This is Amendment No. 1 to Bid No. IW238818, issued by the Texas Department of Criminal Justice (TDCJ) Contracts and Procurement Department for HVAC equipment procurement at the Estelle Unit. The amendment provides clarifications and answers to 29 bidder questions regarding equipment specifications, installation responsibilities, and project scope. The procurement involves the supply of HVAC equipment including 12 five-ton split systems and 3 fifteen-ton split systems, along with packaged units with specified components such as Allied Air (Lennox) equipment, furnaces, and RA panels. The bid opening was scheduled for February 20, 2026, at 3:00 PM. TDCJ is responsible for all installation work, while the vendor's responsibility is limited to equipment supply only. The amendment clarifies that refrigerant piping, hangers, ionizers, thermostats, room controllers, supply grilles, flue piping, auxiliary drain pans, dampers, and float switches are not included in the vendor's scope and must be referred to as equipment-only provisions. Packaged units must be pad-mounted on horizontal curbs with horizontal discharge configurations, and all units will utilize existing loading and unloading dock facilities with forklift assistance available on premises.
The amendment establishes that bidders must acknowledge receipt of this amendment in their bid submission or the bid may not receive consideration. Vendor responsibilities are limited to items specified on pages 2 and 7-10 of the solicitation, with any additional equipment not listed in the statement of work requiring separate requests and submitted at no cost to TDCJ per the specification of the addendum. Training will be provided on TDCJ-installed equipment with timing to be discussed between the awarded vendor and TDCJ, though no factory representative startup or commissioning services are required from the vendor. The procurement operates under the Texas ESBD (Emerging Small Business Development) program framework, requiring current vendor registration and compliance with all program requirements. Interested bidders were directed to submit their name, address, fax number, and email address to the designated contact person, Teria Godwin-Pierce, to ensure receipt of all solicitation amendments and modifications prior to the proposal deadline.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Our mission is to provide public safety, promote positive change in offender behavior, reintegrate offenders into society, and assist victims of crime.
2 Financial Plaza, Suite 703
Huntsville, Texas 77340
(936) 437-3885 www.tdcj.texas.gov
T e x a s D e p a r t m e n t o f C r i m i n a l J u s t i c e
Bobby Lumpkin Executive Director
Contracts and Procurement Department
AMENDMENT No. 1
BID NO.: IW238818
PURCHASER / CONTRACT SPECIALIST: Teria Godwin-Pierce BID OPENING DATE & TIME: 02/20/2026 at 03:00PM
The purpose of this amendment is to provide answers to questions.
Reference attached pages of this amendment.
IN THE SUBMISSION OF BID, BIDDER MUST ACKNOWLEDGE RECEIPT OF THIS
AMENDMENT; OTHERWISE, THE BID MAY NOT BE GIVEN CONSIDERATION.
BIDDER MAY ACKNOWLEDGE RECEIPT ON FACE OF BID OR BY RETURNING
ONE COPY OF THIS NOTICE.
SIGNED:
BIDDER
COMPANY NAME:
(936) 437-3885 www.tdcj.texas.gov
Amendment No. 1 Bid No.: IW238818
Question
No.
Question
Answer
1 I notice the Invitation to bid indicates Allied Air (Lennox) equipment, but the plans indicate Daiken and Carrier. Which is the preferred?
The preferred equipment is Allied Air.
2 3.5 – 5 Ton Furnace, Model #85W41, 80G1UH090CE20 has been replaced with Model #36U07, A80UH1E090C20K, please advise if this is acceptable.
Model # 36U07 is an acceptable part.
3 3.5 – 5 Ton Furnace, Model #85W41, 80G1UH090CE20 has been replaced with Model #36U07, A80UH1E090C20K and includes the refrigerant detection system (RDS) which makes the 24 Volt Noncommunicating System unnecessary.
Please advise if noncommunicating system is still needed.
#85W41 does not come with the RDS system.
#36U07 does have RDS system preinstalled.
4 Please confirm that model provided for line item 5Manufacturer #55HX91WX10 is actually #55HX91WX107.75.
The model number is
LGX180S5MSY.
5 Can you please provide an estimate of how many employees will be requiring training?
Please refer to page 8 of the solicitation.
6 Will training be completed on the TDCJ installed new equipment or will this be general training done in a conference room?
Training will have to provided on the basis of TDCJ employees knowing how to properly work and service the bidded equipment.
7 Is there an estimated number of days/weeks from the time of unit delivery to when TDCJ will be ready for training?
Training duration is discussed with the awarded vendor, and the estimated number will have be discussed.
8 Is TDCJ responsible for installation? TDCJ is responsible for install.
9 Is a factory rep expected on site prior to installation of the equipment for training?
Vendor responsibilities on the solicitation
Please refer to question 7.
(936) 437-3885 www.tdcj.texas.gov make it seem like the training is supposed to be the same day as delivery.
10 Is the vendor expected to perform any kind of startup or commissioning?
No.
11 Are the curbs for the packaged units expected to be ground mounted, side discharge?
The curb is required for install and it is expected to be a horizontal discharge.
12 Can the packaged units be side discharge on a standard straight curb instead of a horizontal transition curb?
No alternatives can be given.
13 Is a curb required if the packaged units can be configured for horizontal supply and return?
A horizontal curb is required.
14 What does the RA panel refer to in the solicitation? Is this some kind of panel or opening for the curb/packaged units, or is it referring to a type of grille or register?
The RA Panel is required.
15 Is refrigerant piping expected to be provided for the split systems?
No, this solicitation is for equipment only.
16 Are hangers expected to be provided for the residential style air handling units?
Please refer to question 15.
17 Are i-Wave R ionizers expected to be provided for any equipment? If so, please specify quantity.
Please refer to question 15.
18 Do thermostats or room controllers need to be provided?
Please refer to question 15.
19 Do supply grilles (typical Titus 122RL) need to be provided for the AHUs?
Please refer to question 15.
20 Are flue piping, auxiliary drain pans, dampers, and float switches required?
Please refer to question 15.
21 Plans show 12 split systems, but bid form lists 15. Am I missing something?
Also the plans show the ductwork “hatched” would mean demolish, but it also says to connect to existing ducts.
Which is correct?
There are 12 Five ton split systems.
12 – 5 Ton Split Systems
There are 3 Fifteen ton split systems.
3 – 15 Ton Split Systems
22 Can you confirm how they want to set the units on the roof?
Units will be pad mounted.
23 Do they just want to sit the unit on the roof or use a curb adapter with duct openings?
Please reference question 11.
(936) 437-3885 www.tdcj.texas.gov
24 Is there a loading/unloading dock/ramp to be used by trucks to be loaded and unloaded?
Yes but a lift gate is recommended.
25 Is there a forklift on the premises that can be used to unload the truck(s) or tractor trailers?
Yes.
26 What is the lift capacity of the forklift that will be used to load/unload the trucks?
This information will be provided to the awarded vendor.
27 The vendor responsibility is to supply equipment only and all installation will be handled by TDCJ personnel?
Yes.
28 Is the vendor only responsible for items 1-9 on the bid form?
Please reference page 2, and 7-10 on the solicitation.
29 Any equipment outside of the item list will be a cost adder to the project?
If you are inquiring if the existing equipment can be substituted for another, the substituted equipment will have to be reviewed by the unit maintenance.
Any additional equipment that is submitted and is not in the provided statement of work will have to be requested separately. If said equipment is applied, the vendor is aware that it is at no cost to TDCJ due to the specification of the addendum.