�on, slit jackets at seams, remove and hand-place in a disposal bag. Do not drop on floor.
• Remove job molded fi�ng insula�on in pieces as large as prac�cal and hand place in a disposal bag. Do not drop on floor.
• Where pipefi�ng insula�on is removed from pipe with straight runs insulated with fibrous glass or other non-asbestos-containing fibrous material, remove fibrous material six inches from the point of contact with the asbestos-containing insula�on and seal exposed ends of remaining pipe insula�on.
Cement Fiber Board Removal Criteria:
• Wet and remove material as indicated above
• Remove material in full panels
• Place panels in disposal bags, containers or wrap with two layers of plas�c shee�ng, 6 mil(min) in thickness, label as required.
Disposal Bag Procedure:
• Place removed material while s�ll in wet condi�on into disposal bags.
• Evacuate air from disposal bags with a HEPA vacuum before sealing.
• Twist neck of bags, bend over, and seal with minimum three wraps of adhesive tape.
• Clean outside of bags and move to decontamina�on unit.
• Place second bag around first immediately prior to moving through decontamina�on unit. Evacuate air, twist neck, and seal the second bag in the same manner as the first.
• Wash bags in shower, wet clean, and pass cleaned bags to adjacent room.
• Atach label to each disposal bag as indicated and in accordance with regulatory requirements.
Disposal Container Procedure:
• Place removed material while s�ll in wet condi�on into disposal containers. Seal container securely.
• Clean outside of containers and move to decontamina�on unit.
• Wash containers in shower, wet clean, and pass cleaned containers to adjacent room.
• Atach label to each container as indicated and in accordance with regulatory requirement.
8. Reports and Plans:
All documents prepared by vendor or furnished to the vendor by HHS will be delivered to and become the property of HHS. All data prepared under the purchase order will be made available upon request to HHS without restric�on or limita�on for further use.
The vendor may, at their own expense, have copies made of the documents or any other data furnished to HHS under the purchase order without restric�on or limita�on for further use.
9. Hours and Days Services are to be Performed:
Services are to be performed between the hours of 8am and 5pm. Any minor adjustment call back services will be performed during regular business hours. Awarded vendor is responsible for not interfering with normal flow of business.
Outside Regular Hours will need to be approved by the Plant Manager and will be paid at hourly rate stated in the Pricing Schedule.
Frequency of Service is on an as needed basis.
10. Point of Contact
The Point of Contact (POC) will be the Maintenance Plant Manager at LFSSLC. The POC will no�fy the vendor to schedule inspec�ons and accompany the vendor during the inspec�on.