- Solicitation number
- 405-25R0005416
- Issued by
- Williamson County, Texas
About this file
This is an addendum and scope of work issued by the Texas Department of Public Safety (DPS) for electrical repairs, upgrades, and installation services at the Williamson County Tactical Training Facility (TTF) in Florence, Texas. The project includes LED lighting upgrades across multiple buildings (A through T3), generator installation, fan installations, and electrical service improvements, with specific requirements for replacing over 200 light fixtures, installing high-velocity low-speed fans, and implementing a diesel generator with 72-hour run time capacity. Two mandatory pre-bid site visits were scheduled for February 3 and 5, 2025, at 8:30 AM CT, with bidders required to attend one session. The addendum provides updated sections including a revised schedule of events, site visit attendance sheets, and a revised statement of work. The bid submission deadline is February 18, 2025, at 5:00 PM CT, with an anticipated contract award date of February 25, 2025.
The scope of work details specific technical requirements for lighting upgrades including 5,000k color temperature LED fixtures, predominantly metal construction with glass lenses, and compatibility with existing lighting control panels. The project includes significant electrical infrastructure work such as installing a new 320a 240v single phase service for Building P and a diesel generator with ATS for the pump house. The contractor must provide detailed project schedules within 30 days of purchase order receipt and maintain safety zones around work areas. The facility will remain active during construction, requiring coordination with ongoing training activities and possible work outside normal business hours to minimize disruption to the driving track and gun range operations.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procurement and Contract Services
Revised-March 10, 2015 PCS form 004
ADDENDUM OF SOLICITATION
1. SOLICITATION NO.
405-25R0005416
2. ADDENDUM NO.
3. EFFECTIVE DATE
02/05/2025
4. ISSUED BY
Department of Public Safety Procurement and Contract Services 5805 North Lamar Blvd. Bldg. A 1st floor Austin, Texas 78752
5. NAME AND ADDRESS OF OFFEROR
6. The above numbered solicitation is amended as set forth in Item 7. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this addendum prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 5 and 8, and returning 3 copies of the addendum; (b) By acknowledging receipt of this addendum on each copy of the offer submitted; or (c) By separate letter or e-mail which includes a reference to the solicitation and addendum numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by e-mail or letter, provided each e-mail or letter makes reference to the solicitation and this addendum, and is received prior to the opening hour and date specified.
7. DESCRIPTION OF ADDENDUM: The purpose of Addendum 1 is to provide:
1. Revised Section D.11 ANTICIPATED SCHEDULE OF EVENTS.
2. The sign in sheets for the mandatory site visits that occurred on 2/3/2025 and 2/5/2024.
3. Revised Exhibit F.7 Statement of Work.
Except as provided herein, all terms and conditions of the solicitation, as heretofore changed, remain unchanged and in full force and effect.
8a. NAME AND TITLE OF SIGNER (Type or Print)
8b. OFFEROR
(Signature of Person Authorized to Sign) Date Signed
D.11 ANTICIPATED SCHEDULE OF EVENTS
DPS currently anticipates that the selection of successful Bidder and award of this Contract, if any, will proceed according to the following schedule:
1/26/2025 Solicitation Posted to ESBD 2/3/2025 8:30 AM CT Mandatory Pre-Bid Site Visit (Attendance at only one of the two is required) 2/5/2025 8:30 AM CT Mandatory Pre-Bid Site Visit (Attendance at only one of the two is required) 2/10/2025 5:00 PM CT Last day to submit written questions for clarification to DPS 2/12/2025 5:00 PM CT Estimated date for DPS to post Question and
Answer (Q&A) document to ESBD 2/18/2025 5:00 PM CT Deadline for DPS to receive Bids 2/25/2025 Anticipated date of Contract Award
DPS reserves the right, in its sole discretion, to change the above date(s). Notices of changes to items directly impacting the original solicitation process will be posted on the Electronic State Business Daily (ESBD) located at: http://www.txsmartbuy.com/esbd. Bidder should check the ESBD frequently for updates. Bidder is solely responsible for verifying receipt of its questions, if applicable, and responding by the deadlines stated. A Bidder’s failure to periodically check the ESBD for updates will in no way release the awarded Bidder from compliance with any requirements in posted “addenda or additional information” although such compliance may result in additional costs to meet the requirements.
Questions regarding this solicitation must be in writing and must be submitted to DPS’s Contract Administrator by the date and time noted in the table listed in this solicitation.
Telephone inquiries will not be accepted. Questions may only be submitted email. DPS intends to post answers to these questions on the ESBD on or before the date and time noted in the table listed in this solicitation. Bidder is solely responsible for verifying DPS’s timely receipt of its questions by the stated deadlines.
http://www.txsmartbuy.com/esbd
TEXAS DEPARTMENT OF PUBLIC SAFETY SCOPE OF WORK
The Texas Department of Public Safety (DPS) is requesting Bid responses for electrical repairs, upgrades, and installation services at the Williamson County Tactical Training Facility (TTF). See the attached scope of work, drawings, and specifications for more information.
Services to Include:
1. LED lighting upgrades and repairs
2. Generator installation
3. Fan upgrades and installation
4. Laundry room electrical upgrades
5. Garage doors electrical upgrades
Project:
Williamson County TTF Installations and Electrical Upgrades 810 Co Rd 240 Florence, TX 76527
Department of Public Safety Contract Department of Public Safety Site Monitor: Contact:
Victoria Madero Chris Mathews Business Operations Director Master Electrician
PH: 512-424-5546 PH: 512-424-7260 MO: 512-563-2438
Victoria.Madero@dps.texas.gov Christopher.Mathews@dps.texas.gov
NOTE: Building contacts will be identified to the bidders for the respective locations for site visits and future access. Access times for each phase of construction must be scheduled ahead of actual work.
Table of Contents Statement of Work Site/Building Plans with Specifications mailto:Victoria.Madero@dps.texas.gov mailto:Christopher.Mathews@dps.texas.gov
STATEMENT OF WORK
1.0 Service Location
Williamson County Tactical Training Center 810 Co Rd 240, Florence, TX 76527
2.0 Contractor Service Requirements
Texas Department of Public Safety is looking to perform various electrical upgrades, lighting upgrades and to install high velocity low speed style fans in various locations around our complex.
The Contractor must furnish all material, labor & equipment necessary to perform service. The Contract Monitor must approve any changes to this schedule in service in writing. (This excludes holidays when the office is closed).
During a pandemic, as determined by DPS, when the Contractor arrives at a DPS Office for a pre-bid conference or to perform contracted services after award, they must bring their own Personal Protective Equipment.
A. Contractor must follow agency-adopted pandemic protocols.
3.0 General Requirements
A. Contractor employees must wear either uniforms or appropriate clothing always identifying them as employees of the Contractor when working in DPS facilities.
Shorts and/or muscle shirts are prohibited. Contractor personnel must always have a DPS supplied identification badge visible at all times when working in DPS facilities.
B. Contractor employees, vehicles, or equipment is prohibited from entering all unauthorized areas. To gain access, the Contract Monitor must grant approval.
C. Contractor will procure, at Contractor’s expense, all necessary and required licenses and permits necessary for the performance of this award. Contractor represents and warrants that the services provided under this award comply with all applicable federal health and safety standards, including but not limited to, the Occupational Safety and Health Administration (OSHA), and all Texas health and safety standards.
Each contractor must also possess a credential that lends credibility to the worker’s ability to demonstrate his or her technical competency. This may include but is not limited to factory training, certification, and/or a trade license.
D. All work must meet or exceed standards set forth by Uniform Mechanical Code, International Mechanical Code, and ordinances cited by Texas Department of Licensing and Regulation.
E. Following each service, the Contractor must email a copy of the delivery ticket to the Contract Monitor.
F. The Contractor is responsible for immediately notifying local building staff of all deficiencies, damages, potential hazards, and other conditions or injuries that may occur. Contractor must adequately protect the work, DPS’s property, adjacent property, and the public. In the event of damage to facilities because of Contactor’s operations, the Contractor must subsequently repair or restore all services to the satisfactory approval of DPS’s Contract Monitor or his/her designated representative.
Further, Contractor must engage any additional outside services, which may be necessary to facilitate repairs until services are restored. All costs involved in making repairs and restoring disrupted services must be at the expense of Contractor, and Contractor will be fully responsible for all claims resulting from the damage.
DPS’s Contract Monitor or his/her designated representative may elect to perform such repairs and deduct the cost of such repairs, replacement parts, and outside services from amounts due to Contractor.
Contractor will be responsible and liable for the safety, injury, and health of its working personnel while its personnel are performing work for DPS.
4.0 General Electrical Provisions
A. Sizes, conditions & final counts are approximations and vendors are responsible for verifying all pre-existing conditions.
B. Building lettering used below corresponds to the attached site plan.
C. When turning in bids provide cutsheets for proposed lights and fans.
D. All lighting will be LED, 5,000k color temperature, predominately metal construction, and glass lenses. Considerations will be made for fixtures that are made of plastic and poly carbonate construction on a case-by-case basis.
E. Retrofit lamps will be considered in some locations and will be a line voltage – ballast bypass type lamp.
F. Retrofit type fixtures will be factory approved and designed in nature.
G. Replacement fixtures will be comparable to existing fixtures in design & color.
H. All new lighting will be compatible with existing lighting control panels. In locations outside of lighting control panels all photocells, time clocks and contactors will be replaced with new ones capable of handling the loads.
I. No wireless controls to be considered.
J. No tandem breakers will be permitted for use in any of this scope of work. In areas where breaker space is not available add a subpanel to accommodate the breakers needed.
5.0 Building Specific Requests
A. Bldg. A – Lighting repair/upgrade to LED. Parking lot was modified previously. Layout is approximation.
1. Site
a. Replace 17 pole light heads (shoe box style) with new fixtures.
i. Type SA & SB fixtures. Ones circled in RED previously removed.
b. Replace 10 pole light heads (post top style) with new fixtures.
i. Type SC fixtures.
c. Replace 2 flagpole lights with new fixtures.
i. Located on poles circled in BLUE.
d. Add 1 shoe box style pole light head on the pole near the main entrance gate. Intent of this is to properly light up the gate area. Other options to light up this area will be considered.
i. Located on pole circled in ORANGE.
2. Building
a. Replace 1 barn style light located on the water tower.
i. Approximate location in GREEN.
b. Replace 1 small wall pack located on the water tower shed.
i. Approximate location in GREEN.
c. Replace 2 small wall lights by the main building entrance. Consideration will be given on a retrofit lamp type repair.
i. Type Q fixture.
d. Replace 6 flood lights located in the upper areas around the building.
i. Type E fixture. Ones circled in YELLOW previously removed.
e. Replace 4 wall sconces located around the building. Consideration will be given on a retrofit lamp type repair.
i. Type S fixture.
B. Bldg. B – Lighting repair/upgrade to LED.
1. Replace 29 recessed strip lights located in the soffit. Consideration will be given to retrofit kits, retrofit lamps or new fixtures.
2. Replace 4 wall sconces located by the main building entrance. Consideration will be given on a retrofit lamp type repair.
3. Replace 16 pole light heads (shoe box style) with new fixtures.
4. Add 2 shoe box style pole light head on the poles located between the building and fueling station. Intent of this is to properly light up the back side of the building. Other options to light up this area will be considered.
5. Replace 8 recessed lights located at the fueling station. Consideration will be given to retrofit kits, retrofit lamps or new fixtures.
C. Bldg. C – Lighting repair/upgrade to LED.
1. Replace 1 canopy light located by front entrance.
2. Replace 2 wall packs around building.
3. Add 5 wall packs around the building. Intent of this is to properly light around the perimeter of the building. Other options to light up this area will be considered.
4. Add lighting to properly illuminate the flag poles located between building C & D.
D. Bldg. D – Lighting repair/upgrade to LED & fan installation.
1. Replace 20 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Replace 4 – 4’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
3. Replace 20 – lay in style troffers. Consideration will be given to retrofit kits, retrofit lamps or new fixtures.
4. Replace 1 wall pack around building.
5. Add 6 wall packs around the building. Intent of this is to properly light around the perimeter of the building. Other options to light up this area will be considered.
6. Install a 16’ high velocity low speed fan centered under the canopy. Consideration of other sizes will be given if they provide proper airflow under the canopy. Fan switch will be located by the lighting switches. Single phase 208v with a max amp draw of 8a. A new circuit will need to be run to the electrical panel.
E. Bldg. E – Lighting repair/upgrade to LED.
Small building
a. Replace 1 wall light by the door.
Larger building
a. Replace 3 small wall packs around the building.
b. Add 7 wall packs around the building. Intent of this is to properly light around the perimeter of the building. Other options to light up this area will be considered.
F. Bldg. F – Lighting repair/upgrade to LED and generator installation.
a. Replace 1 barn style light located on the water tower.
b. Replace 1 small wall pack located on the pump house.
c. Install a diesel generator to supply power to the entire pump house.
Incoming service is 80a 3phase 480v. Generator, ATS and a dual-purpose docking station to be located outside next to the pump house.
Generator features will include:
i. 72 hour run time tank.
ii. Block heater.
iii. Battery charger.
iv. Audible alarm and flashing light will be mounted on the generator to alert when it is running.
v. Level 3 sound enclosure.
vi. 3’ walkway surrounding the entire generator. A platform will be required if the unit requires a ladder to reach all the components.
G. Bldg. G – Lighting repair/upgrade to LED & fan installation.
1. Replace 8 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Install 2 - 5’ high velocity low speed fan centered under the canopy.
Consideration of other sizes will be given if they provide proper airflow under the canopy. Fan switches will be located by the lighting switches and capable of controlling each fan independently. Single phase 120v with a max amp draw of 0.75a. Fans will tie into the existing lighting circuit.
H. Bldg. H – Lighting repair/upgrade to LED & fan installation.
1. Replace 23 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Replace 4 exterior lights with new ones.
3. Install exterior lighting around the entire perimeter of this building. Intent of this is to properly light around the building to the berms and into the parking area.
Lights will be photocell controlled along with a disconnect switch. Switches will be located next to existing switches near the electrical panel and in a way where each side of the building is controlled individually.
4. Install 10 – 8’ high velocity low speed fans. Consideration of other sizes will be given if they provide proper airflow under the canopy. Fan switches will be located by the lighting switches near the electrical panel and capable of controlling each fan independently. Single phase 120v with a max amp draw of 1.25a. New circuits will need to be run to the electrical panel.
5. Relocate 3 existing light switches for overhead lighting to near electrical panels.
I. Bldg. I – Lighting repair/upgrade to LED & fan installation.
1. Replace 6 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Install exterior lighting around the entire perimeter of this building. Intent of this is to properly light around the building to the berms and into the parking area.
Lights will be photocell controlled along with a disconnect switch. Switches will be located next to existing switches and in a way where the berm and parking side of the pavilion are controlled individually. This addition will tie into the existing lighting circuit.
3. Install 2 - 5’ high velocity low speed fan centered under the canopy.
Consideration of other sizes will be given if they provide proper airflow under the canopy. Fan switches will be located by the lighting switches and capable of controlling each fan independently. Single phase 120v with a max amp draw of 0.75a. Fans will tie into the existing lighting circuit.
J. Bldg. J – Lighting repair/upgrade to LED & fan installation.
1. Replace 8 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Install 2 - 5’ high velocity low speed fan centered under the canopy.
Consideration of other sizes will be given if they provide proper airflow under the canopy. Fan switches will be located by the lighting switches and capable of controlling each fan independently. Single phase 120v with a max amp draw of 0.75a. Fans will tie into the existing lighting circuit.
K. Bldg. K– Lighting repair/upgrade to LED & electrical power for laundry room.
1. Replace 12 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Replace 4 – 4’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
3. Project underway to upgrade the service for this building. If old panel is still in place add tandems in the panel to make the washer/dryer work for now. If new panel is installed terminate in new panel.
4. A plumbing contractor will be upgrading the 10-gallon electric water heater to a 50-gallon water heater. Rework power as necessary for new water heater.
5. Add a dedicated circuit for 2 commercial grade washing machines and 1 commercial grade dryer.
L. Bldg. L – Lighting repair/upgrade to LED & fan installation.
1. Replace 10 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Install 4 - 5’ high velocity low speed fan centered under the canopy.
Consideration of other sizes will be given if they provide proper airflow under the canopy. Fan switches will be located by the lighting switches and capable of controlling each fan independently. Single phase 120v with a max amp draw of 0.75a. Fans will tie into the existing lighting circuit.
M. Bldg. M – Lighting repair/upgrade to LED & fan installation.
1. Replace 1 wall pack located by the front entrance. No plans provide for this location but light is located over exterior door.
N. Bldg. N – Lighting repair/upgrade to LED.
1. Replace 9 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Replace 4 – 4’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
O. Bldg. O – Lighting repair/upgrade to LED & fan installation.
1. Replace 18 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Install 11 - 5’ high velocity low speed fan centered under the canopy.
Consideration of other sizes will be given if they provide proper airflow under the canopy. Fan switches will be located by the lighting switches and capable of controlling each fan independently. A secondary switch will be installed on the 4 fans located at the end of the pavilion on the columns. Single phase 120v with a max amp draw of 0.75a. Fans will tie into the existing lighting circuit.
P. Bldg. P – Lighting repair/upgrade to LED, service upgrade & garage door power.
1. Replace 6 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Replace 4 wall packs around building.
3. Add exterior lighting on the front of the building. Intent of this is to properly light into the front parking area. Other options to light up this area will be considered.
4. Add power for garage door openers. The system will be a hydraulic style door requiring up to a 60a 240v circuit. Final power location TBD.
5. Add a new 320a 240v single phase service on the building. Service will take over for existing panel and provide power to new equipment being added. Demo old panel and install a fused disconnect on the old feeder going to the building. Final details TBD.
Q. Bldg. Q – Lighting repair/upgrade to LED & fan installation.
1. Replace 5 wall packs around the building.
2. Replace 2 recess cans. Consideration will be given to retrofit kits or new fixtures.
3. Add 2 new wall packs on either end of the building.
4. Install 2-3 – 8’ high velocity low speed fans. Consideration of other sizes will be given if they provide proper airflow under the canopy. Fan switches will be located by the lighting switches and capable of controlling each fan independently. Single phase 120v with a max amp draw of 1.25a. New circuits will need to be run to the electrical panel.
5. Rework or install new lighting under the pavilion where the fans will be installed.
Install in a manner where a strobing effect does not occur with the fans in operation. Final footcandles at the ground must be equal or better to the current lighting installed.
R. T1 - Lighting repair/upgrade to LED.
1. Replace 11 recessed wall lights. Consideration will be given to retrofit kits, retrofit lamps or new fixtures. In addition to current switches add a new one at the base of the stairs to control these lights from ground level.
2. Replace 2 wall packs around building.
3. Add exterior lighting on each side of the building. Intent of this is to properly light around the building. Other options to light up this area will be considered.
S. T2 - Lighting repair/upgrade to LED.
1. Replace 11 recessed wall lights. Consideration will be given to retrofit kits, retrofit lamps or new fixtures. In addition to current switches add a new one at the base of the stairs to control these lights from ground level.
2. Replace 2 wall packs around building.
3. Add exterior lighting on each side of the building. Intent of this is to properly light around the building. Other options to light up this area will be considered.
T. T3 - Lighting repair/upgrade to LED.
1. Replace 11 recessed wall lights. Consideration will be given to retrofit kits, retrofit lamps or new fixtures. In addition to current switches add a new one at the base of the stairs to control these lights from ground level.
2. Replace 2 wall packs around building.
3. Add exterior lighting on each side of the building. Intent of this is to properly light around the building. Other options to light up this area will be considered.
U. Urban Driving Track – Lighting repair. No plans for this area. See overall site plan for location. Power originates at Tower #1.
1. Current 14 LED street style pole lights around this area do not function properly.
a. Provide a set price to troubleshoot the lighting.
b. Provide an hourly rate and material markup percentage for repairs.
Along with rates provide a NTE estimate for repairs.
V. Ranges: Tactical Area, 50 Yd Pistol Range, 50 Yd Multi-Purpose Range & 100 Yd Rifle
Range
1. Replace 56 stadium style lights with LED.
6.0 Schedules
The contractor will, within 30 days of receipt of purchase order, supply the DPS contract monitor with a project schedule. This site is an active training facility including a driving track and gun range. WARNING - At times bidders and contractors could be in close proximity to driving and gun fire. Schedules will be worked to cause the least disruption to the training in progress. Some work may need to be performed outside of normal business hours to prevent disruption of the driving track and gun range.
7.0 Contractor Cooperation
Contractor agrees to cooperate and coordinate its work with that of other Contractors retained by DPS. Upon discovery of an apparent conflict in the sequencing of work with another Contractor, Contractor must report the concern to the DPS’s Contract Monitor.
8.0 Performance Warranty
Contractor must guarantee all work included in the contract against any defects in workmanship. Any deficiencies that may become apparent within a period of one year after completion of work must be brought into code compliance, at no cost to DPS. The warranty period must commence upon the date of acceptance by DPS.
9.0 Material Warranty
All material furnished must be guaranteed by Contractor to comply with this contract and sufficient for the purpose intended, new and free from defects. Materials furnished under this contract must be the latest improved product in current production, as offered to commercial trade, and must be of quality material. Used, shopworn, demonstrator, prototype, reconditioned, or discontinued products or material are not acceptable.
10.0 Contractor Responsibilities
The Contractor forces must be required to remove and relocate the affected existing DPS site components or equipment deemed required to support the overall installation. Any equipment relocation will be done under the direction of the DPS Contract Monitor.
However, due to liability requirements, the Contractor may not store project equipment, materials, or other components without the consent of the affected DPS staff and holds the agency harmless for theft, material loss or equipment damage from sources beyond the control of the agency.
All work must be done in a timely manner. Once the project has been awarded the successful Contractor will be expected to work from that day forward with a continuous effort to accomplish the service in a timely manner.
11.0 Material Management
Delivered materials will be maintained and stored in an area as directed by the DPS representative and in accordance with the manufacturer’s requirements to maintain shelf life. MSDS safety data for all materials used as part of this project must be submitted to the TDPS representative if requested.
The Vendor will be responsible for the disposal of all materials and debris associated with this project. That disposal must be in accordance with local, state, and federal applicable standards and will be considered as part of this project.
12.0 Equipment and Supplies
The Contractor must maintain possession of all materials and equipment needed to fulfill the contract. DPS personnel will not be responsible for any shipments or storage of materials. It is solely the Contractor’s responsibility to warehouse, receive, and stage the materials and equipment.
Any repair parts must be placed on order within three business days of approval from the contract monitor.
Tools used for the installation must not be left unattended and are the responsibility of the Contractor to prevent unauthorized use or theft. DPS asks all Contractors or sub-contractors to use due diligence to ensure their tools, materials and equipment are secure while working on this project. While DPS investigates any theft or vandalism, it will not be responsible for replacement of any tools, materials or equipment left un-secure while on DPS property.
13.0 Safety Zones
Pedestrian and vehicle safety zones will be maintained around work while in progress.
Safe zone areas are to be clearly marked with barricade fencing to insure separation of work zones from unauthorized access during and after regular business hours. Fire extinguishing equipment is to be available while any hot work is in progress. The Contractor will be required to provide special need safety barricades, cones, marking tape or overhead protection to ensure the safety of the public pedestrian or vehicular traffic in and out of the facility area as required.
14.0 Contractor / Vendor Vehicles
Contractor vehicles used for transport of personnel or materials must be locked with the emergency brake set and the ignition key removed when left unattended. Parking must be located only in approved areas determined by the local building manager. DPS is not responsible for damage by others to Contractor or Personal vehicles left on the project site. Any vehicle or equipment without an ignition key starter must be rendered inoperable if left overnight. In addition, any vehicle or large equipment with a common industrial type of ignition source must be rendered inoperable if left overnight. Security and safety of equipment must be the responsibility of the Vendor during work and after regular business hours. Items such as ladders must be removed and secured prohibiting unauthorized access to the facility.
Scale
Project number Date Drawn by Checked by
DEPARTMENT OF
PUBLIC SAFETY
FACILITIES
These documents are intended for internal use only and shall not be copied, reproduced or electronically transmitted without the express written consent of the Facilities Bureau.
S T
E X A
S
D
P
COURT ESY SERV I CE PROT
EC
T I
ON
N.T.S.
SP-1
Overall Site PlanSite Plan
Florence 11/10/2014
RK
No. Description Date
TRUE
NORTH
PLAN
NORTH
B
A
C D E
H
F
G J
L
KNO M
I
P
Q
T2
T1
T3
Bldg. A Site
Bldg. A – Lighting repair/upgrade to LED.
Parking lot was modified previously. Layout is approximation.
Site
a. Replace 17 pole light heads (shoe box style) with new fixtures. Type SA & SB fixtures. Ones circled in RED previously removed.
b. Replace 10 pole light heads (post top style) with new fixtures. Type SC fixtures.
c. Replace 2 flagpole lights with new fixtures.
Located on poles circled in BLUE.
d. Add 1 shoe box style pole light head on the pole near the main entrance gate. Intent of this is to properly light up the gate area. Other options to light up this area will be considered. Located on pole circled in ORANGE.
Building
a. Replace 1 barn style light located on the water tower. Approximate location in GREEN.
b. Replace 1 small wall pack located on the water tower shed. Approximate location in GREEN.
CM11647
Oval
CM11647
Oval
CM11647
Oval
CM11647
Oval
CM11647
Oval
CM11647
Oval
CM11647
Oval
CM11647
Cross-Out
MECHANANICAL
CATERING KITCHEN
JANITOORRIIAAAALL STORAAGEGE
CACAAAAFFEETTERIAA SSTOTORAGEE
11111114
GALLLEERY
SMAALLL L CCLLLLALALAAASASSSSROOOM
11111111121
MENEENEENNNNN'SS
WOMEN'S
SSSTAAIIRR
111515
LOBBY
CORRIDDOOR
STORAGE
STSTTOOOORRARAAGAGGEEE
GEGEESTTTOTORTORORRRRRRRARARAAAAAAAAAAAAAAGAG
2222626
SSSTORAGAGEE
AAAA
WO
I NT
R
RKKSSSHHOP
STORAAGE
ELLEEEEC.
ELEEVVAATOR MMAACCHH RRRRM
VENNDDIINNG
LLLALARRRRGE CLLASSROOOOMM
STORAGGEE
11111111111
ELECC
1111112112112
110110
WOWOWOOW
MM N
RR
TENA
H
ANANCE
OP
CE
MMMMMMMMMMMMEMEMEEEEEEEEEEECCCH.H RROOOMOMMMMMMMM
119999
1111811818
101044444
12828
MMDDFF RRROOOMOM
21277
CCACACACAAAFAFAFAFAFAFFEFEFEEETTETEEERRRRIIAAAA
1090999
CORRIDORR
13131
116116
1110000105055
Bldg. A 1st floor
Bldg. A – Lighting repair/upgrade to LED.
Parking lot was modified previously. Layout is approximation.
Building
c. Replace 2 small wall lights by the main building entrance. Consideration will be given on a retrofit lamp type repair. Type Q fixture.
CM11647
Cross-Out
2nd floor
Bldg. A – Lighting repair/upgrade to LED.
Parking lot was modified previously. Layout is approximation.
Building
d. Replace 6 flood lights located in the upper areas around the building. Type E fixture. Ones circled in YELLOW previously removed.
e. Replace 4 wall sconces located around the building. Consideration will be given on a retrofit lamp type repair. Type S fixture.
CM11647
Oval
Oval
Photos are of the lights on the water tower and shed as they are not listed on the fixture schedule.
Flag pole lights are not represented on this sheet and should be Hydrel # 7100 150CMT6 TB NSP KM
PAR4/12 34C LPI DNA
Original construction plan light fixture schedule.
Bldg. B – Lighting repair/ upgrade to LED.
1. Replace 29 recessed strip lights located in the soffit.
Consideration will be given to retrofit kits, retrofit lamps or new fixtures.
2. Replace 4 wall sconces located by the main building entrance. Consideration will be given on a retrofit lamp type repair.
Bldg. B Building
R
EF
B-101
315 SF
WAITING
B-102
195 SF
OFFICE
B-103
138 SF
OFFICE
B-104T
78 SF
TELECOM
B-105S
293 SF
STORAGE
B-106J
65 SF
JANITOR
B-107S
43 SF
STORAGE
108S
40 SF
STORAGE
B-
B-
SF
CO
RR
ID
O
R
B-110
463 SF
CORRIDOR
197 SF
WOMEN
B-111RW B-112RM
193 SF
MEN
B-113
359 SF
BREAK
B-114S
31 SF
STOR
B-115M
408 SF
MECHANICAL
B-117S
1379 SF
TRAINING
EQUIP
STORAGE
B-117.01E
94 SF
ELECTRICALB-118S
109 SF
STORAGE
B-119S
104 SF
STORAGE
B-120S
122 SF
STORAGE
B-121
1327 SF
PARTS DEPT
B-122S
182 SF
NEW TIRE
STORAGE
B-123S
186 SF
OLD TIRE
STORAGE
B-124S
109 SF
BATTERY
STORAGE
B-125S
579 SF
EQUIPMENT
STORAGE
B-126S
620 SF
EQUIPMENT
STORAGE
B-127
2545 SF
VEHICLE
SERVICE BAYS
B-128
677 SF
PRESSURE
WASH BAY
B-129
1209 SF
EMERGENCY
VEHICLE BAY
B-130
26 SF
COMPRESSOR
18 recessed strip lights located in this area
11 recessed strip lights located in this area
CM11647
Rectangle
CM11647
Rectangle
Rectangle
Bldg. B Site
Bldg. B – Lighting repair/upgrade to LED.
3. Replace 16 pole light heads (shoe box style) with new fixtures.
4. Add 2 shoe box style pole light head on the poles located between the building and fueling station. Intent of this is to properly light up the back side of the building. Other options to light up this area will be considered. Poles circled in BLUE.
5. Replace 8 recessed lights located at the fueling station. Consideration will be given to retrofit kits, retrofit lamps or new fixtures. Location circled in RED.
CM11647
Oval
CM11647
Oval
CM11647
Oval
Ranges
Light fixture schedule according to original construction plans.
Buildings C, D, G, H, I, J, K, L, M, N & O.
Bldg. C Building
Bldg. C – Lighting repair/upgrade to
LED.
1. Replace 1 canopy light located by front entrance. Circled in BLUE.
2. Replace 2 wall packs around building. Circled in RED
3. Add 5 wall packs around the building. Intent of this is to properly light around the perimeter of the building. Other options to light up this area will be considered. Cross marks are approximate locations.
4. Add lighting to properly illuminate the flag poles located between building
C & D. Approximate location circled in ORANGE.
C D
CM11647
Oval
CM11647
Oval
CM11647
Oval
Bldg. D
Bldg. D – Lighting repair/upgrade to LED & fan installation.
1. Replace 20 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Replace 4 – 4’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
3. Replace 20 – lay in style troffers. Consideration will be given to retrofit kits, retrofit lamps or new fixtures.
4. Replace 1 wall pack around building. Circled in BLUE.
5. Add 6 wall packs around the building. Intent of this is to properly light around the perimeter of the building. Other options to light up this area will be considered.
Cross marks are approximate locations.
6. Install a 16’ high velocity low speed fan centered under the canopy.
Consideration of other sizes will be given if they provide proper airflow under the canopy. Fan switch will be located by the lighting switches. Single phase 208v with a max amp draw of 8a. A new circuit will need to be run to the electrical panel.
E - Larger building
F - PUMP HOUSE
E - Smaller building
F - Water tower
Bldg. E/F Building
Bldg. E – Lighting repair/upgrade to LED.
Small building
a. Replace 1 wall light by the door. Circled in ORANGE Larger building
a. Replace 3 small wall packs around the building. Circled in BLUE.
b. Add 7 wall packs around the building. Intent of this is to properly light around the perimeter of the building. Other options to light up this area will be considered. Approximate locations at cross marks.
Bldg. F – Lighting repair/upgrade to LED and generator installation.
a. Replace 1 barn style light located on the water tower. Circled in RED.
b. Replace 1 small wall pack located on the pump house. Circled in GREEN.
CM11647
Oval
CM11647
Oval
CM11647
Oval
CM11647
Oval
CM11647
Oval
CM11647
Oval
Bldg. E small building Bldg. E - larger building Bldg. F Water tower Bldg. F Pump house
Bldg. E/F
F - PUMP HOUSE
Side of building ATS, dual purpose docking station & generator location
100a disconnect is incoming feeder located inside the building.
#1,3&5 serve the building
Bldg. F – Lighting repair/upgrade to LED and generator installation.
c. Install a diesel generator to supply power to the entire pump house.
Incoming service is 80a 3phase 480v. Generator, ATS and a dual-purpose docking station to be located outside next to the pump house. Generator features will include:
i. 72 hour run time tank.
ii. Block heater.
iii. Battery charger.
iv. Audible alarm and flashing light will be mounted on the generator to alert when it is running.
v. Level 3 sound enclosure.
vi. 3’ walkway surrounding the entire generator. A platform will be required if the unit requires a ladder to reach all the components.
Bldg. F
Bldg. G
Bldg. G – Lighting repair/upgrade to LED & fan installation.
1. Replace 8 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Install 2 - 5’ high velocity low speed fan centered under the canopy. Consideration of other sizes will be given if they provide proper airflow under the canopy. Fan switches will be located by the lighting switches and capable of controlling each fan independently. Single phase 120v with a max amp draw of 0.75a. Fans will tie into the existing lighting circut.
Bldg. H
Bldg. H – Lighting repair/upgrade to LED & fan installation.
1. Replace 23 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures. The 6 highlighted in GREEN were previously removed and 3 were relocated to other parts of the building.
2. Replace 4 exterior lights with new ones.
3. Install exterior lighting around the entire perimeter of this building. Intent of this is to properly light around the building to the berms and into the parking area. Lights will be photocell controlled along with a disconnect switch. Switches will be located next to existing switches and in a way where each side of the building is controlled individually.
4. Install 10 – 8’ high velocity low speed fans. Consideration of other sizes will be given if they provide proper airflow under the canopy. Fan switches will be located by the lighting switches and capable of controlling each fan independently. Single phase 120v with a max amp draw of 1.25a. New circuits will need to be run to the electrical panel.
Rectangle
Bldg. I
Bldg. I – Lighting repair/upgrade to LED & fan installation.
1. Replace 6 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Install exterior lighting around the entire perimeter of this building. Intent of this is to properly light around the building to the berms and into the parking area. Lights will be photocell controlled along with a disconnect switch. Switches will be located next to existing switches and in a way where the berm and parking side of the pavilion are controlled individually. This addition will tie into the existing lighting circuit.
3. Install 2 - 5’ high velocity low speed fan centered under the canopy.
Consideration of other sizes will be given if they provide proper airflow under the canopy. Fan switches will be located by the lighting switches and capable of controlling each fan independently. Single phase 120v with a max amp draw of 0.75a. Fans will tie into the existing lighting circuit.
Bldg. J
Bldg. J – Lighting repair/upgrade to LED & fan installation.
1. Replace 8 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures. Plans show 14 lights but only 8 are installed.
2. Install 2 - 5’ high velocity low speed fan centered under the canopy. Consideration of other sizes will be given if they provide proper airflow under the canopy. Fan switches will be located by the lighting switches and capable of controlling each fan independently. Single phase 120v with a max amp draw of 0.75a. Fans will tie into the existing lighting circuit.
Bldg. K
Bldg. K– Lighting repair/upgrade to LED & electrical power for laundry room.
1. Replace 12 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Replace 4 – 4’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
3. Project underway to upgrade the service for this building. If old panel is still in place add tandems in the panel to make the washer/dryer work for now. If new panel is installed terminate in new panel.
4. A plumbing contractor will be upgrading the 10-gallon electric water heater to a 50-gallon water heater. Rework power as necessary for new water heater. Located in janitor closet. Exact location TBD.
5. Add a dedicated circuit for 2 commercial grade washing machines and 1 commercial grade dryer.
Located in target fab room. Exact location TBD.
Bldg. L
Bldg. L – Lighting repair/upgrade to LED & fan installation.
1. Replace 10 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Install 4 - 5’ high velocity low speed fan centered under the canopy. Consideration of other sizes will be given if they provide proper airflow under the canopy. Fan switches will be located by the lighting switches and capable of controlling each fan independently. Single phase 120v with a max amp draw of 0.75a. Fans will tie into the existing lighting circuit.
Bldg. N
Bldg. N – Lighting repair/upgrade to LED.
1. Replace 9 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Replace 4 – 4’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
Bldg. O
Bldg. O – Lighting repair/upgrade to LED & fan installation.
1. Replace 18 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Install 11 - 5’ high velocity low speed fan centered under the canopy.
Consideration of other sizes will be given if they provide proper airflow under the canopy.
Fan switches will be located by the lighting switches and capable of controlling each fan independently. A secondary switch will be installed on the 4 fans located at the end of the pavilion on the columnsSingle phase 120v with a max amp draw of 0.75a. Fans will tie into the existing lighting circuit.
ss ss ss ss
CM11647
Line
CM11647
Line
CM11647
Line
CM11647
Line
CM11647
Line
CM11647
Line
CM11647
Line
Line
Bldg. P
Bldg. P – Lighting repair/ upgrade to LED & garage door power.
1. Replace 6 – 8’ strip fixtures. Consideration will be given to retrofit kits or new fixtures.
2. Replace 4 wall packs around building.
3. Add exterior lighting on the front of the building. Intent of this is to properly light into the front parking area. Other options to light up this area will be considered.
4. Add power for garage door openers. The system will be a hydraulic style door requiring up to a 60a 240v circuit. Final power location TBD.
5. Add a new 320a 240v single phase service on the building.
Service will take over for existing panel and provide power to new equipment being added. Demo old panel and install a fused disconnect on the old feeder going to the building. Final details
TBD.
Bldg. Q
Bldg. Q – Lighting repair/upgrade to LED & fan installation.
1. Replace 5 wall packs around the building.
2. Replace 2 recess cans. Consideration will be given to retrofit kits or new fixtures.
3. Add 2 new wall packs on either end of the building.
4. Install 2-3 – 8’ high velocity low speed fans. Consideration of other sizes will be given if they provide proper airflow under the canopy. Fan switches will be located by the lighting switches and capable of controlling each fan independently. Single phase 120v with a max amp draw of 1.25a. New circuits will need to be run to the electrical panel.
5. Rework or install new lighting under the pavilion where the fans will be installed. Install in a manner where a strobing effect does not occur with the fans in operation. Final footcandles at the ground must be equal or better to the current lighting installed.
PAVILION
Tower 1, 2 & 3
T1 - Lighting repair/upgrade to LED.
1. Replace 11 recessed wall lights. Consideration will be given to retrofit kits, retrofit lamps or new fixtures. In addition to current switches add a new one at the base of the stairs to control these lights from ground level.
2. Replace 2 wall packs around building.
3. Add exterior lighting on each side of the building. Intent of this is to properly light around the building. Other options to light up this area will be considered.
T2 - Lighting repair/upgrade to LED.
1. Replace 11 recessed wall lights. Consideration will be given to retrofit kits, retrofit lamps or new fixtures. In addition to current switches add a new one at the base of the stairs to control these lights from ground level.
2. Replace 2 wall packs around building.
3. Add exterior lighting on each side of the building. Intent of this is to properly light around the building. Other options to light up this area will be considered.
T3 - Lighting repair/upgrade to LED.
1. Replace 11 recessed wall lights. Consideration will be given to retrofit kits, retrofit lamps or new fixtures. In addition to current switches add a new one at the base of the stairs to control these lights from ground level.
2. Replace 2 wall packs around building.
3. Add exterior lighting on each side of the building. Intent of this is to properly light around the building. Other options to light up this area will be considered.
Photos are representations of all 3 tower locations. Refer to site plan for exact locations.
Range Lights
Ranges: Tactical Area, 50 Yd Pistol Range, 50 Yd Multi-Purpose Range & 100 Yd Rifle Range
1. Replace 56 stadium style lights with LED.
Original construction fixture schedule.
Range Lights
| SOW_FINAL |
| TEXAS DEPARTMENT OF PUBLIC SAFETY SCOPE OF WORK |
| Project: |
| Department of Public Safety Contract Department of Public Safety Site |
| NOTE: Building contacts will be identified to the bidders for the respective locations for site visits and future access. Access times for each phase of construction must be scheduled ahead of actual work. |
| STATEMENT OF WORK |
| 1.0 Service Location |
| 2.0 Contractor Service Requirements |
| 3.0 General Requirements |
| 4.0 General Electrical Provisions |
| 5.0 Building Specific Requests |
| 6.0 Schedules |
| 7.0 Contractor Cooperation |
| 8.0 Performance Warranty |
| 9.0 Material Warranty |
| 10.0 Contractor Responsibilities |
| 11.0 Material Management |
| 12.0 Equipment and Supplies |
| 13.0 Safety Zones |
| 14.0 Contractor / Vendor Vehicles |
| SOW Plans_Revised |
| 1 - Overall documents |
| 1 - Overall documents |
| 1 - Overall documents |
| 1 - Overall documents |
| 1 - Overall documents |
| 1 - Overall documents |
| 1 - Overall documents |
| B |
| FLOR-B-1 - Fleet Maintenance Building |
| Sheets |
| FLOR-B-1 - Fleet Maintenance Building B |
| Range building lights |
| FLOR-C-1 - Admin Bldg C |
| Sheets |
| FLOR-C-1 - ADMIN. BUILDING C |
| Pavilion |
| FLOR-D-1 - Pavillion Bldg D |
| Sheets |
| FLOR-D-1 - Pavillion Bldg D |
| FLOR-E,F - Bldg- E Storage-Bldg- F Pump |
| Sheets |
| FLOR-E,F - Bldg. E Storage/Bldg. F Pump |
| Tower lighting |
| Blank Page |
| Florence Site Plan |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
File details come from the government source that posted it. Updated .