About this file
This document is a set of architectural drawings for a bathroom remodel project at the Presidio La Bahia State Historic Site, prepared by the Texas Historical Commission. The project, identified as Project #HSD-2024-040, involves renovating two public restrooms located at 217 US-183 in Goliad, Texas. The scope of work includes completely demolishing the interior of two existing public bathrooms, constructing new metal stud partitions, installing new finishes and fixtures, removing and replacing the existing electrical panel, and rebuilding existing plumbing with connection to the existing septic system. The drawings are dated for issue on 06.02.2025 and provide comprehensive details including site plans, demolition plans, construction plans, electrical layouts, interior elevations, and specific construction details.
The project specifications emphasize preservation of the historic stone walls, with multiple notes instructing contractors to protect existing surfaces throughout construction. The renovation will incorporate accessibility standards, with specific requirements for bathroom fixtures, door clearances, and fixture heights. Material selections include Talavera 4x4 tile for wall wainscoting, Saltillo 8x4 rectangular natural terracotta tile for flooring, and wood elements stained to match existing historic site aesthetics. The electrical plan includes new lighting fixtures, ceiling-mounted occupancy sensors, and a new 100A electrical panel. The total gross floor area for the renovation is 184.6 square feet, with an occupant load factor of 150 and a maximum of two occupants per restroom.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Goliad
San Antonio RiverSan Antonio Rive r
Presidio La Bahia State Historic Site
BATHROOM REMODEL AT
PRESIDIO LA BAHIA
STATE HISTORI SITE
S OLIAD T
PROJECT #: HSD-2024-040
Texas Historical Commission P.O. Box 12276
Austin, TX 78711-2276 Phone - 512.463.3297
APPLICABLE CODES AND CODE SUMMARY
A-0.0 - GENERAL NOTES
A-0.1 - TEXAS ACCESSIBILITY STANDARDS
A-0.2 - SYMBOLS AND ABBREVIATIONS
A-0.3 - OUTLINE SPECS
A-0.4 - OUTLINE SPECS
A-0.5 - EXISTING PHOTOS
A-1.0 - SITE PLAN
A-1.1 - DEMO PLAN - ABOVE SLAB
A-1.2 - DEMO PLAN - AT SLAB
A-1.3 - DEMO REFLECTED CEILING PLAN
A-2.0 - NEW CONSTRUCTION PLAN - ACCESSORIES
A-2.1 - FINISH PLAN
A-2.2 - DIMENSIONED FLOOR PLAN
A-2.3 - DIMENSIONED FLOOR PLAN
A-3.0 - REFLECTED CEILING PLAN
A-4.0 - ELECTRICAL PLAN
A-5.0 - INTERIOR ELEVATIONS
A-5.1 - INTERIOR ELEVATIONS
A-6.0 - CONSTRUCTION DETAILS
A-6.1 - CONSTRUCTION DETAILS
A-6.2 - CONSTRUCTION DETAILS
A-6.3 - MILLWORK DETAILS
A-7.0 - TOILET ACCESSORIES,ELECTRICAL FIXTURES,FINISHES SCHEDULES
A-8.0 - DOOR SCHEDULE
SCOPE OF WORK SUMMARY
BASE BID:
1. DEMO INTERIOR OF TWO EXISTING PUBLIC BATHROOMS
2. CONSTRUCT NEW METAL STUD PARTITIONS, AND INSTALL NEW FINISHES AND
FIXTURES INSIDE TWO NEW PUBLIC BATHROOMS
3. REMOVE EXISTING ELECTRICAL PANEL INSIDE JANITOR'S CLOSET, INSTALL NEW
ELECTRICAL PANEL AND BREAKERS
4. REBUILD EXISTING PLUMBING & CONNECT TO EXISTING SEPTIC
VICINITY MAP:
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od el
INDEX OF DRAWINGS
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL ELECTRICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2012 TEXAS ACCESSIBILITY STANDARDS
OCCUPANCY CLASSIFICATION: B
CONSTRUCTION TYPE: V-B
TOTAL GROSS FLOOR AREA: 184.6 SF
OCCUPANT LOAD FACTOR: 150
TOTAL OCCUPANTS: 2
WIDTH OF EXITS: 0.2" PER OCCUPANT = 1.4" EXIT WIDTH REQUIRED / 36" PROVIDED
NUMBER OF EXITS: 1 EXIT REQUIRED / 1 PROVIDED
MAX TRAVEL DISTANCE TO EXIT: 24' 8 5/8"
DESIGN TEAM
ARCHITECT:
Texas Historical Commision Historic Sites Division
(512) 463-7948 Pablo Serna, AIA, Chief Achitect Ksenia Nation, Architect
SITE MANAGEMENT:
Presidio La Bahia State Historic Site
(361) 645-3752 Scott McMahon, Site Manager Mitchell Critel, Assistant Site Manager
ISSUE DATE: 06.02.2025
EXHIBIT HALL
NOT IN SCOPE
RR1
RR2
LOBBY
COMMON PATH
OF TRAVEL
JC
P1
P2 P1 8' - 0 34 " P2 16' - 7 78 "
TOTAL: 24' - 8 58 "
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-0.0
General Notes and Life Safety
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
THE TEXAS HISTORICAL COMMISSION (THC)
ISSUES THESE DRAWINGS TO SOLICIT BIDS
FROM QUALIFIED INDIVIDUALS OR FIRMS
FOR PLUMBING REPAIR AND BATHROOM
RENOVATIONS AT THE PRESIDIO LA BAHIA
STATE HISTORIC SITE.
THE FOLLOWING GENERAL NOTES APPLY IN
ALL CASES TO THE CONDITIONS
ENCOUNTERED AND PROVIDE A GENERAL
REFERENCE FOR THE CONTRACTOR AS TO
THE SCOPE, INTENT OF THE WORK AND THE
REQUIRED STANDARDS.
1 ALL WORK MUST COMPLY WITH ALL
APPLICABLE ORDINANCES AND CODES.
2 A REPRESENTATIVE OF THE PRESIDIO LA
BAHIA STATE HISTORIC SITE WILL BE
DESIGNATED FOR INSPECTION OF WORK.
5 STATE BUSINESS HOURS WILL BE
OBSERVED BY CONTRACTOR UNLESS
ALTERNATIVE ARRANGEMENTS ARE MADE
WITH SITE STAFF.
6 NO EQUIPMENT WILL BE ALLOWED OFF
PAVEMENT IN THE PRESIDIO LA BAHIA
STATE HISTORIC SITE AREA WHEN
MOISTURE WILL CREATE TRACKING.
WEATHER DAYS WILL BE GRANTED IF
WARRANTED.
7 PROVIDE ALL MATERIALS AND LABOR TO
COMPLETE THIS JOB AS DESCRIBED IN THE
CONTRACT DOCUMENTS, UNLESS
OTHERWISE NOTED.
8 PROTECT ALL ADJACENT SURFACES AND
OBJECTS FROM DAMAGE. PROTECT ALL
EXISTING TREES & VEGETATION IN WORK
AREA.
9 COORDINATE VEHICULAR ROUTE FOR ALL
WORK AND DELIVERIES WITH SITE
MANAGER, TO LIMIT IMPACT OF PROJECT
ON OVERALL SITE. STAGE AND STORE
MATERIALS AND PARK VEHICLES AS
DIRECTED BY SITE MANAGER.
10 PROTECT INTERIOR OF EXISTING
STRUCTURE AGAINST THE ELEMENTS
DURING THE COURSE OF THIS WORK. THE
CONTRACTOR SHALL BEAR ALL COSTS OF
REPAIR FOR DAMAGE AS A RESULT OF
FAILURE TO COMPLY WITH THIS
REQUIREMENT. NOTE THAT THIS BUILDING
CONTAINS IRREPLACEABLE HISTORIC
ARTIFACTS.
12 PROVIDE RESTROOM FACILITIES FOR
CONSTRUCTION WORKERS. DO NOT USE THE
SITE FACILITIES.
13 ALL WORKMANSHIP SHALL MEET INDUSTRY
STANDARDS AND SHALL BE PERFORMED BY
CRAFTSMEN SKILLED IN THEIR PARTICULAR
TRADE. PROVIDE ADEQUATE NUMBERS OF
CRAFTSMEN AND COMPETENT FULL-TIME
SUPERVISION. ANY WORK THAT IS DETERMINED
BY THE OWNER TO BE DEFICIENT IN
WORKMANSHIP OR QUALITY OF MATERIALS
SHALL BE REJECTED AND CORRECTIVE
MEASURES UNDERTAKEN BY THE CONTRACTOR
SHALL BE AT NO ADDITIONAL COST TO THE
OWNER.
14 THE CONTRACTOR IS SOLELY RESPONSIBLE
FOR JOB SAFETY. COMPLY WITH ALL REQUIRED
SAFETY STANDARDS AND REGULATIONS THAT
APPLY AND BE MINDFUL OF THE SAFETY OF
WORKERS AND THE GENERAL PUBLIC. WHERE
NEEDED OR REQUIRED, ERECT BARRICADES,
SCAFFOLDING AND SIGNS FOR THE SAFE
EXECUTION OF THE WORK. MAINTAIN A CLEAN,
SAFE AND SECURE JOB SITE.
15 DO NOT SCALE THE DRAWINGS. VERIFY ALL
DIMENSIONS AND CONDITIONS BY TAKING FIELD
MEASUREMENTS AND BY OBSERVING EXISTING
CONDITIONS. THE DIMENSIONS SHOWN ON THE
DRAWINGS ARE INTENDED TO GIVE GENERAL
SIZES, SHAPES, RELATIONSHIPS AND TO SHOW
THE EXTENT OF THE WORK. INFORM THE OWNER
PRIOR TO PROCEEDING WITH ANY PORTION OF
THE WORK SHOULD DISCREPANCIES BE
ENCOUNTERED.
17 CONSTRUCT ALL WORK PLUMB, SQUARE,
LEVEL AND TRUE TO LINE.
19 REPAIR ALL AREAS OF SITE DAMAGED BY
CONSTRUCTION ACTIVITIES TO DOCUMENTED
PRE-CONSTRUCTION CONDITION.
20 ELECTRICAL AND WATER SERVICES TO BE
PROVIDED BY SITE.
21 CONTRACTOR TO COORDINATE
CONSTRUCTION PROJECT CONTRACTOR'S SITE
NEEDS WITH PRESIDIO LA BAHIA HISTORIC SITE
MANAGER
22 LEAVE SITE CLEAN AND FREE OF DEBRIS.
DISPOSE OF ALL CONSTRUCTION DEBRIS
LEGALLY OFF SITE.
3 BIDDER MUST VISIT SITE, MEET WITH SITE
MANAGER, AND BECOME THOROUGHLY
FAMILIAR WITH THE EXISTING CONDITIONS
AND REQUIREMENTS BEFORE SUBMITTING
A BID.
4 ALL WORK MUST COMPLY WITH THE
SECRETARY OF THE INTERIOR STANDARDS
FOR THE TREATMENT OF HISTORIC
PROPERTIES.
11 SUBMIT COMPLETE PRODUCT
INFORMATION AND SHOP DRAWINGS FOR
ALL NEW BUILDING COMPONENTS,
PRODUCTS, AND MATERIALS TO ARCHITECT
FOR APPROVAL PRIOR TO COMMENCING
WORK.
18 PRESIDIO LA BAHIA STATE HISTORIC SITE IS
DESIGNATED AS A STATE ANTIQUITIES
LANDMARK AND NATIONAL HISTORIC LANDMARK.
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od el
16 ALL DIMENSIONS ARE SHOWN TO FRAMING
UNLESS NOTED OTHERWISE.
LIFE SAFETY PLAN
SCALE: 3/8" = 1'-0"
06.02.2025
604.4 Seats. The seat height of a water closet above the finish floor shall be 17 inches (430 mm) minimum and 19 inches (485
mm) maximum measured to the top of the seat. Seats shall not be sprung to return to a lifted position.
308.2.2 Obstructed High Reach. Where a high forward reach is
over an obstruction, the clear floor space shall extend beneath the element for a distance not less than the required reach depth over the obstruction. The high forward reach shall be 48 inches (1220 mm) maximum where the reach depth is 20 inches (510 mm) maximum. Where the reach depth exceeds 20 inches (510 mm), the high forward reach shall be 44 inches (1120 mm) maximum and the reach depth shall be 25 inches (635 mm) maximum.
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-0.1
Texas Accessibility Standards
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
TEXAS ACCESSIBILITY STANDARDS
604.2 Location. The water closet shall be positioned with a wall or partition to the rear and to one side. The centerline of the water closet shall be 16 inches (405 mm) minimum to 18 inches (455 mm) maximum from the side wall or partition.
604.3.1 Size. Clearance around a water closet shall be 60
inches (1525 mm) minimum measured perpendicular from the side wall and 56 inches (1420 mm) minimum measured perpendicular from the rear wall.
604.5 Grab Bars
604.5.1 Side Wall. The side wall grab bar shall be 42 inches
(1065 mm) long minimum, located 12 inches (305 mm) maximum from the rear wall and extending 54 inches (1370
mm) minimum from the rear wall.
604.5.2 Rear Wall. The rear wall grab bar shall be 36 inches
(915 mm) long minimum and extend from the centerline of the water closet 12 inches (305 mm) minimum on one side and 24 inches (610 mm) minimum on the other side.
604.7 Dispensers. Toilet paper dispensers shall comply
with 309.4 and shall be 7 inches (180 mm) minimum and 9 inches (230 mm) maximum in front of the water closet measured to the centerline of the dispenser. The outlet of the dispenser shall be 15 inches (380 mm) minimum and 48 inches (1220 mm) maximum above the finish floor and shall not be located behind grab bars.
Dispensers shall not be of a type that controls delivery or that does not allow continuous paper flow.
609.2.1 Circular Cross Section. Grab bars with circular cross sections shall have an outside diameter of 1 1/4 inches (32 mm) minimum and 2 inches (51 mm) maximum.
603.3 Mirrors. Mirrors located above lavatories or countertops shall be installed with the bottom edge of the reflecting surface 40 inches (1015 mm) maximum above the finish floor or ground.
609.3 Spacing. The space between the wall and the grab
bar shall be 1 1/2 inches (38 mm). The space between the grab bar and projecting objects below and at the ends shall be 1 1/2 inches (38 mm) minimum. The space between the grab bar and projecting objects above shall be 12 inches (305 mm) minimum.
609.4 Position of Grab Bars. Grab bars shall be installed in a horizontal position, 33 inches (840 mm) minimum and 36 inches (915 mm) maximum above the finish floor measured to the top of the gripping surface.
304.3.1 Circular Space. The turning space shall be a
space of 60 inches (1525 mm) diameter minimum.
308.2.1 Unobstructed. Where a forward reach is
unobstructed, the high forward reach shall be 48 inches (1220 mm) maximum and the low forward reach shall be 15 inches (380 mm) minimum above the finish floor or ground.
308.3.1 Unobstructed. Where a clear floor or ground
space allows a parallel approach to an element and the side reach is unobstructed, the high side reach shall be 48 inches (1220 mm) maximum and the low side reach shall be 15 inches (380 mm) minimum above the finish floor or ground.
609.5 Surface Hazards. Grab bars and any wall or other
surfaces adjacent to grab bars shall be free of sharp or abrasive elements and shall have rounded edges.
609.6 Fittings. Grab bars shall not rotate within their
fittings.
609.7 Installation. Grab bars shall be installed in any
manner that provides a gripping surface at the specified locations and that does not obstruct the required clear floor space.
609.8 Structural Strength. Allowable stresses shall not
be exceeded for materials used when a vertical or horizontal force of 250 pounds (1112 N) is applied at any point on the grab bar, fastener, mounting device, or supporting structure.
606.4 Faucets. Controls for faucets shall comply with 309.
Hand-operated metering faucets shall remain open for 10 seconds minimum.
309.2 Clear Floor Space. A clear floor or ground space
complying with 305 shall be provided.
309.3 Height. Operable parts shall be placed within one or
more of the reach ranges specified in 308.
309.4 Operation. Operable parts shall be operable with one
hand and shall not require tight grasping, pinching, or twisting of the wrist. The force required to activate operable parts shall be 5 pounds (22.2 N) maximum.
305.3 Size. The clear floor or ground space shall be 30
inches (760 mm) minimum by 48 inches (1220 mm) minimum.
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od el
306.3.1 General. Space under an element between 9 inches
(230 mm) and 27 inches (685 mm) above the finish floor or ground shall be considered knee clearance and shall comply with 306.3.
306.3.2 Maximum Depth. Knee clearance shall extend 25 inches
(635 mm) maximum under an element at 9 inches (230 mm) above the finish floor or ground.
306.3.3 Minimum Required Depth. Where knee clearance is
required under an element as part of a clear floor space, the knee clearance shall be 11 inches (280 mm) deep minimum at 9 inches (230 mm) above the finish floor or ground, and 8 inches (205 mm) deep minimum at 27 inches (685 mm) above the finish floor or ground.
306.3.4 Clearance Reduction. Between 9 inches (230 mm) and
27 inches (685 mm) above the finish floor or ground, the knee clearance shall be permitted to reduce at a rate of 1 inch (25
mm) in depth for each 6 inches (150 mm) in height.
306.3.5 Width. Knee clearance shall be 30 inches (760 mm)
wide minimum.
308.3.1 Unobstructed. Where a clear floor or ground
space allows a parallel approach to an element and the side reach is unobstructed, the high side reach shall be 48 inches (1220 mm) maximum and the low side reach shall be 15 inches (380 mm) minimum above the finish floor or ground.
404.2.3 Clear Width. Door openings shall provide a clear
width of 32 inches (815 mm) minimum. Clear openings of doorways with swinging doors shall be measured between the face of the door and the stop, with the door open 90 degrees. Openings more than 24 inches (610
mm) deep shall provide a clear opening of 36 inches (915 mm) minimum. There shall be no projections into the required clear opening width lower than 34 inches (865 mm) above the finish floor or ground. Projections into the clear opening width between 34 inches (865 mm) and 80 inches (2030 mm) above the finish floor or ground shall not exceed 4 inches (100 mm).
GFCI
SWITCH
SPOT LIGHT
WALL SCONCE
DUPLEX RECEPTACLE
GROUND FAULT CIRCUIT INTERRUPTOR DUPLEX
RECEPTACLE
EXIT SIGN
BATHROOM EXHAUST FAN
A-Y.0 X
A-Y.0 X
SIM
ELEVATION REFERENCE
DETAIL LOCATION ON SHEET
SHEET NUMBER
SIMILAR ELEVATION REFERENCE
DETAIL LOCATION ON SHEET
SHEET NUMBER
A-Y.0 X
ENLARGED DETAIL
EXISTING DOOR TO DEMO
NEW DOOR
V
VENT SWITCH
KEYNOTE
FINISH TAG
DOOR TAG
WALL TAG
OS CEILING-MOUNTED OCCUPANCY/VACANCY SENSORTL1 TERRACOTTA TILE (ELEVATION)
TL2 WALL TILE
PL1 PLASTER
EX1 EXISTING STONE
W1 WOOD
W2 WOOD
TL1 TERRACOTTA TILE (PLAN)
EXISTING STONE WALL TO REMAIN
EXISTING WALL TO DEMO
NEW TYPE "A6" 5 58" METAL STUD
PARTITION
WITH ACOUSTICAL INSULATION
ABV. ABOVE
ACC. ACCESS
ACC. PNL. ACCESS PANEL
ACOUS ACOUSTICAL
ARCH. ARCHITECT/ARCHITECTURAL
AUTO. AUTOMATIC
AVE AVENUE
AVG AVERAGE
A/C AIR CONDITIONING
A/V AUDIO VISUAL
BD. BOARD
BITUM. BITUMINOUS
BLDG. BUILDING
BLKG. BLOCKING
BRKT. BRACKET
CAB. CABINET
CB CATCH BASIN
CEM. CEMENT
CER. CERAMIC
CFMF COLD FORMED METAL FRAMING
CIP CAST IN PLACE
CIR. CIRCLE
CJ CONTROL JOINT
CLG. CEILING
CLG. HT. CEILING HEIGHT
CLR. CLEAR(ANCE)
CL. CLOSET
CMU CONCRETE MASONRY UNIT
CNTR. COUNTER
CONC. CONCRETE
CONT. CONTINUOUS
CORR. CORRIDOR
CTR. CENTER
C.T. CERAMIC TILE
CU.FT. CUBIC FOOT
CU.YD. CUBIC YARD
DBL. DOUBLE
DF DRINKING FOUNTAIN
DIA. DIAMETER
DIM. DIMENSION
DISP. DISPENSER
DR. DOOR
DTL. DETAIL
DWG. DRAWING
EA. EACH
EJ EXPANSION JOINT
ELAS. ELASTIC/ELASTOMERIC
EL. ELEVATION
ELEC. ELECTRICAL
EMER. EMERGENCY
EQUIP. EQUIPMENT
EQ. EQUAL
EXH EXHAUST
EXIST. EXISTING
EXPAN. EXPANSION
EXP. EXPOSED
EXT. EXTERIOR
FA FIRE ALARM
F.C. FIRE CODE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FHC FIRE HOSE CABINET
FH FIRE HYDRANT
FIN. FINISH/FINISHED
FIXT. FIXTURE
HB HOSE BIBB
FLRG. FLOORING
FLR. FLOOR
FLSHG. FLASHING
FRPF. FIREPROOF
FT. FOOT/FEET
FURR. FURRED/FURRING
F.V. FIELD VERIFY
GALV. GALVANIZED
GAL. GALLON
GA GAUGE
GC GENERAL CONTRACTOR
GMP GUARANTEED MAXIMUM PRICE
GR. GRADE/GRADING
GYP. GYPSUM
H.C. HOLLOW CORE
HDCP. HANDICAPPED
HDWR. HARDWARE
HD. HEAD
H.M. HOLLOW METAL
HT. HEIGHT
HVAC HEATING/VENTILATING/AIR CONDITIONING
HYD. HYDRANT
I.D. INSIDE DIAMETER
INCL. INCLUDED
INFO. INFORMATION
INSUL. INSULATION
IN INCH(ES)
JAN JANITOR
JT. JOINT
LAM. LAMINATED
LAV. LAVATORY
LH LEFT-HAND
LV. LEVEL
LIN. LINEAR
LT. LIGHT
LVR. LOUVER
LWT LIGHT-WEIGHT
MACH. MACHINE
MAINT. MAINTENANCE
MATL. MATERIAL
MAX. MAXIMUM
MECH. MECHANICAL
MEP MECHANICAL/ELECTRICAL/PLUMBING
MFR. MANUFACTURER
MH MANHOLE
MIN. MINIMUM
MISC. MISCELLANEOUS
M.L. METAL LATH
MTD. MOUNTED
MTL. METAL
MULL. MULLION
NAT. NATURAL
N.I.C. NOT IN CONTRACT
NO. or # NUMBER
N.T.S. NOT TO SCALE
OA OVERALL
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
OFCI OWNER FURNISHED/CONTRACTOR INSTALLED
OFOI OWNER FURNISHED/OWNER INSTALLED
OH OVERHEAD
O/A OUTSIDE AIR
OPNG. OPENING
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PCT PORCELAIN CERAMIC TILE
PED. PEDESTALL
PLAST. PLASTER
PLAS. PLASTIC
PLBG. PLUMBING
PLYWD. PLYWOOD
POL. POLISHED
PTD. PAINTED
PVC POLYVINYL CHLORIDE
PVG. PAVING
PVMT. PAVEMENT
P.L. PROPERTY LINE
P.LAM PLASTIC LAMINATE
P/C PRECAST
R.O.W. RIGHT OF WAY
QT QUARRY TILE
RCP REFLECTED CEILING PLAN
RECEP. RECEPTICLE
REC. RECESSED
REG. REGULATION
REINF. REINFORCED
REG. REGULATION
REQ'D REQUIRED
RE REFER TO
RFG. ROOFING
RH RIGHT-HAND
R RISER
RM ROOM
R.O. ROUGH OPENING
RAD. RADIUS
R/AG RETURN AIR GRILLE
R/A RETURN AIR
SCHED. SCHEDULE
S.C. SOLID CORE
SECT. SECTION
SF SQUARE FOOT/FEET
SHLV. SHELVES/SHELVING
SHTHG. SHEATHING
SIM. SIMILAR
SPEC. SPECIFICATION
SPKR. SPEAKER
SQ. SQUARE
S.S. STAINLESS STEEL
STOR. STORAGE
STRUCT. STRUCTURE/STRUCTURAL
SW SWITCH
STD. STANDARD
STL. STEEL
SYM. SYMMETRICAL
SYS. SYSTEM
S/AD SUPPLY AIR DIFFUSER
S/A SUPPLY AIR
TEMP. TEMPERED/TEMPORARY/TEMPERATURE
THK. THICK(NESS)
THRES. THRESHOLD
T.O.C. TOP OF CURB/CONCRETE
TOL. TOLERANCE
T.O.S. TOP OF STEEL
T.O.S.S. TOP OF STRUCTURAL STEEL
T.O.W. TOP OF WALL
T.P.D. TOILET PAPER DISPENSER
T TREAD
T&G TONGUE & GROOVE
T.S. TUBE STEEL
TYP. TYPICAL
UL UNDERWRITERS LABORATORY
U.N.O. UNLESS NOTED OTHERWISE
UR. URINAL
VAC. VACUUM
V.C.T. VINYL COMPOSITION TILE
VERT. VERTICAL
VEST. VESTIBULE
WC WATER CLOSET
WDW. WINDOW
WD WOOD
WH WALL HUNG
WF WIDE FLANGE
W.I. WROUGHT IRON
WP. WATERPROOF(ING)
WR. WATER RESISTANT
WT. WEIGHT
W.P. WORK POINT
W/ WITH
W/I WITHIN
W/O WITHOUT
XFMR TRANSFORMER
SS SANITARY SEWER
VIF VERIFY IN FIELD
W/OS WITH OCCUPANCY SENSOR
CONCRETE SLAB
CEILING AS
SCHEDULED
ROOF DECK
16 GA CONTINUOUS TRACK
WITH ANCHOR BOLTS
EVERY 32" O.C. MAX
SEALANT AT ALL VOIDS
BELOW TRACK
8" TYPE X MOISTURE RESISTANT
GYPSUM BOARD
8"
TOP TRACK
5 58" METAL STUD BEYOND
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-0.2
Symbols and Abbreviations
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
SYMBOLS
J:
\3
P re si di o La
B ah ia \A rc hi te ct ur e\
H
SD
-2
4-
M us eu m R es tro om R en ov at io ns \C
AD
\2
7_
PL
B_ Ba th ro om _R em od el
MATERIALS LEGENDWALL TYPESABBREVIATIONS
TYPE "A6" PARTITION (6" MTL. STUDS @16" O.C.)
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-0.3
Outline Specs
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od el
DEMOLITION
1. It is the intend of the demolition to remove all existing construction which conflicts with the intent of new construction. Every demolition detail may not be necessarily covered in these documents prior to bid. The contractor shall review the existing conditions and shall include all demolition work required to accommodate new work, even if not specifically called for.
2. When existing walls are damaged by the contractor to access to service, and new construction is not scheduled or shown on the drawings, the contractor shall be responsible for repairing materials and finishes to match original conditions.
3. Restore exposed finishes of patched areas and extend restoration into adjoining construction in a matter that eliminates evidence of patching and refinishing.
4. Do not cut and patch elements in a manner that could change their load-carrying capacity, load-deflection ration, and/or result in increased maintenance or decreased operational life or safety.
5. Materials suspected of containing hazardous materials are not expected to be encountered on premises. However, if encountered, do not disturb. Suspend the work immediately and notify the architect.
CONCRETE
1. Any required slab demolition must be approved in advance by the architect.
2. All excavated areas affected by the slab breakout are to be backfilled with sand, compacted to 95% standard proctor density by hand tampering or with a mechanical tampering machine. New reinforcing shall be installed or rebar overlapped and tied to the existing reinforcing in the slab. The breakout area shall be repoured over a 6mil. vapor barrier with concrete 5” thick or to match the depth of the existing slab if greater. If rebar at existing slab has been cut off, existing concrete on both sides of the trench must be drilled, doweled, and tied to new rebar in trench to match the pattern of existing layout.
3. If not specified otherwise, provide reinforced rebar with 5” thick, 5 sack, and 3000 PSI hardrock concrete.
4. In araes where slab was partially removed, provide gravel layer and vapor barrier on top of the soil before installing new slab.
WOOD DOORS & TRIM
1. Submit shop drawings, technical data, and material samples to architect.
2. Wood doors shall comply with NFPA 80 and shall be listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction for the ratings indicated.
3. Provide warranty on manufacturer's standard form, signed by manufacturer, installer, and contractor in which manufacturer agrees to repair or replace doors that are defective in material or worksmanship. Warranty shall be in effect from date of substantial completion for life of installation.
4. Door cores to be particle board complying with ANSI A208.1, grade LD-2. Provide manufacturer's standard mineral-core construction as needed to achieve fire rating indicated. Provide blocking in doors as required to eliminate through-bolting hardware.
5. Appropriate wood species include pine, spruce, and cedar.
6. Door facing shall be wood veneer as follows:
a. Grade, AWI premium, with grade faces
b. Species, cut and grain matching visually the existing historic doors
c. Finish, premium grade, matte to imitate natural look
5. Provide manufacturer's standard wood beads if needed.
6. Install doors to comply with manufacturer's written instructions, AWI quality standards, and as indicated.
7. If trim is required, provide nattor trim pieces stained to match the wood doors.
ACOUSTICAL INSULATION
1. Submit technical data to architect before purchasing.
2. Install all building insulation in accordance with the current edition of “Fiberglass Building Insulation Application Instructions”, PUB. 3-BL-4992 of Owens/Coming Fiberglass Corp.
3. In partitions and ceilings showing acoustical insulation, fit insulation snugly between studs and fill all spaces in partitions. Butt material together firmly at joints, stuff spaces full behind boxes and between pipes and conduits.
4. Acoustical insulation shall be fiberglass “noise batts”, U.S. Gypsum “thermafiber” sound attenuation blankets, the width matching stud width as close at possible, or approved equal.
INTERIOR ARCHITECTURAL WOODWORK - VANITY COUNTER
1. Submit shop drawings showing locations of each item, dimensioned plans and elevations, large-scale details, attachment devices, and other components.
2. Provide material samples to architect before pourchasing.
3. Use Olympus ADA Residential Floating Vanity Bracket (FB-07441) for structural support of the vanity counter. Cut and weld the bracket to adjust the height to comply with TAS requirements for sink access.
4. Counter substrate shall be water resistant plywood.
5. Anchor paneling to support substrate with concealed panel-hanger clips. Do not use face fastening.
6. Use solid surface for horizontal counter surface and vertical surfaces. Basis of design for counter solid surface material:
a. Provence Nuwood by Corian - Solid Surface Nuwood Collection, ½” thick
GYPSUM BOARD ASSEMBLIES
1. Submit technical data to architect prior to purchasing.
2. Install metal studs, framing and gypsum board in accordance with ASTM C340, GA-201, GA-214, GA-216 and GA-600.
3. Typical wall studs to be ASTM C-645; 25 gauge, 5 5/8” spaced at 16” O.C. maximum. Contractor shall verify size and gauge of studs based on the stud manufacturer's limiting height tables for the application. Studs shall be installed in full lengths unless height exceeds manufacturer's maximum length in which case contractor shall submit stud splice details by stud manufacturer.
4. Runner shall match stud sizes and shall be a type recommended by a stud manufacturer for floor and ceiling support of studs for vertical abutment of drywall at other work.
5. Contractor to provide stud system accessories, standard clips, shoes, ties, reinforcement, fasteners, and other accessories as needed for a complete stud system.
6. Furring members to be ASTM C-645 USS RCI resilient channel
7. Penetrations in sound insulated partitions above finished ceiling shall be effectively sealed to prevent sound leakage. all butt joints, gyp board penetrations from piping, conduit, etc. will be caulked and sealed to deck to prevent any passage of sound or odors from one room to another.
8. Gypsum board fasteners to be USG, Type S, 1" for single layer.
9. Provide manufacturer's standard metal trim accessories, of the beaded type with face flanges for concealment of joint compound. All partition returns shall have metal corner beads floor to ceiling.
10. Gypsum board fasteners to be USG, Type S, 1” for single layer. Space fasteners at 8” O.C. on perimeter and 12” O.C. in field of panel.
11. All gypsum board is to be 5/8” thickness, Type X fire rated unless otherwise noted. Sheet size should be maximum length available which will minimize joints.
12. For joint treatment material, perforated joint tape to be used. Joint compound to be ready-mixed, vinyl-based for interior use. Provide two grades, one specifically for bedding tape and filling depressions, and one for taping and sanding. Use USG Durabond Joint Compound or approved equal.
13. Install ASTM C-630, 5/8” Type X moisture resistant gypsum board at all locations that are subject to moisture exposure.
14. All partitions with acoustical insulation to be min. 48 STC. No back-to-back wall boxes.
15. USG thermafiber sound attenuation blankets shall be used in all partitions separating restrooms from other finished spaces.
16. Provide recommended wall backing (support) for wall mounted fixtures (grab bars, toilet accessories, etc.). Any wood blocking used to be fire-retardant treated.
17. Apply treatment at gypsum board joints (both directions), flanges trim accessories. Penetrations, fastener heads, surface defects, and elsewhere as required to prepare work for decoration. Pre-fill open joints and round to beveled edges, using type of compound recommended by manufacturer.
18. Apply joint tape at joints between gypsum boards, except where a rim accessory is indicated. Apply joint compound in three (3) coats, sand between first two coats and after last.
19. Embed tape and apply separate first, fill and finish coats of joint compound to tape, fasteners, and trim flanges at panel surfaces that will be exposed to view, unless otherwise indicated.
idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-0.4
Outline Specs
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od el
WOOD CEILING
Submit materials samples with stain color options to match existing wood doors on site to Architect prior to purchasing. Submit shop drawings of ceiling layout to Architect before installation.
For viga beams with herring bone pattern latillas wood ceiling:
1. Use the following standards and references: ASTM E 84: Standard Test Method for Surface Burning Characteristics of Building Materials; 1991. AWI (QSI): Architectural Woodwork Quality Standards Illustrated; 2003. Ceilings and Interior & Specialty Construction Assoc.
(CISCA): Ceiling Systems Handbook. Ceilings and Interior & Specialty Construction Assoc.
(CISCA): Wood Ceiling Guidelines.
2. Installer Qualifications: Engage an experienced Installer, approved by wood ceiling manufacturer, who has completed panel ceilings similar in species, design, and extent to that indicated for this Project and with a record of successful in-service performance.
3. Single-Source Responsibility for Wood Ceiling System: Obtain each type of Linear Wood Ceiling Panels from a single fabricator, with in-house Shop Drawing capabilities, in-house assembly and finishing capabilities, and with resources to provide products of consistent quality in appearance and physical properties without delaying the project.
4. Provide owner with a (1) year warranty for material and workmanship on all installed products.
A. Manufacturers: All materials, wood ceiling and grid, shall be warranted for (1) one year for material and workmanship.
B. Installer:All work shall be warranted for (1) year from final acceptance of completed work.
5. For viga beams, use 4x6 suspended wood beams stained to match the tone of vanity counter, matte coating. Submit samples to architect prior to installation.
6. For herring bone pattern wood, lay out and fasten latillas, natural round log posts of varying 1” to 2” diameter. On the face side of the ceiling, use lime-based plaster to caulk the gaps between the logs.
PLASTERING
Submit technical data and materials samples with color options to Architect prior to purchasing.
1. Basis of design for plastering: Color Atelier - Tadelakt Shower Plaster (Stone White)
2. Substrate preparation for non-wet areas: The drywall should be finished t minimum level 3.
Prime with Color Atelier Bonding Primer. Apply Tadelakt once the primer is fully dry. Sealer and/ or Wax are optional depending on the area. SUBSTRATE Preparation for wet areas:
Over the studs, follow these recommended method:
a. Type X moisture resistant gypsum board
b. Waterproof membrane
c. Metal lathe with J-mold casting. Use Schluter-JOLLY 12.5mm edge protection profile, aluminum, rustic brown
d. Scratch brown coat
e. Color Atelier Base
f. Color Atelier Tadelakt
g. Color Atelier Wax-Sealer
3. Follow manufacturer's instructions for use, mixing, tinting, polishing, wax-sealing and clean up of the product.
4. Do not apply product when the ambient and surface temperature is below 45°F (7°C) or above 90°F (32°C). The ambient and surface temperature must stay consistently within this range until fully dry. Do not apply Tadelakt if there are contaminates on the receiving surface.
Contaminates may include, but are not limited to dust, debris, efflorescence and/or oils.
TERRACOTTA TILE
Submit material samples with sealant applied and grout color options to Architect prior to purchasing for floor tile. Ensure proper direction of tile pattern and the starting point of the tile pattern to Architect before installation.
Submit materials samples with wall tile design options to Architect prior to purchasing as well as technical data and grout color options. Submit samples of tile sealant to Architect before purchasing.
1. Basis of design for floor tile: Saltillo 4X8 Rectangular natural terracotta tile by ICT Tile Mexico SA de CV
a. Make sure the surface, on which you plan to set the tile is structurally sound, clean, dry and free of grease, oil, sealers or other contaminants. Use a premium Laticrete latex-modified thin-set to bond the tile or floor thin-set mortar mixed with acrylic mortar admix, use "terra cotta" color for grout joint treatment. Follow package directions for the proper mixing on thin-set mortars and grouts. Provide maximum of 12" grout joint. Allow for size/shape variations.
b. Apply a premium brand water-based top coat over the entire tile installation. Be sure the installation is thoroughly cured and dry before application.
2. Basis of design for wall wainscot tile: Talavera 4X4 assorted variety of varrying designs by ICT Tile Mexico SA de CV
a. Make sure the surface, on which you plan to set the tile is structurally sound, clean, dry and free of grease, oil, sealers or other contaminants. Use a premium Laticrete latex-modified thin-set to bond the tile or thin-set mortar mixed with acrylic mortar admix, use "terra cotta" color for grout joint treatment. Follow package directions for the proper mixing on thin-set mortars and grouts. Provide 3
16" grout joint. Allow for size/shape variations.
b. Apply a premium brand water-based top coat over the entire tile installation. Be sure the installation is thoroughly cured and dry before application.
WOOD STAIN
Submit material samples to Architect prior to purchasing. Submit technical data and color options for grout to Architect before purchasing.
a. Basis of design for wall wainscot tile: Sherwin Williams Minwax Water-Based Wood Stain
b. Provide low VOC tinted wood stain, color to match existing interior historic doors on site
ROOF PENETRATIONS AND PROCEDURES
1. Contact architect before making any roof penetrations so that appropriate inspections can be scheduled.
2. All roof penetrations, repairs, etc., are to be done by the roofing contractor. All penetrations and equipment supports, pipe supports, etc., shall be constructed in accordance with building standards and in accordance with the following recommendations. Where penetration in the roof requires metal flashing, all seams shall be fully soldered.
3. Contractors, subcontractors, and trades not strictly adhering to building standards and procedures or coordinating properly will be subject to penalties and recovery of damages by the building owner.
4. Air conditioning and plumbing contractors and all other subcontractors and trades involved in work affecting the existing roof must strictly adhere to all coordination procedures for utilizing metal air conditioning flashing roof protection requirements, miscellaneous leak prevention steps, roofing warranty protection, and equipment flashing requirements for the type of the roof used.
idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-0.5
Existing Photos
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od el
LOBBY FACING WEST MEN'S RESTROOM FACING SOUTH MEN'S RESTROOM FACING WEST JANITOR'S CLOSET WOMEN'S RESTROOM FACING WEST
RESTROOMS LOCATIONS
LEGEND
A-2.0
OPEN AREA
BARRACKS
CHAPEL
VI
SI
TO
R
CE
NT
ER
GUEST
QUARTERS
ZARAGOZA
HOUSE
STAGING AREA,
TO BE VERIFIED;
DO NOT BLOCK
THE DRIVEWAY;
DO NOT DISTURB
SOIL ON SITE
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-1.0
Site Plan
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSIONreal places telling real stories
SITE PLAN
SCALE: 1/64" = 1'-0"
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od el
LOBBY
WOMEN
MEN
DEMO EXISTING WOOD FRAME PARTITIONS
DEMO ALL EXISTING TOILET PARTITIONS
DEMO ALL EXISTING WATER CLOSETS AND
PLUMBING COMPLETELY @SLAB
DEMO EXISTING SINK
DEMO EXISTING SINK AND PLUMBING
COMPLETELY @SLAB
DEMO EXISTING WATER CLOSET AND
PLUMBING COMPLETELY @SLAB
DEMO EXISTING URINALS AND PLUMBING
COMPLETELY @SLAB
DEMO EXISTING TOILET PARTITION
DEMO EXISTING DOOR AND FRAME
DEMO EXISTING DOOR AND FRAME
DEMO EXISTING DRINKING FOUNTAIN
AND PLUMBING COMPLETELY @SLAB
DEMO EXISTING FLOOR DOWN TO CONCRETE
DEMO EXISTING FLOOR DOWN TO CONCRETE
DEMO EXISTING JANITOR'S SINK. CAP
PLUMBING @ WALL
DEMO EXISTING ELECTRICAL PANEL
PREP FOR NEW 100A PANEL; COORDINATE
WITH SITE STAFF PRIOR TO SHUT OFF
JC
EXISTING FLOOR TO
REMAIN
EXISTING STONE WALLS TO REMAIN.
PROTECT WITH RAM BOARD OR SIMILAR
THROUGHOUT CONSTRUCTION
EXISTING STONE WALLS TO REMAIN.
PROTECT WITH RAM BOARD OR SIMILAR
THROUGHOUT CONSTRUCTION
EXISTING STONE WALLS TO REMAIN.
PROTECT WITH RAM BOARD OR SIMILAR
THROUGHOUT CONSTRUCTION
PROTECT EXISTING DOOR AND DOOR FRAME
FROM DAMAGE DURING CONSTRUCTION
3'-6"
CAREFULLY REMOVE DOOR/DOOR FRAME AND RETURN TO SITE FOR STORAGE.
INSTALL PLYWOOD TO THE OPENING FOR THE DURATION OF CONSTRUCTION
THE EXISTING STONE WALLS ARE HISTORIC
AND MUST BE PROTECTED THROUGHOUT THE
CONSTRUCTION PHASE
NOTE:
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-1.1
Demo Plan - Above Slab
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
DEMO PLAN
SCALE: 3/8" = 1'-0"
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od
WOMEN
MEN
JC
EXISTING FLOOR TO
REMAIN
CAREFULLY REMOVE DOOR/DOOR FRAME AND RETURN TO SITE FOR STORAGE.
INSTALL PLYWOOD TO THE OPENING FOR THE DURATION OF CONSTRUCTION
EXISTING STONE WALLS TO REMAIN.
PROTECT WITH RAM BOARD OR SIMILAR
THROUGHOUT CONSTRUCTION
EXISTING STONE WALLS TO REMAIN.
PROTECT WITH RAM BOARD OR SIMILAR
THROUGHOUT CONSTRUCTION
PARTIAL DEMO OF EXISTING CONCRETE
SLAB; REMOVE EXISTING WASTE LINES
UP TO WALL CONNECTION AND INSTALL
TEMPORARY CAPS @ WALL TO PREVENT
DEBRIS FROM ENTERING PIPES &
PREVENT SEWER GAS FROM ENTERING
BUILDING; FIELD VERIFY
SEWER LINE TO THE SEPTIC TANK
SEW
ER
LIN
E TO
TH
E R
ESID
EN
T Q U
A R
TER
S
INFORM ARCHITECT OF THE FINDINGS
REGARDING THE CONDITION OF EXISTING
SEWER LINES AND PLUMBING; DO NOT
PROCEED WITH FURTHER WORK PRIOR TO
ARCHITECT'S AUTHORIZATION
3'-6"
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-1.2
Demo Plan - At Slab
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
SLAB DEMO PLAN
SCALE: 3/8" = 1'-0"
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od
WOMEN
MEN
EXISTING
SKYLIGHT
TO REMAIN
EXISTING
SKYLIGHT
TO REMAIN
DEMO EXISTING CEILING
COMPLETE TO ROOF FRAMING
DEMO EXISTING CEILING
COMPLETE TO ROOF FRAMING
JC
EXPOSED CEILING TO
REMAIN
PROTECT EXISTING SKYLIGHTS
THROUGHOUT CONSTRUCTION
CAREFULLY REMOVE DOOR/DOOR FRAME AND RETURN TO SITE FOR STORAGE.
INSTALL PLYWOOD TO THE OPENING FOR THE DURATION OF CONSTRUCTION
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-1.3
Demo Reflected Ceiling Plan
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
DEMO REFLECTED CEILING PLAN
SCALE: 3/8" = 1'-0"
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od
RR1
RR2
SANITARY PRODUCT DISPOSAL
TOILET TISSUE DISPENSER
T1 T2
GRAB BAR; ADD BLOCKING AS REQUIREDT6
PAPER TOWEL DISPENSER AND WASTE RECEPTACLET3
WALL MIRRORT4
COAT HOOKT5
COMMERCIAL WATER CLOSETS, RIGHT FLUSH, TIE INTO EXISTING DRAIN LINET8R
COMMERCIAL SINKST9
COMMERCIAL FAUCETST10
COMMERCIAL SOAP DISPENSERST11
ADA PROTECTIVE UNDERSINK PIPE COVERST7
KEYNOTE LEGEND
INTERIOR LIGHTING FIXTURE, WALL SCONCEL2
LOBBY
A-5.0
A-5.0
A-5.0
A-5.0
SIM
A-5.1
A-5.1
NEW FLOOR DRAINS, TIE INTO EXISTING DRAIN LINET12
A-6.3
A-6.3
JC
N1 ACOUSTICAL INSULATION INSIDE NEW PARTITIONS
N2 REPAIR EXISTING WINDOW SHUTTERS WITH LIKE MATERIALS
VERIFY ALL COMPONENTS WITH ARCHITECT PRIOR TO INSTALLATION
N3 INSTALL NEW 100A ELECTRICAL PANEL
A-5.1
A-6.3
SS1 SOLID SURFACE VANITY COUNTER TOP
DOOR STOP, FLOOR MOUNTEDT13
DOOR STOP, MAGNETIC, FLOOR MOUNTEDT14
COMMERCIAL WATER CLOSETS, LEFT FLUSH, TIE INTO EXISTING DRAIN LINET8L
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-2.0
Construction Plan
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
ENLARGED PLAN
SCALE: 3/8" = 1'-0"
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od
RR1
RR2
LOBBY
SLOPE THE FLOOR TOWARDS THE FLOOR
DRAIN IN THE CENTER OF RESTROOM
SLOPE THE FLOOR TOWARDS THE FLOOR
DRAIN IN THE CENTER OF RESTROOM
TERRACOTTA TILETL1
FINISH LEGEND
TERRACOTTA TILETL2
PLASTERPL1
PROTECT EXISTING STONE WALLS WITH RAM
BOARD OR SIMILAR THROUGHOUT
CONSTRUCTION
JC
NOTE:
N2 REPAIR EXISTING WINDOW SHUTTERS WITH LIKE MATERIALS
VERIFY ALL COMPONENTS WITH ARCHITECT PRIOR TO INSTALLATION
EXISTING FLOOR TO
REMAIN
NEW
EXISTING
NEWEXISTING
NE
W
EX
IS
TIN
G
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-2.1
Finish Plan
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
ENLARGED FINISH PLAN
SCALE: 3/8" = 1'-0"
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od el
EXISTING FLOOR TILE
COURTYARD
NOT IN SCOPE
7'-43 8"
JC
VIF
KEYNOTE LEGEND
N1 ACOUSTICAL INSULATION INSIDE NEW PARTITIONS
N2 REPAIR EXISTING WINDOW SHUTTERS WITH LIKE MATERIALS
VERIFY ALL COMPONENTS WITH ARCHITECT PRIOR TO INSTALLATION
N3 INSTALL NEW 100A ELECTRICAL PANEL AND BREAKERS
ALL DIMENSIONS SHOWN TO FRAME AND TO
EXISTING SURFACE UNLESS OTHERWISE NOTED
NOTE:
1'- 4"
1'- 4"
1'-5"
8"4'-13
4"
VIF
4 1 2" 4 1 2"
7'-
5" VI
F
55 8" 6'-3 12"
VIF
N5 EXISTING CONNECTION TO SEPTIC LINE
N6 EXISTING CONNECTION TO WATER SUPPLY LINE
36" CLEAR MIN
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-2.2
Dimensioned Plan
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
ENLARGED DIMENSIONED PLAN
SCALE: 3/8" = 1'-0"
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od
8" 8"
7'-43 8"
2'-
5 8" 2'-
5 8"
EQ
EQ
EQ
EQ
EQ EQ
EQ EQ
JC
KEYNOTE LEGEND
N1 ACOUSTICAL INSULATION INSIDE NEW PARTITIONS
N2 REPAIR EXISTING WINDOW SHUTTERS WITH LIKE MATERIALS
VERIFY ALL COMPONENTS WITH ARCHITECT PRIOR TO INSTALLATION
N3 INSTALL NEW 100A ELECTRICAL PANEL
ALL DIMENSIONS SHOWN TO FRAME AND TO
EXISTING SURFACE UNLESS OTHERWISE NOTED
NOTE:
VIF
36" CLEAR MIN
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-2.3
Dimensioned Plan
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
ENLARGED DIMENSIONED PLAN
SCALE: 3/8" = 1'-0"
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od
EQ
EQ
EQ
EQ
EQ EQ
EXISTING
SKYLIGHT
TO REMAIN
EXISTING
SKYLIGHT
TO REMAIN
KEYNOTE LEGEND
BATHROOM EXHAUST FANV1
INTERIOR LIGHTING FIXTURE, CENTER BETWEEN WOODEN SLATS, TYP.L1
VIGA BEAMSW1
FINISH LEGEND
LATILLAS - NATURAL ROUND WOOD POLES; HERRINGBONE PATTERNW2
RR1
RR2
LOBBY 1'-6"
EQ EQ
EQ
EQ
EQ
EQ
JC
EXPOSED CEILING TO
REMAIN
ROOF PENETRATION ABOVE FOR BATHROOM VENTSN4
8" 1'-
0"
EQ
EQ
EQ
EQ
1'-31
2" EQ
EQ
EQ
EQ
VIF
EXISTING
STONE TO
REMAIN
EXISTING
STONE TO
REMAIN
VIGA BEAMS SPACING TO DEPEND ON THE
EXISTING SKYLIGHT DIMENSIONS VERIFIED IN
FIELD (SEE 2/A-6.2)
NOTE:
CEILING-MOUNTED OCCUPANCY/VACANCY SENSORS1
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-3.0
Reflected Ceiling Plan
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
REFLECTED CEILING PLAN
SCALE: 3/8" = 1'-0"
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od el
EXISTING CEILING AT GOLIAD STATE PARK AND HISTORIC SITE FOR REFERENCE
3'- 6"
3'- 6"
GFCI
GFCI
KEYNOTE LEGEND
INTERIOR LIGHTING FIXTUREL1
BATHROOM EXHAUST FANV1
EQ EQ
OS
V V
JC
1. ALL OUTLETS TO BE INSTALLED 18" AFF
UNLESS OTHERWISE NOTED
2. ALL LIGHT SWITCHES TO BE INSTALLED TO
HAVE OPERABLE PARTS LOCATED BELOW
48" AFF MAX
3. ALL DIMENSIONS SHOWN TO FACE OF
WALL
NOTES:
GFCI
GFCI
N3 INSTALL NEW 100A ELECTRICAL PANEL
INTERIOR LIGHTING FIXTURE, WALL SCONCEL4
GFCI
GFCI
CEILING-MOUNTED OCCUPANCY/VACANCY SENSORS1
OS
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-4.0
Electrical Plan
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
ELECTRICAL PLAN
SCALE: 3/8" = 1'-0"
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od
SANITARY PRODUCT DISPOSAL
TOILET TISSUE DISPENSER
T1 T2
GRAB BAR; ADD BLOCKING AS REQUIREDT6
PAPER TOWEL DISPENSER AND WASTE RECEPTACLET3
WALL MIRRORT4
COAT HOOKT5
COMMERCIAL WATER CLOSET, LEFT FLUSHT8L
COMMERCIAL SINKST9
COMMERCIAL FAUCETST10
COMMERCIAL SOAP DISPENSERST11
BATHROOM EXHAUST FANT12
ADA PROTECTIVE UNDERSINK PIPE COVERST7
KEYNOTE LEGEND
INTERIOR LIGHTING FIXTUREL2
OUTLETE1
LIGHT SWITCHE2
ALL DIMENSIONS SHOWN TO FRAME, FLOOR
FINISH, OR EXISTING SURFACE UNLESS
OTHERWISE NOTED
NOTE:
GFCI OUTLETE1G
COMMERCIAL WATER CLOSETS, RIGHT FLUSHT8R
TERRACOTTA TILE - BASE BIDTL1
FINISH LEGEND
TERRACOTTA TILETL2
PLASTERPL1
EXPOSED STONE, EXISTING TO REMAINEX1
2'- 9"
3'-9" A-6.3
A-6.3
SIM
" M
AX
17"
5'-0"
12"24"
3'-
2'- 9"
ART
(OWNER
PROVIDED)
A-6.3 2A-6.3
ALIGN
3'-
0"
4"
DESIGNATED
OUTLET FOR
SOAP DISPENSER1'-
6"
A-6.2 2, 4
A-6.2 1, 3
A-6.2 2, 4
SIM
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-5.0
Interior Elevations
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od el
RR2 EAST INTERIOR ELEVATION
SCALE: 1/2" = 1'-0"
SOUTH INTERIOR ELEVATIONS
SCALE: 1/2" = 1'-0"
EXISTING WINDOW - INTERIOR 3
PARTITION AND CEILING FRAMING SCHEME
SCALE: 1/2" = 1'-0"
SANITARY PRODUCT DISPOSAL
TOILET TISSUE DISPENSER
T1 T2
GRAB BAR; ADD BLOCKING AS REQUIREDT6
PAPER TOWEL DISPENSER AND WASTE RECEPTACLET3
WALL MIRRORT4
COAT HOOKT5
COMMERCIAL WATER CLOSET, LEFT FLUSHT8L
COMMERCIAL SINKST9
COMMERCIAL FAUCETST10
COMMERCIAL SOAP DISPENSERST11
BATHROOM EXHAUST FANT12
ADA PROTECTIVE UNDERSINK PIPE COVERST7
KEYNOTE LEGEND
INTERIOR LIGHTING FIXTUREL2
OUTLETE1
LIGHT SWITCHE2
ALL DIMENSIONS SHOWN TO FRAME, FLOOR
FINISH, OR EXISTING SURFACE UNLESS
NOTE:
GFCI OUTLETE1G
COMMERCIAL WATER CLOSETS, RIGHT FLUSHT8R
TERRACOTTA TILE - BASE BIDTL1
FINISH LEGEND
TERRACOTTA TILETL2
PLASTERPL1
EXPOSED STONE, EXISTING TO REMAINEX1
8'- 0"
" M
AX
3'- 0" 2'-
7" 3"
A-6.1
A-6.1
4"
3'- 0"
SIM
1'- 6"
8'- 0"
3'- 0"
4"
" M
AX
RESTROOM
9"
RESTROOM
9"
NOTE: PROVIDE TWO SINGLE-USE RESTROOM SIGNS ON BLACK BACKGROUND COMPLYING WITH TAS REQUIREMENTS
6'- 8"
1'- 6"
Pr es idi o L a B ah ia :: S tat e H ist or ic Si te
7 U S-
3, Go lia d, Te xa s 7
Pl um bi ng
Re pa irs
Ba th ro om
Re no va tio ns
ISSUE DATE DESCRIPTION
SHEET NO.
REVISIONS
DRAWN BY:
PROJECT REF #:
DATE:
KN
HSD-2024-040
A-5.1
Interior Elevations
Historic Sites Division P.O. Box #12276, Austin, TX 78711
PH: (512) 463-7948
TEXAS HISTORICAL COMMISSION
real places telling real stories
NORTH RESTROOMS INTERIOR ELEVATIONS
SCALE: 1/2" = 1'-0"
J:
\3
P re si di o
La B ah ia
\A rc hi te ct ur e\ H
SD
-2
4-
M us eu m
R es tro om
R en ov at io ns
\C
AD
\2
7_
PL
B_
Ba th ro om
_R em od el
EXISTING STUCCO
SOUTH LOBBY INTERIOR ELEVATION
SCALE: 1/2" = 1'-0"
OTHERWISE NOTED
WATERPROOFING MEMBRANE
WALL TILE AS SCHEDULED
GROUT
1. SUBMIT GROUT TECHNICAL DATA AND
COLOR SAMPLES TO ARCHITECT
PRIOR TO INSTALLATION
2. SUBMIT SEALANT TECHNICAL DATA
AND COLOR SAMPLES TO ARCHITECT
PRIOR TO INSTALLATION
THIN-SET MORTAR
NOTES:
SEALANT OVER TILE
AND GROUT JOINT
RECOMMENDED BY
MANUFACTURER
METAL LATHE
WATERPROOFING
MEMBRANE
THIN-SET MORTAR
TYPE X MOISTURE
RESISTANT GYPSUM
BOARD SUBSTRATE
RUNNER CHANNEL
ACOUSTICAL SEALANT
AS PART OF PARTITION
WATERPROOFING MEMBRANE
WALL TILE AS SCHEDULED
GROUT
SEALANT OVER TILE
AND GROUT JOINT
RECOMMENDED BY
MANUFACTURER
METAL LATHE
THIN-SET MORTAR
1. SUBMIT GROUT TECHNICAL DATA AND COLOR
SAMPLES TO ARCHITECT PRIOR TO INSTALLATION
2. SUBMIT SEALANT TECHNICAL DATA AND COLOR
SAMPLES TO ARCHITECT PRIOR TO INSTALLATION
3. SUBMIT PLASTER TECHNICAL DATA AND COLOR
SAMPLES TO ARCHITECT PRIOR TO INSTALLATION
4. SUBMIT J-MOLD CASING TECHNICAL DATA AND
COLOR SAMPLES TO ARCHITECT PRIOR TO
INSTALLATION
NOTES:
SCRATCH BROWN COAT AS
PART OF TELADAKT
PLASTER SYSTEM
COLOR ATELIER BASE,
TELADAKT,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .