ESBD_379270_1728687298007_Appendix E - HUB Search Assistance.pdf

PDF 177 KB Posted

Attached to
735-2025-8243 McCullough-Trigg and Killingsworth Flooring Project
Solicitation number
735-2025-8243
Issued by
Van Zandt County, Texas

About this file

The document provides guidance on the Historically Underutilized Businesses (HUB) search process for the state of Texas, including information on the NIGP Commodity/Services Code system and the Centralized Master Bidders List (CMBL). It outlines how the NIGP code system is used by the state to classify procurements and match vendors, and provides instructions on how to search the CMBL database to identify potential HUB vendors.

The related state and local contract opportunity is for the McCullough-Trigg and Killingsworth Flooring Project at Midwestern State University in Wichita Falls, Texas. The project involves the installation of approximately 12,048 square feet of new carpet and 5,037 square feet of luxury vinyl tile (LVT) flooring in Killingsworth Hall, as well as 5,667 square feet of new carpet in McCullough-Trigg Hall. An alternate is included for installing 5,230 square feet of LVT at the Sikes Lake Center. Proposals are due by November 5, 2024 at 2:00 pm CT, and the anticipated contract term is from September 1, 2024 to August 31, 2025, with two optional one-year renewal periods. The award will be made based on the best value to the university, considering factors such as past performance, completeness of response, cost, and references. The RFP indicates that a HUB subcontracting plan may be required, and the Prevailing Wage Determination for Midwestern State University construction projects in Wichita County, Texas is included.

View the file

Other files

File Type Posted
ESBD_379270_1729875884355_Killingsworth 3rd floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1728687342368_Appendix F - KW flooring project - carpet and LVT areas 09-30-2024.pdf PDF
ESBD_379270_1729875887326_Mc-Trigg 1st floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875886845_Mc-Trigg 2nd floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875883400_Killingsworth 4th floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1729875886328_Killingsworth 5th floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1729875882917_Mc-Trigg 3rd floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1728687494225_Appendix J - Campus Map.pdf PDF
ESBD_379270_1729875885312_Killingsworth 2nd floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1728687425717_Appendix H - Sikes Lake Center, 3-22-16.pdf PDF
ESBD_379270_1729875887765_Mc-Trigg 6th floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875885805_Killingsworth 6th floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1729875884835_Sikes Lake Center, 3-22-16 RF.dwg DWG drawing
ESBD_379270_1729875550572_735-2024-8243 Addendum 1.pdf PDF
ESBD_379270_1728687241177_Appendix D - MSU Standard Products & Services Agreement- Sample.pdf PDF
ESBD_379270_1728687389960_Appendix G - McT floorng project - carpet areas 09-30-2024.pdf PDF
ESBD_379270_1729875883894_Mc-Trigg 5th floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1728687465341_Appendix I - Prevailing Wage Rates.pdf PDF
ESBD_379270_1729875882313_Mc-Trigg 4th floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875888294_Killingsworth 1st floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1728687161621_735-2025-8243 McCullough-Trigg and Killingsworth Flooring Project FINAL - POST.pdf PDF
ESBD_379270_1729875883400_Killingsworth 4th floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1728687425717_Appendix H - Sikes Lake Center, 3-22-16.pdf PDF
ESBD_379270_1728687298007_Appendix E - HUB Search Assistance.pdf PDF
ESBD_379270_1729875888294_Killingsworth 1st floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1729875887326_Mc-Trigg 1st floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875886845_Mc-Trigg 2nd floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875550572_735-2024-8243 Addendum 1.pdf PDF
ESBD_379270_1729875885312_Killingsworth 2nd floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1728687342368_Appendix F - KW flooring project - carpet and LVT areas 09-30-2024.pdf PDF
ESBD_379270_1729875882313_Mc-Trigg 4th floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875885805_Killingsworth 6th floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1728687161621_735-2025-8243 McCullough-Trigg and Killingsworth Flooring Project FINAL - POST.pdf PDF
ESBD_379270_1728687465341_Appendix I - Prevailing Wage Rates.pdf PDF
ESBD_379270_1729875884835_Sikes Lake Center, 3-22-16 RF.dwg DWG drawing
ESBD_379270_1729875883894_Mc-Trigg 5th floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1729875884355_Killingsworth 3rd floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1729875882917_Mc-Trigg 3rd floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1728687494225_Appendix J - Campus Map.pdf PDF
ESBD_379270_1729875886328_Killingsworth 5th floor 12-10-15 RF.dwg DWG drawing
ESBD_379270_1728687389960_Appendix G - McT floorng project - carpet areas 09-30-2024.pdf PDF
ESBD_379270_1728687241177_Appendix D - MSU Standard Products & Services Agreement- Sample.pdf PDF
ESBD_379270_1729875887765_Mc-Trigg 6th floor 12-3-15 RF.dwg DWG drawing
ESBD_379270_1728687389960_Appendix G - McT floorng project - carpet areas 09-30-2024.pdf PDF
ESBD_379270_1728687161621_735-2025-8243 McCullough-Trigg and Killingsworth Flooring Project FINAL - POST.pdf PDF
ESBD_379270_1728687494225_Appendix J - Campus Map.pdf PDF
ESBD_379270_1728687342368_Appendix F - KW flooring project - carpet and LVT areas 09-30-2024.pdf PDF
ESBD_379270_1728687425717_Appendix H - Sikes Lake Center, 3-22-16.pdf PDF
ESBD_379270_1728687298007_Appendix E - HUB Search Assistance.pdf PDF
ESBD_379270_1728687465341_Appendix I - Prevailing Wage Rates.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Historically Underutilized Businesses (HUB) Search Assistance

The NIGP Commodity/Services Code, developed by the National Institute of Governmental Purchasing, is used by the state of Texas to classify procurements, and match potential vendors with the state’s needs.

The Statewide Procurement Division (SPD) and Texas Department of Information Resources also use the NIGP code to help purchasers source commodities and services through statewide contracts.

The NIGP is organized as follows:

Class Codes 001 to 899 are commodities/products and 900 to 999 are services.

Examples:

Commodity Codes:

025‐43: Compressor: High Pressure, All Sizes and Models.

204‐53: Microcomputers, Desktop or Tower based.

Service Codes:

918‐21: Business Consulting 968‐66: Right of Way Services, Including Title, Relocation, Condemnation, etc.

https://mycpa.cpa.state.tx.us/commbook/indexSearch

Respondents can use the class‐item numbering and description found in the book to properly code products or services. Bidders are encouraged to become familiar with the format and contents of this book as they apply to the Centralized Master Bidders List search and vendor providing.

The CMBL is a master database used by the state of Texas purchasing entities to develop a mailing list for vendors to receive bids based on the products or services they can provide to the state of Texas.

https://mycpa.cpa.state.tx.us/tpasscmblsearch/tpasscmblsearch.do

CMBL/HUB Directory Search Tips can be found at the following link:

https://comptroller.texas.gov/purchasing/vendor/registration/search‐tips.php https://comptroller.texas.gov/purchasing/vendor/registration/search-tips.php https://mycpa.cpa.state.tx.us/tpasscmblsearch/tpasscmblsearch.do https://mycpa.cpa.state.tx.us/commbook/indexSearch

File details come from the government source that posted it. Updated .