ESBD_379270_1728687342368_Appendix F - KW flooring project - carpet and LVT areas 09-30-2024.pdf

PDF 1 MB Posted

Attached to
735-2025-8243 McCullough-Trigg and Killingsworth Flooring Project
Solicitation number
735-2025-8243
Issued by
Van Zandt County, Texas

About this file

This document is an appendix to a Request for Proposal (RFP) issued by Midwestern State University for the McCullough-Trigg and Killingsworth Flooring Project. The RFP seeks proposals from qualified vendors to install approximately 12,048 GSF of carpet and 5,037 GSF of luxury vinyl tile (LVT) in Killingsworth Hall, as well as 5,667 GSF of carpet in McCullough-Trigg Hall on the university's campus. An alternate is included for installing 5,230 GSF of LVT at the Sikes Lake Center. Proposals are due by November 5, 2024 at 2:00 pm CT, and the anticipated contract term is from September 1, 2024 to August 31, 2025, with two optional one-year renewal periods.

The RFP provides detailed specifications for the carpet and LVT products, as well as requirements for floor preparation, installation methods, and site protection. The award will be made based on the best value to the university, considering factors such as past performance, completeness of response, cost, and references. The Prevailing Wage Determination for Midwestern State University construction projects in Wichita County, Texas is included, which outlines the required hourly wage rates for various construction trade classifications. The RFP indicates that a Historically Underutilized Businesses (HUB) subcontracting plan may be required, but no incumbent contractors or budget ranges are provided in the documentation.

View the file

Other files

File Type Posted
ESBD_379270_1729875884355_Killingsworth 3rd floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1728687342368_Appendix F - KW flooring project - carpet and LVT areas 09-30-2024.pdf PDF
ESBD_379270_1729875887326_Mc-Trigg 1st floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875886845_Mc-Trigg 2nd floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875883400_Killingsworth 4th floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1729875886328_Killingsworth 5th floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1729875882917_Mc-Trigg 3rd floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1728687494225_Appendix J - Campus Map.pdf PDF
ESBD_379270_1729875885312_Killingsworth 2nd floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1728687425717_Appendix H - Sikes Lake Center, 3-22-16.pdf PDF
ESBD_379270_1729875887765_Mc-Trigg 6th floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875885805_Killingsworth 6th floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1729875884835_Sikes Lake Center, 3-22-16 RF.dwg DWG drawing
ESBD_379270_1729875550572_735-2024-8243 Addendum 1.pdf PDF
ESBD_379270_1728687241177_Appendix D - MSU Standard Products & Services Agreement- Sample.pdf PDF
ESBD_379270_1728687389960_Appendix G - McT floorng project - carpet areas 09-30-2024.pdf PDF
ESBD_379270_1728687298007_Appendix E - HUB Search Assistance.pdf PDF
ESBD_379270_1729875883894_Mc-Trigg 5th floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1728687465341_Appendix I - Prevailing Wage Rates.pdf PDF
ESBD_379270_1729875882313_Mc-Trigg 4th floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875888294_Killingsworth 1st floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1728687161621_735-2025-8243 McCullough-Trigg and Killingsworth Flooring Project FINAL - POST.pdf PDF
ESBD_379270_1729875883400_Killingsworth 4th floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1728687425717_Appendix H - Sikes Lake Center, 3-22-16.pdf PDF
ESBD_379270_1728687298007_Appendix E - HUB Search Assistance.pdf PDF
ESBD_379270_1729875888294_Killingsworth 1st floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1729875887326_Mc-Trigg 1st floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875886845_Mc-Trigg 2nd floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875550572_735-2024-8243 Addendum 1.pdf PDF
ESBD_379270_1729875885312_Killingsworth 2nd floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1729875882313_Mc-Trigg 4th floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875885805_Killingsworth 6th floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1728687161621_735-2025-8243 McCullough-Trigg and Killingsworth Flooring Project FINAL - POST.pdf PDF
ESBD_379270_1728687465341_Appendix I - Prevailing Wage Rates.pdf PDF
ESBD_379270_1729875884835_Sikes Lake Center, 3-22-16 RF.dwg DWG drawing
ESBD_379270_1729875883894_Mc-Trigg 5th floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875884355_Killingsworth 3rd floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1729875882917_Mc-Trigg 3rd floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1728687494225_Appendix J - Campus Map.pdf PDF
ESBD_379270_1729875886328_Killingsworth 5th floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1728687389960_Appendix G - McT floorng project - carpet areas 09-30-2024.pdf PDF
ESBD_379270_1728687241177_Appendix D - MSU Standard Products & Services Agreement- Sample.pdf PDF
ESBD_379270_1729875887765_Mc-Trigg 6th floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1728687389960_Appendix G - McT floorng project - carpet areas 09-30-2024.pdf PDF
ESBD_379270_1728687161621_735-2025-8243 McCullough-Trigg and Killingsworth Flooring Project FINAL - POST.pdf PDF
ESBD_379270_1728687494225_Appendix J - Campus Map.pdf PDF
ESBD_379270_1728687342368_Appendix F - KW flooring project - carpet and LVT areas 09-30-2024.pdf PDF
ESBD_379270_1728687425717_Appendix H - Sikes Lake Center, 3-22-16.pdf PDF
ESBD_379270_1728687298007_Appendix E - HUB Search Assistance.pdf PDF
ESBD_379270_1728687465341_Appendix I - Prevailing Wage Rates.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

kyle.owen Area Measurement

745.4 sf kyle.owen Area Measurement

757.1 sf kyle.owen Area Measurement

241.9 sf kyle.owen Area Measurement 271 sf kyle.owen Callout Carpet to be installed in all red outlined areas

2nd Floor LVT

Callout LVT installed in yellow filled areas kyle.owen Callout Carpet to be installed in all other red outlined areas kyle.owen Text Box

Text Box

3rd Floor LVT

Text Box kyle.owen Callout LVT installed in yellow filled areas kyle.owen Callout Carpet to be installed in all other red outlined areas

4th Floor LVT

Text Box kyle.owen Callout LVT installed in yellow filled areas kyle.owen Callout Carpet to be installed in all other red outlined areas

5th Floor LVT

Text Box kyle.owen Callout LVT installed in yellow filled areas kyle.owen Callout Carpet to be installed in all other red outlined areas

6th Floor LVT

Text Box kyle.owen Callout LVT installed in yellow filled areas kyle.owen Callout Carpet to be installed in all other red outlined areas kyle.owen Text Box 146 sf kyle.owen Text Box kyle.owen Text Box

140.32 sf kyle.owen Text Box

158.06 sf kyle.owen Line kyle.owen Line kyle.owen Line

File details come from the government source that posted it. Updated .