ESBD_383128_1731968696182_02. Specifications.pdf

PDF 253 KB Posted

Attached to
Salt Brine Conveyor Systems for the TxDOT Bowie Maintenance Section
Solicitation number
601310000092926
Issued by
Medina County, Texas

About this file

This is a technical specification document from the Texas Department of Transportation (TxDOT) for a salt brine conveyor system with hopper, specification number TxDOT 560-21-92926, dated November 2024. The specification details requirements for a stainless steel conveyor system with a minimum 20-foot length, 20-inch wide cleated belt, and 2HP 110/220v single phase motor. Key components include a frame constructed of minimum 1-1/4 inch outer diameter steel tubing, chevron cleats at 10-inch centers, wheels for mobility, and a front-end loader hopper with 1.5 cubic yard capacity and 10-foot load opening top zone. The system must include a bin vibrator with single phase 110v power and adjustable height flowgate control.

The document outlines acceptance inspection requirements with a five-day testing period, a minimum 12-month warranty requirement, and mandates that all equipment must be new - used, shopworn, demonstrator, prototype, remanufactured, reconditioned or discontinued models are not acceptable. TxDOT provides an example model (Redline Systems SD-2-2120 / N97) but allows for approved equivalents. The specification emphasizes environmental considerations, encouraging manufacturers to comply with SAE plastic marking standards and ISO 9001-9003 quality management standards. Pricing terms and specific funding details are not included in this technical specification document.

View the file

Other files

File Type Posted
ESBD_383128_1731968735326_04. Texas Family Code Schedule.pdf PDF
ESBD_383128_1731968696182_02. Specifications.pdf PDF
ESBD_383128_1731968677700_01. IFB 601310000092926.pdf PDF
ESBD_383128_1731968855501_601310000092926_Bid Table.xlsx XLSX spreadsheet
ESBD_383128_1731968756367_05. Appendix B-Early Payment Plan.pdf PDF
ESBD_383128_1731968715675_03. Execution of Bid.pdf PDF
ESBD_383128_1731968649554_601310000092926_Instructions to Respondents.pdf PDF
ESBD_383128_1731968855501_601310000092926_Bid Table.xlsx XLSX spreadsheet
ESBD_383128_1731968677700_01. IFB 601310000092926.pdf PDF
ESBD_383128_1731968649554_601310000092926_Instructions to Respondents.pdf PDF
ESBD_383128_1731968756367_05. Appendix B-Early Payment Plan.pdf PDF
ESBD_383128_1731968735326_04. Texas Family Code Schedule.pdf PDF
ESBD_383128_1731968715675_03. Execution of Bid.pdf PDF
ESBD_383128_1731968696182_02. Specifications.pdf PDF
ESBD_383128_1731968649554_601310000092926_Instructions to Respondents.pdf PDF
ESBD_383128_1731968735326_04. Texas Family Code Schedule.pdf PDF
ESBD_383128_1731968855501_601310000092926_Bid Table.xlsx XLSX spreadsheet
ESBD_383128_1731968756367_05. Appendix B-Early Payment Plan.pdf PDF
ESBD_383128_1731968677700_01. IFB 601310000092926.pdf PDF
ESBD_383128_1731968715675_03. Execution of Bid.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATION NO.

TxDOT 560-21-92926

DATED: NOVEMBER 2024

1-4

TEXAS DEPARTMENT OF TRANSPORTATION

SALT BRINE CONVEYOR SYSTEM

PUBLICATION

This specification is a product of the Texas Department of Transportation (TxDOT). It is the practice of TxDOT to support other entities by making this specification available through the National Institute of Governmental Purchasing (NIGP). This specification may not be sold for profit or monetary gain. If this specification is altered in any way, the header and any and all references to TxDOT must be removed.

TxDOT does not assume, nor accept, any liability when this specification is used in the procurement process by any other entity.

PART I

GENERAL CLAUSES AND CONDITIONS

1. The equipment furnished under this specification must be the latest improved model in current production, as offered to commercial trade, and must be of quality workmanship and material. The respondent represents that all equipment offered under this specification must be new. USED, SHOPWORN, DEMONSTRATOR, PROTOTYPE, REMANUFACTURED, RECONDITIONED

OR DISCONTINUED MODELS ARE NOT ACCEPTABLE. Respondent must submit with the solicitation the latest printed literature and detailed specifications on equipment the respondent proposes to furnish. This literature is for informational purposes only. All parts not specifically mentioned which are necessary for the unit to be complete and ready for operation or which are normally furnished as standard equipment shall be furnished by the vendor. All parts shall conform in strength, quality, and workmanship to the accepted standard of the industry. The unit provided must meet or exceed all federal and state of Texas safety, health, lighting, and noise regulations and standards in effect and applicable to equipment furnished at the time of manufacture.

2. DATA SHEETS: Data sheet(s) should be returned for informational purposes only. The data sheet(s) must be provided within three working days of request. Failure to provide the completed data sheet(s) within the requested time will result in the response being considered non-responsive.

3. MANUAL(S): Original manual(s) containing illustrated parts list(s) and operating and service instructions for the unit must be delivered with each unit. Copies of manual(s) are not acceptable.

Electronic copies of manuals from the manufacturer are acceptable. Manual(s) must include all necessary service, warnings, operating instructions and safety precautions for each unit delivered.

Parts list(s) must cover all components of the unit. Each part must be identified by part number, description, and component location. The following additional information must be provided by the vendor at time of delivery if not included in the manual referenced above:

DATED: NOVEMBER 2024

2-4

3.1. Manufacturer’s recommended service and preventive maintenance intervals.

3.2. Recommended fluids, lubricants and their SAE/API equivalents

4. ACCEPTANCE INSPECTION: All equipment ordered with this request will be subject to acceptance inspection and performance testing upon receipt. Acceptance inspection and performance testing will not take more than five working days, weather permitting. Acceptance inspection will not occur until after the equipment has been delivered and installation and training is completed. The vendor will be notified within this time frame of any units not delivered in full compliance with the purchase order specifications. If any units are canceled for non-acceptance, the needed equipment may be purchased elsewhere and the vendor may be charged full increase, if any, in cost and handling.

5. WARRANTY: Vendor must warrant equipment for a minimum of 12 months. If the manufacturer's standard warranty period exceeds 12 months, then the standard warranty period must apply. The warranty begins on the date the unit is determined to meet specifications and accepted into TxDOT’s inventory. The vendor must furnish a warranty with the equipment indicating the terms and conditions of the warranty and list of names and addresses of servicing dealers in the state of Texas who perform warranty work.

6. It is the intent of TxDOT to purchase goods, equipment, and services having the least adverse environmental impact, within the constraints of statutory purchasing requirements, TxDOT need, availability, and sound economical considerations. Suggested changes and environmental enhancements for possible inclusion in future revisions of this specification are encouraged.

7. TxDOT encourages all manufacturers to comply voluntarily with the Society of Automotive Engineers (SAE) Recommended Practice for marking of plastic parts per current SAE J1344 standard. All plastic components furnished to this specification should have an imprinted SAE symbol identifying the resin composition of the component so that the item can be recycled after its useful life. Manufacturers are encouraged to use recycled plastics and materials in the manufacture of their products in order to conserve natural resources, energy and landfill space. Respondent should note that future specification revisions may require mandatory compliance with the SAE plastic coding system.

8. TxDOT is committed to procuring quality goods and equipment. TxDOT encourages manufacturers to adopt the International Organization for Standardization (ISO) 9001-9003 standards, technically equivalent to the current American National Standards Institute/American Society for Quality Control (ANSI/ASQC Q91-93), and obtain certification. Adopting and implementing these standards is considered beneficial to the manufacturer, TxDOT, and the environment. It is TxDOT's position that the total quality management concepts contained within these standards can result in reduced production costs, higher quality products, and more efficient use of energy and natural resources.

DATED: NOVEMBER 2024

3-4

PART II

SPECIFICATION

1. SCOPE: This specification describes a salt brine conveyor system with hopper.

EXAMPLE:

Redline Systems SD-2-2120 / N97, or TxDOT approved equal

NOTICE TO RESPONDENT: Any example shown is listed to show type and class of equipment desired. Respondent is cautioned to read the specification carefully, as there may be special requirements not commonly offered by the manufacturer. DO NOT ASSUME STANDARD

EQUIPMENT MEETS ALL OF THE DETAILED SPECIFICATION REQUIREMENTS

MERELY BECAUSE IT IS LISTED AS AN EXAMPLE. Respondent is cautioned that any unit delivered to the FOB point which does not meet specification in every aspect will not be accepted.

2. DESIGN REQUIREMENTS: Conveyor system must be:

2.1. Frame:

2.1.1. Stainless Steel Construction

2.1.2. Overall Length: Minimum 20 feet

2.1.3. Minimum 1-1/4 inch Outer Diameter Steel Tubing

2.1.4. Belt: Minimum 20 inch wide cleated belt

2.1.5. Cleat: 1/25 inch tall chevron cleat, 10 inch centers

2.1.6. Equipped with wheels for transportation to different locations

2.2. Motor:

2.2.1. Minimum 2HP 110/220v

2.2.2. Single Phase C-Face

2.2.3. Gearbox Drive

2.2.4. Must include On/off Switch

DATED: NOVEMBER 2024

4-4

2.3. Front End Loader Hopper

2.3.1. Minimum 1.5 cubic yard capacity

2.3.2. Minimum 10 foot load opening top zone

2.3.3. Bin Vibrator: Single Phase Power 110v

2.3.4. Adjustable Height, Flowgate control