ESBD_392676_1739390657717_SOL_ADD_2_405-25R0005416_910-82.pdf
PDF 234 KB Posted
- Solicitation number
- 405-25R0005416
- Issued by
- Williamson County, Texas
About this file
This is Addendum #2 to Solicitation #405-25R0005416 issued by the Texas Department of Public Safety (DPS) Procurement and Contract Services for the Williamson County Tactical Training Facility Electrical Upgrades project. The addendum, effective February 12, 2025, provides answers to contractor questions received prior to the February 10, 2025, 5:00 PM CT deadline. The document maintains all original terms and conditions of the solicitation, with no extension to the offer submission deadline.
The addendum clarifies five key technical points: 1) contractors are responsible for old fixture/bulb disposal per Section 11.0 Material Management, 2) multiple buildings may be worked on simultaneously if training is not disrupted, 3) PEC's responsibility for Building P ends at the transformer pole, 4) fan amp specifications are maximum values with lower amps being acceptable, and 5) the Urban Driving track lighting has no known voltage over 600v under DPS responsibility, with higher voltages managed by the power company. The document requires acknowledgment by offerors through one of three methods: returning three signed copies, acknowledging receipt on offer copies, or sending a reference letter/email.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procurement and Contract Services
Revised-March 10, 2015 PCS form 004
ADDENDUM OF SOLICITATION
1. SOLICITATION NO.
405-25R0005416
2. ADDENDUM NO.
3. EFFECTIVE DATE
02/12/2025
4. ISSUED BY
Department of Public Safety Procurement and Contract Services 5805 North Lamar Blvd. Bldg. A 1st floor Austin, Texas 78752
5. NAME AND ADDRESS OF OFFEROR
6. The above numbered solicitation is amended as set forth in Item 7. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this addendum prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 5 and 8, and returning 3 copies of the addendum; (b) By acknowledging receipt of this addendum on each copy of the offer submitted; or (c) By separate letter or e-mail which includes a reference to the solicitation and addendum numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by e-mail or letter, provided each e-mail or letter makes reference to the solicitation and this addendum, and is received prior to the opening hour and date specified.
7. DESCRIPTION OF ADDENDUM:
The purpose of Addendum 2 is to provide the answers to questions received prior to the published deadline of 2/10/2025 by 5:00 PM CT.
Except as provided herein, all terms and conditions of the solicitation, as heretofore changed, remain unchanged and in full force and effect.
8a. NAME AND TITLE OF SIGNER (Type or Print)
8b. OFFEROR
(Signature of Person Authorized to Sign) Date Signed
QUESTIONS & ANSWERS
1. Is the contractor responsible for old fixture/bulb disposal?
a. Yes. This is outlined in Section 11.0 Material Management of the SOW exhibit.
2. Will DPS allow multiple buildings to be worked on at a time as long as there is no interference with training?
a. Yes. Final schedule will be coordinated between awarded contractor & training staff so that the training schedule is not interfered with.
3. Is PEC furnishing the riser and meter pole for BLDG P?
a. PEC responsibility stops at the final pole with the transformer. All other work will be the responsibility of the contractor following PEC standards.
4. Is there any flexibility on the amps per fans at any of the locations?
a. The amps listed is the max amps per fan. The amps being lower is no issue.
5. What is the current voltage of the Urban Driving track lights?
a. The site visit was the opportunity for contractors to field verify existing conditions. This site does not have any known voltage over 600v that DPS is responsible for though. Any voltage over 600v is taken care of by the power company.