ESBD_420080_1747266046272_2024-06418_Notice of Project-CS_25.5.14.pdf

PDF 150 KB Posted

Attached to
SSC 2024-06418 School of Rural Public Health Repair/Replace Hail Damaged Roof
Solicitation number
SSC_2024-06418
Issued by
Brazos County, Texas

About this file

This Notice of Project (NOP) is issued by SSC Services for Education on behalf of Texas A&M University for a roof repair and replacement project at the School of Public Health. The project involves scarifying 2.5" of existing foam roof and applying 2" of new foam with impact-resistant and silicone coating with granules for Buildings 1518, 1519, and 1520 in College Station, TX. The project is scheduled to run from July 1, 2025, to December 31, 2025, with CSP RFP submissions due on 6/24/2025 at 2:00 PM and HSP submissions due on 6/25/2025 at 2:00 PM. A pre-proposal meeting is set for 5/21/2025 at 9:30 AM in SSC Facilities Services, Conference Room S118.

The project requires a Historically Underutilized Business (HUB) Subcontracting Plan, with monthly HUB Progress Assessment Reports mandatory with each pay application. RFQ documents are available electronically through an eBuilder platform, and submissions should be mailed or hand-delivered to SSC Service Solutions in College Station. The project manager is Robert Beamon, and technical inquiries should be directed to Dennis Leifrig from ARMKO Industries. Contact for HUB-related questions is Shawna Kennedy from Texas A&M University, with a phone number of 979-845-3425.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SSC Services for Education Facilities Services Revised 02/2024

NOTICE OF PROJECT (NOP)

POSTED ON BEHALF OF SSC BY Texas A&M University (Part 02)

Attention: (02/23) Shawna Kennedy - Shawna.Kennedy@tamu.edu Date of Request: 5/14/2025

PROJECT INFORMATION

Project Number: 2024-06418 Project Name: Repair/Replace Hail Damaged Roof Project Location: College Station, TX School of Public Health A, B, & C, BLDS 1518, 1519, 1520 Project Start Date: 7/1/2025 Project Finish Date: 12/31/2025 Project Description: Scarify 2.5” of existing foam roof. Apply 2” of new foam with Impact resistant coating and silicone coating with granules.

DOCUMENT ACQUSITION INFORMATION

RFQ Documents (A/E) and information are available electronically at https://app.e-builder.net/public/publicLanding.aspx?QS=7b3be8f436684548ae1a3307119ed1b2

SUBMISSION INFORMATION

CSP RFP Submissions are due: Date: 6/24/2025 Time: 2:00 PM HSP Submissions are due: Date: 6/25/2025 Time: 2:00 PM Public Proposal Opening: SSC Facilities Services, Conf. Rm 204 Date: 6/25/2025 Time: 2:30 PM Public Proposal Virtual Meeting (web link): N/A

Mail or Hand-deliver to: SSC Service Solutions Facilities Services EDCS 1371 TAMU (Physical Address: 600 Agronomy Road, Suite 218) College Station, TX 77843

HISTORICALLY UNDERUTILIZED BUSINESS (HUB)

HUB Subcontracting Plan Required: Yes ☒ No ☐ If yes, monthly HUB Progress Assessment Reports (PARs) are required with each pay application.

Contact (02/23) Shawna Kennedy - shawna.kennedy@tamu.edu, 979-845-3425 with all HUB-related questions.

QUERY INFORMATION

Pre-proposal Meeting Location (if applicable): SSC Facilities Services, Conf Rm S118 Date: 5/21/2025 Time: 9:30 AM

Inquiries regarding the submission process/requirements should be directed to SSC Project Manager: Robert Beamon Email: Robert.beamon@sscserv.com Phone: 979-530-3014

If applicable, inquiries regarding the technical aspects of the Construction Documents shall be directed to:

A/E Contact: Dennis Leifrig A/E Firm: ARMKO Industries Email: dleifrig@armko.com Phone: 832-922-9232 https://app.e-builder.net/public/publicLanding.aspx?QS=7b3be8f436684548ae1a3307119ed1b2 https://app.e-builder.net/public/publicLanding.aspx?QS=7b3be8f436684548ae1a3307119ed1b2

File details come from the government source that posted it. Updated .