This document is a Bid Proposal for the City of Waco's Franklin Avenue Utility Relocation project, detailing an extensive infrastructure renovation involving wastewater, water, storm drain, and miscellaneous improvements. The comprehensive bid includes 190 line items covering multiple aspects of utility infrastructure work, such as pipe installations, abandonments, removals, connections, manhole constructions, surface replacements, and associated site work. The bid proposal requires detailed unit pricing for various pipe sizes, depths, and installation methods, including street and off-street trench work, dry bore installations, and encasement pipe placements across different utility types.

The bid requires the general contractor to self-perform a minimum of 50% of the contract work and includes provisions for subcontractor listings. While no specific total project budget is explicitly stated, the bid proposal allows for quantity adjustments based on unit prices and approved budgeted funds. The bid encompasses complex infrastructure work involving wastewater lines ranging from 4" to 30", water lines from 4" to 16", storm drain improvements, and miscellaneous site restoration tasks such as concrete work, surface replacements, traffic markings, and landscaping. The comprehensive nature of the bid suggests a significant municipal infrastructure renewal project with multiple interconnected components requiring precise technical execution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO. DESCRIPTION QTY UNIT UNIT PRICE SUB-TOTAL

GENERAL CONDITIONS

Mobilization, Permits and Project Incidentals (10% Maximum of Total Bid)

1 LS $ -

2 Bonding & Insurance (2.5% Maximum of Total Bid) 1 LS $ -

3 Stormwater Pollution & Prevention Plan 1 LS $ -

4 Stormwater Pollution & Prevention Plan Implementation 1 LS $ -

Testing of Improvements, including but not limited to all testing required for acceptance of the water & wastewater improvements, and all material, labor, equipment and incidentals, complete and in place.

1 LS $ -

6 Trench Safety Plan 1 LS $ -

7 Confined Space Plan & Implementation 1 LS $ -

Building Waco Signage, including furnishing all materials, construction & placement of signage, removal & disposal and all material, labor, equipment and incidentals, complete and in place.

2 EA $ -

Utility Potholes, including necessary excavation, traffic control plans and implementation, completion of pothole data form, surface material and all material, labor, equipment and incidentals, complete and in place.

1 LS $ -

10 Traffic Control Plan 1 LS $ -

11 Traffic Control Implementation 1 LS $ -

Night Time or After Hours Utility Installation, including all lighting, traffic control, platting, and all material, labor, equipment and incidentals, complete and in place.

1 LS $ -

Fire Watch (All Locations) including all necessary personnel, coordination w/ City of Waco Fire Department, and all material, labor, equipment and incidentals, complete and in place.

1 LS $ -

PRICING INFORMATION

NOTE: Depending on unit prices, requirements and approved budgeted funds, quantities may be reduced or increased during the contract period.

THE CONTRACTOR IS RESPONSIBLE FOR ALL MATH, CALCULATIONS, AND FORMULAS

SUBTOTAL - GENERAL CONDITIONS

City of Waco Franklin Avenue Utility Relocation

BID PROPOSAL

Grout Fill & Cap Existing 27" Wastewater Line to be Abandoned, including all necessary installation of caps on existing wastewater line, trust blocking, excavation, gravel trench backfill, surface replacement, and all material, labor, equipment, and incidentals complete and in place

122 LF $ -

Grout Fill & Cap Existing 24" Wastewater Line to be Abandoned, including all necessary installation of caps on existing wastewater line, trust blocking, excavation, gravel trench backfill, surface replacement, and all material, labor, equipment, and incidentals complete and in place

125 LF $ -

Grout Fill & Cap Existing 18" Wastewater Line to be Abandoned, including all necessary installation of caps on existing wastewater line, trust blocking, excavation, gravel trench backfill, surface replacement, and all material, labor, equipment, and incidentals complete and in place

308 LF $ -

Grout Fill & Cap Existing 10" Wastewater Line to be Abandoned, including all necessary installation of caps on existing wastewater line, trust blocking, excavation, gravel trench backfill, surface replacement, and all material, labor, equipment, and incidentals complete and in place

748 LF $ -

Grout Fill & Cap Existing 8" Wastewater Line to be Abandoned, including all necessary installation of caps on existing wastewater line, trust blocking, excavation, gravel trench backfill, surface replacement, and all material, labor, equipment, and incidentals complete and in place

2,738 LF $ -

Grout Fill & Cap Existing 6" Wastewater Line to be Abandoned, including all necessary installation of caps on existing wastewater line, trust blocking, excavation, gravel trench backfill, surface replacement, and all material, labor, equipment, and incidentals complete and in place

395 LF $ -

Removal of Existing 27" Wastewater Line (All Depths) and Disposal Offsite, including any necessary traffic control implementation, excavation, removal, installation of gravel trench backfill, surface replacement, and all material, labor, equipment, and incidentals complete and in place

23 LF $ -

Removal of Existing 10" Wastewater Line (All Depths) and Disposal Offsite, including any necessary traffic control implementation, excavation, removal, installation of gravel trench backfill, surface replacement, and all material, labor, equipment, and incidentals complete and in place

37 LF $ -

Removal of Existing 8" Wastewater Line (All Depths) and Disposal Offsite, including any necessary traffic control implementation, excavation, removal, installation of gravel trench backfill, surface replacement, and all material, labor, equipment, and incidentals complete and in place

70 LF $ -

WASTEWATER IMPROVEMENTS

City of Waco Franklin Avenue Utility Relocation

Existing Wastewater Manhole (All Sizes) (All Depths) to be Abandoned, including all necessary installation of caps on existing wastewater line, trust blocking, excavation, gravel trench backfill, surface replacement, and all material, labor, equipment, and incidentals complete and in place

3 EA $ -

Existing Wastewater Manhole (All Sizes) (All Depths) to be Removed and Disposed Offsite, including necessary excavation, plugging of existing wastewater lines, removal, transportation and disposal, placement of select fill in excavated areas, necessary traffic control implementation, surface replacement and all material, labor, equipment and incidentals, complete and in place

14 EA $ -

Existing pole & signage to be removed including disposal of pole, delivery of sign to City of Waco, placement of select fill in excavated areas and all material, labor, equipment, and incidentals complete and in place.

1 EA $ -

Connection to existing 27" wastewater line, including necessary pothole investigation, embedment, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

Connection to existing 24" wastewater line, including necessary pothole investigation, embedment, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

Connection to existing 10" wastewater line, including necessary pothole investigation, embedment, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

Connection to existing 8" wastewater line, including necessary pothole investigation, embedment, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

5 EA $ -

Connection to existing 6" wastewater line, including necessary pothole investigation, embedment, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

3 EA $ -

Connection to existing 4" force main line, including necessary pothole investigation, embedment, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

Connection to existing wastewater service, including necessary pothole investigation, embedment, gravel trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

30" PS46, ASTM F679 Wastewater Line (10'-15' Depth) (Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

143 LF $ -

City of Waco Franklin Avenue Utility Relocation

30" PS46, ASTM F679 Wastewater Line (15'-20' Depth) (Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

180 LF $ -

30" PS46, ASTM F679 Wastewater Line (10'-15' Depth) (Off-Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

17 LF $ -

30" PS46, ASTM F679 Wastewater Line (15'-20' Depth) (Off-Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

48 LF $ -

12" SDR-26 PVC ASTM-3034 Wastewater Line (5'-10' Depth) (Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

316 LF $ -

12" SDR-26 PVC ASTM-3034 Wastewater Line (10'-15' Depth) (Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

88 LF $ -

12" SDR-26 PVC Type PSM, ASTM-D2241 Wastewater Line (10'-15' Depth) (Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

32 LF $ -

12" SDR-26 PVC Type PSM, ASTM-D2241 Wastewater Line (10'-15' Depth) (Off Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

42 LF $ -

10" SDR-26 PVC ASTM-3034 Wastewater Line (5'-10' Depth) (Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

151 LF $ -

10" SDR-26 PVC TYPE PSM, ASTM-D2241 Wastewater Line (5'-10' Depth) (Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

237 LF $ -

8" SDR-26 PVC ASTM-3034 Wastewater Line (5' - 10' Depth) (Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

539 LF $ -

City of Waco Franklin Avenue Utility Relocation

8" SDR-26 PVC ASTM-3034 Wastewater Line (10' - 15' Depth) (Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

149 LF $ -

8" SDR-26 PVC, Type PSM ASTM-2241 Wastewater Line (5' - 10' Depths) (Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

97 LF $ -

8" SDR-26 PVC, Type PSM ASTM-2241 Wastewater Line (10'-15') Depths) (Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

409 LF $ -

6" SDR-26 PVC ASTM-3034 Wastewater Line (5'-10' Depth) (Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

261 LF $ -

6" SDR-26 PVC ASTM-3034 Wastewater Line (10'-15' Depth) (Street Trench) including excavation, surveying, embedment, placement, tracer wire, gravel trench backfill and all material, labor, equipment and incidentals complete and in place

52 LF $ -

30" PS46, ASTM F679 Wastewater Line (All Depths) Installed in 42" Steel Encasement Pipe (All Depths) including tracer wire, installation of utility and all material, labor, equipment, and incidentals complete and in place

352 LF $ -

12" SDR-26 PVC ASTM-3034 Wastewater Line (All Depths) Installed in 24" Steel Encasement Pipe (All Depths) including tracer wire, installation of utility and all material, labor, equipment, and incidentals complete and in place

98 LF $ -

12" SDR-26 PVC ASTM-D2241 Wastewater Line (All Depths) Installed in 24" Steel Encasement Pipe (All Depths) including tracer wire, installation of utility and all material, labor, equipment, and incidentals complete and in place

21 LF $ -

10" SDR-26 PVC ASTM-3034 Wastewater Line (All Depths) Installed in 24" Steel Encasement Pipe (All Depths) including tracer wire, installation of utility and all material, labor, equipment, and incidentals complete and in place

222 LF $ -

8" SDR-26 PVC Type PSM ASTM-2241 Wastewater Line (All Depths) Installed in 16" Steel Encasement Pipe (All Depths) including tracer wire, installation of utility and all material, labor, equipment, and incidentals complete and in place

194 LF $ -

City of Waco Franklin Avenue Utility Relocation

42" Steel Encasement Pipe installed by Dry Bore (All Depths) including necessary excavation, construction of bore pits, jacking of encasement pipe, and all material, labor, equipment, and incidentals complete and in place

352 LF $ -

24" Steel Encasement Pipe installed by Dry Bore (All Depths) including necessary excavation, construction of bore pits, jacking of encasement pipe, and all material, labor, equipment, and incidentals complete and in place.

184 LF $ -

24" Steel Encasement Pipe installed by Open Cut (Street Trench) (All Depths) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place

157 LF $ -

16" Steel Encasement Pipe installed by Open Cut (Street Trench) (All Depths) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place

194 LF $ -

6' Diameter Manhole (10' - 15' Depth) (Street Trench) with standard ring and cover including all excavation, bedding, manhole coatings, installation, backfill, and all material, labor, equipment and incidentals, complete and in place

2 EA $ -

6' Diameter Manhole constructed on existing wastewater line (All Sizes) (10' - 15' Depths) (Street Trench) with standard ring and cover, including all excavation, bedding, manhole coatings, installation, backfill, and all material, labor, equipment and incidentals, complete and in place

1 EA $ -

6' Diameter Manhole (15' - 20' Depth) (Street Trench) with standard ring and cover including all excavation, bedding, manhole coatings, installation, backfill, and all material, labor, equipment and incidentals, complete and in place

2 EA $ -

6' Diameter Manhole constructed on existing wastewater line (All Sizes) (15' - 20' Depths) (Street Trench) with standard ring and cover, including all excavation, bedding, manhole coatings, installation, backfill, and all material, labor, equipment and incidentals, complete and in place

1 EA $ -

5' Diameter Manhole (5' - 10' Depth) (Street Trench) with standard ring and cover including all excavation, bedding, manhole coatings, installation, backfill, and all material, labor, equipment and incidentals, complete and in place

7 EA $ -

5' Diameter Manhole constructed on existing wastewater line (All Sizes) (10' - 15' Depths) (Street Trench) with standard ring and cover and 8" External Drop Fixture, including all excavation, bedding, manhole coatings, installation, backfill, and all material, labor, equipment and incidentals, complete and in place

1 EA $ -

City of Waco Franklin Avenue Utility Relocation

6' Diameter Manhole constructed on existing wastewater line (All Sizes) (10' - 15' Depths) (Street Trench) with standard ring and cover and 6" External Drop Fixture, including all excavation, bedding, manhole coatings, installation, backfill, and all material, labor, equipment and incidentals, complete and in place

1 EA $ -

5' Diameter Manhole constructed on existing Wastewater Line (5' - 10' Depth) (Street Trench) with standard ring and cover including all excavation, bedding, manhole coatings, installation, backfill, connection to existing wastewater piping, and all material, labor, equipment and incidentals, complete and in place

3 EA $ -

4' Diameter Manhole (5'-10' Depth) (Street Trench) with standard ring and cover including all excavation, bedding, manhole coatings, installation, backfill, and all material, labor, equipment and incidentals, complete and in place

4 EA $ -

4' Diameter Manhole (10' - 15' Depths) (Street Trench) with standard ring and cover including all excavation, bedding, manhole coatings, installation, backfill, and all material, labor, equipment and incidentals, complete and in place

3 EA $ -

4' Diameter Manhole @ STA 2+68.21 Line G (Street Trench) with standard ring and cover and 6" External Drop Fixture, including all excavation, bedding, manhole coatings, installation, backfill, and all material, labor, equipment and incidentals, complete and in place

1 EA $ -

4' Diameter Manhole @ STA 4+34.67 Line G (Street Trench) with standard ring and cover and 6" External Drop Fixture, including all excavation, bedding, manhole coatings, installation, backfill, and all material, labor, equipment and incidentals, complete and in place

1 EA $ -

4' Diameter Manhole @ STA 6+33.65 Line G (Street Trench) with standard ring and cover and 6" External Drop Fixture, including all excavation, bedding, manhole coatings, installation, backfill, and all material, labor, equipment and incidentals, complete and in place

1 EA $ -

4' Diameter Manhole (10' - 15' Depths) (Street Trench) with standard ring and cover and 6" External Drop Fixture, including all excavation, bedding, manhole coatings, installation, backfill, and all material, labor, equipment and incidentals, complete and in place

1 EA $ -

4' Diameter Manhole constructed on existing wastewater line (All Sizes) (10' - 15' Depths) (Street Trench) with standard ring and cover, including all excavation, bedding, manhole coatings, installation, backfill, and all material, labor, equipment and incidentals, complete and in place

1 EA $ -

6" SCH-40 PVC 45 Degree Wye and Cleanout, including all necessary excavation, embedment, gravel trench backfill, connection to existing wastewater service, surface replacement, solid block sod and all material, labor, equipment and incidentals complete and in place

5 EA $ -

City of Waco Franklin Avenue Utility Relocation

6" SCH-40 PVC 22.5 Degree Wye and Cleanout, including all necessary excavation, embedment, gravel trench backfill, connection to existing wastewater service, surface replacement, solid block sod and all material, labor, equipment and incidentals complete and in place

1 EA $ -

6" SCH-40 PVC Cleanout, including all necessary excavation, embedment, gravel trench backfill, connection to existing wastewater service, surface replacement, solid block sod and all material, labor, equipment and incidentals complete and in place

1 EA $ -

6" SCH-40 PVC Commercial Wastewater Service (All Lengths) (Street Trench) connected to private service, including all necessary excavation, embedment, gravel trench backfill, connection to existing wastewater service, surface replacement, solid block sod and all material, labor, equipment and incidentals complete and in place

5 EA $ -

15" Waste Access Chamber, including all necessary excavation, embedment, gravel trench backfill, surface replacement and all material, labor, equipment and incidentals complete and in place.

1 EA $ -

Adjustment of Wastewater Manhole Ring and Cover to final grade and installation of reinforce concrete diamond, including all necessary saw cutting, adjustment and all material, labor, equipment and incidentals complete and in place

6 EA $ -

Concrete Encasement, including all material, labor, equipment, and incidentals, complete and in place.

70 LF $ -

Trench Safety Implementation, including all necessary material, labor, equipment, training and incidentals complete and in place

3,184 LF $ -

Bypass Pumping Plan (All Locations), including necessary research, development, and submission to achieve approval and all incidentals complete.

1 LS $ -

Bypass Pumping Implementation (All Locations), including all necessary Electrical, Pumping, Controls, Traffic Controls, Implementation and removal of all material, labor, equipment and incidentals complete and in place.

1 LS $ -

Existing 6" Water Line (All Types) to be abandoned in place, including installation of plugs in pipe, grout installation, and all material, labor, equipment and incidentals, complete and in place

1,661 LF $ -

Existing 8" Water Line (All Types) to be abandoned in place, including installation of plugs in pipe, grout installation, and all material, labor, equipment and incidentals, complete and in place

1,889 LF $ -

SUBTOTAL - WASTEWATER IMPROVEMENTS

WATER IMPROVEMENTS - BASE BID

City of Waco Franklin Avenue Utility Relocation

Existing 10" Water Line (All Types) to be abandoned in place, including installation of plugs in pipe, grout installation, and all material, labor, equipment and incidentals, complete and in place

360 LF $ -

Existing 12" Water Line (All Types) to be abandoned in place, including installation of plugs in pipe, grout installation, and all material, labor, equipment and incidentals, complete and in place

3,952 LF $ -

Existing 16" Water Line (All Types) to be abandoned in place, including installation of plugs in pipe, grout installation, and all material, labor, equipment and incidentals, complete and in place

374 LF $ -

Removal of Existing 6" Water Line (All Depths) and Disposal Offsite, including any necessary traffic control implementation, excavation, removal, installation of gravel trench backfill, surface replacement, and all material, labor, equipment, and incidentals complete and in place

65 LF $ -

Removal of Existing 8" Water Line (All Depths) and Disposal Offsite, including any necessary traffic control implementation, excavation, removal, installation of gravel trench backfill, surface replacement, and all material, labor, equipment, and incidentals complete and in place

126 LF $ -

Removal of Existing 12" Water Line (All Depths) and Disposal Offsite, including any necessary traffic control implementation, excavation, removal, installation of gravel trench backfill, surface replacement, and all material, labor, equipment, and incidentals complete and in place

81 LF $ -

Existing Gate Valve (All Sizes) to be Removed and Delivered to the City of Waco, including necessary excavation, dewatering, transportation and delivery to City Facilities, installation of backfill, installation of solid block sod, and all material, labor, equipment, and incidentals complete and in place

37 EA $ -

Existing Fire Hydrant to be Removed and Delivered to the City of Waco, including necessary excavation, dewatering, transportation and delivery to City Facilities, installation of backfill, installation of solid block sod, and all material, labor, equipment, and incidentals complete and in place

8 EA $ -

Existing PRV, Gate Valves, Piping, All Appurtenances and Vault to be Removed. Valves to be Delivered to the City of Waco. All other material to be disposed offsite, including any necessary traffic control implementation, excavation, removal, installation of select fill, surface replacement, and all material, labor, equipment, and incidentals complete and in place.

1 EA $ -

Existing blow off valves (All Sizes) to be removed and disposed offsite, including removal of piping to existing water main and all material, labor, equipment, and incidentals complete and in place.

1 EA $ -

Installation of 8" Concrete Plug, including all necessary excavation, cutting of pipe, installation of plug, trench backfill, surface replacement, and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

City of Waco Franklin Avenue Utility Relocation

Connection to existing Gate Valve, including necessary pothole investigation, special fittings, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

Connection to existing 4" water line, including necessary pothole investigation, special fittings, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

Connection to existing 6" water line, including necessary pothole investigation, special fittings, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

2 EA $ -

Connection to existing 8" water line, including necessary pothole investigation, special fittings, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

11 EA $ -

Connection to existing Fire Line Vault (All Sizes), including necessary pothole investigation, special fittings, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

2 EA $ -

Connection to existing 12" water line, including necessary pothole investigation, special fittings, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

8 EA $ -

Connection to existing 16" water line, including necessary pothole investigation, special fittings, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

4" C-900 PVC Non-Restrained Joint Water Line (All Depths) (Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, and trench backfill and all material, labor, equipment, and incidentals complete and in place

20 LF $ -

8" C-900 PVC Restrained Joint Water Line (All Depths) Installed in 20" Steel Encasement Pipe (All Depths) including tracer wire, installation of utility and all material, labor, equipment, and incidentals complete and in place

249 LF $ -

8" C-900 PVC Restrained Joint Water Line (All Depths) (Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, and trench backfill and all material, labor, equipment, and incidentals complete and in place

999 LF $ -

8" C-900 PVC Non-Restrained Joint Water Line (All Depths) (Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, and trench backfill and all material, labor, equipment, and incidentals complete and in place

1,628 LF $ -

City of Waco Franklin Avenue Utility Relocation

8" C-900 PVC Non-Restrained Joint Water Line (All Depths) Installed in 16" Steel Encasement Pipe (All Depths) including tracer wire, installation of utility and all material, labor, equipment, and incidentals complete and in place

80 LF $ -

8" C-900 PVC Restrained Joint Water Line (All Depths) Installed in 16" Steel Encasement Pipe (All Depths) including tracer wire, installation of utility and all material, labor, equipment, and incidentals complete and in place

40 LF $ -

8" C-900 DR18 PVC Fire Line (All Depths) (Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, and trench backfill and all material, labor, equipment, and incidentals complete and in place

84 LF $ -

10" C-900 PVC Restrained Joint Water Line (All Depths) (Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place

5 LF $ -

12" C-900 PVC Restrained Joint Water Line (All Depths) Installed in 24" Steel Encasement Pipe (All Depths) including tracer wire, installation of utility and all material, labor, equipment, and incidentals complete and in place

764 LF $ -

12" C-900 PVC Restrained Joint Water Line (All Depths) (Off Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place

159 LF $ -

12" C-900 PVC Restrained Joint Water Line (All Depths) (Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place

2,110 LF $ -

12" C-900 PVC Non-Restrained Joint Water Line (All Depths) (Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place

2,455 LF $ -

16" C-900 PVC Restrained Joint Water Line (All Depths) (Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, and trench backfill and all material, labor, equipment, and incidentals complete and in place

139 LF $ -

16" C-900 PVC Non- Restrained Joint Water Line (All Depths) (Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, and trench backfill and all material, labor, equipment, and incidentals complete and in place

208 LF $ -

City of Waco Franklin Avenue Utility Relocation

10" C-900 PVC Restrained Joint Fire Line (All Depths) (Street Trench) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place

18 LF $ -

16" Steel Encasement Pipe installed by Open Cut (All Depths) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place

120 LF $ -

20" Steel Encasement Pipe installed by Dry Bore (All Depths) including necessary excavation, construction of bore pits, jacking of encasement pipe, and all material, labor, equipment, and incidentals complete and in place

249 LF $ -

24" Steel Encasement Pipe installed by Dry Bore (All Depths) including necessary excavation, construction of bore pits, jacking of encasement pipe, and all material, labor, equipment, and incidentals complete and in place

648 LF $ -

24" Steel Encasement Pipe installed by Open Cut (All Depths) including necessary excavation, embedment, tracer wire, marking tape, installation of utility, trench backfill and all material, labor, equipment, and incidentals complete and in place

116 LF $ -

16" X 12" DIP Tee, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

12" X 12" DIP Tee, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

8 EA $ -

12" X 10" DIP Tee, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

12" X 8" DIP Tee, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

7 EA $ -

12" X 6" DIP Tee, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

3 EA $ -

12" X 4" DIP Tee, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

8" X 8" DIP Tee, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

3 EA $ -

City of Waco Franklin Avenue Utility Relocation

8" X 6" DIP Tee, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

6 EA $ -

6" - 45° DIP Bend, including necessary excavation, connection to water line, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

8" - 45° DIP Bend, including necessary excavation, connection to water line, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

44 EA $ -

10" - 45° DIP Bend, including necessary excavation, connection to water line, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

2 EA $ -

12" - 45° DIP Bend, including necessary excavation, connection to water line, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

56 EA $ -

12" - 22.5° DIP Bend, including necessary excavation, connection to water line, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

4 EA $ -

12" - 11.25° DIP Bend, including necessary excavation, connection to water line, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

2 EA $ -

16" - 45° DIP Bend, including necessary excavation, connection to water line, spool pieces, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

6 EA $ -

16" X 12" DIP Reducer, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

12" X 10" DIP Reducer, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

12" X 8" DIP Reducer, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

4 EA $ -

8" X 6" DIP Reducer, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

2 EA $ -

12" DIP Plug, including necessary excavation, thrust blocking, trench backfill and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

City of Waco Franklin Avenue Utility Relocation

16" Resilient Seat Gate Valve, including necessary excavation, connection to water line, thrust blocking, tracer wire, thrust blocking, valve box and lid, and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

12" Resilient Seat Gate Valve, including necessary excavation, connection to water line, thrust blocking, tracer wire, thrust blocking, valve box and lid, and all material, labor, equipment, and incidentals complete and in place

30 EA $ -

10" Resilient Seat Gate Valve, including necessary excavation, connection to water line, thrust blocking, tracer wire, thrust blocking, valve box and lid, and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

8" Resilient Seat Gate Valve, including necessary excavation, connection to water line, thrust blocking, tracer wire, thrust blocking, valve box and lid, and all material, labor, equipment, and incidentals complete and in place

15 EA $ -

4" Resilient Seat Gate Valve, including necessary excavation, connection to water line, tracer wire, thrust blocking, valve box and lid, and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

10" PRV, Vault and Pressure Plane Valve, including necessary excavation, connection to water line, tracer wire, thrust blocking, valve box and lid, and all material, labor, equipment, and incidentals complete and in place

1 EA $ -

2" Air Release & Vacuum Valve (In Street), including service tap, service, line, valve vault, appurtenances, vent, vent enclosure, and all material, labor, equipment, and incidentals complete and in place.

2 EA $ -

2" Air Release & Vacuum Valve (Off Street), including service tap, service, line, valve vault, appurtenances, vent, vent enclosure, and all material, labor, equipment, and incidentals complete and in place.

1 EA $ -

6" Above Ground Blowoff, including necessary excavation, piping, embedment, backfill, and all material, labor, equipment, and incidentals complete and in place.

1 EA $ -

Fire Hydrant Assembly, including necessary excavation, embedment, 6" DIP Fire Line, 6" Resilient Seat Gate Valve, valve box and lid, Gradlock, trench backfill, and all material labor, equipment, and incidentals complete and in place

5 EA $ -

Alternate Fire Hydrant Assembly, including necessary excavation, embedment, 6" DIP Fire Line, 6" Resilient Seat Gate Valve, valve box and lid, Gradlock, trench backfill, and all material labor, equipment, and incidentals complete and in place

3 EA $ -

1" Irrigation Service (Short) (Street Trench) necessary excavation, embedment, installation of service, backfill, connection to existing meter, and all material, labor, equipment, and incidentals, complete and in place.

1 EA $ -

City of Waco Franklin Avenue Utility Relocation

2" Irrigation Service (Long) (Street Trench) including necessary excavation, embedment, installation of service, backfill, connection to existing meter, and all material, labor, equipment, and incidentals, complete and in place.

1 EA $ -

2" Commercial Service (Long) (Street Trench) including necessary excavation, embedment, installation of service, backfill, connection to existing meter, and all material, labor, equipment, and incidentals, complete and in place.

1 EA $ -

2" Commercial Service (Short) (Street Trench) including necessary excavation, embedment, installation of service, backfill, connection to existing meter, and all material, labor, equipment, and incidentals, complete and in place.

4 EA $ -

2" Commercial Service (Short) (Street Trench) and Traffic Rated Meter Box including installation of existing meter, embedment, installation of service, backfill and all material, labor, equipment, and incidentals, complete and in place.

15 EA $ -

2" Commercial Service (Short) (Street Trench) and Traffic Rated Meter Box (No Meter) including embedment , installation of service backfill and all material, labor, equipment, and incidentals, complete and in place.

1 EA $ -

1 1/2" Backflow Preventer Installed in Traffic Rated Meter Box, including connection to existing domestic water service, backfill and all material, labor, equipment, and incidentals, complete and in place.

14 EA $ -

2" Double Detector Backflow Preventer Installed in Concrete Vault, including 2" PVC SCH 40 Piping, Bends, Connections to Existing Domestic Service, backfill, solid block sod and all material, labor, equipment, and incidentals, complete and in place.

1 EA $ -

Adjustment of Valve Box and Lid to final grade and installation of reinforced concrete diamond, including all necessary saw cutting, adjustment and all material, labor, equipment and incidentals complete and in place

13 EA $ -

6" Unreinforced Concrete Cap, including all material, labor, equipment, and incidentals, complete and in place

85 LF $ -

Concrete Encasement, including all material, labor, equipment, and incidentals, complete and in place.

248 LF $ -

Trench Safety Implementation, including all necessary material, labor, equipment, training and incidentals complete and in place

9,127 LF $ -

18" Class IV Reinforced Concrete Pipe (All Depths)(Street Trench) including excavation, disposal of existing pipe, subgrade compaction, installation of utility and all material, labor, equipment, and incidentals complete and in place.

428 LF $ -

SUBTOTAL - WATER IMPROVEMENTS

STORM DRAIN IMPROVEMENTS

City of Waco Franklin Avenue Utility Relocation

18" Safety End Treatment including all forming reinforcement, placement of concrete, all material, labor, equipment, and incidentals complete and in place.

12 EA $ -

Trench Safety Implementation, including all necessary material, labor, equipment, training and incidentals complete and in place

428 LF $ -

Unclassified Excavation including all excavation, subgrade compaction, and all material, labor, equipment, and incidentals complete and in place.

745 CY $ -

Existing Concrete Curb and Gutter to Be Removed and Replaced, including necessary saw cutting, removal transportation and disposal, forming, reinforcement, dowels, placement of concrete, curing, and all material, labor, equipment and incidentals complete and in place

381 LF $ -

Existing Concrete Ribbon Curb to Be Removed and Replaced, including necessary saw cutting, removal transportation and disposal, forming, reinforcement, dowels, placement of concrete, curing, and all material, labor, equipment and incidentals complete and in place

29 LF $ -

Class 'A' Surface Replacement, including all necessary preparation, sawcutting of existing pavement, subgrade compaction, installation of concrete base, bonding course, placement of HMAC (Type D), cleanup and all material, labor, equipment and incidentals complete and in place

1,131 LF $ -

Class 'B' Surface Replacement, including all necessary preparation, sawcutting of existing pavement, subgrade compaction, reinforcement, forming, installation of asphalt, connection to existing concrete pavement, cleanup and all material, labor, equipment and incidentals complete and in place

599 LF $ -

Class 'C' Surface Replacement, including all necessary preparation, sawcutting of existing pavement, subgrade compaction, reinforcement, forming, installation of asphalt, connection to existing concrete pavement, cleanup and all material, labor, equipment and incidentals complete and in place

1,066 LF $ -

Class 'D' Surface Replacement, including all necessary preparation, sawcutting of existing pavement, subgrade compaction, reinforcement, forming, installation of asphalt, connection to existing concrete pavement, cleanup and all material, labor, equipment and incidentals complete and in place

1,927 LF $ -

Class 'E' Surface Replacement, including all necessary preparation, subgrade compaction, cleanup and all material, labor, equipment and incidentals complete and in place

180 SF $ -

SUBTOTAL - STORM DRAIN IMPROVEMENTS

MISCELLANEOUS IMPROVEMENTS

City of Waco Franklin Avenue Utility Relocation

Class 'F' Surface Replacement Solid Block Sod, including all necessary preparation, installation of salvaged topsoil, watering, and all material, labor, equipment and incidentals complete and in place

9,271 SY $ -

Temporary Street Replacement, including instalaltion of prime coat on gravel trench backfill, instalaltion of 2" HMAC Type "C", installation of temporary striping as requuired, saw cutting and removal of material upon acceptance of utility, disposal of removed material, and all material, labor, equipment and incidentals complete and in place

4,746 LF $ -

Removal and Replacement of Type 10 TxDOT Ramp, including sawcutting, disposal of existing concrete, subgrade preparation, forming, dowels, reinforcement, placement of concrete, connection to existing concrete, and all material, labor, equipment, and incidentals complete and in place.

1 EA $ -

Removal and Replacement of Reinforced Concrete Sidewalk, including sawcutting, subgrade preparation, forming, dowels, reinforcement, placement of concrete, and all material, labor, equipment, and incidentals complete and in place.

700 SF $ -

Removal and Replacement of Reinforced Concrete Drive Approach, including sawcutting subgrade preperation, forming, dowels, reinforcement, placement of concrete, and all material, labor, equipment, and incidentals complete and in place.

30 SF $ -

Removal and Replacement of Existing Concrete Channel, including sawcutting, subgrade preparation, forming, dowels, reinforcement, placement of concrete, and all material, labor, equipment, and incidentals complete and in place.

4,500 SF $ -

Removal of Existing Pole Sign, Foundation, Electrical Circuits and all incidentials including delivry of sign to Property Owner and all material, labor, equipment, and incidentals complete and in place.

1 LS $ -

Removal and Storage and reinstallation of Light Poles at 5101 Franklin Ave, including all necessary electrical removal and replacement and all material, labor, equipment, and incidentals complete and in place.

1 LS $ -

Removal and replacement of existing concrete headwall, including all excavation, demolition, and disposal of existing headwall, connection to existing culvert and all material, labor, equipment, and incidentals complete and in place.

1 LS $ -

Furnish and Install Galvanized Steel Square Tubing, install Retained Signage(All Types), including all excavation, placement of concrete, temporary traffic signage and all material, labor, equipment, and incidentals, complete and in place.

16 EA $ -

Furnish and install Galvenized Steel "U" Channel Delineator Post and install provided signage (All Types), including all material, labor, equipment, and incidentals, complete and in place.

5 EA $ -

City of Waco Franklin Avenue Utility Relocation

TxDOT DMS-8200 Traffic Paint, Color: White, 4" Solid (25 Mil), including all material, labor, equipment, and incidentals, complete and in place

290 LF $ -

Reflective Pavement Marking Type 1, Color: White, Width 24", Solid, 100 Mil including all material, labor, equipment, and incidentals, complete and in place.

12 LF $ -

Reflective Pavement Marking Type 1, Color: White, Width 12", Solid, 100 Mil including all material, labor, equipment, and incidentals, complete and in place. WORD: STOP

1 EA $ -

Removal of Existing Tree (All Types), including excavation, installation of select fill in excavated area, installation of topsoil & solid block sod, watering, and all material, labor, equipment, and incidentals complete and in place.

12 EA $ -

SUBTOTAL - MISCELLANEOUS IMPROVEMENTS

TOTAL BASE BID AMOUNT

City of Waco Franklin Avenue Utility Relocation

THIS COMPLETE FORM MUST BE SUBMITTED WITH BID

SIGNATURE PAGE

SUBCONTRACTOR TYPE OF WORK

FIRM NAME:

BY:

TITLE:

ADDRESS:

Contractor acknowledges and agrees that the official TOTAL AMOUNT OF BID is determined by multiplying the unit bid prices by the respective estimated quantities shown in this bid proposal and then totaling all of the extended amounts.

Extended amounts SHOULD NOT be rounded up or down. All dollar amounts should be either written legibly or typed.

Any mistakes should be rewritten and initialed by the Contractor.

The General Contractor must self perform a minimum of 50% of the work in the awarded contract.

I WILL USE THE FOLLOWING SUBCONTRACTORS FOR THIS WORK:

City of Waco Franklin Avenue Utility Relocation

Franklin Ave Utility Reloc - Bid Proposal Form
Franklin Ave Utility Reloc - Bid Proposal Signature Page

File details come from the government source that posted it. Updated .