ESBD_416655_1746730499404_Attachment A - Respondent Bid Form and Checklist.pdf

PDF 235 KB Posted

Attached to
Infrared Electrical Systems Survey
Solicitation number
809-25-0021
Issued by
Travis County, Austin City, Texas

About this file

This document is a Respondent Bid Form and Checklist for Invitation for Bid (IFB) 809-25-0021 issued by the State Preservation Board (SPB) for an Infrared Electrical Systems Survey. The solicitation covers comprehensive infrared electrical systems survey services for multiple state properties in Texas, including the Capitol and Capitol Extension, Capitol Visitor Center, Visitors Parking Garage, Texas State Cemetery, Governor's Mansion, Sam Houston Building, John H. Reagan State Office Building, Robert E. Johnson Legislative Office Building, and Bullock Texas State History Museum.

The bid requires a lump sum pricing approach for all material and labor, with bidders required to submit a comprehensive package of documents including a completed bid form, HUB Subcontracting Plan, company profile, references, project schedule, proof of thermographer training, safety manual, equipment list, calibration statements, sample report, and insurance certificate. Bidders must be prepared to complete the entire project within a specified number of calendar days, and the form emphasizes that incomplete submissions may result in bid disqualification. The document also includes a checkbox for Historically Underutilized Business (HUB) certification with the State of Texas Comptroller's Office.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Respondent Bid Form and Checklist

IFB 809-25-0021

Infrared Electrical Systems Survey

This form must be complete, signed, and submitted with the respondent's bid. Failure to submit this completed form will result in disqualification of the bid.

Firm Name (Legal Name):

DBA Name, if applicable:

Contact Person’s Name and Title (Firm’s Legal Representative)

Address:

Phone Number:

Email Address:

Federal Employer Identification Number (FEIN):

Is your company a certified Historically Underutilized Business (HUB) with the State of Texas Comptroller’s Office? Yes___ No___

Bid Pricing

LUMP SUM BID PRICING FOR EACH SPB PROPERTY LISTED IN THE SCOPE TO FURNISH ALL

LABOR, MATERIALS, EQUIPMENT, SUPERVISION, AND EVERYTHING NECESSARY TO PROVIDE

THE SERVICES DESCRIBED IN THIS INVITATION FOR BID. PRICES ARE FIRM FOR THE DURATION

OF THE PERFORMANCE OF SERVICES. THE STATE PRESERVATION BOARD (SPB) IS SOLICITING

A BID FOR THE FOLLOWING LOCATIONS:

• Capitol and Capitol Extension

• Capitol Visitor Center

• Visitors Parking Garage

• Texas State Cemetery

• Governor’s Mansion

• Sam Houston Building State Office Building

• John H. Reagan State Office Building

• Robert E. Johnson Legislative Office Building

• Bullock Texas State History Museum

Having carefully examined the invitation for bids (IFB) for Infrared Electrical Systems Survey the undersigned proposes to provide the requested services for the sum of:

LUMP SUM BID – All Properties LUMP SUM PRICE/DAYS

All Material and Labor $

Calendar Days to Complete

Total Lump Sum Bid Written in Words:

I, the undersigned, am the above referenced company’s representative, and I am authorized to submit this response and sign future contract documents. By signing below I also acknowledge and accept all addenda to this RFP posted with the solicitation on Electronic State Business Daily

(ESBD).

Authorized Signature Date

Checklist: Required Bid Content

Each item listed below must be included with the bid submission. Bids that are missing an item or items may be disqualified.

1. Complete and signed Respondent Bid Form with Bid Pricing

2. Complete and signed HUB Subcontracting Plan (Attachment B)

3. Company Profile

4. References with Corresponding Projects

5. Proposed Project Schedule

6. Proof of Thermographer Training

7. Copy of respondent’s Safety Manual Table of Contents

8. List of Equipment and Calibration Statements

9. Sample Report

10. Copy of Certificate of Insurance

Calendar Days to Complete:
Date:
All Material and Labor:
Text1:
Text2:
Text3:
Text4:
Text5:
Text6:
Text7:
Check Box8: Off
Check Box9: Off

File details come from the government source that posted it. Updated .