ESBD_456627_1758723524492_COOLING TOWER - ATTACHMENT A.pdf

PDF 222 KB Posted

Attached to
RFP # 717-25-740 Central Plant Cooling Tower Basin & Gearbox
Solicitation number
717-25-740
Issued by
Texas

About this file

These are engineering drawings for a Cooling Tower project created by Tower Engineering, Inc. (TEI), labeled as an "As-Built" plan with Revision 2, specifically documenting detailed plan and section views for a cooling tower infrastructure. The technical drawings include multiple section views (A-A, B-B, C-C) and detailed engineering schematics for Cooling Tower Sections 8, showing precise architectural and structural specifications. The drawings include multiple cooling tower cells (CT-1 through CT-4), with intricate technical details about structural components, elevation changes, material specifications, and mechanical integration points. The documents are professionally drafted engineering plans that provide comprehensive technical specifications for the construction and layout of a cooling tower system, with precise measurements, structural annotations, and engineering cross-sections.

The technical drawings are marked as proprietary and contain specific engineering notes regarding design parameters, suggesting these are final construction documents intended for actual implementation. The plans include detailed cross-sectional views showing structural elements like foundation layers, mechanical components, and spatial relationships between different tower sections. While no specific pricing or contractual information is visible, the drawings represent a high-level engineering design document that would be used for construction bidding, permitting, or actual infrastructure development of a cooling tower facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .