The document is a Bid Pricing Form for the City of Waco's Riverwalk Re-Development Project (Project No: 1TIF 2202), located at 598 River St in Waco, TX 76706. The project involves comprehensive construction work including riverwalk development, water wall retaining walls, bridge structures, electrical installations, landscaping, irrigation, and various site improvements. The bid includes a base bid with multiple line items covering general conditions, construction elements, and project-specific requirements, along with nine specific alternates that provide optional additions or modifications to the base project scope.
The pricing form includes two primary allowances: $15,000 for Sandtown Historic Informational Displays and a $200,000 Owner's Allowance. The bid requires Minority Woman Owned Business (MWB) certification for each subcontractor and provides detailed pricing breakdown for various project components. All base bid items are currently listed at $0.00, indicating this is a draft or template document. The City reserves the right to select any combination of additive alternates in the best interests of the City of Waco, suggesting flexibility in the final project configuration and budget allocation.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| ESBD_411991_1744919448720_RFB 2025-033 Bid Package (with SmartFile link).pdf | ||
| ESBD_411991_1744919470231_RFB 2025-033 Zoom Information.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW RE-BID (DRAFT 7B)
598 River St Waco TX 76706
CITY OF WACO
BID PRICING FORM 2025-033
Riverwalk Re-Development Project COW Project No: 1TIF 2202 p.1 of 3
Item
No.
Description Unit Price
(A)
No. of
Units (B)
Total Price
(A x B) = C 1.0
GENERAL CONDITIONS (This item includes all work shown on the drawings or indicated in the specifications and not included in other items.)
Mobilization (NTE 10% of Total Contract) 1(Lump Sum) $0.00
Trench Safety Plan/Implementation (storm 730 LF,Water 465 LF,ELEC.N/A, WI-FI not provided.) 1(Lump Sum) $0.00
Pedestrian Safety Plan 1(Lump Sum) $0.00
Stormwater Pollution and Prevention Plan/Implementation 1(Lump Sum) $0.00
General Work Requirements 1(Lump Sum) $0.00
Performance, Payment,and Other Bonds 1(Lump Sum) $0.00
Contractor's Insurance: Worker's Compensation, Employer's Liability , Comprehensive General Liability,Business Automobile
Liability,Builder's Risk
1(Lump Sum) $0.00
SUB-TOTAL GENERAL CONDITIONS: 1(Lump Sum) $
2.0 Riverwalk -Construction as shown in the drawings including but not limited to all necessary labor and materials for demolition, site clearing, abandonment of existing items, tree protection, site grading, paving, base, lime, subgrade preparation, sidewalk, hardscaping, all walls not referenced in other scopes, footings, stairs, backfill, railing Types 1/2, utilities, drainage facilities, trench backfill, top soil placement, fencing, light pole bases, bollards, benches, trash receptacles, bike racks, erosion control, graffiti protection, and other miscellaneous features, furnished, installed, operating, complete, and accepted in place in accordance with all regulatory requirements. Conduit and vaults for future wi-fi are included as an additive alternate and are excluded from the base bid.
1(Lump Sum) $0.00
3.0 Water Wall Retaining Wall and Adjacent Wing Walls Concrete Retaining Walls Construction - Construction as shown in the drawings including but not limited to all necessary labor and materials for installation of 16" thick concrete wall with no batter stopping at approximate elev. 390'6". Adjacent concrete wing walls not meant to receive future waterfeature are at elevation 394'-8", and thickness varies re: 3-S441. (Provide slat fencing SIM.3-L208 and per 32 3119 at top of concrete waterwall base elevation 390'-6"- 395' to align with adjacent fencing included in Riverwalk Base Bid if Alternate 1A for
Waterwall trough is not accepted.)All Water Wall Concrete Retaining Wall Structural and Civil, elements and other miscellaneous features, furnished, installed, complete, and accepted in place in accordance with all regulatory requirements.
All infrastructure to create the water wall feature such as plumbing,electrical controls/control panels, electrical wire, pumps, and lighting are included as an additive alternate and are excluded from the base bid.
1(Lump Sum) $0.00
4.0 Electrical – Construction as shown in the drawings including but not limited to all necessary labor and materials for installation of lighting, light poles, handholes, conduit, electrical equipment pads, and other miscellaneous features, furnished, installed, operating, complete, and accepted in place in accordance with all regulatory requirements.Pad for electrical equipment, lighting, and all controls at the Water Wall is included as an add alternate and excluded from the base bid.
1(Lump Sum) $0.00
5.0 Landscaping– BASE BID ASSUMES HYDROSEED BERMUDA GRASS AT AREAS SHOWN WITH HATCH OR
PLANTING ON THE 3- L601B through 3-L607B planting sheets, and (4)"UA" trees at Sandtown Plaza shown on 3-L
603A.Construction as shown in the drawings including but not limited to all necessary labor and materials for installation of landscaping throughout the project and other miscellaneous features, furnished, installed, operating, complete, and accepted in place in accordance with all regulatory requirements. Planting of trees and ornamental plants/grasses is excluded from the base bid, and sddressed in Alternates.
1(Lump Sum) $0.00
6.0 Irrigation – BASE BID ASSUMES NO IRRIGATION . BASE BID REQUIRES THE CONTRACTOR TO PROVIDE
WATERING OF AREAS TO RECEIVE HYDROSEED BERMUDA GRASS(AREAS SHOWN WITH HATCH OR
PLANTING ON THE 3- L601B through 3-L607B planting sheets, and the (4) trees at Santown Plaza until established.)*Full or partial irrigation system is an Alternate and excluded from the base bid.
1(Lump Sum) $0.00
7.0 Bridge Structure Under I-35- Construction as shown in the drawings including but not limited to all necessary labor and materials for installation of piers, beams, decking, railing Type 1, and other miscellaneous features, furnished, installed, operating, complete, and accepted in place in accordance with all regulatory requirements.
1(Lump Sum) $0.00
8.0 Project Dewatering Requirements by Area:( BASE BID :INCLUDE ONLY WHERE REQUIRED)-Contractor to provide water control barriers and dewatering for all necessary to construct elements shown on the base bid drawings.
Area 1: 1(Lump Sum) $0.00
Area 2: 1(Lump Sum) $0.00
Area 3: 1(Lump Sum) $0.00
Area 4: 1(Lump Sum) $0.00
Area 5: 1(Lump Sum) $0.00
Area 6: 1(Lump Sum) $0.00
Area 7: 1(Lump Sum) $0.00
SUB-TOTAL BASE BID DEWATERING: $
SUB-TOTAL MAIN BID ITEMS 1.0 -8.0: $
ALLOWANCES
9.0 Sandtown Historic Informational Displays RE: 01 2100 $15,000.00 1
+(Lump Sum)
$15,000.00
10.0 Owner's Allowance RE: 01 2100 $200,000.00 1 $200,000.00
SUB-TOTAL ALLOWANCES: $
TOTAL MAIN BASE BID ITEMS PLUS ALLOWANCES: $
p.1 of 3 (cont.)
ALTERNATES(RE: 01 2300) See P.2
NOTE: The City Requires the (MWB)Minority Woman Owned Business Certification to be completed for each subcontractor used. Please provide the MWB Sheet provided in this RFB when submitting your bid.
Contractor acknowledges and agrees that the official TOTAL AMOUNT OF BID is determined by multiplying the unit bid pices by the respective quantities shown in this bid proposal and then totaling all of the extended amounts. Extended amounts SHOULD NOT be rounded up or down. All dollar amounts should be either written legibly or typed. Any mistakes should be rewritten and initialed by the Contractor.
NEW RE-BID (DRAFT 7B)
CITY OF WACO
BID PRICING FORM 2025-033
Riverwalk Re-Development Project COW Project No: 1TIF 2202 p.2 of 3
ALT. ALTERNATES (RE: 01 2300)
1.A No.1A: Waterwall Trough, Finish, Vaults and Plumbing Outside Vaults :Construct structural elements of trough at top of waterwall re: 4C/3-S542. Block out for discharge piping connection and discharge piping locations shown for coordination re:
Detail 1/3-WF22A, Details 1-3 on 3/WF-30A,Details 1-3 on 3-WF31A,Details 1-4 on 3-WF32A, Detail 4 on 3-WF53A and 6/3-L303. INCLUDE WATER WALL BATTER. *SHOWN ON 1A/3A/4C 3-S542 (BASE BID NOTED AS STRAIGHT
VERTICAL WALL ), VAULTS, COMMUNICATION PLUMBING BETWEEN VAULTS, INTAKE PIPING BETWEEN
VAULTS/RIVER, (5) INTAKE ASSEMBLIES,and SEEDED AGGREGATE FINISH (Details 5/6 on 3-L303 and Specification 32
1550).Reference 3-C104A, C-113A, 3-C126A for Civil work.See 3-S441A and 3-S400A for references to vaults .(*3-L201 indicates finished appearance of waterwall if ALT.1A accepted.) Include costs for any additional water control equipment/dewatering beyond base bid to construct the alternate.
1+(Lump Sum) $0.00
1.B NO.1B - ADD Remaining MEP Components of Waterwall :(Only applicable if Alt. 1A is accepted):Install all remaining
Waterwall MEP Components :ADD MEP Components of Waterwall as shown on Sheets 3-WF21A, 3-WF22A, 3-WF30A,3-
WF31A, 3-WF32A, WF50A,3-WF52A, and 3-WF53A and Electrical series 3-EL104A.Construction as shown in the drawings including but not limited to all necessary labor and materials for installation of plumbing within the equipment vaults,discharge plumbing, electrical concrete platform, electrical controls/control panels, electrical wire, pumps, lighting, and other miscellaneous features for the water wall, furnished, installed, operating, complete, and accepted in place in accordance with all regulatory requirements. (*3-L201 indicates finished appearance if ALT.1B accepted.)
1+(Lump Sum) $0.00
1.C NO.1.C -ADD limestone finish to wing walls adjacent to Water Wall : See Detail 2 on 3-L201, Details 5/6 on 3-L303 and Specification 04 4253,and 1A/3-S-542.(*3-L201 indicates finished appearance if ALT.1C accepted.)
1+(Lump Sum) $0.00
2.0 NO.2 - ADD ENTIRE WEBSTER OVERLOOK NORTH OF RETAINING WALL: RE:3-C111A, 3-C121A,3-L102, 3-
S421A , 3-S422A, 3-S423A,Detail 4C/3-S900A for axon. Electrical re:3-EL102A. See 3-L205, Detail 3-L301. All structural base, structural canopy, deck, SF-02 benches,Type 1 railing(See Details 2A/5B on 3-G101), finish, electrical lighting and receptacle components of Webster Overlook structure .Include SF-01 bench shown south of retaining wall on Landscape 3-
L102 and detail sheets 3-L302 through 3-L304. (*Not accepting this Alternate Requires add back to Base Bid for Type 2 railing at opening to Overlook deck from main Riverwalk path. )Construction as shown in the drawings including but not limited to all necessary labor and materials for installation of the Webster Overlook base /canopy, lighting and other miscellaneous features, furnished, installed, operating, complete, and accepted in place in accordance with all regulatory requirements. Include costs for any additional water control equipment/dewatering beyond base bid to construct the alternate.
1+(Lump Sum) $0.00
3.0 NO.3 -ADD Cove Bridge Construction- As shown on drawings 3-C121A, 3-C122A, S-103A/3-S431A,Detail 4A/3-S900A for axon.Alternate includes but is not limited to all necessary labor and materials for installation of piers, beams, decking, Type
1 railing (See Details 2A/6B on 3-G101)and other miscellaneous features, furnished, installed, operating, complete, and accepted in place in accordance with all regulatory requirements. Includes additional sidewalk noted on plans. Include any additional water control devices/dewatering beyond base bid to construct the alternate.Include lighting re: 3-EL103A1.See 3-
L103 for paving /joints.See 2/3-L202 for conceptual elevation.
1+(Lump Sum) $0.00
4.0 NO.4 - ADD Conduit and Vaults for Future Wi-Fi -Construction as shown in the drawings including but not limited to all necessary labor and materials for installation of conduits, vaults, and other miscellaneous features, furnished, installed, operating, complete, and accepted in place in accordance with all regulatory requirements.RE: Civil 3-C303A through 3-C305A, 3-
C520A.Include any additional water control devices/dewatering beyond base bid to construct the alternate.
1+(Lump Sum) $0.00
5.0 NO.5 : ADD Cove Fountain: Construction as shown in the drawings including but not limited to all necessary labor and materials for installation of the Cove Water Feature, including electrical, plumbing, and other miscellaneous features, furnished, installed, operating, complete, and accepted in place in accordance with all regulatory requirements.RE 3-WF20A , 3-WF33A , 3-WF51A and 3-EL103A2. Include any additional water control devices/dewatering beyond base bid to construct the alternate.See 2/3-L202 for conceptual elevation.
1+/-(Lump Sum) $0.00
6.0 NO.6: ADD Picnic Area and Parking Improvements at Ft. Fisher Area: RE: 3-C115A/3-C116A ,3-C128A,3-C202A, and 3-C302A . Add stair SF-05 and SF-23 per Landscape 3-L106,Details 2/3 on 3-L210, and Detail A4/3-C509 . ADD new paving and parking at Ft.Fisher areas 6/7and as illustrated on 3-L106/3-L107 (Do not include base bid lower 12'W path
).Include decomposed granite area with curb noted 3-L106 along with site features shown bike racks, picnic tables, and trash cans. Lighting and light poles RE: 3-EL106A. Stair railings : 3-G101 details 1C/2C.Stair railings : 3-G101 details 1C/2C.
1+/-(Lump Sum) $0.00
7.0 NO.7-ADD full original planting scheme : Full build out as described by sheets 3-L600 through 3-L700. Includes full irrigation as described on 3-L500A through 3-L554.Exclude (4) "UA" trees at Sandtown Plaza that are part of base bid from this alternate, but provide irrigation to them.
1+/-(Lump Sum) $0.00
8.0 NO.8-ADD reduced original planting scheme: Reduce trees shown on schedule 3-L600 and 3-L601A through 3/607A series by 50%, and reduce irrigation shown on 3L-500 series accordingly. Do not provide plants and grasses planting described on the 3-L601B series.Delete irrigation shown on 3L-500 series that serves 3-L601B planting.
1+/-(Lump Sum) $0.00
9.0 NO.9 : Add lower walkway pavement next to river between areas 3 and 4 , as well as SF-04 stairs. Re :3-L103/3-L104 and Detail 1 on 3-L210 .RE:3-C102A,3-C104A, 3-C122A,3-C123A, Detail A4/3-C509 and Structural 3-S103A, Detail
1B/4B 3-S502 SIM. for sidewalk detail. See 3-L103/L304 for paving /joints.
1+/-(Lump Sum) $0.00
SUB-TOTAL ALTERNATES: $0.00
TOTAL BASE BID, ALLOWANCES, AND ALL ALTERNATES $0.00
The Owner reserves the right to select any combination of Additive Alternates in the best interests of the City of Waco.
RE-BID(Draft 7B)
CITY OF WACO
BID PRICING FORM NO. 2025-033
Riverwalk Re-Development Project COW Project No: 1TIF 2202 (CONT.) p.3 of 3
16.0
SUBCONTRACTOR
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
END OF BID DOCUMENT p.3 of 3
E-mail/Phone Contact Info.
NOTE: The City Requires the (MWB)Minority Woman Owned Business Certification to be completed for each subcontractor used. Please provide the MWB Sheet provided in this RFB when submitting your bid.
TYPE OF WORK
I WILL USE THE FOLLOWING SUBCONTRACTORS FOR THIS WORK:
Firm Name
By
Title
Address
File details come from the government source that posted it. Updated .