ESBD_427033_1749489571560_RFP 26.04 - Specifications.pdf

PDF 127 KB Posted

Attached to
RFP 26. 04 - Walk-Cooler / Freezer Replacement at West Brook High School
Solicitation number
26.04
Issued by
Texas

About this file

The document is a specification sheet for a walk-in cooler and freezer replacement project for West Brook High School in the Beaumont Independent School District (BISD). The project involves procuring and installing a two-compartment L-shaped walk-in cooler and freezer manufactured by American Panel Corporation, with a refrigeration system by Refrigerated Design Technologies (RDT), and installation services by ProKitchen Installations. The replacement is scheduled during the district's Christmas Break from December 23, 2025, to January 3, 2026, with specific requirements for a comprehensive walk-in unit featuring detailed dimensional specifications, multiple accessories, and advanced temperature monitoring capabilities.

The specification details three primary items: the walk-in unit (Item #1), a remote refrigeration system (Item #2), and a turnkey installation service (Item #3). The walk-in unit includes specific features like magnetic infitting doors, intelligent controllers, LED lighting, and various specialized components. The refrigeration system includes separate evaporator coils for the cooler and freezer, with a rack system designed for outdoor installation using R-448a refrigerant. The installation scope covers complete removal of the existing unit, electrical modifications, installation per manufacturer specifications, functional testing, and operator training for BISD staff. The project includes warranty provisions, with a two-year warranty on parts and labor and a four-year warranty on compressors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications Page 1

West Brook HS Beaumont ISD Walk-in cooler / Freezer Replacement

Whenever product(s) and/or material(s) are referred by BISD in this solicitation by describing a proprietary product or by using the name of a manufacturer or brand name, the term “or equal” if not inserted shall be implied, as applicable.

Delivery & Installation:

Shall be coordinated with the Beaumont ISD Director of Child Nutrition, Mary Ellen Vivrett. Delivery and installation are expected to take place during the District closure of Christmas Break (December 23, 2025 – January 3, 2026). Any changes or updates to delivery and installation dates shall be approved by BISD Child Nutrition Director.

ITEM # 1

DESCRIPTION: WALK IN

QTY REQUIRED: 1

MANUFACTURER: AMERICAN PANEL CORPORATON (or equal)

MODEL # 212864

American Panel Two Compartment L-Shaped Walk-In, model #212864 . Overall exterior dimensions to be 63'-4" X 15'-6" X 8'-9" high. Freezer interior dimensions to be 12'-10" X 35'-0" X 8'-1.25" high with 4" Insulated Floor. Interior floor finish to be 1/8'' Diamond Aluminum Treadplate (Intg.). Cooler interior dimensions to be 14'-10" X 27'-4" X 8'-1.25" high with 4" Insulated Floor.Interior floor finish to be 1/8'' Diamond Aluminum Treadplate (Intg.). Interior wall finish to be .040 white stucco alum., interior ceiling to be .040 white stucco alum., exposed exterior to be 26 ga. stucco acrylume, unexposed exterior to be 26 ga. stucco acrylume.

(2) 36" X 77" flush mount magnetic infitting door with cam-rise hinges, padlockable deadbolt handle (exterior doors only), closer, brushed hardware, fully programmable Intelligent Controller (IC) featuring audio/visual temperature alarm with digital thermometer, high & low set points, energy saving door frame heater wire, vapor proof light & switch with pilot light.

Accessories to include:

(568) Vinyl Membrane Rain Roof, Flat (401-800 sq ft)

(568) One-Way Pitch (Sloped 1/4"/ft.) (401-800 sq ft)

(997) Upcharge for 5" roof panels replacing 4" roof panels

(10) Snowload C-Channel 14 Ga. Galv. Reinf. in Ceiling Panel (per panel, 11'-7.125" to 14'-0")

(518) 20 ga. Galv. St. repl. Ext. 26 ga. Acrylume. (Snowload Roof ext., >9'-8" & <11'-7")

(518) 20 ga. Galv. St. replacing Int. 26 ga. Acrylume (Fla. Outdr. roofs > 11'-7")

(102) Hurricane Code Floor (Stainless Steel) Angle (for walk-ins with floor) 3" x 1 1/2" int. walls, 6 3/4" x 1 1/2" ext. walls

(997) 3/4" Plywood Underlayment in Floor Panel (not available with 2" floors)

(1) Floor Ramp, Interior (24" deep) for up to 42" door

(2) Corner Notch (With Floor)

(2) Intelligent Controller Plus (IC/IC+) LC Package (Wi-Fi, Dry Contacts, USB, Batt., 25' Probe, Panic Alarm)

(1) Secondary Probe (25') for 2 Compart. Alarm Monitoring (run probe in field), avail on IC+

(12) LED Light Fixture, Cooler & Freezer, 48" 2-lamp (-40°F or higher operating temp.)

(2) Foot Treadle (Dent D-82)

(1) Dial Thermometer, 4.5" St. Steel with 15' sensor

(1) Dial Thermometer, 4.5" St. Steel with 30' sensor

(2) Flex. Strip Curtain, up to 36" x 77" Opening

(4) Door Kickplate, 1/10" aluminum treadplate, 36" High, <37" Door

(2) Vision Window, 14" x 14" heated

(2) Extra Hinge

Specifications Page 2

Refrigeration System #1 (by RDT) to have a system capacity, sized for a walk-in heatload of 19,418 BTUH.

Refrigeration System #2 (by RDT) to have a system capacity, sized for a walk-in heatload of 20,008 BTUH.

American Panel insulated panel products are warranted for a period of ten (10) years after date of installation.

Component parts supplied by American Panel are warranted for a period of one (1) year after date of installation

ITEM # 2

DESCRIPTION: REFRIGERATION SYSTEM, REMOTE

QTY REQUIRED: 1

MANUFACTURER: RDT (REFRIGERATED DESIGN TECHNOLOGIES) (or equal)

MODEL # ECO COOL

WALK-IN COOLER EVAPORATOR COIL

Model No. BEL0095 Quantity: 2 Electrical: 115v/1ph Evaporator coils shall be a direct expansion type. Evaporators used will be all "Underwriters Laboratory Listed" supplied from factory with an electronic expansion valve, solenoid valve and Eco-Smart on-demand defrost controller, pre-wired and pre-piped under nitrogen pressure and designed for use with the refrigerant specified.

WALK-IN FREEZER EVAPORATOR COIL

Model No. BEL0130 Quantity: 2 Electrical: 208v/1ph Evaporator coils shall be a direct expansion type. Evaporators used will be all "Underwriters Laboratory Listed" supplied from factory with an electronic expansion valve, solenoid valve and Eco-Smart on-demand defrost controller, pre-wired and pre-piped under nitrogen pressure and designed for use with the refrigerant specified.

REFRIGERATION RACK SYSTEM

Model No. ZS1-02Z-CT3-AST as manufacturer by Refrigeration Design Technologies (RDT) Quantity: 1 Electrical: 208-230v/3ph The RDT UL-Listed horizontal discharge, air-cooled rack system designed for outdoor installation. The unit shall be pre-wired for a single point electrical connection with a main non-fused disconnect. The refrigeration unit shall be housed in a weather-protected compact structural galvanized steel frame. The unit shall include individual dedicated air-cooled condensers. Condensers shall have aluminum fin/copper tube with designed to operate at 15 degrees TD.

The exterior housing shall feature stainless steel with one-piece stainless-steel louvers. The entire galvanized metal frame shall be pre-assembled, welded and cleaned. Lifting points shall be integrated in the feet at each corner to facilitate installation. Condenser fan motors shall be mounted within the enclosure.

All compressor units shall be scroll type and factory assembled to operate with R-448a refrigerant.

• Walk-In Cooler system (A) to have a 2.5 HP scroll compressor.

• Walk-In Freezer system (B) to have a 9.0 HP scroll compressor.

Compressors and refrigeration piping will be installed in such a manner as to eliminate noise with vibration eliminators in refrigeration lines, as needed.

Each compressor unit shall be equipped with a ball-bearing fan motor, fixed head pressure control, suction filter, liquid line sight glass, liquid line drier, crankcase heaters, heated and insulated receivers, headmaster controls and fan cycling, liquid line inlet and outlet valves, defrost cycle and armored super hose connections (in lieu of capillary tubes).

Specifications Page 3

All refrigerant lines shall be extended to one side of the package in a neat and orderly manner. All tubing shall be securely supported and anchored with non-corrosive coated clamps. All joints must be brazed, not soldered. All piping and controls shall be factory pressure-tested with nitrogen at 175 PSI.

All field piping installed as per factory standards and the sizing of the piping shall meet proper velocities as per factory standards. Insulation will be foam type 25/50 smoke and fire type. Medium temperature will use 3/4" thick wall, low temperature will use 1" thick wall and sub-cooled liquid lines will use 1/2'' thick wall insulation. All insulation shall be jacketed with Aluminum (complying with division 15000,) 1-1/2” overlap and secured with wire “zip” ties. All jacket elbows to be roll formed. All field piping installed with plastic bushing wherever steel to copper tubing comes together. Include all labor, material, equipment, tools, refrigerant, oil, and other required accessories for the complete installation of the systems as shown and specified. Interconnection of all accessories accomplished for ease of servicing.

After installation and before charging, evacuate all piping systems to a 500-micron evacuation. After evacuation, charge system with nitrogen and maintain pressure of 150% working pressure for 6 hours. Cap off, install pressure gauge and hold for 24 hours minimum. Re-evacuate, hold for 6 hours, charge and make electronic detector test all joints.

Final wiring of connections, conduit and/or pull boxes, provided under applicable electrical and plumbing contracts.

See R-1 drawing for wiring schematic for field wiring.

WARRANTY AND SERVICE:

Included shall be a full two (2) year warranty for all parts and labor by factory on the entire refrigeration package and four (4) year warranty on the compressors, from the day of final acceptance of the installation as previously specified.

ITEM # 3

DESCRIPTION: TURN KEY INSTALLATION

QTY REQUIRED: 1

MANUFACTURER: PROKITCHEN INSTALLATIONS (or equal)

MODEL # INSTALLATION

Full Turn Installation Scope:

• Factory approved / authorized installation of walk-in in compliance with local municipal code and guidelines.

• All work to be performed during normal business hours.

• Disconnect existing utilities from the walk-in.

• Remove and dispose of existing walk-in off site.

• Electrical modifications to accommodate new walk-in.

• Receive, deliver and install new walk-in per manufacture specifications.

• Start up and functional test new walk-in and all equipment.

• Rep to perform operator training to Beaumont ISD staff

File details come from the government source that posted it. Updated .