This is a Scope of Work document from the State Preservation Board of Texas for RFP No. 809-25-0003, which seeks metal refinishing and maintenance services for nine state properties including the Texas State Capitol, Capitol Extension, Sam Houston Building, Robert E. Johnson Building, John H. Reagan Building, Capitol Visitors Center, Bullock Texas State History Museum, Texas State Cemetery, and Governor's Mansion. The contract is anticipated to be a two-year term with quarterly, bi-annual, semi-annual, and annual maintenance deliverables. Work must be performed after hours (typically outside 7am-6pm CST), with special scheduling requirements during the Legislative session from January 1, 2025 to June 1, 2025. The scope includes refinishing and maintenance of brass handrails, bronze elevator entrances and cabs, stainless steel surfaces, and wood touch-up services for elevator cab interiors.

The technical requirements specify various metal finishing processes including stripping, scratch removal, cleaning, polishing, and lacquering, with specific requirements for different metal types (bronze, brass, stainless steel, aluminum) and finishes (oil rubbed, polished, satin, decorative). Contractors must provide mockups for owner approval, protect properties from damage, maintain clean work areas, and follow strict safety protocols including fire marshal approval for chemical usage. Special security clearance is required for work at the Governor's Mansion, with DPS clearance needed 2 days in advance. The document does not specify pricing terms or funding sources.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A: Scope of Work RFP-809-24-0003 1

State Preservation Board

REQUEST FOR PROPOSALS

RFP No. 809-25-0003

FOR

STATE PRESERVATION BOARD PROPERTIES METAL REFINISHING AND

MAINTENANCE

ATTACHMENT A: SCOPE OF WORK

Attachment A: Scope of Work RFP-809-24-0003 2

RFP No. 809-25-0003

STATE PRESERVATION BOARD PROPERTIES METAL REFINISHING AND MAINTENANCE

ATTACHMENT A: SCOPE OF WORK

DETAILED DESCRIPTION OF SERVICES REQUESTED

The State Preservation Board (SPB) is accepting bids to furnish all labor, materials, insurance, equipment, schedule, and supervision necessary to perform a two – year cycle contract for metal refinishing and regular maintenance of unpainted architectural metals, and as needed wood touch up services (starred buildings) for elevator cab interior panels for the State Preservation Board properties and state office buildings below:

1. Texas State Capitol*

2. Capitol Extension

3. Sam Houston Building (SHB)

4. Robert E. Johnson (REJ) Building*

5. John H. Reagan (JHR) Building

6. Capitol Visitors Center

7. Bullock Texas State History Museum*

8. Texas State Cemetery

9. Governor’s Mansion*

FREQUENCIES:

B - BI-ANNUALLY (Every 2 years) S - SEMI-ANNUALLY (Twice a year) A - ANNUALLY (Once a year) Q - QUARTERLY (Four times a year)

1) Texas State Capitol*

a) Brass handrails on three (3) levels of rotunda (Takeoff (LF) : Second Floor-139', Third

Floor – 139', Fourth Floor – 139'

i) Clean and lacquer - Bi-Annually

ii) Wash and wax - quarterly thereafter

iii) Historic treatment note: A nitrocellulose lacquer should be utilized. Low VOC options are available, with equal performance. Three layers should be used, for maximum protection of these original building elements in high traffic areas. Strip and replace every 2 years, watch and consider more frequent replacement, as this type of finish can wear quickly. Consider a sacrificial wax finish on higher-use areas, Attachment A: Scope of Work RFP-809-24-0003 3 as a potential cost savings measure to allow longer periods between lacquer replacement.

• Wax would be more maintainable, but is not strong enough to protect from scratches from hand rings, and would have a high maintenance cost over time.

• Nitrocellulose lacquer is more durable than an acrylic lacquer, and appropriate for internal use where not exposed to UV rays.

• Rails should be cleaned chemically and gently to remove lacquers and any corrosion (most found between the hand-rubbed areas and the retained lacquer finish area).

• Re-finish should be as gentle as possible to restore an accurate period finish and evening out mirror finish and worn areas.

• Finish should be a non-directional satin, to achieve a dull satin shine without directional brush strokes. As close as possible to the naturally hand-rubbed finish on the worn areas is the goal.

b) Brass handrails on East and West stairways and Grand Stairways (Takeoff (LF): First Floor

– 257'-3", Second Floor – 234'-6", Third Floor – 124')

i) Clean and lacquer- Bi-Annually

ii) Wash and wax – Quarterly thereafter

(a) See treatment for brass handrails above

c) North Elevator Bank: Four (4) Bronze elevator entrances per level on 3 levels (G, E1, and

E2), each consisting of: doors, frames, and fixtures. Plus, Four (4) doors and fixtures per floor on four floors (First Floor, Second Floor, Third Floor, Fourth Floor) consisting of:

doors and fixtures.

i) Clean and lacquer – Bi-Annually

ii) Wash and wax – Quarterly thereafter

d) South Elevator Bank: One (1) Bronze elevator entrance per level on 4 levels (First Floor, Second Floor, Third Floor, Fourth Floor), each consisting of: doors and fixtures.

i) Clean and lacquer – Bi-Annually

ii) Wash and wax – Quarterly thereafter

e) Interior bronze in five (5) elevator cabs (four north bank and one south bank) each consisting of: Doors, return panels, rails, and headers

i) Touch up refinish – Bi-Annually

ii) Wash and wax – Quarterly

iii) Interior rails

(1) Clean and lacquer Semi-Annually

f) West (Speaker of House) and East (Senate) Wing – Two (2) Stainless elevator entrances per level (4 levels), each consisting of: doors, frames, and fixtures

i) Remove scratches, clean, and polish quarterly

Attachment A: Scope of Work RFP-809-24-0003 4

g) West (Speaker of House) and East (Senate) Wing* - Interior Stainless in Two (2) elevator cabs – doors, return panels, wall trim and rails

1) Capitol Extension

a) Interior bronze in eight (8) elevator cabs each consisting of:

i) Doors, return panels, header

(1) Touch up refinish – Bi-Annually

(2) Wash and wax – Quarterly

ii) Rear handrails

(1) Clean and lacquer Semi-Annually

b) Eight (8) bronze elevator entrances per level on two levels (E1 and E2), doors, return panels, and wall trim

i) Touch up refinish – Semi-Annually

ii) Wash and wax – Quarterly thereafter

c) Bronze handrails throughout lobby on stairways, balcony rails

i) Oxidize and lacquer – Bi-Annually

ii) Wash and wax - Quarterly

d) Bronze door handles at East and West Elevator Pavilions

i) Clean and lacquer – Semi-Annually

2) Sam Houston Building

a) Interior stainless steel in four (4) elevator cabs, each consisting of doors, return panels and trim

i) Remove scratches, clean, and polish quarterly

b) Eight (8) stainless steel elevator entrances (4 per floor on 2 levels) each consisting of doors only

3) Robert E. Johnson Building*

a) Interior stainless steel in six (6) elevator cabs*, each consisting of: doors, return panels, rail, control panels, trim, and header

i) Remove scratches, clean, and polish quarterly

b) Six (6) stainless steel elevator entrances plus two (2) janitor closet entrances per level on six (levels) each consisting of: doors, headers, and return panels

4) John H. Reagan Building

a) Interior stainless steel in three (3) elevator cabs*, each consisting of: doors, return panels, railing, and trim

i) Remove scratches, clean, and polish, quarterly

Attachment A: Scope of Work RFP-809-24-0003 5

b) Three (3) stainless steel elevator entrances per level on five (levels) each consisting of:

doors, headers, and return panels

5) Capitol Visitors Center

a) Interior stainless steel in one (1) elevator consisting of: double entry with doors and return panels

6) Bullock Texas State History Museum*

a) Interior bronze in six (6) elevator cabs* (two in lobby, two in exhibit, two in garage), each consisting of: doors, return panels, header and handrails

i) Polish and lacquer – Bi-Annually

ii) Wash and wax – Quarterly

b) Bronze elevator entrances, each consisting of: doors and frames. (lobby and exhibit elevators are two (2) per level for four (4) levels. Garage is two (2) per level on ground floor

i) Polish and lacquer – Bi-Annually

ii) Wash and wax – Quarterly

7) Texas State Cemetery

a) Four (4) bronze entrances (1 to gallery, 1 to Bob Bullock Admin building, 1 to gallery rear entrance, 1 to Memorial Center Meeting Space)

i) Oxidize and lacquer – Bi-Annually

ii) Wash and wax – Quarterly

8) Governor’s Mansion*

a) One (1) Interior Bronze elevator handrail

i) Polish and lacquer – Bi-Annually

ii) Wash and wax – Semi-Annually

* Note: Coordinate with SPB project manager for any wood touch up in elevator cab interiors as noted during each cycle.

Attachment A: Scope of Work RFP-809-24-0003 6

GENERAL EXECUTION REQUIREMENTS

• Performance o Match existing finish.

▪ Finishes

• Metals o Bronze

▪ Oil rubbed

▪ Polished

▪ Satin

▪ Decorative o Brass

▪ Polished

▪ Satin o Stainless steel

▪ Directional and non-directional o Aluminum

▪ Brushed

• Wood o Miscellaneous hardwood veneers of elevator cab interior panels.

o Contractor to provide mockup of finish for each metal and finish type for owner approval.

▪ Sample finish process

• Metal Refinishing Process (suggested – If different from the following please provide process information) o Strip existing coating – acetone or similar solvent o Remove scratches with orbital sander

▪ Vary sanding methods based on depth of scratch and direction of finish o Clean o Polish

▪ Vary buffing methods based on degree of finish o Century RFU Lacquer (or similar)

• Wood Touch Up Process (suggested – If different from the following please provide process information) o Scratch or Field hole repair – wood filler (blending sticks/putty sticks +powder)

▪ Touch up

• Sand

Attachment A: Scope of Work RFP-809-24-0003 7

• Recolor - Toners try to match color (try to mix toner with

Lacquer. Try to match

▪ Recoat with sealer – Century RFU (or similar) o Contractor will protect SPB properties from damage during the process of repair, refinishing, and lacquering of metal surfaces.

o The contractor shall leave the work area in a clean, “broom swept” state upon completion of the work at the end of each work day. The contractor must dispose of all debris generated in an appropriate manner.

o The contractor shall be responsible for all safety training, procedures and requirements.

o Mask and tape off to avoid damaging adjacent materials o Remove blemishes, scratches, gouges, without damaging or altering the metal or wood substrate.

o Even and consistent finish.

o Submit product submittals and process for each metal and finish type before beginning work.

o Coordinate with owner for site access, schedule, and process.

o All chemical strippers, lacquers, and any off gassing or fumes should be cleared through the State Preservation Board with the Fire Marshal prior to starting work.

o Vendor provided portable fire extinguishers must be placed in the work area.

o Amount of flammables in the building must be limited to what is needed for the nightly tasks.

PROJECT SCHEDULE

Anticipate a two-year contract with quarterly, bi-annual, semi-annual, and annual maintenance and refinishing deliverables.

• After hours work, outside of building operation hours as listed on their websites, Typically 7am-6pm CST.

• As available during Legislative session January 1st, 2025 to June 1st, 2025.

• Otherwise before session and immediately after.

• All work to be scheduled a minimum of 3-4 days in advance and to be approved and coordinated through the SPB Project Manager.

• Governor’s Mansion may permit work during the weekday business hours.

Workers will need to be cleared by DPS 2 days in advance by sending specified form of identification. (Drivers License, passport, government issued id. Etc.)

o Security clearance is required at the Governor’s Mansion.