ESBD_474874_1765471935410_02. Pricing Schedule.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Rental of Dry Mops and Safety Floor Mats
- Solicitation number
- 601340000063981
- Issued by
- Texas
About this file
This is a Pricing Schedule for Solicitation No. 601340000063981 issued by the State of Texas for the rental of dry mops and safety floor mats. The contract requires services to be performed bi-weekly throughout the year, totaling 26 service occurrences annually. The solicitation encompasses multiple maintenance facilities and administrative offices across the Texas Panhandle region, including locations in Amarillo, Borger, Canadian, Canyon, Channing, Claude, Dalhart, Dumas, Groom, Gruver, Hereford, Pampa, Panhandle, Potter County, Stratford, and Vega, Texas. Line items detail specific quantities of equipment needed at each location, including 36-inch, 24-inch, and 42-inch dust mops; 3-foot by 5-foot and 3-foot by 10-foot safety floor mats; and floor scrapers. The pricing schedule contains 59 line items across all locations, with quantities varying based on facility requirements and operational needs.
Respondents are required to submit unit prices for each line item, with a unit price of $0.00 or failure to provide pricing for any line item resulting in a non-responsive bid. The extended price for each line item must be calculated by multiplying the unit price by the quantity and then by 26 weeks to reflect the annual service commitment. The grand total pricing encompasses all facilities and the complete year of service. Respondents must return the completed pricing schedule in Excel format; failure to do so will render the response non-responsive. All pricing must reflect the bi-weekly rental and delivery of equipment to the specified locations throughout the contract year.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING SCHEDULE
| PRICING SCHEDULE |
| SOLICITATION No. 601340000063981 |
RESPONDENT NAME:
| INSTRUCTIONS TO RESPONDENT: RESPONDENT SHALL INPUT A UNIT PRICE FOR EACH LINE ITEM OR RESPONSE WILL BE CONSIDERED NON-RESPONSVE. A UNIT PRICE OF $0.00 ON ANY LINE ITEM WILL BE CONSIDERED NON-RESPONSIVE. | |||||
| LINE ITEM 1: Rental of Dry Mops and Safety Floor Mats - Services to be performed every other week per year (26 times) | |||||
| ITEM | DESCRIPTION OF GOOD/SERVICE | QUANTITY | UNIT | UNIT PRICE | EXTENDED PRICE |
| Amarillo AE, 8404 S FM 1541, Amarillo, TX | |||||
| 1 | 36" Dust Mop | 1 | EA | $ - 0 | $ - 0 |
| 2 | 3'x5' Safety Mat | 9 | EA | $ - 0 | $ - 0 |
| 3 | 3'x10' Safety Mat | 2 | EA | $ - 0 | $ - 0 |
| 4 | Scraper | 1 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 1-4 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Amarillo District Office, 5715 Canyon Dr. Amarillo, TX | |||||
| 5 | 3'x5' Safety Mat | 5 | EA | $ - 0 | $ - 0 |
| 6 | Scraper | 2 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 5-6 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Amarillo Human Resources, 5715 Canyon Dr. Amarillo, TX | |||||
| 7 | 3'x5' Safety Mat | 2 | EA | $ - 0 | $ - 0 |
| Subtotal Line 7 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Amarillo Lab, 5715 Canyon Dr. Amarillo, TX | |||||
| 8 | 24" Dust Mop | 2 | EA | $ - 0 | $ - 0 |
| 9 | 3'x5' Safety Mat | 2 | EA | $ - 0 | $ - 0 |
| 10 | Scraper | 2 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 8-10 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Amarillo Maintenance, 5715 Canyon Dr. Amarillo, TX | |||||
| 11 | 3'x5' Safety Mat | 3 | EA | $ - 0 | $ - 0 |
| Subtotal Line 11 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Amarillo Radio Shop, 5715 Canyon Dr. Amarillo, TX | |||||
| 12 | 42" Dust Mop | 1 | EA | $ - 0 | $ - 0 |
| 13 | 3'x5' Safety Mat | 2 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 12-13 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Amarillo Sign Shop, 5715 Canyon Dr. Amarillo, TX | |||||
| 14 | 42" Dust Mop | 2 | EA | $ - 0 | $ - 0 |
| 15 | 3'x5' Safety Mat | 2 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 14-15 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Amarillo Special Jobs, 5715 Canyon Dr. Amarillo, TX | |||||
| 16 | 42" Dust Mop | 3 | EA | $ - 0 | $ - 0 |
| 17 | 3'x5' Safety Mat | 3 | EA | $ - 0 | $ - 0 |
| 18 | Scraper | 5 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 16-18 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Amarillo Vehicle Shop, 5715 Canyon Dr. Amarillo, TX | |||||
| 19 | 3'x5' Safety Mat | 8 | EA | $ - 0 | $ - 0 |
| Subtotal Line 19 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Amarillo Warehouse, 5715 Canyon Dr. Amarillo, TX | |||||
| 20 | 36" Dust Mop | 2 | EA | $ - 0 | $ - 0 |
| 21 | 42" Dust Mop | 4 | EA | $ - 0 | $ - 0 |
| 22 | 3'x5' Safety Mat | 3 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 20-22 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Borger Maintenance, 2500 S Cedar, Borger, TX | |||||
| 23 | 24" Dust Mop | 1 | EA | $ - 0 | $ - 0 |
| 24 | 3'x5' Safety Mat | 5 | EA | $ - 0 | $ - 0 |
| 25 | 3'x10' Safety Mat | 1 | EA | $ - 0 | $ - 0 |
| 26 | Scraper | 1 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 23-26 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Canadian Maintenance, 11100 US 560, Canadian, TX | |||||
| 27 | 36" Dust Mop | 1 | EA | $ - 0 | $ - 0 |
| 28 | 3'x5' Safety Mat | 7 | EA | $ - 0 | $ - 0 |
| 29 | Scraper | 3 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 27-29 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Canyon Maintenance, 305 W US 60, Canyon, TX | |||||
| 30 | 3'x5' Safety Mat | 2 | EA | $ - 0 | $ - 0 |
| 31 | 3'x10' Safety Mat | 1 | EA | $ - 0 | $ - 0 |
| 32 | Scraper | 1 | EA | $ - 0 | $ - 0 |
| Subtotal for lines 30-32 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Channing Maintenance, 200 Rock Island, Channing, TX | |||||
| 33 | 3'x5' Safety Mat | 5 | EA | $ - 0 | $ - 0 |
| 34 | Scraper | 2 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 33-34 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Claude Maintenance, 801 SH 207 S, Claude, TX | |||||
| 35 | 24" Dust Mop | 1 | EA | $ - 0 | $ - 0 |
| 36 | 3'x5' Safety Mat | 3 | EA | $ - 0 | $ - 0 |
| 37 | Scraper | 1 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 35-37 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Dalhart Maintenance, 12190 US 87, Dalhart, TX | |||||
| 38 | 24" Dust Mop | 1 | EA | $ - 0 | $ - 0 |
| 39 | 3'x5' Safety Mat | 7 | EA | $ - 0 | $ - 0 |
| 40 | Scraper | 2 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 38-40 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Dumas Maintenance, 2149 N Maddox, Dumas, TX | |||||
| 41 | 3'x5' Safety Mat | 4 | EA | $ - 0 | $ - 0 |
| 42 | Scraper | 1 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 41-42 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Groom Maintenance, 809 Front St. Groom, TX | |||||
| 43 | 3'x5' Safety Mat | 5 | EA | $ - 0 | $ - 0 |
| 44 | Scraper | 2 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 43-44 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Gruver Maintenance, 114 W SH 15, Gruver, TX | |||||
| 45 | 3'x5' Safety Mat | 4 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 45 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Hereford Maintenance, 3869 US Hwy 3855, Hereford, TX | |||||
| 46 | 3'x5' Safety Mat | 5 | EA | $ - 0 | $ - 0 |
| 47 | Scraper | 2 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 46-47 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Pampa Maintenance and AE, 12129 E Frederic, Pampa, TX | |||||
| 48 | 3'x5' Safety Mat | 11 | EA | $ - 0 | $ - 0 |
| 49 | Scraper | 2 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 48-49 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Panhandle Maintenance, 101 S Elsie, Panhandle, TX | |||||
| 50 | 3'x5' Safety Mat | 3 | EA | $ - 0 | $ - 0 |
| 51 | 3'x10' Safety Mat | 2 | EA | $ - 0 | $ - 0 |
| 52 | Scraper | 2 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 50-52 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Potter County Maintenance, 7700 E Loop 335 N, Amarillo, TX | |||||
| 53 | 3'x5' Safety Mat | 4 | EA | $ - 0 | $ - 0 |
| 54 | Scraper | 2 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 53-54 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Stratford Maintenance, 1202 E Texas Ave, Stratford, TX | |||||
| 55 | 24" Dust Mop | 2 | EA | $ - 0 | $ - 0 |
| 56 | 3'x5' Safety Mat | 6 | EA | $ - 0 | $ - 0 |
| 57 | Scraper | 2 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 55-57 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 | ||||
| Vega Maintenance, 606 W Vega Blvd., Vega, TX | |||||
| 58 | 3'x5' Safety Mat | 3 | EA | $ - 0 | $ - 0 |
| 59 | Scraper | 2 | EA | $ - 0 | $ - 0 |
| Subtotal Lines 58-59 | $ - 0 | ||||
| Total (26 weeks) | $ - 0 |
GRAND TOTAL FOR LINES 1-59 in the ITEM COLUMN $ - 0
FAILURE TO RETURN THIS SCHEDULE IN EXCEL WILL RESULT IN THE RESPONSE BEING CONSIDERED NON-RESPONSIVE
&P of &N
File details come from the government source that posted it. Updated .